Statewide Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

ORE141, Tigard MP 5

Shoulder, bicycle lane closures and pedestrian detours.

Project Description: We are making a series of pedestrian and bicycle improvements on Hall Boulevard in Tigard between SW Locust Street and SW Durham Road and at the intersection with SW Greenburg Road. Improvements include a new enhanced crosswalk at the intersection of Hall Boulevard and SW Ashford Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)

Updated
2/9/2025 1:05:00 PM

Closure

HWY100, 5 miles West of Ainsworth State Park MP 18

A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025.

Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The west viaduct will be closed fall 2024 through spring 2025. The east viaduct will be closed fall 2025 through spring 2026. Traffic Impacts: A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle or bicycle access to Multnomah Falls heading eastbound on the Historic Highway. The Wahkeena-Multnomah Falls return trail #442 is open to hikers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)

Updated
2/9/2025 10:56:00 AM

I-205: SB MP 8.32 to 11.06
I-205, West Linn

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: Lane, shoulder and ramp closures in the project area. Nighttime lane closures on OR43 northbound 8 pm to 6 am Monday through Wednesday. Nighttime lane closures on OR43 southbound 8 pm to 6 am Thursday through Friday. Nighttime partial ramp closure from I-205 southbound to OR43 northbound (right lane closure; OR43 northbound traffic detour via roundabout) 8 pm to 6 am Monday through Wednesday. Nighttime ramp closure from OR99E to I-205 northbound from 10 pm to 5 am Monday through Friday. OR43 lane closure at I-205. Pedestrian detours on OR 43 and 99E.
Last Updated
5/04/2025 6:22 AM

I-5: NB MP 147 to 148.3
I-5, 11 miles North of Sutherlin

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. This work will be for 10 days.
Last Updated
4/29/2025 9:02 AM

I-5: NB MP 148.2
I-5, 12 miles North of Sutherlin

Construction Work
Estimated delay under 20 minutes
On Ramp
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected.
Last Updated
4/23/2025 1:30 AM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. On 4/23 and 4/24 from 9 p.m. to 5 a.m., expect the South Commercial Street ramp from northbound I-5 and the right lane of southbound I-5 near milepost 249.4 to close nightly, follow the signed detour.? Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
4/21/2025 12:27 PM

I-5: SB MP 295.9 to 296.1
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. Project Description: Improves the I-5 bridge over SW 26th Avenue in Southwest Portland with a new structure and upgrades SW 26th Avenue with better lighting, bike lanes, and sidewalks.
Last Updated
2/09/2025 10:32 AM

I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
Last Updated
3/10/2025 6:05 AM

I-84: EB MP 159 to 164
I-84, 5 miles West of Boardman

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane, ramp or shoulder closures for the paving operation and/or guardrail upgrades. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22517)
Last Updated
5/02/2025 7:34 AM

I-84: WB MP 179 to 194
I-84, 11 miles East of Intersection with Columbia River Highway US30

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane, ramp or shoulder closures for the paving operation and/or guardrail upgrades. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22517)
Last Updated
4/28/2025 8:34 AM

I-84: EB MP 188 to 203.65
I-84, 20 miles East of Intersection with Columbia River Highway US30

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect I-84 EB and WB A-lane closures between MP 187--204 for asphalt milling and paving. Intermittent single lane closures on I-84 between MP 187-204 for concrete pavement repairs. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20548)
Last Updated
4/28/2025 8:43 AM

US101: MP 13 to 25
US101, 6 miles North of Gearhart

Maintenance Work
Estimated delay under 20 minutes
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
4/09/2025 12:15 AM

US101: MP 13.7 to 14
US101, 5 miles North of Gearhart

Information
Future Event: Estimated delay under 20 minutes
Expected Start Date
5/7/2025 10:00:00 PM
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Utility work is occurring. Prepare to slow.
Last Updated
4/30/2025 12:54 AM

US101: MP 46.6 to 47.5
US101, Wheeler

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
5/5/2025 7:30:00 AM
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/01/2025 12:52 PM

US101: MP 117.83 to 112.78
US101, Lincoln City

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time. From NW Logan Rd to SW 48th Street. Some side streets may also be closed as needed. Work may also occasionally occur on Friday's. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
4/24/2025 10:15 AM

US101: NB MP 124.9 to 123.42
US101, 1 mile South of Lincoln Beach

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time from North Fogarty Creek State Park (Road) to Lancer Street/Seadrove Drive. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
4/24/2025 12:52 PM

US101: MP 315.9
US101, 11 miles North of Wedderburn

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Sunken grade. Prepare to slow.
Last Updated
1/19/2025 8:34 PM

US101: SB MP 332.5
US101, 4 miles South of Gold Beach

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken grade. Prepare to slow.
Last Updated
1/31/2025 4:12 PM

US101: MP 333 to 334
US101, 4 miles South of Gold Beach

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
1/14/2025 2:36 PM

US101: MP 334.12 to 334.41
US101, 5 miles South of Gold Beach

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/23/2025 1:29 AM

US101: MP 356 to 356.7
US101, Brookings

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/23/2025 1:29 AM

US20: MP 0.15
US20, Intersection with Corvallis - Lebanon Highway ORE34

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures, construction noise, and minor delays Sunday through Thursday nights from 7:00 PM to 6:00 AM. There will be times that sidewalk closures will be in place. Pedestrians will be detoured through the work zone with a signed detour route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21552)
Last Updated
3/04/2025 12:27 PM

US26: MP 2.73 to 2.74
US26, 3 miles East of I-405

Construction Work
Estimated delay under 20 minutes
Comments
Traffic impacts: Single lane closures from 8 a.m. to 4 p.m. Project Description: We are improving safety for people walking, biking or rolling at the existing, striped crosswalk east of the intersection of U.S. 26 (SE Powell Boulevard) and SE 36th Avenue. Starting in early 2025, we begin construction to upgrade the currently unsignalized crosswalk on SE Powell Boulevard at SE 36th Avenue with a new pedestrian activated beacon, also known as a Rectangular Rapid Flashing Beacon, or RRFB. <!--Links Start Here--> [Link to Additional Information](https://www.tinyurl.com/SEPowellandSE36thAve)
Last Updated
4/28/2025 6:04 AM

US26: MP 5.56 to 5.62
US26, Portland

Construction Work
Estimated delay under 20 minutes
Comments
Traffic impacts: Daytime single lane closures. Project description: We are creating safer and more accessible highway connections for all sidewalk users on U.S. 26 (SE Powell Boulevard). We are bringing sidewalk curb ramps into compliance with Americans with Disabilities Act (ADA) standards on highways throughout Oregon, including on all corners of the intersection of U.S. 26 (SE Powell Boulevard) at SE 92nd Avenue. <!--Links Start Here--> [Link to Additional Information](https://tinyurl.com/SEPowellandSE92ndAve)
Last Updated
3/16/2025 7:43 AM

US26: MP 222.82
US26, 8 miles North of Ironside

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect daytime closures with flagging. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/14/2025 5:55 PM

US30: MP 3.94 to 6.51
US30, Portland

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime lane closures. Pedestrian detours. Bicycles use roadway travel lanes. Project Description: We are making safety improvements for travelers on U.S. 30 (NW St. Helens Road), between NW Bridge Avenue and NW Kittridge Avenue. We are repaving the roadway, replacing traffic signals, adjusting vehicle lane widths, building curb ramps to meet Americans with Disabilities Act (ADA) requirements and improving conditions for people biking.
Last Updated
2/09/2025 10:28 AM

US30: MP 32.5 to 33.5
US30, 2 miles West of Columbia City

Information
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane (Westbound) 1 Lane
Comments
Utility work is occurring. Prepare to slow.
Last Updated
4/13/2025 10:04 AM

US30: MP 34.5 to 37.3
US30, 4 miles West of Columbia City

Information
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane (Westbound) 1 Lane
Comments
Utility work is occurring. Prepare to slow.
Last Updated
4/13/2025 10:04 AM

US30: MP 49.07 to 50.98
US30, Hood River

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime lane closures and side street closures. Pedestrian detours. Project Description: We are improving safety and access for all by upgrading sidewalk curb ramps to the current Americans with Disabilities Act (ADA) accessibility standards on a section of U.S. 30 (Cascade Avenue and Oak Street in Hood River) from Mt. Adams Avenue to E 2nd Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22621)
Last Updated
2/09/2025 1:55 PM

US97: MP 252.44 to 278.81
US97, 22 miles North of Klamath Falls

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Bridge work on USBR Bridge at MP 273.71, Link River Bridge at MP 275.03, and the Green Spring Bridge at MP 277.12. USBR Bridge at MP 273.71: Bridge work will be done under the bridge, no delays expected. Link River Bridge at MP 275.03: Lane shift traffic control installed on Main Street, bridge work will be done behind the barrier, no delays expected. Conger Avenue is closed for thru traffic, detour in place. OR140 at the Green Springs Bridge: Lane shift traffic control installed, bridge work will be done behind the barrier, no delays expected.
Last Updated
4/13/2025 8:24 PM

ORE126: MP 0.22 to 13.5
ORE126, Redmond

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for single lane closures. Crews will be working from MP 1 to MP 7. Work will be performed between 7pm and 7am. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20167)
Last Updated
4/28/2025 8:58 AM

ORE138: MP 49.1
ORE138, 32 miles East of Glide

Crash/Hazard
Estimated delay under 20 minutes
Comments
A landslide has occurred. Prepare to slow. Both lanes are currently open, but slow down in the area as the lanes are narrow.
Last Updated
4/23/2025 1:30 AM

ORE140: MP 57 to 63
ORE140, 10 miles West of Klamath Falls

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/13/2025 8:24 PM

ORE19: MP 115.8
ORE19, 9 miles North of Intersection with US26

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
A rock fall has occurred. Prepare to slow.
Last Updated
5/01/2025 6:03 PM

ORE202: MP 1.65 to 1.67
ORE202, Astoria

Information
Future Event: Estimated delay under 20 minutes
Expected Start Date
5/6/2025 8:00:00 AM
Comments
Utility work is occurring. Prepare to slow.
Last Updated
5/03/2025 5:44 AM

ORE238: WB MP 38.75
ORE238, Intersection with Rogue Valley Highway ORE99

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for intermittent lane closures through the work zone, Sunday night – Friday morning and possible shoulder/turning lane closures during the day. OR-99 (MP 4.36-5.71), OR-238 (MP 37.63-38.75), Hwy 62 (MP 0.91). <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21676)
Last Updated
4/23/2025 1:31 AM

ORE42: MP 62.63
ORE42, 1 mile West of Tenmile

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/23/2025 1:30 AM

ORE42: MP 62.7
ORE42, 1 mile West of Tenmile

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Culvert Replacement. This project will replace a culvert 1 mile west of Tenmile. The highway is limited to a single lane of traffic with flaggers. Prepare to slow. Maintenance work on the highway will be taking place with minor delays of 20 minutes or less.
Last Updated
4/23/2025 10:48 AM

ORE42: MP 72 to 77
ORE42, 1 mile West of Winston

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/23/2025 1:31 AM

ORE46: MP 4 to 5
ORE46, 4 miles East of Cave Junction

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/02/2025 7:56 AM

ORE47: MP 82.9 to 83
ORE47, 1 mile North of Banks

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Work is currently scheduled for Monday through Thursday from 9 a.m. to 3 p.m. through August 30th, 2025.
Last Updated
2/27/2025 3:11 PM

ORE47: NB MP 88.05 to 83.81
ORE47, 1 mile North of Forest Grove

Maintenance Work
Estimated delay under 20 minutes
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/03/2025 5:28 AM

ORE540: MP 4.9 to 6.1
ORE540, 4 miles South of North Bend

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/23/2025 1:27 AM

ORE58: MP 33.1 to 33.3
ORE58, 2 miles West of Oakridge

Maintenance Work
Estimated delay under 20 minutes
Comments
Bridge work is occurring. Prepare to slow. Expect short delays up to 20 minutes 8A-5P M-F for equipment entering and leaving the highway on the west side of the bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20543)
Last Updated
4/03/2025 10:15 AM

ORE58: MP 42 to 44
ORE58, 3 miles West of McCredie Springs

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Expect daytime single lane closures with an automatic flagger assistant device helping direct traffic east of Oakridge near milepost 43, construction noise and delays up to 20 minutes. Work is currently scheduled to be Monday through Friday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22557)
Last Updated
4/03/2025 3:38 PM

ORE86: MP 49.6
ORE86, 9 miles East of Richland

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Contractor plans to work outside the shoulder. Expect possible shoulder closures. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21875)
Last Updated
4/21/2025 6:23 PM

ORE99: MP 10.2 to 11.25
ORE99, 1 mile North of Phoenix

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for intermittent lane closures through the work zone, Monday – Friday as utility work is taking place.
Last Updated
4/23/2025 1:31 AM

ORE99: MP 10.8 to 12.2
ORE99, 2 miles East of Rogue River

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. This project will replace three 1920s-era bridges on Rogue River Highway with structures that are better able to withstand earthquakes. Watch for intermittent lane closures at Millers Gulch and Foots Creek. Flaggers will provide traffic control as needed. Expect brief delays and watch for workers in the road.
Last Updated
4/28/2025 6:22 AM

ORE99EB: NB MP 4.36 to 4.84
99EBus, Salem, Intersection with Market St

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21572)
Last Updated
2/03/2025 8:37 AM

ORE99W: MP 7.7 to 10.4
ORE99W, Tigard (north city limits)

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: Nighttime lane closures and flagging. Project description: The ARTS Program aims to reduce serious crashes at various intersections on state highway and on local roads. Intersections typically have high rates of crashes. This ARTS project improves safety and visibility on OR 99W from Ross Island Bridge to SW Wills Lane and U.S. 30 Bypass from Kerby Avenue to Northeast 165th Avenue. Improvements to upgrade signs, traffic signals and road markings will occur at 58 intersections on OR 99W and U.S. 30 Bypass. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20435)
Last Updated
4/28/2025 6:05 AM

HWY100: MP 14.05
HWY100, 7 miles East of Corbett

Construction Work
Estimated delay under 20 minutes
Comments
Periodic lane closures with flaggers directing traffic on U.S. 30/Historic Highway weekdays. Project Description: We are repairing a bridge on the Historic Columbia River Highway between Shepperd’s Dell State Park and Bridal Veil Falls to continue carrying traffic over the creek. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
2/09/2025 1:44 PM