Current Travel Conditions By Route

Closure with Detour

ORE99, Creswell MP 6

Road construction has closed the road; a detour is in place. Use an alternate route.

Front Street (Creswell)- Construction will begin October 3rd. Night time work 7:00 PM to 7:00 AM. Full closure of the Railroad and Front Street intersection starting Friday, October 7th at 7:00 AM to Tuesday, October 11th 7:00 AM.

Issued
10/3/2022 7:00:00 PM

Closure with Detour

ORE6, Intersection with Oregon Coast Highway US101 MP 0

Road construction has closed the road; a detour is in place.

Beginning Sunday night 10/2 a section of OR-6 will be closed. A detour will be in place using 3rd St and Laurel Ave.

Updated
9/30/2022 7:48:00 PM

Closure with Detour

ORE214, Woodburn MP 36 - 37

Road construction has closed the road; a detour is in place. Use an alternate route.

Eastbound traffic to use Butteview Rd.

Updated
8/24/2022 2:19:00 PM

Closure with Detour

ORE153, Amity MP 6

Bridge work has the highway closed; a detour is in place. Use an alternate route.
Issued
6/9/2022 8:04:00 AM

Closure

ORE47, 1 mile North of Banks MP 83

Bridge work has the highway closed. Use alternate routes.

Northbound traffic can take OR 6 to southbound U.S. 26, use Exit 55 onto NW Dersham Road and left onto northbound U.S. 26. Southbound traffic can take U.S. 26 to OR 6. Sellers Road is closed to local access only.

Updated
6/29/2022 4:42:00 PM

I-205: SB MP 8.32 to 11.06

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime full closure of OR 99E at I-205 from 10 p.m. Sunday to 2 a.m. Monday. Follow signed detour. Nighttime single lane closures on OR 99E from 8 p.m. to 6 a.m. week nights. Lane closures on I-205 north and south starting at 10 p.m. week nights.
Last Updated
10/02/2022 7:44 AM

I-205: MP 8.64 to 8.821

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 8.84 to MP 8.62 (West Linn) Effective October 3, 2022, this section of I-205 northbound will be intermittently restricted to 14 feet 00 inches in width, between the hours of 10 PM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-205: MP 8.821 to 8.64

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 8.84 to MP 8.62 (West Linn) Effective October 3, 2022, this section of I-205 southbound will be intermittently restricted to 14 feet 00 inches in width, between the hours of 10 PM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-205: NB MP 19.61 to 19.77

Construction Work
No to Minimum Delay
Comments
Periodic shoulder closures.
Last Updated
9/26/2022 6:42 AM

I-205: NB MP 21.1 to 22

Construction Work
Estimated delay under 20 minutes
Comments
: Nighttime single lane closures on I-84 east and west. I-84 east Exit 7 closed through to Oct. 17. Shoulder closure on I-205 north between Glisan Street and Exit 22, on I-84 east and west.
Last Updated
10/02/2022 7:41 AM

I-405: MP 1.24

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 1D off-ramp to WB US26 (Portland) Effective October 7, 2022, the I-405 northbound off-ramp to US26 westbound will be closed between the hours of 9 PM & 5 AM. The estimated completion date for this work is October 8, 2022.
Last Updated
10/04/2022 7:00 PM

I-405: MP 1.96

Commercial Vehicle Information
Informational only
Details
I-405 MP 1.97 SW Taylor St crossing over I-405 (Portland) Effective June 18, 2020, SW Taylor Street crossing over I-405 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 GVW, Weight Table 2.
Last Updated
10/04/2022 7:00 PM

I-405: MP 2.8 to 4.21

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.80 to MP 4.20 (Fremont Bridge - Portland) Effective October 17, 2022, this section of I-405 northbound will be intermittently closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is October 19, 2022.
Last Updated
10/04/2022 7:00 PM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective October 17, 2022, the I-405 northbound off-ramp to I-5 southbound will be intermittently closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is October 20.
Last Updated
10/04/2022 7:00 PM

I-5: NB MP 1 to 1.25

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
9/12/2022 10:54 AM

I-5: SB MP 2.5

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred causing no to minimum delays. Use caution.
Last Updated
10/05/2022 3:57 AM

I-5: MP 5.28

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from OR273 (Ashland) Effective July 20, 2022, the I-5 southbound on-ramp from OR273 at Exit 6 will be closed at all hours. The estimated completion date for this work is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: SB MP 6

Maintenance Work
Informational only
On Ramp
Comments
Road maintenance operations is or will be occurring. Use caution. Ramps Affected. The southbound on ramp at milepost 6 will be closed.
Last Updated
9/02/2022 6:15 AM

I-5: SB MP 6 to 5

Maintenance Work
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
9/06/2022 1:25 AM

I-5: NB MP 8.5 to 11

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
9/12/2022 7:33 AM

I-5: NB MP 9 to 9.5

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
9/29/2022 8:40 AM

I-5: SB MP 9.5 to 9

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
9/29/2022 8:39 AM

I-5: NB MP 11

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
A crash has occurred, use caution.
Last Updated
10/04/2022 2:44 PM

I-5: MP 57.93

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 58 off-ramp crossing under I-5 to OR99/Scoville Rd (Grants Pass) Effective September 27, 2021, OR99/Scoville Road/6th Street southbound MP -2.6 (Grants Pass) will be intermittently restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is October 28, 2022. This restriction is NOT on the I-5 mainline.
Last Updated
10/04/2022 7:00 PM

I-5: MP 78.11

Commercial Vehicle Information
Informational only
Details
I-5 MP 78.11 Speaker Rd crossing over I-5 (Canyonville) Effective March 12, 2021, Speaker Rd crossing over I-5 is restricted to 21,500 lbs. single axle; 43,000 lbs. tandem axle; Weight Table 3.
Last Updated
10/04/2022 7:00 PM

I-5: SB MP 99 to 136

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. This project will replace ADA sidewalk ramps at several locations in southern Oregon. Pedestrians will be provided alternate routes when sidewalks are closed. Ramps are mostly finished in Canyonville, Tri City and Roseburg. Some final paving work along shoulders remains, but probably will not impact traffic or pedestrians.
Last Updated
9/12/2022 8:08 PM

I-5: MP 104.85

Commercial Vehicle Information
Informational only
Details
I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Last Updated
10/04/2022 7:00 PM

I-5: NB MP 113 to 118

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 2 Lanes (Northbound) 2 Lanes
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Watch for intermittent lane closures and ramp work Sunday through Friday nights (9 p.m. to 6 a.m.) installing pavement markings.
Last Updated
9/26/2022 8:56 PM

I-5: MP 117.74

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 117.5 to MP 119 (Roseburg) Effective September 18, 2022, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: NB MP 118 to 126

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes
Comments
Road construction is occurring. Use caution. This project will pave eight miles of I-5 between the Garden Valley interchange and Roberts Creek and install or replace sidewalk ADA ramps. Watch for intermittent weeknight (Sunday night to Friday morning, 9 p.m. to 6 a.m.) ramp, lane and shoulder closures.
Last Updated
9/12/2022 8:11 PM

I-5: MP 119.18 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 119 to MP 125.5 (Roseburg) Effective September 18, 2022, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights 1/2 hour after sunset to 1/2 before sunrise. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 119.18 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 119 to MP 125.5 (Roseburg) Effective September 18, 2022, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in height and southbound will be restricted to 16 feet 05 inches in height Sunday through Thursday nights 1/2 hour after sunset to 1/2 before sunrise. Loads over 16 feet 00 inches in height northbound or over 16 feet 05 inches in height southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 138.3 to 140.48

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 138 to MP 141 (Oakland) Effective October 11, 2022, this section of I-5 northbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 6 PM & 7 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 18, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 140.48

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 140 on-ramp from Old Hwy 99/DC388 (Oakland) Effective October 11, 2022 the I-5 northbound Exit 140 on-ramp from Old Hwy 99/DC388 will be intermittently closed Sunday through Friday nights between the hours of 6 PM & 7 AM. The estimated completion date for this project is October 18, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 148.201 to 150.761

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 148 to MP 151 (Rice Hill) Effective October 9, 2022, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 6 PM & 7 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 13, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 148.41

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 148 on-ramp from Rice Hill/John Long Rd (Rice Hill) Effective October 9, 2022 the I-5 northbound Exit 148 on-ramp from Rice Hill will be intermittently closed Sunday through Friday nights between the hours of 6 PM & 7 AM. The estimated completion date for this project is October 13, 2022
Last Updated
10/04/2022 7:00 PM

I-5: MP 150.001

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 150 on- and off-ramps to/from Yoncalla/Drain/Eagle Valley Rd (Eagle Valley) Effective September 25, 2022, the I-5 northbound Exit 150 on- and off-ramps to/from Yoncalla/Drain/Eagle Valley Rd (Eagle Valley) will be intermittently closed Sunday through Friday nights between the hours of 6 PM & 7 AM. The estimated completion date for this project is September 29 , 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 151.81

Commercial Vehicle Information
Informational only
Details
I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
10/04/2022 7:00 PM

I-5: NB MP 172

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
10/05/2022 4:19 AM

I-5: NB MP 266 to 271

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes
Comments
Road construction is occurring. Use caution.
Last Updated
9/13/2022 7:24 PM

I-5: NB MP 278.67 to 278.06

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Construction at the Aurora Donald interchange may require occasional shoulder closure on I-5 Northbound. Construction on Ehlen Road continues nightly from 8:00 pm to 6:00 am Sunday night through Friday morning and may impact the exit ramps at Exit 278.
Last Updated
9/26/2022 8:46 AM

I-5: SB MP 283.2 to 288.6

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
9/26/2022 6:35 AM

I-5: MP 293.16

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Haines St/65th Ave (Portland) Effective March 21, 2022, the I-5 northbound on-ramp from Haines Street/65th Avenue will be intermittently closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this project is October 31, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: NB MP 293.73

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single and double lane closures on northbound I-5 from 7:30 p.m. to 5:30 a.m. . Monday through Saturday
Last Updated
9/26/2022 6:34 AM

I-5: MP 293.75

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 293.75 (Portland) Effective February 24, 2022, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9:30 PM & 5:30 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 299.83

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 299A off-ramp to OR43 (Portland) Effective November 7, 2022, the I-5 southbound Exit 299A off-ramp to OR43 will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is November 18, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 300.30 to MP 299.30 (Portland) Effective October 17, 2022, this section of I-5 southbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 8 PM & 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 28, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 300.30 to MP 299.30 (Portland) Effective October 17, 2022, this section of I-5 southbound will be intermittently restricted to 16 feet 6 inches in height Monday through Thursday nights between the hours of 8 PM & 5 AM. Loads over 16 feet 6 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 28, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 300.30 to MP 299.30 (Portland) Effective October 17, 2022, this section of I-5 southbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 8 PM & 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 28, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 300.30 to MP 299.30 (Portland) Effective October 17, 2022, this section of I-5 southbound will be intermittently restricted to 16 feet 6 inches in height Monday through Thursday nights between the hours of 8 PM & 5 AM. Loads over 16 feet 6 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 28, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 300.30 to MP 299.30 (Portland) Effective October 17, 2022, this section of I-5 southbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 8 PM & 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 28, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 300.271 to 299.56

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 300.30 to MP 299.30 (Portland) Effective October 17, 2022, this section of I-5 southbound will be intermittently restricted to 16 feet 6 inches in height Monday through Thursday nights between the hours of 8 PM & 5 AM. Loads over 16 feet 6 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 28, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 300B off-ramp to US26 East/OR99E (Morrison St bridge - Portland) Effective October 14, 2022 the I-5 southbound Exit 300B off-ramp to to US26 East/OR99E (Morrison St bridge) will be closed all weekend starting Friday at 10 pm through Monday at 5 AM. The estimated completion date for this work is October 17, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 300B off-ramp to US26 East/OR99E (Morrison St bridge - Portland) Effective October 21, 2022, the I-5 southbound Exit 300B off-ramp to to US26 East/OR99E (Morrison St bridge) will be closed all weekend starting Friday at 10 pm through Monday at 5 AM. The estimated completion date for this work is October 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 300B off-ramp to US26 East/OR99E (Morrison St bridge - Portland) Effective October 14, 2022 the I-5 southbound Exit 300B off-ramp to to US26 East/OR99E (Morrison St bridge) will be closed all weekend starting Friday at 10 pm through Monday at 5 AM. The estimated completion date for this work is October 17, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 300B off-ramp to US26 East/OR99E (Morrison St bridge - Portland) Effective October 21, 2022, the I-5 southbound Exit 300B off-ramp to to US26 East/OR99E (Morrison St bridge) will be closed all weekend starting Friday at 10 pm through Monday at 5 AM. The estimated completion date for this work is October 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 300B off-ramp to US26 East/OR99E (Morrison St bridge - Portland) Effective October 14, 2022 the I-5 southbound Exit 300B off-ramp to to US26 East/OR99E (Morrison St bridge) will be closed all weekend starting Friday at 10 pm through Monday at 5 AM. The estimated completion date for this work is October 17, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 300B off-ramp to US26 East/OR99E (Morrison St bridge - Portland) Effective October 21, 2022, the I-5 southbound Exit 300B off-ramp to to US26 East/OR99E (Morrison St bridge) will be closed all weekend starting Friday at 10 pm through Monday at 5 AM. The estimated completion date for this work is October 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 301.911

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 301.93 to MP 301.90 (Portland) Effective October 28, 2022, this section of I-5 southbound will be restricted to 17 feet 00 inches in width between the hours of 3 AM & 5 AM. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 28, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 302.35

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 302.35 to MP 302.38 (Portland) Effective October 11, 2022, this section of I-5 northbound will be restricted to 16 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 12, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 302.74

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 302B off-ramp to I-405 SB/US30 WB (Portland) Effective October 17, 2022 the I-5 northbound Exit 302B off-ramp to I-405 southbound/US30 westbound will be intermittently restricted to 13 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 21, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 302.92

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 302C off-ramp to Greeley Ave/Swan Island (Portland) Effective October 21, 2022, the I-5 northbound Exit 302C off-ramp to Greeley Avenue/Swan Island will be intermittently closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is October 22, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 303.04 to 303.16

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 303.00 to MP 303.30 (Portland) Effective October 19, 2022 this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 21, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Greeley Ave (Portland) Effective October 21, the I-5 southbound on-ramp from Greeley Avenue will be intermittently closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is October 22, 2021.
Last Updated
10/04/2022 7:00 PM

I-5: MP 303.47

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 302B off-ramp to I-405/US30 (Portland) Effective October 17, 2022, the I-5 southbound Exit 302B off-ramp to I-405/US30 will be intermittently restricted to 15 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 15 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. he estimated completion date for this work is October 20, 2022.
Last Updated
10/04/2022 7:00 PM

I-5: SB MP 304.19 to 304.22

Construction Work
No to Minimum Delay
Comments
Night lane closures at Washington Street over I-205 Monday and on I-5 at Alberta Tuesday. Daytime lane closures on Lombard over I-5 Friday.
Last Updated
7/22/2022 2:30 PM

I-84: WB MP 2 to 9.7

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures on I-84 east and west. I-84 east Exit 7 closed through to Oct. 17. Shoulder closure on I-205 north between Glisan Street and Exit 22, on I-84 east and west.
Last Updated
10/02/2022 7:42 AM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective October 18, 2022, the I-84 eastbound Exit 7 off-ramp to Halsey Street will be closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is November 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective October 18, 2022, the I-84 eastbound Exit 7 off-ramp to Halsey Street will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 3, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective September 14, 2022 the I-84 eastbound Exit 7 off-ramp to Halsey Street will be closed all hours. The estimated completion date for this work is October 17, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective October 18, 2022, the I-84 eastbound Exit 7 off-ramp to Halsey Street will be closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is November 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective October 18, 2022, the I-84 eastbound Exit 7 off-ramp to Halsey Street will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 3, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective September 14, 2022 the I-84 eastbound Exit 7 off-ramp to Halsey Street will be closed all hours. The estimated completion date for this work is October 17, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 5.74 to 5.95

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 5.72 to MP 5.96 (Portland) Effective September 18, 2022, this section of I-84 eastbound will be restricted to 13 feet 00 inches in width, between the hours of 9 PM and 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: EB MP 5.86

Maintenance Work
Closure
Off Ramp
Comments
Roadwork has the Eastbound exit to Halsey closed, use alternate route. Ramps Affected.
Last Updated
9/28/2022 6:24 AM

I-84: MP 6.39 to 5.64

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 6.35 to MP 5.60 (Portland) Effective September 7, 2022, this section of I-84 WB will be restricted to 13 feet 00 inches in width, between the hours of 9:30 PM and 5:00 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 6.39 to 5.64

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 6.35 to MP 5.60 (Portland) Effective September 7, 2022, this section of I-84 WB will be restricted to 18 feet 11 inches in height, between the hours of 9:30 PM and 5:00 AM. Loads over 18 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 6.39 to 5.64

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 6.35 to MP 5.60 (Portland) Effective September 7, 2022, this section of I-84 WB will be restricted to 13 feet 00 inches in width, between the hours of 9:30 PM and 5:00 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 6.39 to 5.64

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 6.35 to MP 5.60 (Portland) Effective September 7, 2022, this section of I-84 WB will be restricted to 18 feet 11 inches in height, between the hours of 9:30 PM and 5:00 AM. Loads over 18 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 10.02 to 12.73

Commercial Vehicle Information
Informational only
Details
I-84 EB and WB MP 9.50 to MP 12.80 (Gresham) Effective September 9, 2022, this section of I-84 eastbound and westbound will be intermittently restricted to 16 feet 00 inches in width at night, between the hours of 10:00 PM & 5:30 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: WB MP 20 to 32

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. This project is complete.
Last Updated
9/26/2022 6:38 AM

I-84: MP 21.9 to 22.36

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 21.00 to MP 23.00 (Corbett) Effective October 18, 2022, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width between the hours of 7 AM & 5 PM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this emergency work is October 18, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 22.1

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 22.10 (Corbett) Effective October 18, 2022, this section of I-84 eastbound will be restricted to 18 feet 3 inches in height between the hours of 7 AM & 5 PM. Loads over 18 feet 3 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this emergency work is October 18, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 22.36

Commercial Vehicle Information
Informational only
Details
I-84 EB on-ramp from Corbett Hill Rd (Corbett) Effective October 18, 2022, the I-84 eastbound on-ramp from Corbett Hill Road will be closed between the hours of 7 AM & 5 PM. The estimated completion date for this emergency work is October 18, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: EB MP 34.5 to 41

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Roadwork has the EB right lane closed from mile post 34.5 to mile post 41. Use caution.
Last Updated
10/04/2022 8:21 PM

I-84: MP 35.14 to 45.33

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 31.77 to MP 46.00 (Cascade Locks) Effective October 1, 2022, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights, between the hours of 7 PM and 7 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 2, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 35.14 to 45.33

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 31.77 to MP 46.00 (Cascade Locks) Effective April 11, 2022, this section of I-84 eastbound and westbound will be restricted to 9 feet 00 inches in width Sunday through Thursday nights, between the hours of 7 PM and 7 AM. Loads over 9 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 35.14 to 45.33

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 31.77 to MP 46.00 (Cascade Locks) Effective October 1, 2022, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights, between the hours of 7 PM and 7 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 2, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 35.14 to 45.33

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 31.77 to MP 46.00 (Cascade Locks) Effective April 11, 2022, this section of I-84 eastbound and westbound will be restricted to 9 feet 00 inches in width Sunday through Thursday nights, between the hours of 7 PM and 7 AM. Loads over 9 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 35.23

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 35 off-ramp to Historic Hwy/Hwy 100 (Cascade Locks) Effective September 6, 2022, the I-84 eastbound off-ramp to the Historic Hwy/Hwy 100 will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 35.31

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 35 on-ramp from Historic Hwy/Hwy 100 (Cascade Locks) Effective September 7, 2022, the I-84 westbound off-ramp to the Historic Hwy/Hwy 100 will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 35.58

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 35 off-ramp to Historic Hwy/Hwy 100 (Cascade Locks) Effective September 7, 2022, the I-84 westbound off-ramp to the Historic Hwy/Hwy 100 will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 35.63

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 35 on-ramp From Historic Hwy/Hwy 100 (Cascade Locks) Effective September 6, 2022, the I-84 eastbound off-ramp to the Historic Hwy/Hwy 100 will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 37.65

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 37 off-ramp to Warrendale (Cascade Locks) Effective August 24, 2022, the I-84 westbound off-ramp to Warrendale will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is October 1, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 40.18

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramp from Bonneville Dam/Exit 40 (Cascade Locks) Effective September 6, 2022, the I-84 westbound on-ramp from Bonneville Dam/Exit 40 will be intermittently closed Sunday through Friday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 40.42

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 40 on-ramp from Bonneville Dam (Cascade Locks) Effective September 11, 2022, the I-84 eastbound off-ramp to the Historic Hwy/Hwy 100 will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is October 1, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 40.57

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 40 off-ramp to Bonneville Dam (Cascade Locks) Effective September 6, 2022, the I-84 westbound Exit 40 off-ramp to Bonneville Dam will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is Ocotber 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 41.43

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 to Eagle Creek (Eagle Creek Bridge) Effective June 18, 2020, the I-84 EB Exit 41 ramp over Eagle Creek is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2. This restriction is NOT on the I-84 mainline.
Last Updated
10/04/2022 7:00 PM

I-84: MP 41.43

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 off-ramp to Fish Hatchery/Eagle Creek Rec Area (Cascade Locks) Effective September 6, 2022, the I-84 eastbound off-ramp to the Historic Hwy/Hwy 100 will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 41.43

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 to Eagle Creek (Eagle Creek Bridge) Effective June 18, 2020, the I-84 EB Exit 41 ramp over Eagle Creek is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2. This restriction is NOT on the I-84 mainline.
Last Updated
10/04/2022 7:00 PM

I-84: EB MP 41.48

Construction Work
Informational only
Off Ramp
Comments
I-84 east Exit 41 to Eagle Creek will be closed 7 p.m. Thursday, Oct. 6 to 7 a.m. Friday. Ramps Affected.
Last Updated
10/03/2022 1:32 PM

I-84: MP 41.9

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 on-ramp from Fish Hatchery/Eagle Creek Rec Area (Cascade Locks) Effective September 6, 2022, the I-84 eastbound off-ramp to the Historic Hwy/Hwy 100 will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 43.11

Commercial Vehicle Information
Informational only
Details
I-84 WB on-ramp from WB US30/Exit 44 (Cascade Locks) Effective September 6, 2022, the I-84 westbound on-ramp from US30/Exit 44 will be intermittently closed Sunday through Friday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is Ocotber 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 43.38 to 45.05

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 43.30 to MP 45.20 (Cascade Locks) Beginning Sunday, September 18, 2022, this section of I-84 eastbound and westbound will be restricted to 9 feet 00 inches in width continuously from Sundays at 5 PM to Thursdays at 4 PM. The estimated completion date for this work is October 6, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 44.64

Commercial Vehicle Information
Informational only
Details
I-84 EB off-ramp to the Cascade Locks Scale (Cascade Locks) Effective September 6, 2022, the I-84 eastbound off-ramp to the Historic Hwy/Hwy 100 will be intermittently closed Sunday through Friday nights between the hours of 7 PM and 7 AM. The estimated completion date for this work is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 45.24

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 44 off ramp to US30 (Cascade Locks) Effective September 6, 2022, the I-84 westbound off-ramp to US30 will be intermittently closed Sunday through Friday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 45.33

Commercial Vehicle Information
Informational only
Details
I-84 EB on-ramp from Cascade Locks/Scale (Cascade Locks) Effective September 6, 2022, the I-84 eastbound on-ramp from Cascade locks scale and Cascade Locks will be intermittently closed Sunday through Friday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is October 7, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: WB MP 46 to 31

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane closures from 7 p.m. to 7 a.m. Sunday through Thursday nights. Periodic shoulder closures. Periodic nighttime lane closures at on- and off-ramps at Exits 35, 37, 40 and 41.
Last Updated
10/03/2022 1:33 PM

I-84: MP 54.77 to 58.59

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 53.70 to MP 58.60 (Hood River) Effective October 3, 2022, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is November 18, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 54.77 to 58.59

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 53.70 to MP 58.60 (Hood River) Effective May 13, 2022, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width Monday through Thursday during daylight hours only, half an hour before sunrise to half an hour after sunset. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 3, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 54.77 to 58.59

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 53.70 to MP 58.60 (Hood River) Effective October 3, 2022, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is November 18, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 54.77 to 58.59

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 53.70 to MP 58.60 (Hood River) Effective May 13, 2022, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width Monday through Thursday during daylight hours only, half an hour before sunrise to half an hour after sunset. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 3, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: WB MP 56 to 58

Construction Work
Estimated delay under 20 minutes
Comments
Around-the-clock single lane closure on I-84 east near Viento State Park begins Monday through mid-November.
Last Updated
10/02/2022 7:43 AM

I-84: EB MP 58.39 to 59

Construction Work
Closure
Off Ramp
Comments
I-84 Exit 58 to Mitchell Point Overlook closed around-the-clock. Ramps Affected.
Last Updated
9/26/2022 6:41 AM

I-84: WB MP 59 to 61

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts.
Last Updated
6/10/2022 12:44 PM

I-84: MP 63.43 to 73.18

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 63.34 to MP 74.39 (Hood River) Effective October 3, 2022, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday thorugh Thursday nights between the hours of 6 PM & 6 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 63.92

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 63.92 Effective October 3, 2022, this section of I-84 eastbound will be intermittently restricted to 15 feet 10 inches in height Monday through Thursday nights between the hours of 6 PM & 6 AM. Loads over 15 feet 10 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 64.26

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 64.26 (Hood River) Effective October 3, 2022, this section of I-84 eastbound will be intermittently restricted to 16 feet 5 inches in height Monday through Thursday nights between the hours of 6 PM & 6 AM. Loads over 16 feet 5 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: EB MP 65.34 to 149.48

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
9/26/2022 6:43 AM

I-84: MP 69.79

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 69.79 (Hood River) Effective October 3, 2022, this section of I-84 eastbound will be intermittently restricted to 16 feet 5 inches in height Monday through Thursday nights between the hours of 6 PM & 6 AM. Loads over 16 feet 5 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 130.87 to 148.59

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 130.05 to MP 149.48 (Arlington) Effective October 3, 2022, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday thorugh Thursday nights between the hours of 6 PM & 6 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 147.35

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 147.35 (Arlington) Effective October 3, 2022, this section of I-84 eastbound will be intermittently restricted to 16 feet 7 inches in height Monday through Thursday nights between the hours of 6 PM & 6 AM. Loads over 16 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 23, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: EB MP 237.6 to 248.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Watch for lane closures. Expect delays. Speed reduction to 50 MPH in the work zone. Use caution. Watch for construction vehicles entering and exiting highway.
Last Updated
9/26/2022 7:01 AM

I-84: MP 240.12 to 248.94

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 240.00 to MP 249.00 (Meacham) Effective April 7, 2022, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 243.82

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 243.82 (Meacham) Effective April 7, 2022, this section of I-84 eastbound will be restricted to 16 feet 9 inches in height at all hours. Loads over 16 feet 9 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: EB MP 249 to 260.4

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Watch for lane closures. Use caution.
Last Updated
9/26/2022 7:19 AM

I-84: EB MP 272.1 to 285.4

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Watch for single lane closures. Speed reduced to 50 MPH in the work zone. Use caution.
Last Updated
9/26/2022 7:23 AM

I-84: MP 273.65 to 284.66

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 272.17 to 285.33 (North Powder) Effective August 22, 2022, this section of I-84 eastbound and westbound will be intermittently restricted to 17 feet 00 inches in width during the day, half an hour before sunrise to half an hour after sunset, but never at the same time. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 273.65 to 284.66

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 272.17 to 285.33 (North Powder) Effective August 22, 2022, this section of I-84 eastbound and westbound will be intermittently restricted to 12 feet 00 inches in width at night half an hour after sunset to half an hour before sunrise. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 273.91

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 272.17 to 275.50 (North Powder) Effective August 22, 2022, this section of I-84 eastbound will be restricted to 16 feet 11 inches in height at all hours. Loads over 16 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 280.53

Commercial Vehicle Information
Informational only
Details
I-84 MP 280.53 McCanse Rd crossing over I-84 (west of Baker City) Effective March 5, 2018, McCanse Rd crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
10/04/2022 7:00 PM

I-84: MP 283.64

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 283.64 (North Powder) Effective July 18, 2022, this section of I-84 westbound will be restricted to 16 feet 6 inches in height at all hours. Loads over 16 feet 6 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2022.
Last Updated
10/04/2022 7:00 PM

I-84: MP 291.65

Commercial Vehicle Information
Informational only
Details
I-84 MP 291.65 Charles Green Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Charles Green Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
10/04/2022 7:00 PM

I-84: MP 295.67

Commercial Vehicle Information
Informational only
Details
I-84 MP 295.67 Culley Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Culley Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
10/04/2022 7:00 PM

I-84: EB MP 317.65 to 342.12

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
10/03/2022 10:22 PM

I-84: EB MP 354

Information
Informational only
Comments
I-84 Eastbound Olds Ferry scales are closed.
Last Updated
9/15/2022 1:35 PM

US101: NB MP 4.4 to 6.4

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution.
Last Updated
9/30/2022 5:53 AM

US101: MP 4.78

Commercial Vehicle Information
Informational only
Details
US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
10/04/2022 7:00 PM

US101: MP 6.35

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 5.31 to MP 6.40 (Astoria) Effective April 18, 2022, this section of US101 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Friday nights between the hours of 8 PM & 6 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2022.
Last Updated
10/04/2022 7:00 PM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective July 1, 2020, US101 Business crossing the Old Youngs Bay Bridge is restricted to the following weights: 25 tons SU4 & SU5 (4 and 5 axle single unit trucks); 26 tons SU6 & SU7 (6 and 7 axle single-unit trucks); 20,000 single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1 for combinations.
Last Updated
10/04/2022 7:00 PM

US101: MP 9.48

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Use caution. Staged Construction Work is occurring and may restrict NB and/or SB Traffic to one lane through the Project. Side Roads on US101 (Perkins and OR104) will be closed during staged work and will have corresponding detours. There will be intermittent lane closures, delays, and reduced speed in the work zone.
Last Updated
8/03/2022 7:43 PM

US101: MP 9.48

Commercial Vehicle Information
Informational only
Details
US101 NB MP 9.48 (Warrenton) Effective August 18, 2022 the northbound left turn to junction with OR104 (Columbia Beach Rd) from US101 northbound will be closed at all hours. The estimated completion date for this work is October 31, 2022.
Last Updated
10/04/2022 7:00 PM

US101: MP 28.11 to 28.07

Information
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Utility work is occurring. Expect minor delays. Prepare to slow.
Last Updated
9/23/2022 7:00 PM

US101: MP 28.7 to 33.5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Paving preservation project from Ecola Creek to Arcadia Beach. Expect delays of up to 20 minutes during lane closure activities. Bridge locations will be narrowed, eliminating either northbound or southbound shoulder access for pedestrians and bicyclists. Nightly lane closures are anticipated Sunday evening through Friday morning. Flaggers will control traffic around the work zone. The bridge locations will have temporary concrete barrier installed, and temporary striping will guide the open lanes around the work zone. Initial project setup activities are occurring. A work zone behind the concrete barrier at the bridge locations will be installed and maintained until the bridge rail reconstruction is completed.
Last Updated
9/29/2022 4:48 AM

US101: MP 77 to 76.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution.
Last Updated
9/26/2022 8:27 AM

US101: MP 77.53

Commercial Vehicle Information
Informational only
Details
US101 MP 77.53 (West Beaver Creek Bridge - Beaver) Effective October 23, 2020, US101 crossing West Beaver Creek Bridge at MP 77.53 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

US101: MP 79.61

Commercial Vehicle Information
Informational only
Details
US101 MP 79.61 (Beaver Creek Bridge - Beaver) Effective January 4, 2019, US101 crossing Beaver Creek Bridge at MP 76.61 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

US101: MP 80.32

Commercial Vehicle Information
Informational only
Details
US101 MP 80.32 (Beaver Creek Bridge - Beaver) Effective March 12, 2021, US101 crossing Beaver Creek Bridge at MP 80.32 is restricted to the following weights: 26 tons for SU5 & SU6 (5 to 6-axle single-unit trucks); 27 tons SU7 (7 axle-single-unit trucks).
Last Updated
10/04/2022 7:00 PM

US101: MP 114.5 to 115

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. The remaining work will be done and night and is weather dependent. It includes installing a concrete surfacing to the bridge, paving at the bridge ends, and striping. There is also a small amount of coating work to finish on the bridge rail posts.
Last Updated
9/19/2022 8:13 AM

US101: MP 141.44 to 141.83

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution.
Last Updated
7/26/2022 6:16 AM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
10/04/2022 7:00 PM

US101: MP 190.98

Commercial Vehicle Information
Informational only
Details
US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Last Updated
10/04/2022 7:00 PM

US101: MP 202.7 to 213.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project replaces the rails and makes other repairs on two U.S. 101 bridges in Douglas County: Tahkenitch Creek (MP 202.7) and Ranch Road south of Reedsport (MP 213.2). At Takhenitch Creek, a portable traffic signal is in use. Expect brief delays. At the bridge over Ranch Road south of Reedsport, watch for a traffic alignment change and traffic control devices. Flaggers will provide traffic control as needed.
Last Updated
9/12/2022 8:01 PM

US101: MP 261 to 275

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will improve safety for pedestrians in Bandon by bringing several highway curb ramps into compliance with the Americans with Disabilities Act and installing a new pedestrian crossing at the intersection of U.S. 101 and 9th Street. The project also will replace ADA sidewalk ramps in Camas Valley and Winston. In Bandon, watch for intermittent lane and shoulder closures along U.S. 101. Alternate routes will be identified for pedestrians during sidewalk construction.
Last Updated
9/12/2022 8:09 PM

US101: MP 300 to 301

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will pave U.S. 101 through Port Orford, replace ADA curb ramps at 15 intersections and make other safety improvements. Watch for intermittent lane and shoulder closures as the contractor mobilizes the work zone. Watch for sidewalk construction at the south end of the work zone, near Deady Street and Jefferson Street.
Last Updated
9/26/2022 8:54 PM

US101: MP 311.4

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic.
Last Updated
10/04/2022 7:00 PM

US101: MP 326.47

Commercial Vehicle Information
Informational only
Details
US101 MP 326.47 (Connector Road Bridge - Gold Beach) Effective January 14, 2019, US101 crossing Connector Road Bridge at MP 326.47 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 vehicles (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

US197: MP 0.05 to 0.61

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Single lane closures will take place overnight; expect minimal delays while flaggers control traffic across the bridge. Speed reduced to 35 MPH. Weekend full closures of the bridge will resume September 29th and will continue each weekend (except holiday weekends of Thanksgiving, Christmas & New Years)
Last Updated
10/03/2022 8:50 AM

US199: MP 8 to 7

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred causing no to minimum delays. Use caution.
Last Updated
10/05/2022 4:35 AM

US20: MP 0.3 to 0.55

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Work being done at night, Sunday through Thursday nights from 7:00PM - 6:00AM.
Last Updated
6/15/2022 11:42 AM

US20: MP 7 to 4.6

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Night work for paving Sunday-Tuesday nights (Sept 25-27th from 7PM-6AM)
Last Updated
9/26/2022 7:17 PM

US20: MP 19.03 to 20.99

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 18.99 to MP 20.99 (Bend) Effective September 28, 2022, this section of US20 eastbound and westbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2022.
Last Updated
10/04/2022 7:00 PM

US20: MP 20.99 to 18.99

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 2 Lanes
Comments
Road construction is occurring. Expect single lane closures with delays and congestion. Use caution. Work consists of updates to the sidewalks, bike lanes and ADA ramps. Updates to the signals, illumination devices, and storm water and drainage features. Updates to the bus stop locations, installation of new signs, and the installation of rapid flashing beacon crosswalks.
Last Updated
9/22/2022 10:08 AM

US20: MP 26.64 to 30.35

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. During construction expect delays up to 20 minutes. Work is expected to occur Monday through Friday, between 7:00am to 5:00pm.
Last Updated
7/12/2022 7:20 AM

US20: MP 30.2 to 30.8

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. During construction expect single lane closures and lane shifts. Work is expected to occur Monday through Friday, between 8:00am to 4:00pm.
Last Updated
4/28/2022 3:39 PM

US20: MP 54 to 57

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Expect single lane closures and delays up to 20 minutes weekdays between 6:00am to 6:00pm.
Last Updated
9/27/2022 7:48 AM

US20: MP 56.6

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 55.90 to MP 56.90 (Cascadia) Effective April 4, 2022, this section of US20 eastbound and westbound will be restricted to 12 feet 00 inches in width Mondays through Fridays 1/2 before sunrise to 1/2 after sunset. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 12, 2022.
Last Updated
10/04/2022 7:00 PM

US20: MP 99.94

Commercial Vehicle Information
Informational only
Details
US20 MP 99.94 EB & WB (Sisters) Effective November 28, 2017, this section of US20 eastbound and westbound is restricted to 14 feet 00 inches in width and/or 154 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
10/04/2022 7:00 PM

US20: MP 132.5

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Bridge work is occurring causing no to minimum delays. Use caution.
Last Updated
10/04/2022 7:23 PM

US20: MP 171.8 to 223.16

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Watch for lane closures and loose gravel. Use caution. Description of work: Traffic Control, Bridge Work, Paving, Chip seal and Guard rail.
Last Updated
9/15/2022 9:04 AM

US26: MP 5.85 to 9.96

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Project Description: We are constructing safety improvements to help people travel Outer SE Powell Boulevard more safely from SE 99th Avenue to SE 122nd Avenue and SE 136th Avenue to just east of SE 174th Avenue (the Portland/Gresham city limits). The first phase, from SE 122nd Avenue to SE 136th Avenue, is complete. The overall Outer Powell Project will add a center turn lane, sidewalks and bike lanes. These improvements reduce the frequency and severity of crashes as well as help people driving, taking transit, walking and biking share the road with fewer conflicts. Pre-construction activity begins August 2022. Road construction begins in spring 2023 and will last four years.
Last Updated
9/07/2022 3:25 PM

US26: MP 8.22

Commercial Vehicle Information
Informational only
Details
US26 MP 8.22 (Little Humbug Creek Bridge - Necanicum Jct) Effective October 23, 2020, US26 crossing Little Humbug Creek Bridge at MP 8.22 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

US26: EB MP 24.51 to 22.89

Construction Work
No to Minimum Delay
Comments
Shoulder closures, lane shifts, flaggers directing traffic and pedestrian detours.
Last Updated
9/26/2022 6:44 AM

US26: MP 25.56 to 24.61

Construction Work
Estimated delay under 20 minutes
Comments
Daytime single lane closures on U.S. 26 west.
Last Updated
9/18/2022 8:58 AM

US26: MP 26.1 to 38.75

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 26.00 to MP 39.00 (Sandy) Effective July 26, 2022, this section of US26 eastbound and westbound will be intermittently restricted to 23 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 10 AM. Loads over 23 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2022.
Last Updated
10/04/2022 7:00 PM

US26: MP 27.1 to 62.15

Construction Work
Estimated delay under 20 minutes
Comments
Single lane and shoulder closures between Sandy and Frog Lake Sno-Park.
Last Updated
10/02/2022 7:48 AM

US26: MP 48.5 to 50

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
9/13/2022 6:05 AM

US26: MP 66.43 to 112.91

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution.
Last Updated
9/26/2022 6:14 AM

US26: EB MP 71.3 to 66.5

Construction Work
No to Minimum Delay
Comments
Periodic shoulder closures.
Last Updated
9/26/2022 6:43 AM

US26: MP 73.33

Commercial Vehicle Information
Informational only
Details
US26 WB on-ramp from Jefferson St (Portland) Effective October 14, 2022, the US26 westbound on-ramp from Jefferson Street will be closed at night between the hours of 9 PM and 6 AM. The estimated completion date for this work is October 15, 2022.
Last Updated
10/04/2022 7:00 PM

US26: MP 115.58

Commercial Vehicle Information
Informational only
Details
US26 MP 115.58 (North Unit Canal Bridge - Madras) Effective February 5, 2019, US26 crossing North Unit Canal Bridge at MP 115.58 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

US30: MP 0.03

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Last Updated
10/04/2022 7:00 PM

US30: MP 1.58 to 2.1

Commercial Vehicle Information
Informational only
Details
US30 La Grande-Baker Hwy NB & SB MP 1.58 to MP 2.10 (La Grande) On Friday, October 21, 2022, US30 northbound and southbound between 3rd Street and Hemlock Street in La Grande will be closed between the hours of 4:30 PM & 6:00 PM for one day only. The closure is necessary for the Eastern Oregon University Homecoming Parade.
Last Updated
10/04/2022 7:00 PM

US30: MP 1.65 to 2.02

Commercial Vehicle Information
Informational only
Details
US30 La Grande-Baker Hwy NB & SB MP 1.66 to MP 2.02 (La Grande) On Monday, October 31, 2022, this section of US30 northbound and southbound between Greenwood St and Fourth St, will be closed between the hours of 3 PM & 7 PM, for one day only, for the La Grande Main Street Trick or Treat event.
Last Updated
10/04/2022 7:00 PM

US30: WB MP 3.1

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Expect intermittent lane closures and flaggers. Use caution.
Last Updated
9/26/2022 6:46 AM

US30: MP 3.94 to 6.51

Construction Work
Estimated delay under 20 minutes
Comments
Daytime single lane closures. The center turn lane between NW 55th and NW Saltzman is closed through Oct. 14. Pedestrian detours. We are making safety improvements for people walking, biking, rolling, driving and moving freight on U.S. 30 (NW St. Helens Road), between NW Bridge Avenue and NW Kittridge Avenue. We are repaving the roadway, replacing traffic signals, adjusting vehicle lane widths, building curb ramps to meet Americans with Disabilities Act (ADA) requirements and improving conditions for people biking.
Last Updated
10/02/2022 7:49 AM

US30: MP 6.41

Commercial Vehicle Information
Informational only
Details
US30 WB off-ramp to Bridge Ave/US30 Bypass/St John's Bridge (Portland) Effective September 26, 2022, the US30 westbound off-ramp to Bridge Avenue/US30 Bypass/St John's Bridge will be intermittently closed at night between the hours of 8 PM & 9 AM. The estimated completion date for this project is September 30, 2022.
Last Updated
10/04/2022 7:00 PM

US30: MP 11.93

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

US30: MP 13.14

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 13.14 (Shepperd's Dell Bridge) Effective March 12, 2021, US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperd's Dell) Bridge is restricted to the following weights: 18 tons for Type 3 Vehicles (3 axle single-unit trucks); 17 tons for SU4 (4 axle single-unit trucks); 19 tons for SU5, SU6 & SU7 (5 to 7 axle single-unit trucks); 28 tons for Type 3S2 (truck tractor/semitrailer); 35 tons for Type 3-3 (truck and trailer vehicles).
Last Updated
10/04/2022 7:00 PM

US30: MP 17.68

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) Effective March 12, 2021, US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 11 tons for all vehicles.
Last Updated
10/04/2022 7:00 PM

US30: MP 18.21

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 18.21 (East Multnomah Falls Bridge) Effective March 12, 2021 , US30 (Historic Columbia River Hwy) crossing East Multnomah Falls Bridge is restricted to 20,000 lbs. single axle; 34,000 lbs. tandem axle; Weight Table 2.
Last Updated
10/04/2022 7:00 PM

US30: MP 20.39

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
10/04/2022 7:00 PM

US30: MP 23.15

Commercial Vehicle Information
Informational only
Details
US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
Last Updated
10/04/2022 7:00 PM

US30: MP 26.96 to 25.8

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Expect delays and lane closures. Traffic on U.S. 30 will not be detoured. The intersections of U.S. 30 and Millard Road and/or U.S. 30 and Bennett Road will be impacted at various times during construction. Work will be done Monday through Friday, from 6 a.m. to 5 p.m. There may be night work needed.
Last Updated
7/28/2022 6:42 AM

US30: MP 30.42

Commercial Vehicle Information
Informational only
Details
US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective October 28, 2019, Bridge of the Gods at US30 MP 30.42 is restricted to the following weights: 25 tons Type 3; 25 tons SU4 (4 axle single-unit trucks); 27 tons SU5 & SU6 (5 and 6 axle single-unit trucks); 28 tons SU7 (7 axle single-unit trucks); 40 tons Type 3S2; 40 tons Type 3-3. This bridge belongs to the Port of Cascade Locks.
Last Updated
10/04/2022 7:00 PM

US30: MP 48.67

Commercial Vehicle Information
Informational only
Details
US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Last Updated
10/04/2022 7:00 PM

US30: MP 51.24 to 52.04

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution.
Last Updated
9/26/2022 8:04 AM

US30: MP 51.79 to 52.04

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.79 to MP 52.04 (Baker City) On Saturday, October 8, 2022, this section of US30 northbound and southbound will be closed between the hours of 2 PM & 8 PM, for one day only, for the Taste of Downtown Baker City Event.
Last Updated
10/04/2022 7:00 PM

US30: MP 51.79 to 52.04

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.79 to MP 52.04 (Baker City) On Monday, October 31, 2022, this section of US30 northbound and southbound will be closed between the hours of 3:30 PM & 6:30 PM, for one day only, for the Baker City Annual Trick or Treat Event.
Last Updated
10/04/2022 7:00 PM

US30: MP 57.281

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 57.28 (Rock Creek Bridge - Mosier) Effective December 17, 2019, US30 (Historic Columbia River Hwy) crossing Rock Creek Bridge at MP 57.28 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 31 tons for SU6 vehicles (6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

US30: MP 57.84

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 57.84 (Mosier Creek Bridge - Mosier) Effective December 17, 2019, US30 (Historic Columbia River Hwy) crossing Mosier Creek Bridge at MP 57.28 is restricted to the following weights: 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

US30: MP 98.79 to 98.94

Construction Work
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
10/03/2022 6:30 PM

US30BY: MP 3 to 5

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime lane or shoulder closures.
Last Updated
9/26/2022 6:45 AM

US30BY: MP 5.34

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts.
Last Updated
10/02/2022 7:55 AM

US395: NB MP 0.09 to 1.48

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Expect intermittent daytime shoulder and/or lane closures. Use caution.
Last Updated
9/26/2022 8:07 AM

US395: MP 0.6 to 0.85

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
9/26/2022 9:11 AM

US730: MP 182.71 to 183.34

Commercial Vehicle Information
Informational only
Details
US730 EB & WB MP 182.71 to MP 183.34 (Umatilla) On Friday October 28, 2022, this section of US730 eastbound and westbound, between "B" Street and "J" Street, will be closed, for one day only, between the hours of 3:45 PM and 6:45 PM for a downtown trick or treat event.
Last Updated
10/04/2022 7:00 PM

US97: MP 124.4 to 133.51

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Deceleration lanes at Quarry Ave and 61st St from US97 Southbound. Acceleration lane from 61st St to US97 southbound to provide greater merge distance, median barrier installation south of the Tumalo Road Interchange. A turn around from US97 southbound to northbound.
Last Updated
10/01/2022 12:38 AM

US97: SB MP 143.68 to 164.17

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. ODOT will be installing Road and Weather Information System (RWIS), speed sensors, travel time readers and changeable message signs.
Last Updated
10/01/2022 12:38 AM

US97: NB MP 153.11 to 156.26

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Project: Construction of 2 lane NB alignment to extend the divided section. Construct 2 wildlife undercrossing bridges. Install wildlife fencing. Construction of new intersection of US97 and Vandevert Rd.
Last Updated
9/22/2022 10:01 AM

US97: MP 252.44 to 278.81

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 2 Lanes
Comments
Road construction is occurring causing no to minimum delays. Use caution. Bridge work on Nevada Street Bridge at MP 273.62 and USBR Bridge at MP 273.71. Traffic Control installed on Nevada Street/Oregon Avenue work will be done behind concrete barrier, no delays expected. US97: lane shift traffic control installed, bridge work will be done behind the barrier, no delays expected.
Last Updated
9/12/2022 8:00 PM

US97: MP 267.41 to 268.73

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 2 Lanes
Comments
Road construction is occurring. Use caution. Pipe work at MP 267.41 to MP 268.73, 24 hour flagging zone expect 20 minute delays Monday thru Friday.
Last Updated
9/12/2022 7:55 PM

ORE104: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Last Updated
10/04/2022 7:00 PM

ORE120: MP 0.38

Commercial Vehicle Information
Informational only
Details
OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) Effective February 12, 2019, OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to the following weights: 18 tons Type 3, 18 tons SU4, SU5, SU6, & SU7, 28 tons Type 3S2, 35 tons Type 3-3.
Last Updated
10/04/2022 7:00 PM

ORE126: MP 15.19

Commercial Vehicle Information
Informational only
Details
OR126 Right-of-Way MP 15.19 (Knowles Creek Bridge, east of Mapleton) Effective December 1, 2015, all vehicles must be centered on the bridge when crossing. This bridge is NOT on the OR126 mainline.
Last Updated
10/04/2022 7:00 PM

ORE126: MP 15.84

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 15.84 (Prineville) Effective August 5, 2020, this section of OR126 eastbound and westbound is restricted to 16 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 16 feet 00 inches in width. Loads wider than 16 feet and/or 135 feet in overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
10/04/2022 7:00 PM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) Effective March 17, 2022, OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge at MP 3.23 is restricted to the following weights: 23 tons for SU4 vehicles (4 axle single-unit trucks); 25 tons for SU5 & SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE130: MP 3.6

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) Effective October 23, 2020, OR130 crossing Squaw Creek Bridge at MP 3.60 is restricted to the following weights: 25 tons for SU4 vehicles (4 axle single-unit trucks); 26 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE130: MP 3.82

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
10/04/2022 7:00 PM

ORE130: MP 4.15

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) Effective July 18, 2022, OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge at MP 4.15 is restricted to the following weights: 23 tons for SU4 (4 axle single-unit trucks), 25 tons for SU5 (5 axle single-unit trucks), 27 tons for SU6 & SU7 (6 and 7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE130: MP 4.76

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
10/04/2022 7:00 PM

ORE138: MP 17.95

Commercial Vehicle Information
Informational only
Details
OR138 EB & WB MP 17.95 (Lone Rock Bridge - Glide) Effective October 3, 2022, this section of OR138 eastbound and westbound, across the Lone Rock Bridge, will be restricted to 14 feet 00 inches in height at all hours, structural steel repairs on the existing Lone Rock Bridge, will prevent loads from straddling the center line. The estimated completion date for this work is March 1, 2023.
Last Updated
10/04/2022 7:00 PM

ORE138: EB MP 22 to 38

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Use caution in this wildfire recovery work zone. Ongoing activities include hazard tree removal, cleanup, and maintenance operations. Watch for intermittent lane closures from milepost 22 to 38 and expect delays up to 20 minutes. Flaggers and pilot cars will provide traffic control as needed.
Last Updated
9/12/2022 8:18 PM

ORE140: MP 3.74 to 4.75

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Earthwork, paving, curbs and pipe work on Brett Way and Wings Way, expect minor delays.
Last Updated
9/12/2022 8:15 PM

ORE140: WB MP 8.46

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Expect delays due to flaggers and temporary signals at the bridges over both Little Butte Creek (MP 7.8) and Lick Creek (MP 9.2). This project will also seismically strengthen the bridge at N. Fork Little Butte Creek (MP 15.44). This project seismically strengthens the following bridges: Little Butte Creek (MP 7.75), Lick Creek MP 9.15), N. Fork Little Butte Creek (15.44).
Last Updated
9/12/2022 8:04 PM

ORE140: MP 15.44

Commercial Vehicle Information
Informational only
Details
OR140 EB & WB MP 15.30 to MP 15.60 (White City) Effective May 26, 2022, this section of OR140 eastbound and westbound will be intermittently restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is October 5, 2022.
Last Updated
10/04/2022 7:00 PM

ORE140: MP 18.23 to 18.25

Commercial Vehicle Information
Informational only
Details
OR140 EB & WB MP 18.00 to MP 19.00 (Klamath Falls) Effective August 29, 2022, this section of OR140 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Thursday between the hours of 6:00 AM & 5:30 PM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 1, 2022.
Last Updated
10/04/2022 7:00 PM

ORE141: MP 2.83 to 4.09

Construction Work
Estimated delay under 20 minutes
Comments
Single lane closures weekdays. Single lane closures with flaggers directing traffic from 8:30 a.m. to 3:30 p.m. weekdays between Greenburg Road and Washington Drive. Single lane closures from 9 a.m. to 2:30 p.m. weekdays between Scholls Ferry and Greenburg Road.
Last Updated
10/02/2022 7:52 AM

ORE153: MP 5.88

Maintenance Work
Closure with Detour
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Bridge work has the highway closed; a detour is in place. Use an alternate route.
Last Updated
6/09/2022 8:04 AM

ORE153: MP 5.88

Commercial Vehicle Information
Informational only
Details
OR153 (Bellevue-Hopewell Hwy) MP 5.88 (Salt Creek Bridge - west of Amity) Effective June 18, 2020, OR153 crossing Salt Creek (Ash Swale) Bridge at MP 5.88 is restricted to 9 tons for all vehicles.
Last Updated
10/04/2022 7:00 PM

ORE153: MP 5.88

Commercial Vehicle Information
Informational only
Details
OR153 EB & WB MP 5.88 (Salt Creek Bridge - Amity) Effective May 31, 2022, this section of OR153 eastbound and westbound will be closed at all hours. The estimated completion date for this project is September 15, 2023.
Last Updated
10/04/2022 7:00 PM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
10/04/2022 7:00 PM

ORE18: MP 45.63

Commercial Vehicle Information
Informational only
Details
OR18 MP 45.63 (S Yamhill River Bridge - McMinnville) Effective November 3, 2022, this section of OR18 eastbound will be restricted to 16 feet 00 inches in width at night between the hours of 8 PM and 10 PM. The estimated completion date for this work is November 3, 2022.
Last Updated
10/04/2022 7:00 PM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) Effective November 3, 2022, this section of OR18 eastbound will be restricted to 16 feet 00 inches in width at night between the hours of 10 PM and 1 AM. The estimated completion date for this project is November 4, 2022.
Last Updated
10/04/2022 7:00 PM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
10/04/2022 7:00 PM

ORE211: MP 12.3 to 13.4

Construction Work
No to Minimum Delay
Comments
Lane shifts with bike and pedestrian detours at Beach in Estacada and Metzler, Swiegle and Mathias in Molalla
Last Updated
10/02/2022 7:53 AM

ORE212: EB MP 4.92 to 8.15

Construction Work
Estimated delay under 20 minutes
Comments
Daytime single lane closures on OR 212 and side streets. Project Description: We are installing modern traffic signal controllers, additional vehicle radar detection equipment and traffic monitoring cameras along on OR 212 (Clackamas Highway) from OR 213 (SE 82nd Drive) to Rock Creek Junction (OR 224). The new equipment will allow ODOT engineers and technicians to monitor traffic signal performance, manage congestion and improve safety along this corridor.
Last Updated
9/26/2022 6:50 AM

ORE213: MP 0.48 to 0.5

Construction Work
No to Minimum Delay
Comments
Intermittent lane closures during non-peak hours expected for one month in Fall 2022. ODOT is improving safety for people walking, biking and rolling at the intersection of NE 82 Avenue and NE Alberta Street in Portland.
Last Updated
7/26/2022 4:21 PM

ORE213: MP 2.23

Commercial Vehicle Information
Informational only
Details
OR213 (NE 82nd Ave) MP 2.24 (UPRR Bridge - Portland) Effective November 21, 2019, OR213 crossing UPRR Bridge at MP 2.23 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE213: MP 15.71

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 15.60 to MP 15.80 (Molalla) Effective August 1, 2022, this section of OR213 northbound and southbound will be restricted to 10 feet 00 inches in width at all hours. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2022.
Last Updated
10/04/2022 7:00 PM

ORE213: MP 15.8 to 15.9

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder
Comments
Single lane closures with automated flaggers directing traffic.
Last Updated
9/26/2022 6:51 AM

ORE217: SB MP 2 to 6

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Periodic nighttime single lane closures on OR 217 south between Scholls Ferry Road and Greenburg Road Friday night. Left-turns closed to/from the Allen Boulevard southbound ramps 24/7 through fall 2022. Daytime shoulder closures on OR 217 and local roads near the highway ramps. On- and off-ramps temporarily narrowed. Short-term pedestrian detours on the north side of Hall Boulevard near Cascade Avenue and the north side of the Denney Road overpass.
Last Updated
10/02/2022 7:55 AM

ORE217: MP 2.26 to 2.7

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 2B on- and off-ramps to/from Allen Blvd (Beaverton) Effective January 1, 2022, the OR217 southbound Exit 2B on- and off-ramps to/from Allen Boulevard will be intermittently restricted to 13 feet 00 inches in width at all hours. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 17, 2022.
Last Updated
10/04/2022 7:00 PM

ORE217: MP 2.78 to 3.26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 3 on- and off-ramps to/from Denney Rd (Beaverton) Effective May 19, 2022, the OR217 southbound Exit 3 on- and off-ramps to/from Denney Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 30, 2022.
Last Updated
10/04/2022 7:00 PM

ORE217: MP 3.56

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4A off-ramp to Hall Blvd (Beaverton) Effective January 24, 2022, the OR217 southbound Exit 4A off-ramp to Hall Boulevard will be intermittently restricted to 13 feet 00 inches in width at all hours. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 31, 2022.
Last Updated
10/04/2022 7:00 PM

ORE217: MP 3.83

Commercial Vehicle Information
Informational only
Details
OR217 SB on-ramp from Hall Blvd (Beaverton) Effective January 19, 2022, the OR217 southbound on-ramp from Hall Boulevard will be intermittently restricted to 13 feet 00 inches in width at all hours. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 31, 2022.
Last Updated
10/04/2022 7:00 PM

ORE217: MP 4.12 to 4.51

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Rd (Beaverton) Effective January 19, 2022, the OR217 southbound Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Road will be intermittently restricted to 13 feet 00 inches in width at all hours. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 31, 2022.
Last Updated
10/04/2022 7:00 PM

ORE217: MP 4.78 to 5.17

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 5 on- and off-ramps to/from Greenburg Rd (Beaverton) Effective January 26, 2022, the OR217 southbound Exit 5 on- and off-ramps to/from Greenburg Road will be intermittently restricted to 13 feet 00 inches in width at all hours. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 31, 2022.
Last Updated
10/04/2022 7:00 PM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
10/04/2022 7:00 PM

ORE219: MP 35.8 to 36.5

Construction Work
Closure with Detour
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction has closed the road; a detour is in place. Use an alternate route. Eastbound traffic to use Butteview Rd.
Last Updated
8/24/2022 2:19 PM

ORE219: MP 36.24 to 0.41

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring. Use caution. ADA ramp replacement (removal and replacement of existing sidewalk facilities). Work is expected to occur during the day Monday through Friday from 5:00am to 4:00pm. Highway shoulders along both sides of the 99E may be intermittently closed around intersections of adjacent streets, with active travel lanes remaining open. Pedestrian facilities will remain open to foot traffic. Both sides of the OR214 through East Woodburn may have intermittent lane and shoulder closures while vehicle travel in either direction will still be maintained. Bikes and pedestrians may be placed on the roadway around active construction areas. Pedestrians can expect minor detours across the highway around closed sidewalk sections.
Last Updated
9/08/2022 9:30 PM

ORE22: MP 0.33

Commercial Vehicle Information
Informational only
Details
OR22 MP 0.33 (Yamhill River Bridge - Willamina) Effective November 2, 2022, this section of OR22 westbound will be restricted to 10 feet 00 inches in width at night between the hours of 8 PM and 10 PM. Loads over 10 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 2, 2022.
Last Updated
10/04/2022 7:00 PM

ORE22: MP 0.65

Maintenance Work
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
9/26/2022 9:32 AM

ORE22: MP 1.47

Commercial Vehicle Information
Informational only
Details
OR22 MP 1.47 (Cedar Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Cedar Creek Bridge at MP 1.47 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE22: MP 2.8 to 8

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
10/04/2022 1:30 PM

ORE22: MP 5.81

Commercial Vehicle Information
Informational only
Details
OR22 MP 5.81 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 5.81 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE22: MP 6.43

Commercial Vehicle Information
Informational only
Details
OR22/OR99E Bus SB/EB on-ramp from 12th St & 13th St (Salem) Effective October 3, 2022, the OR22/OR99E Bus SB/EB on-ramp from 12th street and 13th street will be closed between the hours of 11 PM & 1 AM. The estimated completion date for this work is October 4, 2022.
Last Updated
10/04/2022 7:00 PM

ORE22: MP 7.19

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.19 (Buck Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Buck Creek Bridge at MP 7.19 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE22: MP 7.32

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.32 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 7.32 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE22: MP 10.49

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
10/04/2022 7:00 PM

ORE22: MP 10.66

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
10/04/2022 7:00 PM

ORE22: MP 25.63

Commercial Vehicle Information
Informational only
Details
OR22 WB MP 25.15 to MP 25.63 (Salem) Effective July 24, 2022 , this section of OR22 westbound will be intermittently restricted to 21 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 7 AM. Loads over 21 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 11, 2022.
Last Updated
10/04/2022 7:00 PM

ORE22: MP 25.63

Commercial Vehicle Information
Informational only
Details
OR22 WB MP 25.15 to MP 25.63 (Salem) Effective July 27, 2022, the OR22 westbound 2 lane portion after the OR221 west end split of the bridge will be intermittently closed Sunday Night Through Friday Morning between the hours of 8 PM and 7 AM. The estimated completion date for this project is October 31, 2022. (Note: There are 3 other additional OR22 westbound ramp closures taking place in the area, however these ramps will not be closed at the same times as their specified detour routes).
Last Updated
10/04/2022 7:00 PM

ORE22: MP 25.63

Commercial Vehicle Information
Informational only
Details
OR22 WB MP 25.15 to MP 25.63 (Salem) Effective July 24, 2022 , this section of OR22 westbound will be intermittently restricted to 21 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 7 AM. Loads over 21 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 11, 2022.
Last Updated
10/04/2022 7:00 PM

ORE22: MP 25.63

Commercial Vehicle Information
Informational only
Details
OR22 WB MP 25.15 to MP 25.63 (Salem) Effective July 27, 2022, the OR22 westbound 2 lane portion after the OR221 west end split of the bridge will be intermittently closed Sunday Night Through Friday Morning between the hours of 8 PM and 7 AM. The estimated completion date for this project is October 31, 2022. (Note: There are 3 other additional OR22 westbound ramp closures taking place in the area, however these ramps will not be closed at the same times as their specified detour routes).
Last Updated
10/04/2022 7:00 PM

ORE22: MP 25.63

Commercial Vehicle Information
Informational only
Details
OR22 WB MP 25.15 to MP 25.63 (Salem) Effective July 24, 2022 , this section of OR22 westbound will be intermittently restricted to 21 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 7 AM. Loads over 21 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 11, 2022.
Last Updated
10/04/2022 7:00 PM

ORE22: MP 25.63

Commercial Vehicle Information
Informational only
Details
OR22 WB MP 25.15 to MP 25.63 (Salem) Effective July 27, 2022, the OR22 westbound 2 lane portion after the OR221 west end split of the bridge will be intermittently closed Sunday Night Through Friday Morning between the hours of 8 PM and 7 AM. The estimated completion date for this project is October 31, 2022. (Note: There are 3 other additional OR22 westbound ramp closures taking place in the area, however these ramps will not be closed at the same times as their specified detour routes).
Last Updated
10/04/2022 7:00 PM

ORE22: MP 25.81

Commercial Vehicle Information
Informational only
Details
OR22 WB off-ramp to OR221 (Salem) Effective July 27, 2022, the OR22 westbound off-ramp to OR221 northbound will be intermittently closed Sunday Night Through Friday Morning between the hours of 8 PM and 7 AM. The estimated completion date for this project is October 31, 2022. (Note: There are 3 other additional OR22 westbound ramp closures taking place in the area, however these ramps will not be closed at the same times as their specified detour routes).
Last Updated
10/04/2022 7:00 PM

ORE22: WB MP 25.93

Maintenance Work
Estimated delay of 20 minutes - 2 hours
On Ramp
Comments
Road maintenance operations are occurring. Use caution. Ramps Affected. Detours are in place. Follow detour signage. Night work from 7/26 through 10/31 nightly 8 p.m. to 7 a.m. Sunday night through Friday morning.
Last Updated
9/16/2022 7:41 AM

ORE22: MP 25.97

Commercial Vehicle Information
Informational only
Details
OR22 EB Exit to EB OR22/SB OR99E Bus (Salem) October 3, 2022, the OR22 eastbound Exit to EB OR22/SB OR99E Business will be closed at night between the hours of 8 PM & 3 AM. The estimated completion date for this work is October 4, 2022.
Last Updated
10/04/2022 7:00 PM

ORE22: MP 26.07

Commercial Vehicle Information
Informational only
Details
OR22 WB on-ramp from Front St (Salem) Effective July 27, 2022, the OR22 westbound on-ramp from Front Street will be intermittently closed Sunday Night Through Friday Morning between the hours of 8 PM and 7 AM. The estimated completion date for this project is October 31, 2022. (Note: There are 3 other additional OR22 westbound ramp closures taking place in the area, however these ramps will not be closed at the same times as their specified detour routes).
Last Updated
10/04/2022 7:00 PM

ORE22: MP 26.18

Commercial Vehicle Information
Informational only
Details
OR22 WB on-ramp from Commercial Street (Salem) Effective July 27, 2022, the OR22 westbound on-ramp from Commercial Street will be intermittently closed Sunday Night Through Friday Morning between the hours of 8 PM and 7 AM. The estimated completion date for this project is October 31, 2022. (Note: There are 3 other additional OR22 westbound ramp closures taking place in the area, however these ramps will not be closed at the same times as the specified detour routes).
Last Updated
10/04/2022 7:00 PM

ORE221: MP 17.55 to 20.78

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
9/27/2022 7:54 PM

ORE221: MP 20.78

Commercial Vehicle Information
Informational only
Details
OR221 SB off-ramp to OR22 EB (Salem) Effective October 3, 2022, the OR221 southbound off-ramp to OR22 eastbound will be closed at night between the hours of 8 PM & 3 AM. The estimated completion date for this work is October 4, 2022
Last Updated
10/04/2022 7:00 PM

ORE223: MP 10.11

Commercial Vehicle Information
Informational only
Details
OR223 MP 10.11 (Little Luckiamute River Bridge - south of Dallas) Effective November 29, 2018, OR223 crossing Little Luckiamute River Bridge at MP 10.11 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE224: EB MP 0.01 to 4.11

Construction Work
Estimated delay under 20 minutes
Comments
Daytime single lane closures on OR 224 and side streets. Project Description: We are installing modern traffic signal controllers, additional vehicle radar detection equipment and traffic monitoring cameras along Oregon 224 (Milwaukie Expressway) from SE 17th Avenue to I-205. We are also adding new thermal imaging sensors at five signalized intersections on OR 224 to detect bicyclists and trigger longer green lights, allowing them more time to cross wide intersections. The new equipment will allow ODOT engineers and technicians to monitor traffic signal performance, manage congestion and improve safety along this corridor.
Last Updated
9/26/2022 6:53 AM

ORE224: MP 4.12 to 4.46

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
9/07/2022 3:33 PM

ORE224: MP 31 to 49.97

Maintenance Work
Informational only
Comments
Wildfire recovery work continues. Expect road construction delays up to 20 minutes at multiple work zones, seven days a week. U.S. Forest Service Hole in the Wall and Moore Creek boat access day sites are open. All other Forest Service sites are closed through 2022. USFS roads 46 and 57 remain closed.
Last Updated
7/01/2022 12:43 PM

ORE224: MP 49.911

Commercial Vehicle Information
Informational only
Details
OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE228: MP 20.59 to 21.38

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. During construction expect delays up to 20 minutes. Work is expected to occur Monday through Friday, between 7:00am to 5:00pm.
Last Updated
7/21/2022 8:13 PM

ORE241: MP 4.5 to 6.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. This two-year (2021-22) project will replace 15 culverts and 12 tide-gates as well as repair five existing culverts. Construction in 2022 will involve replacing five culverts and tide gates, and adding liners to several others. Starting Monday, July 11, watch for intermittent lane closures through the work zone. Some delays will be 5-10 minutes, but 20-minute delays may be necessary at times. Traffic control will be provided by flaggers.
Last Updated
9/26/2022 8:55 PM

ORE245: MP 3.42

Commercial Vehicle Information
Informational only
Details
OR245 MP 3.42 (Burnt River Bridge - Unity Dam) Effective March 11, 2022, OR245 crossing Burnt River Bridge is restricted to the following weights: 23 tons for SU4 (4 axle single-unit trucks); 24 tons for SU5 and SU6 (5 and 6 axle single-unit trucks); 28 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE27: MP 1.9

Commercial Vehicle Information
Informational only
Details
OR27 MP 1.90 (Irrigation Ditch - Prineville) Effective March 17, 2022, OR27 crossing Irrigation Ditch at MP 1.90 is restricted to the following weights: 19 tons for Type 3 vehicles (3 axle single-unit trucks); 17 tons for SU4 & SU5 (4 and 5 axle single-unit trucks); 18 tons for SU6 (6 axle single-unit trucks); 19 tons for SU7 (7 axle single-unit trucks); 27 tons Type 3-S2 (truck tractor/semitrailer); 36 tons Type 3-3 (truck and trailer).
Last Updated
10/04/2022 7:00 PM

ORE27: MP 2.88

Commercial Vehicle Information
Informational only
Details
OR27 MP 2.88 (Irrigation Ditch - Prineville) Effective March 17, 2022, OR27 crossing Irrigation Ditch at MP 2.88 is restricted to the following weights: 19 tons for Type 3 vehicles (3 axle single-unit trucks); 17 tons for SU4 & SU5 (4 and 5 axle single-unit trucks); 18 tons for SU6 (6 axle single-unit trucks); 19 tons for SU7 (7 axle single-unit trucks); 27 tons Type 3-S2 (truck tractor/semitrailer); 36 tons Type 3-3 (truck and trailer).
Last Updated
10/04/2022 7:00 PM

ORE27: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR27 MP 4.62 (Irrigation Ditch - Prineville) Effective March 17, 2022, OR27 crossing Irrigation Ditch at MP 4.62 is restricted to the following weights: 19 tons for Type 3 vehicles (3 axle single-unit trucks); 17 tons for SU4 & SU5 (4 and 5 axle single-unit trucks); 18 tons for SU6 (6 axle single-unit trucks); 19 tons for SU7 (7 axle single-unit trucks); 27 tons Type 3-S2 (truck tractor/semitrailer); 36 tons Type 3-3 (truck and trailer).
Last Updated
10/04/2022 7:00 PM

ORE27: MP 27.23

Commercial Vehicle Information
Informational only
Details
OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) Effective May 27, 2021, OR27 crossing Bear Creek Bridge is restricted to the following weights: 34 tons for SU6 vehicles (6 axle single-unit trucks); 35 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE281: MP 12.9

Commercial Vehicle Information
Informational only
Details
OR281 MP 12.90 (E Fork Hood River Bridge - Dee) Effective March 26, 2021, OR281 crossing E Fork Hood River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 36 tons for SU7 vehicles.
Last Updated
10/04/2022 7:00 PM

ORE334: MP 17.34

Commercial Vehicle Information
Informational only
Details
OR334 NB & SB MP 17.34 to MP 17.48 (Athena) On October 31, 2022, this section of OR334 northbound and southbound will be closed between the hours of 3 PM & 8 PM for a Trunk or Treat event for one day only.
Last Updated
10/04/2022 7:00 PM

ORE339: MP 3.16

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
10/04/2022 7:00 PM

ORE339: MP 3.31

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
10/04/2022 7:00 PM

ORE34: MP 0.13

Commercial Vehicle Information
Informational only
Details
Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Effective March 24, 2021, Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 12 tons for all vehicles.
Last Updated
10/04/2022 7:00 PM

ORE35: MP 101.82

Commercial Vehicle Information
Informational only
Details
OR35 crossing Columbia River (White Salmon) Bridge - Hood River Effective February 3, 2021, OR35 crossing the Columbia River (White Salmon) Bridge is restricted to the following weights: 24 tons for Type 3 (3 axle single-unit trucks); 22 tons for SU4 (4 axle single-unit trucks); 24 tons for SU5 (5 axle single-unit trucks); 25 tons for SU6 & SU7 (6 and 7 axle single-unit trucks); 32 tons for Type 3S2 (truck tractor/semitrailer) & Type 3-3 (truck and trailer vehicles). This bridge belongs to Port of Hood River.
Last Updated
10/04/2022 7:00 PM

ORE38: MP 16

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project replaces the 1929 Scottsburg Bridge on a new alignment. During construction, Oregon 38 will remain open at all times. Oregon 38 is limited to a single lane through the work zone. Watch for a temporary traffic signal or flaggers. Use caution and watch for stopped traffic. Expect delays up to 20 minutes. Main Street is now closed for demolition of the old bridge. A short section of Scottsburg West Road is open. Lutsinger Creek Road remains open and access is marked in a temporary location while road construction continues. Side road traffic need to wait for the pilot car before proceeding.
Last Updated
9/12/2022 8:07 PM

ORE42: MP 9.6 to 15.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will repave more than five miles of Oregon 42 through Coquille, level the roadway between West Central Blvd. and the Oregon 42S junction (milepost 9.9-10.8), replace ADA sidewalk ramps and make other improvements. Oregon 42 is limited to one lane in each direction between West Central Blvd. and the Oregon 42S junction. At times, this area may be limited to a single travel lane, with flaggers providing traffic control. Watch for congestion and expect delays. The lane closures will allow workers to replace a 48” culvert. Watch for intermittent lane closures in the two-mile section of Oregon 42 between Cedar Point Road and 4th Ct. for paving work. Flaggers will provide traffic control as needed. Expect delays and drive with caution through the work zone.
Last Updated
9/12/2022 8:16 PM

ORE42: MP 35.44 to 35.59

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
8/23/2022 9:50 PM

ORE42: MP 45 to 52

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project paves seven miles of highway (MP 45.8-52.6), repairs 11 bridges, repairs a slide area (MP 49.5) and adds protective rock screen (MP 50.0). Construction is scheduled for completion in September. Watch for intermittent lane closures with flaggers and delays, Monday-Thursday (7 a.m. to 6 p.m.) and Friday (7 a.m. to 3 p.m.).
Last Updated
9/12/2022 7:57 PM

ORE42: MP 76.5

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
10/05/2022 3:04 AM

ORE43: MP 11.37 to 11.55

Construction Work
Informational only
Comments
OR 43 Arch Bridge will be closed to vehicle traffic Sat, Oct. 1, 7 a.m. to 3 p.m. for the Arch Bridge Centennial Celebration.
Last Updated
9/29/2022 2:31 PM

ORE43: MP 11.43

Commercial Vehicle Information
Informational only
Details
OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) Effective September 1, 2021, OR43 crossing the Willamette River Arch Bridge is restricted to the following weights: 25 tons for Type 3 (3 axle single-unit trucks); 23 tons for SU4 (4 axle single-unit trucks); 25 tons for SU5 (5 axle single-unit trucks); 26 tons for SU6 & SU7 (6 and 7 axle single-unit trucks); 40 tons Type 3S2 (truck tractor/semitrailer); 40 tons for Type 3-3 (truck and trailer vehicles).
Last Updated
10/04/2022 7:00 PM

ORE47: MP 21.77

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
9/01/2022 8:35 AM

ORE47: MP 21.89

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
9/01/2022 9:00 AM

ORE47: MP 61.28

Commercial Vehicle Information
Informational only
Details
OR47 NB & SB MP 61.28 (Nehalem River Bridge - Vernonia) Effective April 18, 2022, this section of OR47 northbound and southbound, across the Nehalem River bridge, will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2022.
Last Updated
10/04/2022 7:00 PM

ORE47: MP 61.28

Commercial Vehicle Information
Informational only
Details
OR47 NB & SB MP 61.28 (Nehalem River Bridge - Vernonia) Effective April 18, 2022, this section of OR47 northbound and southbound, across the Nehalem River bridge, will be restricted to 14 feet 00 inches in height at all hours, structural steel repairs and painting on the existing Nehalem River Bridge, will prevent loads from straddling the center line. The estimated completion date for this project is October 31, 2022.
Last Updated
10/04/2022 7:00 PM

ORE47: MP 61.28

Commercial Vehicle Information
Informational only
Details
OR47 MP 61.28 (Nehalem River Bridge - Vernonia) Effective March 18, 2022, OR47 crossing Nehalem River Bridge at MP 61.28 is restricted to the following weights: 23 tons for SU4 (4 axle single-unit trucks); 26 tons for SU5 (5 axle single-unit trucks); 29 tons for SU6 & SU7 (6 and 7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE47: MP 64.6

Commercial Vehicle Information
Informational only
Details
OR47 MP 64.60 (Beaver Creek Bridge - south of Vernonia) Effective September 23, 2019, OR47 crossing Beaver Creek Bridge at MP 64.60 is restricted to the following weights: 31 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE47: MP 82.6

Maintenance Work
Closure
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Bridge work has the highway closed. Use alternate routes. Northbound traffic can take OR 6 to southbound U.S. 26, use Exit 55 onto NW Dersham Road and left onto northbound U.S. 26. Southbound traffic can take U.S. 26 to OR 6. Sellers Road is closed to local access only.
Last Updated
6/29/2022 4:42 PM

ORE47: MP 82.65

Commercial Vehicle Information
Informational only
Details
OR47 NB & SB MP 82.53 to MP 82.76 (West Fork Dairy Creek Bridge - Banks) Effective Monday May 16, 2022, this section of OR47 northbound and southbound will be closed at all hours. The estimated completion date for this project is September 30, 2022.
Last Updated
10/04/2022 7:00 PM

ORE47: MP 86.34

Commercial Vehicle Information
Informational only
Details
OR47 MP 86.34 (West Fork Dairy Creek Bridge - north of Forest Grove) Effective March 21, 2022, OR47 crossing West Fork Dairy Creek Bridge at MP 86.34 is restricted to the following weights: 28 tons for SU5 & SU6 (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE47: MP 88.05

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
10/04/2022 7:00 PM

ORE501: MP 0.1

Commercial Vehicle Information
Informational only
Details
OR501 MP 0.10 (North Fork Alsea River Bridge - Alsea) Effective February 24, 2022, OR501 crossing the North Fork Alsea River Bridge is restricted to 33 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) Effective September 23, 2019, OR53 crossing Jack Horner Creek Bridge at MP 5.98 is restricted to the following weights: 26 tons for SU4 (4 axle single-unit trucks); 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE53: MP 17.76

Commercial Vehicle Information
Informational only
Details
OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE53: MP 19 to 11

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
7/14/2022 7:57 AM

ORE569: MP 7.63

Commercial Vehicle Information
Informational only
Details
OR569 EB MP 7.63 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 18 feet 2 inches in height, Sunday through Thursday nights between the hours of 9:30 PM & 5:00 AM. Loads over 18 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
10/04/2022 7:00 PM

ORE569: MP 8.25 to 10.08

Commercial Vehicle Information
Informational only
Details
OR569 EB & WB MP 8.10 to MP 10.10 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 9:30 PM & 5:00 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
10/04/2022 7:00 PM

ORE569: EB MP 8.5

Construction Work
No to Minimum Delay
Off Ramp
Comments
Road construction is occurring causing no to minimum delays. Use caution. Ramps Affected. Intermittent ADA ramp and traffic signal work throughout the end of the year.
Last Updated
9/22/2022 2:36 PM

ORE569: EB MP 8.7 to 11.6

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Barrier work: Left lane closed between MP 8.7 – MP 11.6 for both Eastbound and Westbound lanes starting at 8 PM – 5 AM.
Last Updated
8/31/2022 2:33 PM

ORE569: MP 10.64

Commercial Vehicle Information
Informational only
Details
OR569 EB MP 10.64 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 15 feet 6 inches in height, Sunday through Thursday nights between the hours of 9:30 PM & 5:00 AM. Loads over 15 feet 6 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
10/04/2022 7:00 PM

ORE569: MP 10.64 to 11.66

Commercial Vehicle Information
Informational only
Details
OR569 EB & WB MP 10.10 to MP 11.68 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM & 5:00 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
10/04/2022 7:00 PM

ORE569: MP 10.64

Commercial Vehicle Information
Informational only
Details
OR569 EB MP 10.64 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 15 feet 6 inches in height, Sunday through Thursday nights between the hours of 9:30 PM & 5:00 AM. Loads over 15 feet 6 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
10/04/2022 7:00 PM

ORE569: MP 10.64 to 11.66

Commercial Vehicle Information
Informational only
Details
OR569 EB & WB MP 10.10 to MP 11.68 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM & 5:00 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
10/04/2022 7:00 PM

ORE58: MP 56 to 70

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Use caution. Paving work is occurring during the day between 6:00 am and 8:00 pm Monday through Friday. Expect delays of up to 20 minutes.
Last Updated
9/27/2022 10:02 AM

ORE7: MP 4 to 5

Traffic Congestion
No to Minimum Delay
Comments
Slow traffic causing no to minimum delays. Use caution.
Last Updated
9/13/2022 9:19 AM

ORE7: MP 48.11

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of an abandoned vehicle creating a hazard has been received. Use caution.
Last Updated
10/04/2022 11:30 PM

ORE8: MP 2.65 to 3.6

Commercial Vehicle Information
Informational only
Details
OR8 EB & WB MP 2.67 to MP 3.60 (Beaverton) Effective August 15, 2022, this section of OR8 (Tualatin Valley Highway) will be restricted to 10 feet 00 inches in width Monday through Friday nights between the hours of 8:00 PM and 5:00 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 31, 2023.
Last Updated
10/04/2022 7:00 PM

ORE8: MP 2.81 to 7

Construction Work
No to Minimum Delay
Comments
Single lane closures from 8 p.m. to 5:30 a.m. weekdays between SW 110th and Watson and at SW 178th and 192nd. Pedestrian detours.
Last Updated
10/03/2022 7:38 AM

ORE82: MP 45.6 to 46.1

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Bike travelers to use caution while passing through Wallowa due to work vehicles and construction equipment on site.
Last Updated
9/26/2022 7:16 AM

ORE82: MP 46.78 to 55.05

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Project consists of upgrading the ADA ramps at various corners throughout Lostine and Wallowa.
Last Updated
9/26/2022 7:29 AM

ORE82: MP 71.14 to 71.42

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
9/26/2022 8:11 AM

ORE86: MP 40.64

Commercial Vehicle Information
Informational only
Details
OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Last Updated
10/04/2022 7:00 PM

ORE99: MP -2.63 to -2.85

Commercial Vehicle Information
Informational only
Details
OR99 MP -2.63 to MP -2.85 (Grants Pass) Effective June 13, 2022 this section of OR99/Scoville Rd Road/7th Street northbound will be intermittently restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is February 24, 2023
Last Updated
10/04/2022 7:00 PM

ORE99: MP -0.36

Commercial Vehicle Information
Informational only
Details
OR99W MP -0.36 (Steel Bridge - Portland) Effective October 28, 2019, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 2 & for Non-Divisible Loads 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3.
Last Updated
10/04/2022 7:00 PM

ORE99: MP -0.14

Commercial Vehicle Information
Informational only
Details
OR99 SB MP -0.13 (Rogue River Bridge - Grants Pass) Effective March 24, 2021, the Rogue River (Caveman) Bridge is restricted to Weight Table 3 weights. All single-trip permits over Weight Table 3 must stop traffic, straddle centerline, and be the only vehicle on the bridge when crossing.
Last Updated
10/04/2022 7:00 PM

ORE99: MP 1.41

Commercial Vehicle Information
Informational only
Details
OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE99: MP 3.25

Commercial Vehicle Information
Informational only
Details
OR99W MP 3.25 (Newbury St Viaduct - Portland) Effective March 17, 2022, OR99W crossing over Newbury Street Viaduct at MP 3.25 is restricted to the following weights: 20 tons for Type 3 vehicles (3 axle single-unit trucks); 18 tons for SU4 (4 axle single-unit trucks; 20 tons for SU5 (5 axle single-unit trucks); 23 tons for SU6 & SU7 (6 and 7 axle single-unit trucks); 30 tons for Type 3-S2 (truck tractor/semitrailer); 40 tons for Type 3-3 (truck and trailer).
Last Updated
10/04/2022 7:00 PM

ORE99: MP 5.78

Construction Work
Closure with Detour
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction has closed the road; a detour is in place. Use an alternate route. Front Street (Creswell)- Construction will begin October 3rd. Night time work 7:00 PM to 7:00 AM. Full closure of the Railroad and Front Street intersection starting Friday, October 7th at 7:00 AM to Tuesday, October 11th 7:00 AM.
Last Updated
10/03/2022 7:00 PM

ORE99: MP 5.78

Commercial Vehicle Information
Informational only
Details
OR99 NB & SB at MP 5.78 (Oregon Ave - Creswell) Effective October 7, 2022, this section of OR99 northbound and southbound, will be closed continuously at all hours. The estimated completion date for this work is October 11, 2022.
Last Updated
10/04/2022 7:00 PM

ORE99: MP 6.81

Commercial Vehicle Information
Informational only
Details
OR99 MP 6.81 (Hill Creek Bridge - Creswell) Effective February 15, 2022, OR99 crossing Hill Creek Bridge is restricted to the following weights: 30 tons for SU6 (6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
10/04/2022 7:00 PM

ORE99: MP 8.621

Commercial Vehicle Information
Informational only
Details
OR99W SB off-ramp to OR217 NB (Tigard) Effective April 13, 2022, the OR99W southbound off-ramp to OR217 northbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this project is October 31, 2022.
Last Updated
10/04/2022 7:00 PM

ORE99: MP 11.11 to 10.91

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 2 Lanes
Comments
Road construction is occurring. Use caution. Watch for single-lane traffic in each direction and construction in the work zone. Concrete is scheduled to be poured for the second half of the bridge early Thursday morning, Aug, 18. The project completion is this October.
Last Updated
9/12/2022 8:10 PM

ORE99: MP 11.63 to 11.81

Commercial Vehicle Information
Informational only
Details
OR99E SB MP 11.63 to MP 11.81 (Portland) Effective October 2, 2022, this section of OR99E southbound will be intermittently restricted to 17 feet 00 inches in width Monday through Friday nights between the hours of 8 PM & 6 AM. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 3, 2022.
Last Updated
10/04/2022 7:00 PM

ORE99: MP 11.81 to 11.63

Commercial Vehicle Information
Informational only
Details
OR99E NB MP 11.63 to MP 11.81 (Portland) Effective October 2, 2022, this section of OR99E northbound will be intermittently restricted to 15 feet 00 inches in width Monday through Friday nights between the hours of 8 PM & 6 AM. Loads over 15 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 3, 2022.
Last Updated
10/04/2022 7:00 PM

ORE99: MP 13.8 to 14.3

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Cottage Grove Urban Upgrade Project: Currently placing storm pipe through the median section. Brief Flagging as needed. Later stages will have sidewalks, sidewalk ramps, illumination, signals and a pedestrian center island with push buttons.
Last Updated
8/31/2022 2:30 PM

ORE99: MP 13.87 to 14.33

Commercial Vehicle Information
Informational only
Details
OR99 NB & SB MP 13.83 to MP 14.33 (Cottage Grove) Effective August 8, 2022, this section of OR99 northbound and southbound will be restricted to 12 feet 00 inches in width Sunday through Saturday between the hours of 9 AM & 4 PM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 30, 2022.
Last Updated
10/04/2022 7:00 PM

ORE99: MP 14.39

Commercial Vehicle Information
Informational only
Details
OR99 MP 14.39 (Wagner Creek Bridge - Talent) Effective February 15, 2022, OR99 crossing Wagner Creek Bridge is restricted to the following weights: 21 tons for Type 3 vehicles (3 axle single-unit trucks); 19 tons SU4 vehicles (4 axle single-unit trucks); 20 tons for SU5 & SU6 (5 and 6 axle-axle single-unit trucks); 22 tons for SU7 (7 axle single-unit trucks); 31 tons Type 3-S2 (truck tractor/semitrailer); 40 tons Type 3-3 (truck and trailer).
Last Updated
10/04/2022 7:00 PM

ORE99: MP 116.74 to 109.77

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Expect survey work this week and drive safe.
Last Updated
9/30/2022 7:34 PM

ORE99E: SB MP 0.4 to 0.45

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Improvements being made to intersection of OR99E and Airport Rd/Albany Ave, including new signals, ADA ramps, and widening work on Airport Rd. Work being done at night, Sunday through Thursday nights from 7:00PM - 6:00AM
Last Updated
6/15/2022 11:13 AM

ORE99E: NB MP 3

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
9/19/2022 8:02 AM

ORE99E: SB MP 4.62 to 12.46

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts.
Last Updated
10/02/2022 7:50 AM

ORE99E: MP 18.97 to 20.13

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. During construction expect lane shifts and shoulder closures. Be aware of side street closures and pedestrian detours. Work is expected to occur Monday through Friday, between 8:00 am to 5:00 pm.
Last Updated
8/07/2022 8:21 AM

ORE99E: MP 30.65 to 27.07

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. ADA ramp replacement (removal and replacement of existing sidewalk facilities). Work is expected to occur during the day. Expect delays up to 20 minutes during construction work. Monday through Thursday 5:00am to 4:00pm, crews will uncommonly work Fridays.
Last Updated
9/08/2022 9:21 PM

ORE99E: MP 32.94 to 30.85

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring. Use caution. ADA ramp replacement (removal and replacement of existing sidewalk facilities). Work is expected to occur during the day Monday through Friday from 5:00am to 4:00pm. Highway shoulders along both sides of the 99E may be intermittently closed around intersections of adjacent streets, with active travel lanes remaining open. Pedestrian facilities will remain open to foot traffic. Both sides of the OR214 through East Woodburn may have intermittent lane and shoulder closures while vehicle travel in either direction will still be maintained. Bikes and pedestrians may be placed on the roadway around active construction areas. Pedestrians can expect minor detours across the highway around closed sidewalk sections.
Last Updated
10/02/2022 1:19 PM

ORE99W: MP 5.86 to 6.54

Construction Work
No to Minimum Delay
Comments
Periodic lane closures on OR 99W and SW Taylors Ferry Road.
Last Updated
10/02/2022 7:52 AM

ORE99W: MP 84.49

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. New traffic flow pattern at Crystal Lake Dr/Avery Ave. The new bike signal is fully operational as of 8/18. Please watch for people biking who will be using the new signal and diagonal crossing.
Last Updated
9/16/2022 7:32 PM

HWY100: MP 16.9

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Periodic short-term delays for trucks entering the work zone.
Last Updated
10/02/2022 7:48 AM