Statewide Oregon Road Conditions
Highways with no adverse conditions do not show up on this report.
Current Travel Conditions By Route
Closure with Detour
I-5, Portland, Intersection with Killingsworth St MP 304 - 302
The highway is closed from I-405/Fremont Bridge to the Morrison Bridge. Follow detour in place.
- Updated
- 9/12/2026 7:35:00 AM
Closure
I-405, Interstate 5 MP 4
I-405 NB ramp to I-5 SB is closed. Use an alternate route.
- Updated
- 9/12/2026 8:30:00 AM
Closure
ORE224, 11 miles West of Ripplebrook Ranger Station MP 39
A fire is in the area has the SB lanes closed at MP 39. Use an alternate route.
- Updated
- 9/10/2026 12:17:00 PM
Closure
ORE127, Multnomah - Washington County Line MP 5
Cornelius Pass Road is currently closed at the Rock Creek Bridge between Old Cornelius Pass Road and Kaiser Road through September 29
- Updated
- 9/11/2026 11:42:00 AM
Closure
ORE229, 10 miles North of Siletz MP 14 - 15
A landslide has occurred. Use an alternate route.
- Updated
- 9/5/2026 3:03:00 PM
Weather Alert
North Blue Mnts, WA-Northwest Blue Mnts
Flash Flood Watch
I-205: MP 8.56 to 9.56
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 NB MP 8.56 to MP 9.56 (Oregon City) Effective, July 6, 2026, this section of I-205 northbound will be restricted to 18 feet 00 inches in width Saturday through Sunday nights through Thursday between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. The estimated completion date for this work is October 3, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-205: MP 8.56 to 9.9
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 SB MP 8.56 to MP 9.90 (Oregon City) Effective June 15, 2026, this section of I-205 southbound will be intermittently restricted to 18 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5 AM and Friday thru Saturday nights between the hours of 10 PM and 7 AM. The estimated completion date for this work is September 25, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-205: SB MP 8.8 to 9.3
I-205, OR 99E
Construction Work
Estimated delay under 20 minutes
- Comments
- Traffic Impacts: Closure of OR 43, and lane and ramp closures in Oregon City and West Linn. Nighttime lane closures • I-205 Northbound lane(s) Monday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am.• I-205 Southbound lane(s) Monday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am.• OR43 Southbound and Northbound Tuesday from 8:00 pm to 6:00 am.• OR43 Northbound Friday from 8:00 pm to 8:00 am. Nighttime ramp closure • OR43 to I-205 Northbound On Ramp Wednesday through Thursday from 10:00 pm to 5:00 am.• I-205 Southbound to OR43 (Exit 8) Off Ramp Tuesday and Thursday from 10:00 pm to 5:00 am. • I-205 Southbound to OR99E (Exit 9) Off Ramp Tuesday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. • OR99E On-ramp to I-205 Southbound Wednesday from 10:00 pm to 5:00 am. Daytime Flagging: OR43 Lane Closures <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
- Last Updated
- 9/11/2026 11:34 AM
I-205: MP 9.01
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective August 26, 2026, the I-205 southbound Exit 8 off-ramp to OR43 southbound will be closed intermittently Sunday through Thursday nights between the hours of 7 PM and 5 AM and Friday nights between the hours of 7 PM and 7 AM and Saturday nights between the hours of 7 PM and 8 AM. The estimated completion date for this work is December 31, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-205: MP 9.01
I-205, OR 99E
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/23/2026 12:00:00 AM
- Details
- Alert: I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective September 23, 2026, the I-205 southbound Exit 8 off-ramp to OR43 southbound will be intermittently closed Monday through Thursday nights between the hours of 7 PM and 5 AM. The estimated completion date for this work is September 26, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-205: MP 9.23
I-205, OR 99E
Commercial Vehicle Information
Informational only
- Details
- Alert: I-205 NB Exit 9 off-ramp to OR99E NB (Oregon City) Effective February 25, 2026, the I-205 northbound Exit 9 off-ramp to OR99E northbound will be closed Monday through Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. The estimated completion date for this work is September 12, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-205: MP 9.56
I-205, OR 213 Park Place
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/28/2026 12:00:00 AM
- Details
- Alert: I-205 SB Exit 9 off-ramp to OR99E (Oregon City) Effective September 28, 2026, the I-205 southbound Exit 9 off-ramp to OR99E will be intermittently restricted to 9 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM. Loads over 9 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 3, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-205: NB MP 23 to 12
I-205, NE Prescott St
Construction Work
Informational only
- Comments
- Traffic Impacts: No work scheduled. Project Description: ODOT is improving safety at ramp intersections along I-205 between the Columbia River and SE 82nd Drive improving signals, lighting, striping and updating signs. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22772)
- Last Updated
- 9/11/2026 11:31 AM
I-405: MP 0
I-405, Interstate 5
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/26/2026 12:00:00 AM
- Details
- Alert: I-405 SB off-ramp to I-5 SB (Portland) Effective September 26, 2026, the I-405 southbound off-ramp to I-5 southbound will be restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is September 27, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-405: MP 0.77
I-405, 1 mile North of Interstate 5
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/24/2026 12:00:00 AM
- Details
- Alert: I-405 SB off-ramp to I-5 NB Marquam Bridge (Portland) Effective September 24, 2026, the I-405 southbound off-ramp to I-5 northbound Marquam Bridge will be restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is September 25, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 26.7 to 28.36
I-5, Medford
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB MP 26.7 to MP 28.36 (Medford) Effective August 17, 2026, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 6:00 PM and 5:00 AM. Loads over 12 feet 00 inches in width may accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is September 17, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 26.7 to 28.36
I-5, Medford
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB Exit 27 off-ramp to Highland Drive/Garfield St (Medford) Effective August 17, 2026, the I-5 northbound Exit 27 off-ramp to Highland Drive/Garfield Street, will be closed Sunday through Thursday nights from 6:00 PM to 5:00 AM. The estimated completion date for this work is September 17, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: NB MP 58.18 to 66.7
I-5, Intersection with Pacific Highway ORE99
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) , Shoulder (Northbound) , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane,ramp and shoulder closures Sunday – Friday from 7 a.m. – 7 p.m. <!--Links Start Here--> [Link to additional information](https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2Fprojects%2Fpages%2Fproject-details.aspx%3Fproject%3D21674&data=05%7C02%7CCarter.B.HARPER%40odot.oregon.gov%7C317a6bfac3c14ad58b8808de0b344b86%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C638960516398910346%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=k%2FDlSc6c62l%2F5z4iMoJ%2FdoDe40RmykdT3DPFi%2BolSjY%3D&reserved=0)
- Last Updated
- 8/13/2026 5:58 PM
I-5: MP 58.25
I-5, Intersection with Pacific Highway ORE99
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB Exit 58 on-ramp from OR99/US199/NE Scoville Rd (Grants Pass) Effective September 8, 2026, the I-5 northbound Exit 58 on-ramp from OR99/US199/NE Scoville Rd will be intermittently closed at night from 7:00 PM to 7:00 AM. The estimated completion date for this work is October 2, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 58.3
I-5, Intersection with Pacific Highway ORE99
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB Exit 58 off-ramp to OR99/US199/NE Scoville Rd (Grants Pass) Effective September 8, 2026, the I-5 southbound Exit 58 off-ramp to OR99/US199/NE Scoville Road will be intermittently closed at night from 7:00 PM to 7:00 AM. The estimated completion date for this work is October 2, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 58.52 to 61.68
I-5, Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB MP 58.52 to 67.80 (Grants Pass) Effective November 20, 2025, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 59.94
I-5, 2 miles North of Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 59.94 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 17 feet 1 inches in height Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. The estimated completion date for this work is October 15, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 61.5
I-5, 4 miles North of Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB Exit 61 on- and off-ramp to/from Merlin Road/Monument Drive (Grants Pass) Effective September 8, 2026, the I-5 northbound on- and off-ramp to/from Merlin Road/Monument Drive will be intermittently closed at night from 7:00 PM and 7:00 AM. The estimated completion date for this work is October 2, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 61.5
I-5, 4 miles North of Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB Exit 61 on- and off-ramp to/from Merlin Rd/Monument Drive (Grants Pass) Effective September 8, 2026, the I-5 southbound Exit 61 on- and off-ramp to/from Merlin Rd/Monument Drive will be intermittently closed at night between the hours of 7:00 PM & 7:00 AM. The estimated completion date for this work is October 2, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 62 to 58.17
I-5, 4 miles North of Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 67.80 to 58.17 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 66
I-5, 8 miles North of Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB Exit 66 on- and off-ramp to/from Monument Dr (Grants Pass) Effective September 8, 2026, the I-5 southbound Exit 66 on- and off-ramp to/from Monument Drive will be intermittently closed at night between the hours of 7:00 PM & 7:00 AM. The estimated completion date for this work is October 2, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 66
I-5, 8 miles North of Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB Exit 66 on- and off-ramp to/from Monument Dr (Grants Pass) Effective September 8, 2026, the I-5 northbound Exit 66 on- and off-ramp to/from Monument Drive will be intermittently closed at night from 7:00 PM to 7:00 AM. The estimated completion date for this work is October 2, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 66.28
I-5, 8 miles North of Grants Pass
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB MP 66.28 (Grants Pass) Effective July 22, 2026, this section of I-5 northbound will be restricted to 16 feet 8 inches in height Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. The estimated completion date for this work is October 15, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: SB MP 66.8
I-5, 9 miles North of Grants Pass
Crash/Hazard
No to Minimum Delay
- Lanes Affected
- (Southbound) 2 Lanes
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 5/21/2026 9:46 AM
I-5: NB MP 95
I-5, 3 miles South of Canyonville
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 9/08/2026 8:01 PM
I-5: SB MP 103 to 87
I-5, 5 miles North of Canyonville
Traffic Congestion
Estimated delay under 20 minutes
- Comments
- September 14th THRU THE 18TH there will be rolling slow downs for maintenance work. Expect traffic slowdowns 9/14 to 9/18.
- Last Updated
- 9/11/2026 6:13 AM
I-5: MP 119.7 to 119.9
I-5, 5 miles South of Roseburg
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB Exit 119 on/off-ramps to/from OR42 (Winston) Effective June 23, 2026, the I-5 northbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is September 25, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: SB MP 124.5
I-5, Roseburg
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 8/13/2026 5:18 PM
I-5: SB MP 129
I-5, 4 miles North of Roseburg
Maintenance Work
Estimated delay under 20 minutes
- Comments
- Bridge work is occurring. Prepare to slow.
- Last Updated
- 8/18/2026 9:06 PM
I-5: MP 129.1 to 128.71
I-5, 4 miles North of Roseburg
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 129.10 to 128.71 (Roseburg) Effective August 24, 2026, this section of I-5 southbound will be restricted to 10 feet 00 inches in width Sunday through Thursday between the hours of 6:00 PM and 12:00 PM (noon). Loads wider than 10 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 129.17 to 128.5
I-5, 4 miles North of Roseburg
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB Exit 129 on-ramp from Del Rio Rd (Roseburg) Effective September 8, 2026, the I-5 southbound on-ramp from Del Rio Road will be closed Sunday through Thursday nights between the hours of 6:00 PM and 12:00 PM. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 129.17 to 128.5
I-5, 4 miles North of Roseburg
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB Exit 129 on-ramp from Del Rio Rd (Roseburg) Effective September 8, 2026, the I-5 southbound on-ramp from Del Rio Road will be restricted to 10 feet 00 inches in width daily Monday through Thursday between the hours of 12:00 PM and 6:00 PM and Friday from 12:00 PM until Sunday at 6:00 PM. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 139.7 to 140.53
I-5, 4 miles North of Sutherlin
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/14/2026 12:00:00 AM
- Details
- Alert: I-5 SB Exit 140 off-ramp to Old Hwy 99 (Oakland) Effective September 14, 2026, the I-5 southbound Exit 140 off-ramp to Old Hwy 99, will be closed at night between the hours of 6:00 PM to 7:00 AM. The estimated completion date for this work is September 16, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: SB MP 140
I-5, 4 miles North of Sutherlin
Maintenance Work
No to Minimum Delay
- Comments
- Road maintenance operations are occurring on 9/14 and 9/15 causing minimal delay to traffic. Prepare to slow or move over for worker safety. Expect delays.
- Last Updated
- 9/09/2026 1:10 PM
I-5: NB MP 142
I-5, 6 miles North of Sutherlin
Maintenance Work
No to Minimum Delay
- Comments
- Road maintenance operations are occurring on 9/16 causing minimal delay to traffic. Prepare to slow or move over for worker safety. Expect delays.
- Last Updated
- 9/09/2026 1:09 PM
I-5: MP 142.02 to 142.36
I-5, 6 miles North of Sutherlin
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/16/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 142 on- and off-ramps to/from Metz Hill Rd (Oakland) Effective September 16, 2026, the I-5 northbound Exit 142 on- and off-ramps to/from Metz Hill Rd, will be closed at night between the hours of 6:00 PM to 7:00 AM. The estimated completion date for this work is September 17, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: NB MP 176 to 169
I-5, 2 miles North of Cottage Grove
Construction Work
Estimated delay under 20 minutes
On Ramp
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22938)
- Last Updated
- 8/24/2026 9:23 AM
I-5: NB MP 199.31 to 203.45
I-5, 4 miles North of Intersection with Beltline Highway
Construction Work
Future Event: Estimated delay under 20 minutes
- Expected Start Date
- 9/13/2026 8:00:00 PM
- Lanes Affected
- (Northbound) 2 Lanes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Contract paving in the NB and SB directions of I5 around the Coburg Exit MP199. The work requires the closure of the NB on ramp and the SB on and off ramps when paving is in the area.
- Last Updated
- 9/09/2026 6:11 AM
I-5: MP 232.94
I-5, Intersection with Santiam Highway US20
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/21/2026 12:00:00 AM
- Details
- Alert: I-5 SB Exit 233 on-ramp from US20 (Albany) Effective September 21, 2026, the I-5 southbound Exit 233 on-ramp from US20 will be closed at night between the hours of 9:00 PM & 5:00 AM. The estimated completion date for this work is September 22, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: SB MP 242 to 243
I-5, 8 miles North of Albany
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22723)
- Last Updated
- 9/10/2026 6:03 AM
I-5: NB MP 242 to 243
I-5, 8 miles North of Albany
Construction Work
No to Minimum Delay
Off Ramp
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Ramps Affected. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22723)
- Last Updated
- 9/10/2026 6:03 AM
I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 9/03/2026 2:32 PM
I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2027.
- Last Updated
- 9/12/2026 7:00 AM
I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
- Last Updated
- 7/21/2026 5:36 AM
I-5: NB MP 282 to 283
I-5, 2 miles South of Wilsonville
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring this summer and fall w/nighttime delays. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M23061)
- Last Updated
- 6/17/2026 9:45 AM
I-5: SB MP 284 to 291
I-5, Wilsonville
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: No traffic impacts. Project Description: This project improves system operations in the region by replacing and upgrading equipment that is beyond its service life. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22867)
- Last Updated
- 9/11/2026 11:47 AM
I-5: MP 299.52
I-5, 1 mile North of I-405 South Interchange
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/26/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 299B off-ramp to I-405 NB (Portland) Effective September 26, 2026, the I-5 northbound Exit 299B off-ramp to I-405 northbound will be restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is September 27, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 300.06 to 300.08
I-5, 1 mile South of Interstate 84
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/25/2026 12:00:00 AM
- Details
- Alert: I-5 NB MP 300.06 off-ramp to I-5 NB Marquam Bridge (Portland) Effective September 25, 2026, the I-5 northbound MP 300.06 off-ramp to I-5 northbound Marquam Bridge will be restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is September 26, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 300.36 to 299.75
I-5, 1 mile South of Interstate 84
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/21/2026 12:00:00 AM
- Details
- Alert: I-5 SB MP 299.75 to MP 300.36 (Portland) Effective September 21, 2026, this section of I-5 southbound will be closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is September 24, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 300.88 to 301.1
I-5, Interstate 84
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: I-5 NB Exit 300 off-ramp to SE Water Ave (Portland) Effective Sunday October 4, 2026, the I-5 northbound Exit 300 off-ramp to SE Water Avenue will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 301.35 to 303.47
I-5, Interstate 84
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 301.35 to MP 303.47 (Portland) Effective September 11, 2026, this section of I-5 southbound will be closed at all hours. The estimated completion date for this work is October 16, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: SB MP 301.5 to 303
I-5, 1 mile South of I-405 North Interchange
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Full closure of I-5 southbound. • 24/7 closure of I-5 southbound between Exit 302A to Broadway and the I-84 westbound on-ramp to I-5 southbound starting September 11 and continuing for up to five weeks. One lane of I-5 southbound will be open between the junction at I-405 and the Broadway exit for local and event center access. Closure will begin at approximately 10 p.m. on September 11 – some ramps and lanes may begin closing as early as 9 p.m. The primary detour routes are I-205 and I-405. • Overnight right lane closures of I-5 northbound between Exit 302C to Greeley Ave and the I-405 on-ramp on Sept 14-18 from 10 p.m. to 5 a.m. each night for pipe and manhole work on I-5. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
- Last Updated
- 9/11/2026 12:25 PM
I-5: MP 301.59 to 301.96
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB MP 301.59 to MP 301.96 (Portland) Effective June 17, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 7, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: SB MP 302.29
I-5, I-405 North Interchange
Crash/Hazard
Closure
On Ramp
- Comments
- The onramp from Weidler to I-5 SB closed. Use an alternate route. Ramps Affected.
- Last Updated
- 9/12/2026 6:43 AM
I-5: MP 302.33
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 SB MP 302.33 (Portland) Effective May 7, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 7, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: SB MP 302.62 to 302.82
I-5, 1 mile North of I-405 North Interchange
Crash/Hazard
Closure
Off Ramp
- Comments
- The Exit for Broadway/Weidler closed. Use an alternate route. Ramps Affected.
- Last Updated
- 9/12/2026 8:11 AM
I-5: MP 302.98 to 303.45
I-5, 1 mile North of I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB MP 302.98 to MP 303.45 (Portland) Effective August 28, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Sunday night thru Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: MP 303.15
I-5, 1 mile South of Portland, Intersection with Going St
Commercial Vehicle Information
Informational only
- Details
- Alert: I-5 NB MP 303.15 (Portland) Effective August 28, 2026, this section of I-5 northbound will be restricted to 15 feet 7 inches in height Sunday night thru Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. Loads over 15 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-5: SB MP 303.5 to 301.51
I-5, Portland, Intersection with Killingsworth St
Crash/Hazard
Closure with Detour
- Lanes Affected
- (Southbound) Median , 3 Lanes , Shoulder
- Comments
- The highway is closed from I-405/Fremont Bridge to the Morrison Bridge. Follow detour in place. Till 10/16/2026.
- Last Updated
- 9/12/2026 7:35 AM
I-5: SB MP 303.98
I-5, Portland, Intersection with Killingsworth St
Crash/Hazard
Closure
On Ramp
- Comments
- Road maintenance operations have the SB on-ramp from Going St closed. Use an alternate route. Ramps Affected.
- Last Updated
- 9/12/2026 6:14 AM
I-5: SB MP 304.18
I-5, Portland, Intersection with Killingsworth St
Crash/Hazard
Closure
On Ramp
- Comments
- The onramp from Alberta to I-5 SB is closed. Use an alternate route. Ramps Affected.
- Last Updated
- 9/12/2026 6:47 AM
I-5: SB MP 306
I-5, 1 mile South of Portland, Intersection with Victory Blvd
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: No traffic impacts. Project Description: This project improves system operations in the region by replacing and upgrading equipment that is beyond its service life. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22867)
- Last Updated
- 9/11/2026 11:48 AM
I-84: WB MP 0 to 16
I-84, Interstate 5
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Ramp closures on I-84 ramps at SE Grand Ave. and Halsey St. in Portland. We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 9/11/2026 11:30 AM
I-84: EB MP 0 to 16
I-84, Interstate 5
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Ramp closures on I-84 ramps at SE Grand Ave. and Halsey St. in Portland. We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 9/11/2026 11:31 AM
I-84: EB MP 0.03 to 0.51
I-84, Interstate 5
Crash/Hazard
Closure
Off Ramp
- Comments
- The ramp from I-5 SB to 84 EB closed. Use an alternate route. Ramps Affected.
- Last Updated
- 9/12/2026 8:17 AM
I-84: WB MP 17.5 to 19.5
I-84, 1 mile East of Troutdale
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. Maintenance crews are paving sections of I-84 in both directions between Troutdale and Corbett to improve the road. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 9/03/2026 2:45 PM
I-84: MP 17.5 to 21
I-84, 1 mile East of Troutdale
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/23/2026 12:00:00 AM
- Details
- Alert: I-84 EB and WB MP 17.5 to MP 21.0 (Troutdale) Effective September 23, 2026, this section of I-84 eastbound and westbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 8 AM. The estimated completion date for this work is September 25, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-84: WB MP 18
I-84, 1 mile East of Troutdale
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Daytime periodic lane closures on Jordan Road, with flaggers directing traffic. We're building a new multi-use path parallel to Jordan Road (near I-84 at Exit 18) from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 9/11/2026 11:29 AM
I-84: MP 18
I-84, 1 mile East of Troutdale
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/23/2026 12:00:00 AM
- Details
- Alert: I-84 EB Exit 18 on- and off-ramp to/from Crown Point Hwy (Troutdale) Effective September 23, 2026, the I-84 eastbound Exit 18 on- and off-ramp to/from Crown Point Hwy will be closed at night between the hours of 10 PM and 5 AM. The estimated completion date for this work is September 25, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-84: EB MP 37
I-84, 6 miles East of Multnomah Falls
Maintenance Work
Closure
On Ramp
- Comments
- Roadwork has the EB on ramp closed at MP 37. Use an alternate route. Ramps Affected.
- Last Updated
- 7/17/2026 3:05 PM
I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls
Construction Work
Estimated delay under 20 minutes
- Comments
- Traffic impacts: Travelers can expect all travel lanes open eastbound and westbound on I-84 at McCord Creek Bridge. We are working on a construction project to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale through fall 2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
- Last Updated
- 9/11/2026 6:57 PM
I-84: MP 67 to 69.5
I-84, 3 miles East of Hood River
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/28/2026 12:00:00 AM
- Details
- Alert: I-84 EB MP 67 to MP 69.50 (Hood River) Effective September 28, 2026, this section of I-84 eastbound will be restricted to 14 feet and 00 inches in width Monday through Thursday between the hours of 7:00 AM and 4:00 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 7, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-84: EB MP 68 to 69.5
I-84, 4 miles East of Hood River
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Eastbound) 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect shoulder and lane closures for guardrail work. Work will be done Sept 10th - Oct 7th from 7am to pm Monday thru Friday.
- Last Updated
- 9/10/2026 1:49 PM
I-84: WB MP 205 to 211
I-84, 4 miles West of Pendleton
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) , Shoulder (Eastbound) , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect shoulder and single lane closures on I-84 between MP205 and MP211 at the Rieth Road and Southgate US395 interchange. Expect speed reduction throughout work zone(s) in place for crossover construction along I-84 EB and WB. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22855)
- Last Updated
- 9/10/2026 12:58 PM
I-84: EB MP 211 to 213
I-84, Pendleton
Maintenance Work
No to Minimum Delay
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 9/11/2026 12:19 PM
I-84: EB MP 259.89 to 261.56
I-84, La Grande
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Contractor will be onsite building crossovers in the median. Traffic to be controlled with single lane closures EB & WB. Use caution, prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22930)
- Last Updated
- 9/07/2026 12:11 AM
I-84: EB MP 347.05 to 368.16
I-84, 1 mile East of Huntington
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Expect single lane closures with possible crossover traffic as well as exit and on-ramp closures for daytime paving operations, closed lanes may vary. Use caution, prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22919)
- Last Updated
- 9/07/2026 12:12 AM
I-84: MP 351 to 356
I-84, 5 miles East of Huntington
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 EB & WB MP 351.0 to 356.0 (Huntington) Effective March 20, 2026, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-84: MP 351 to 356
I-84, 5 miles East of Huntington
Commercial Vehicle Information
Informational only
- Details
- Alert: I-84 EB Exit 356 on- and off-ramp to/from OR201 (Huntington) Effective July 8, 2026, the I-84 eastbound on- and off-ramp to/from OR201 will be closed at all hours. The estimated completion date for this work is October 6, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-84: MP 352.84
I-84, 7 miles East of Huntington
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/28/2026 12:00:00 AM
- Details
- Alert: I-84 EB Exit 353 off-ramp to US30/Farewell Bend (Huntington) Effective September 28, 2026, the I-84 eastbound Exit 353 off-ramp to US30/Farewell Bend, will be closed beginning Monday at 6:00 AM at all hours, re-opening Wednesday at 10:00 PM. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-84: MP 352.84
I-84, 7 miles East of Huntington
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/14/2026 12:00:00 AM
- Details
- Alert: I-84 WB Exit 353 on-ramp from US30/Farewell Bend (Huntington) Effective September 14, 2026, the I-84 westbound Exit 353 on-ramp from US30/Farewell Bend, will be closed beginning Monday at 6:00 AM at all hours, re-opening Wednesday at 10:00 PM. The estimated completion date for this work is September 17, 2026.
- Last Updated
- 9/12/2026 7:00 AM
I-84: MP 353
I-84, 7 miles East of Huntington
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/28/2026 12:00:00 AM
- Details
- Alert: I-84 EB Exit 353 on-ramp from US30/Farewell Bend (Huntington) Effective September 28, 2026, the I-84 eastbound Exit 353 on-ramp from US30/Farewell Bend will be closed at all hours. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US101: MP 0 to 4.14
US101, Oregon - Washington Border
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/11/2026 12:00:00 AM
- Details
- Alert: US101 NB & SB MP 0.00 (Astoria Megler Bridge - Astoria) Effective October 11, 2026, this section of US101, across the Astoria Megler Bridge, will be closed between the hours of 8:30 AM & 11:00 AM. The estimated completion date for this work is October 11, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US101: MP 4.91 to 4
US101, Astoria
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/14/2026 12:00:00 AM
- Details
- Alert: US101 NB & SB MP 4.91 New Youngs Bay Bridge (Astoria) Effective October 14, 2026, this section of US101 northbound and southbound will be closed at night between the hours of 9 PM & 6 AM. The estimated completion date for this work is October 17, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US101: MP 26
US101, 4 miles North of Cannon Beach
Crash/Hazard
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- A crash has occurred. Prepare to slow or move over for worker safety.
- Last Updated
- 9/12/2026 9:12 AM
US101: MP 73.46 to 136.29
US101, 8 miles South of Tillamook
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Night Work: 7:00pm to 7:00am. Culvert Project. August 10, 2026 to August 13, 2026 Work will occur at MP 129.13 .
- Last Updated
- 8/18/2026 8:21 PM
US101: MP 112.35 to 118
US101, Lincoln City
Maintenance Work
No to Minimum Delay
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 9/08/2026 6:04 AM
US101: MP 127.61
US101, Depoe Bay
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday. Most lane closures will occur during nighttime hours, with a few exceptions that will happen during the day between the hours of 7AM and 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
- Last Updated
- 7/31/2026 1:38 PM
US101: MP 134
US101, 7 miles North of Newport
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 9/05/2026 3:01 PM
US101: MP 232 to 233
US101, 3 miles North of North Bend
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) 1 Lane
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety. This project will end sometime in September.
- Last Updated
- 6/04/2026 11:20 AM
US101: MP 244.5 to 244.3
US101, 1 mile South of Intersection with Coos Bay - Roseburg Highway ORE42
Commercial Vehicle Information
Informational only
- Details
- Alert: US101 NB MP 244.5 to MP 244.3 (Coos Bay) Effective September 7, 2026, this section of US101 northbound will be restricted to 10 feet 00 inches in width Monday through Friday between the hours of 7 AM & 6 PM. The estimated completion date for this work is September 18, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US101: MP 274
US101, Bandon
Information
No to Minimum Delay
- Comments
- A special event is taking place September 12th and 13th causing minimal delay to traffic. Use caution.
- Last Updated
- 9/10/2026 8:34 AM
US101: MP 312
US101, 12 miles South of Port Orford
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 8/13/2026 5:15 PM
US101: MP 327.4 to 329.5
US101, Wedderburn
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 8/13/2026 5:15 PM
US101: MP 331 to 333
US101, 2 miles South of Gold Beach
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) 2 Lanes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. The highway is limited to a single lane of traffic controlled by flaggers. Delays less than 20 minutes are expected.
- Last Updated
- 8/13/2026 5:16 PM
US101: MP 342.5
US101, 14 miles North of Brookings
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 8/13/2026 5:16 PM
US101: MP 354.8 to 359.3
US101, Brookings
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 8/13/2026 5:15 PM
US197: MP 29 to 32
US197, 5 miles North of Tygh Valley
Crash/Hazard
No to Minimum Delay
- Comments
- Watch for possible rocks falling causing minimal delay to traffic. Use caution.
- Last Updated
- 9/06/2026 9:48 AM
US199: NB MP 2.15
US199, Grants Pass
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement on pathway is causing minimal delay to traffic. Pedestrians and bicyclists use caution.
- Last Updated
- 2/06/2026 12:45 PM
US20: MP 1.82 to 2.8
US20, N.E. Purcell Blvd. (Bend)
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) , Shoulder (Eastbound) , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. The Contractor will be performing work at the intersections of Powers Rd., Butler Market, and Azure to install new ADA ramps. The work will occur Tuesday - Friday from 8pm - 6am, expect minimal delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22442)
- Last Updated
- 9/07/2026 12:05 AM
US20: MP 18.8 to 19.05
US20, Intersection with The Dalles - California Highway US97
Crash/Hazard
No to Minimum Delay
- Comments
- Watch for signage along road for work that is being done off highway.
- Last Updated
- 9/11/2026 7:29 AM
US20: MP 19 to 20
US20, Intersection with The Dalles - California Highway US97
Crash/Hazard
No to Minimum Delay
- Comments
- Watch for signage along road for work that is being done off highway.
- Last Updated
- 9/11/2026 7:29 AM
US20: MP 19.72 to 19.85
US20, 1 mile South of Intersection with The Dalles - California Highway US97
Commercial Vehicle Information
Informational only
- Details
- Alert: US20/US97 Bus EB off-ramp to NE Division St (Bend) Effective August 31, 2026, the U20/US97 Buisness eastbound off-ramp to NE Division Street will be closed at all hours. The estimated completion date for this work is October 1, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US20: MP 19.8 to 19.7
US20, 1 mile South of Intersection with The Dalles - California Highway US97
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/1/2026 12:00:00 AM
- Details
- Alert: US20/US97 EB & WB on- and off-ramps to/from Division St (Bend) Effective October 1, 2026, the US20/UR97 Business eastbound and westbound on- and off-ramps to/from Division Street will be closed at all hours. The estimated completion date for this work is April 30, 2027.
- Last Updated
- 9/12/2026 7:00 AM
US20: MP 50.81 to 51.92
US20, Philomath
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Starting June 1st, you will see crews demoing on ADA corners to construct and remediate the ADA curb ramps throughout the community along the state highway. Drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-corvallis)
- Last Updated
- 7/31/2026 1:42 PM
US20: MP 92.29 to 92.7
ORE126, Sisters
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be onsite continuing shoulder work to install new ADA ramps. Use caution, prepare to slow.
- Last Updated
- 9/07/2026 12:04 AM
US26: MP 0.01 to 0.21
US26, I-405
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: US26 WB MP 0.01 to MP 0.21 (Portland) Effective Sunday October 4, 2026, the exit to Naito Parkway on this section of US26 westbound, will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US26: MP 0.13 to 0.32
US26, I-405
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: US26 EB MP -0.13 to MP 0.32 (Portland) Effective Sunday October 4, 2026, this section of US26 eastbound Ross Island Way from SW Arthur Street to SW Kelly Avenue, will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US26: MP 5.85 to 9.96
US26, Portland
Construction Work
Informational only
- Comments
- Traffic Impacts: Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8 a.m. to 5 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. - Closure of SE 154th at Powell through mid-September. Possible nighttime work with closures. Travelers can expect congestion during construction. Alternate routes are available. Flaggers may be directing traffic. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/Outer%20Powell%20Transportation%20Safety%20Improvements.aspx)
- Last Updated
- 9/11/2026 11:36 AM
US26: MP 5.87 to 7.9
US26, Portland
Commercial Vehicle Information
Informational only
- Details
- Alert: US26 EB & WB MP 5.87 to MP 7.9 (Portland) Effective July 13, 2025, this section of US26 eastbound and westbound will be restricted to 10 feet 00 inches in width at night half an hour after sunset to half an hour before sunrise. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US26: MP 7.9 to 9.96
US26, Portland
Commercial Vehicle Information
Informational only
- Details
- Alert: US26 Powell Blvd EB & WB 7.90 to MP 9.96 (Portland) Effective November 21, 2025, this section of US26 eastbound and westbound will be continuously restricted to 10 feet 00 inches in width at all hours. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 2, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US26: MP 9.27
US26, Portland
Maintenance Work
No to Minimum Delay
- Comments
- Road maintenance operations have the intersection with 162nd under flagger control. Prepare to slow or move over for worker safety.
- Last Updated
- 9/12/2026 6:09 AM
US26: MP 13
US26, 4 miles East of Necanicum
Crash/Hazard
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 2 Lanes (Eastbound) 1 Lane
- Comments
- Sunken grade. Prepare to slow.
- Last Updated
- 9/05/2026 3:04 PM
US26: MP 53.9 to 56.1
US26, Intersection with Timberline Highway
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/21/2026 12:00:00 AM
- Details
- Alert: US26 EB and WB MP 53.9 to MP 57.8 (Government Camp) Effective September 21, 2026, this section of US26 eastbound and westbound will be restricted to 12 feet 00 inches in width Monday through Friday between the hours of 7 AM & 8 PM. Loads over 12 feet 00 inches in width may accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is September 25, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US26: MP 108
US26, 5 miles South of Warm Springs
Crash/Hazard
No to Minimum Delay
- Comments
- A disabled vehicle is creating a hazard, causing minimal delay to traffic. Use caution.
- Last Updated
- 9/12/2026 8:53 AM
US26: MP 117.71 to 116.4
US26, Intersection with The Dalles - California Highway US97
Construction Work
No to Minimum Delay
- Lanes Affected
- (Northbound) , Shoulder (Southbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be working on the shoulder. Use caution, prepare to slow.
- Last Updated
- 9/07/2026 12:03 AM
US30: MP 1.72 to 1.77
US30, Portland
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: US30 WB off-ramp/left turn to Vaughn St/23rd Ave (Portland) Effective Sunday October 4, 2026, the US30 westbound off-ramp/left turn to Vaughn Street & NW 23rd Avenue south, will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US30: EB MP 2.81 to 3.61
US30, Pendleton
Construction Work
No to Minimum Delay
- Lanes Affected
- (Westbound) , Shoulder (Eastbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be on-site to continue work on an ADA Curb Ramp project. Use caution, obey all signs while passing through the work zone.
- Last Updated
- 9/08/2026 3:50 AM
US30: EB MP 3.16 to 3.6
US30, Pendleton
Information
Estimated delay of 20 minutes - 2 hours
- Lanes Affected
- (Eastbound) Median , 2 Lanes , Shoulder
- Comments
- A special event is taking place. Prepare to slow. Pendleton Round-Up Parade 'Dress Up Parade'
- Last Updated
- 9/12/2026 9:40 AM
US30: WB MP 3.6 to 2.7
US30, Pendleton
Information
Estimated delay of 20 minutes - 2 hours
- Lanes Affected
- (Westbound) Median , 2 Lanes , Shoulder
- Comments
- A special event is taking place. Prepare to slow. Pendleton Round-Up Parade 'Dress Up Parade'
- Last Updated
- 9/12/2026 9:41 AM
US30: NB MP 3.71 to 3.91
I-405, Interstate 5
Crash/Hazard
Closure
- Comments
- I-405 NB ramp to I-5 SB is closed. Use an alternate route.
- Last Updated
- 9/12/2026 8:30 AM
US30: MP 20.66
US30, Scappoose
Maintenance Work
Future Event: No to Minimum Delay
- Expected Start Date
- 9/22/2026 9:00:00 AM
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 6/18/2026 1:13 PM
US30: MP 48.4 to 50.4
US30, Rainier
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Road construction is occurring and may cause minimal traffic delays. Use caution and watch for workers. Paving and barrier replacement operations are scheduled from 7:00 p.m. Sunday, August 23, through 6:00 a.m. Friday, October 30. Work will predominantly occur Sunday nights through Friday mornings. US30 eastbound and westbound on- and off-ramps to and from the Rainier-Longview Bridge will be intermittently closed Sunday through Thursday nights between 10:00 p.m. and 5:00 a.m. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21547)
- Last Updated
- 9/10/2026 3:29 PM
US30: MP 48.4 to 50.2
US30, Rainier
Commercial Vehicle Information
Informational only
- Details
- Alert: US30 EB & WB MP 48.4 to 50.2 (Rainier) Effective September 1, 2026, this section of US30 eastbound and westbound will be restricted to 10 feet 00 inches in width weekly between Sunday 7 PM to Friday 12 PM. Loads over 10 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for more information. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US30: MP 48.4 to 48.9
US30, Rainier
Commercial Vehicle Information
Informational only
- Details
- Alert: US30 EB & WB on- and off-ramps to/from the Rainier-Longview Bridge (Rainier) Effective September 1, 2026, the US30 eastbound and westbound on- and off-ramps to/from the Rainier-Longview Bridge will be intermittently closed Sunday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US30: MP 48.67
US30, Rainier
Commercial Vehicle Information
Informational only
- Details
- Alert: US30 EB MP 48.67 (Rainier) Effective September 1, 2026, this section of US30 eastbound will be restricted to 15 feet 11 inches in height weekly between Sunday 7 PM to Friday 12 PM. Loads over 15 feet 11 inches in height may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for more information. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US30: MP 48.67
US30, Rainier
Commercial Vehicle Information
Informational only
- Details
- Alert: US30 WB MP 48.67 (Rainier) Effective September 1, 2026, this section of US30 westbound will be restricted to 16 feet 00 inches in height weekly between Sunday 7 PM to Friday 12 PM. Loads over 16 feet 00 inches in height may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for more information. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US30: MP 50.2 to 50.4
US30, 1 mile West of Rainier
Commercial Vehicle Information
Informational only
- Details
- Alert: US30 EB & WB MP 50.2 to 50.4 (Rainier) Effective September 1, 2026, this section of US30 eastbound and westbound will be restricted to 10 feet 00 inches in width Sunday through Friday between the hours of 7 PM and 6 AM. Loads over 10 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for more information. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US30: MP 87.65 to 92.4
US30, 9 miles East of Astoria
Construction Work
Future Event: No to Minimum Delay
- Expected Start Date
- 9/14/2026 8:45:00 PM
- Lanes Affected
- (Eastbound) 1 Lane (Westbound) 1 Lane
- Comments
- Road construction is scheduled to occur. Overlay paving operations.
- Last Updated
- 9/08/2026 3:28 PM
US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Lane closures on OR 8/SW Baseline Street in Hillsboro between SW Dennis Avenue and SW Main Street. Closure of Main Street northbound between Oak and Baseline. This safety improvement project in three locations on OR 8 in Hillsboro and Forest Grove includes new sidewalks, an enhanced pedestrian crosswalk, new lighting and upgraded traffic signals. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/Pages/OR8-Construction.aspx)
- Last Updated
- 9/11/2026 11:40 AM
US30BY: MP 1.32 to 12.13
US30BP, 1 mile East of Intersection with Lower Columbia River Highway US30
Construction Work
Future Event: No to Minimum Delay
- Expected Start Date
- 9/14/2026 10:00:00 AM
- Comments
- Work upgrade ADA sidewalk curb ramps along U.S. 30 Bypass means short-term lane and sidewalk closures. We are bringing approximately 260 sidewalk curb ramps into compliance with Americans with Disabilities Act (ADA) accessibility standards on U.S. 30 Bypass between N. Ivanhoe Street and NE 162nd Avenue in Portland. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23458)
- Last Updated
- 9/10/2026 6:22 PM
US30BY: MP 8.19 to 8.41
US30BP, 3 miles West of Intersection with East Portland Highway I-205
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: NE Lombard Street reduced to one lane in each direction Project Description: NE Lombard Street reduced to one lane in each direction for the duration of the bridge construction for PBOT's NE 42nd Avenue Bridge Replacement, which will make a seismically safe crossing for an emergency route and provide better access for freight, pedestrians, and people biking on the bridge and NE Lombard Street below the span. <!--Links Start Here--> [Link to Additional Information](https://www.portland.gov/transportation/pbot-projects/construction/ne-42nd-avenue-bridge-replacement-over-lombard-street?utm_medium=email&utm_source=govdelivery)
- Last Updated
- 9/11/2026 11:37 AM
US395: MP 73.2
US395, 16 miles North of Long Creek
Information
No to Minimum Delay
- Lanes Affected
- (Southbound) , Shoulder
- Comments
- Highway erosion is causing minimal delay to traffic. There is an abrupt edge to the roadway. Use caution.
- Last Updated
- 9/07/2026 4:12 AM
US395: MP 130 to 135
US395, 13 miles North of Lakeview
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 9/10/2026 3:18 PM
US95: MP 0 to 51.5
US95, Oregon - Idaho Border
Maintenance Work
No to Minimum Delay
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- A Chip Seal project is occurring causing minimal delay. Obey traffic control. Use caution on loose gravel. Watch for wet paint.
- Last Updated
- 8/31/2026 9:01 AM
US97: MP 18.57 to 28
US97, 1 mile South of Moro
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures controlled by flaggers Monday - Friday, 7pm to 7am between milepost 19 and milepost 28. Expect delays up to 20 minutes. Use caution, prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21648)
- Last Updated
- 8/17/2026 12:37 AM
US97: MP 18.88 to 27.4
US97, 1 mile South of Moro
Commercial Vehicle Information
Informational only
- Details
- Alert: US97 NB & SB MP 18.88 to MP 27.4 (Moro & Grass Valley) Effective June 22, 2026, this section of US97 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM and 7 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 18, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US97: MP 91.58 to 97.3
US97, Madras
Construction Work
No to Minimum Delay
- Lanes Affected
- (Northbound) , Shoulder (Southbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be onsite on the shoulder. Use caution, prepare to slow.
- Last Updated
- 9/07/2026 12:03 AM
US97: MP 114.56 to 116.56
US97, 1 mile North of Terrebonne
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Access to Lower Bridge Way from US97 will be closed to all traffic, use posted detour. Access to 11th St on the north end of Terrebonne, please use Central Ave. The contractor will paving driveways throughout town, traffic will be controlled with flaggers and possible lane shifts. Use caution, prepare to slow or move over. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21162)
- Last Updated
- 9/07/2026 12:02 AM
US97: MP 114.75 to 116.41
US97, 1 mile North of Terrebonne
Commercial Vehicle Information
Informational only
- Details
- Alert: US97 NB & SB MP 114.75 to MP 116.41 (Terrebonne) Effective May 11, 2026, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width at all hours. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US97: MP 115.23
US97, 1 mile North of Terrebonne
Commercial Vehicle Information
Informational only
- Details
- Alert: US97 NB & SB on- and off-ramps to/from Lower Bridge Way (Terrebonne) Effective April 27, 2026, the US97 northbound & southbound on- and off-ramps to/from Lower Bridge Way will be closed. The estimated completion date for this work is October 31, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US97: MP 117.2 to 118.7
US97, 1 mile South of Terrebonne
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. The contractor will have a single lane closures on NB US97 Monday to Friday 7am to 3pm to widen the highway. There will also be a closure with detour for the O'Neil Hwy and US97 junction for additional work. Traffic can expect minimal delays. Use caution, prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22777)
- Last Updated
- 9/06/2026 11:59 PM
US97: MP 117.2 to 118.7
US97, 1 mile South of Terrebonne
Commercial Vehicle Information
Informational only
- Details
- Alert: US97 NB & SB on- and off-ramps to/from OR370 (Redmond) Effective August 13, 2026, the US97 northbound & southbound on- and off-ramps to/from OR370 will be closed at all hours. The estimated completion date for this work is October 2, 2026.
- Last Updated
- 9/12/2026 7:00 AM
US97: MP 118.98 to 121.45
US97, 3 miles South of Terrebonne
Construction Work
No to Minimum Delay
- Lanes Affected
- (Northbound) , Shoulder (Southbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The contractor will be working on the shoulder of the road in various locations. Use caution, prepare to slow.
- Last Updated
- 9/06/2026 11:58 PM
US97: NB MP 135.98 to 140.06
US97, Intersection with McKenzie - Bend Highway US20
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) , Shoulder (Southbound) , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. The contractor will be performing work at the intersections of Powers Rd, Butler Market, 27th St and Azure to install new ADA ramps. The work will occur Tuesday - Friday from 8pm - 6am. Expect minimal delays.
- Last Updated
- 9/07/2026 12:06 AM
ORE126: MP 0 to 9
ORE126, Intersection with Santiam Highway US20
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 9/10/2026 4:14 PM
ORE126: MP 1.63 to 2.12
ORE126B, Springfield
Commercial Vehicle Information
Informational only
- Details
- Alert: OR126 Bus EB & WB MP 1.63 to MP 2.12 (Springfield) On Friday, September 12, 2026, this section of OR126 business eastbound and westbound will be closed between the hours of 11 AM & 10:30 PM for a block party.
- Last Updated
- 9/12/2026 7:00 AM
ORE126: MP 10.87 to 38.02
ORE126, 2 miles West of Walterville
Construction Work
Future Event: No to Minimum Delay
- Expected Start Date
- 9/14/2026 8:00:00 AM
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Intermittent contract paving. Expect minimal delays and flaggers with a pilot car. Schedule is currently 9/14 at 8 a.m. through 9/15 at 6 p.m.
- Last Updated
- 8/25/2026 2:14 PM
ORE126: MP 26 to 52
ORE126, 7 miles West of Walton
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 9/11/2026 3:59 AM
ORE126: MP 110.1 to 111.1
ORE126, 1 mile West of Redmond
Commercial Vehicle Information
Informational only
- Details
- Alert: OR126 EB & WB MP 110.15 to 111.07 (Redmond) Effective August 6, 2026, this section of OR126 eastbound and westbound will be restricted to 11 feet 00 inches in width at night between the hours of 8 PM and 6 AM. The estimated completion date for this work is September 20, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE126: MP 110.65 to 111.97
ORE126, Redmond
Construction Work
No to Minimum Delay
- Lanes Affected
- (Westbound) , Shoulder (Eastbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The contractor will be working on the shoulder of the road in various locations. Use caution, prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
- Last Updated
- 9/06/2026 11:58 PM
ORE138: MP 0.5 to 1.4
ORE138, Roseburg
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 8/13/2026 5:30 PM
ORE138: MP 29.5 to 30.9
ORE138, 13 miles East of Glide
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 8/13/2026 5:30 PM
ORE138: MP 29.5 to 30.9
ORE138, 13 miles East of Glide
Commercial Vehicle Information
Informational only
- Details
- Alert: OR138 EB & WB MP 29.5 to MP 30.9 (Glide) Effective June 8, 2026, this section of OR138 eastbound and westbound will be restricted to 12 feet 00 inches in width at all times. The estimated completion date for this work is May 18, 2027.
- Last Updated
- 9/12/2026 7:00 AM
ORE141: MP 5.59 to 5.88
ORE141, Tigard
Construction Work
Informational only
- Comments
- Traffic Impacts: Shoulder and lane closures with flagging Monday-Friday 9:00 am to 3:00 pm. We're improving safety for people walking, biking or rolling by installing a new pedestrian-activated crossing, known as a Rectangular Rapid Flashing Beacon, on Hall Boulevard (OR 141) at SW Omara Street and upgrading the existing signalized crosswalk at SW Fanno Creek Trail. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23509)
- Last Updated
- 9/11/2026 11:42 AM
ORE141: MP 5.59 to 5.88
ORE141, Tigard
Construction Work
Informational only
- Comments
- Traffic Impacts: Shoulder and lane closures with flagging Monday-Friday 9:00 am to 3:00 pm. We're improving safety for people walking, biking or rolling by installing a new pedestrian-activated crossing, known as a Rectangular Rapid Flashing Beacon, on Hall Boulevard (OR 141) at SW Omara Street and upgrading the existing signalized crosswalk at SW Fanno Creek Trail. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23509)
- Last Updated
- 9/11/2026 11:43 AM
ORE141: MP 5.59 to 5.88
ORE141, Tigard
Commercial Vehicle Information
Informational only
- Details
- Alert: OR141/Hall Blvd NB & SB MP 5.59 to MP 5.88 (Tigard) Effective July 27, 2026, this section of OR141/Hall Boulevard will be restricted to 12 feet 00 inches in width Monday through Friday between the hours of 9 AM and 3 PM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 8, 2027.
- Last Updated
- 9/12/2026 7:00 AM
ORE141: MP 7.07 to 3.3
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
- Last Updated
- 6/08/2025 6:59 AM
ORE141: MP 7.07 to 5.01
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
- Last Updated
- 11/09/2025 5:54 PM
ORE18B: MP 2 to 2.67
ORE18B, Willamina
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
- Last Updated
- 7/31/2026 1:40 PM
ORE18B: MP 5.94 to 7.6
ORE18B, Sheridan
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
- Last Updated
- 7/31/2026 1:40 PM
ORE201: MP 29.5
ORE201, Ontario
Crash/Hazard
No to Minimum Delay
- Comments
- There are rough road conditions causing minimal delay to traffic. Use caution.
- Last Updated
- 9/08/2026 4:00 PM
ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld
Maintenance Work
No to Minimum Delay
- Comments
- Bridge work is occurring causing minimal delay to traffic. Use caution. Bridge construction is occurring. Prepare to slow. Watch for workers. 3/11/26 - 10/28/26: MP 38.5 to MP 38.63 (Bridge structure ID: 03113A) portable traffic signal in place with 24-hour lane closure. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23117)
- Last Updated
- 9/02/2026 7:33 AM
ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld
Commercial Vehicle Information
Informational only
- Details
- Alert: OR202 EB & WB MP 38.5 to 38.63 (Vesper) Effective March 11, 2026, this section of OR202 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this work is October 27, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE213: MP 7.23 to 7.41
ORE213, Portland
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: Periodic daytime and nighttime single lane closures on SE 82 Ave. (OR 213) between SE Foster Rd. and SE Lindy St. We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
- Last Updated
- 9/11/2026 11:45 AM
ORE214: MP 9 to 45
ORE214, Intersection with North Santiam Highway ORE22
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 9/10/2026 3:36 PM
ORE219: MP 18.35 to 20.8
ORE219, Newberg
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
- Last Updated
- 9/05/2026 3:05 PM
ORE22: MP 8.26
99EBus, Salem, Intersection with Pacific Highway I-5
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Southbound) 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
- Last Updated
- 7/31/2026 1:44 PM
ORE22: MP 21 to 24.07
ORE22, 4 miles West of Salem
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
- Last Updated
- 9/05/2026 3:05 PM
ORE22: MP 30.17
ORE22, Mill City
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring on Alder/1st St. Use caution and watch for workers.
- Last Updated
- 9/08/2026 7:10 AM
ORE223: MP 2.13 to 4.28
ORE223, Dallas
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
- Last Updated
- 7/31/2026 1:35 PM
ORE224: MP 39
ORE224, 11 miles West of Ripplebrook Ranger Station
Crash/Hazard
Closure
- Lanes Affected
- (Westbound) Median , 1 Lane , Shoulder
- Comments
- A fire is in the area has the SB lanes closed at MP 39. Use an alternate route.
- Last Updated
- 9/10/2026 12:17 PM
ORE228: MP 0.37 to 5
ORE228, Intersection with Albany - Junction City Highway ORE99E
Construction Work
Future Event: No to Minimum Delay
- Expected Start Date
- 9/27/2026 7:00:00 PM
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Intermittent contract paving. Expect minimal delays and flaggers with a pilot car. Schedule is currently 9/27 at 7 p.m. through 10/8 at 6 a.m., Sunday through Thursday.
- Last Updated
- 8/25/2026 2:25 PM
ORE229: MP 14.1 to 14.3
ORE229, 10 miles North of Siletz
Commercial Vehicle Information
Informational only
- Details
- Alert: OR229 NB & SB MP 14.18 (Siletz) Effective December 12, 2025, this section of OR229 northbound and southbound will be closed due to a landslide. There is no estimated date that the road will reopen at this time.
- Last Updated
- 9/12/2026 7:00 AM
ORE229: MP 14.2 to 15.1
ORE229, 10 miles North of Siletz
Crash/Hazard
Closure
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- A landslide has occurred. Use an alternate route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx)
- Last Updated
- 9/05/2026 3:03 PM
ORE237: MP 31.54 to 32.15
ORE237, North Powder
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be onsite for continuing work. Exercise caution and obey all traffic control signs through work zone(s). Use caution, prepare to slow.
- Last Updated
- 9/08/2026 3:47 AM
ORE238: MP 11.73 to 12.03
ORE238, 2 miles West of Provolt
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/18/2026 12:00:00 AM
- Details
- Alert: OR238 EB & WB MP 11.73 to MP 12.03 (Grants Pass) Effective September 18, 2026, this section or OR238 eastbound and westbound will be restricted to 11 feet 00 inches in width between the hours of 7:00 AM and 5:00 PM. The estimated completion date for this work is September 18, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE240: MP 11.04 to 11.26
ORE240, Newberg
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
- Last Updated
- 7/31/2026 1:41 PM
ORE241: EB MP 2 to 14.9
ORE241, Coos Bay
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 8/13/2026 5:11 PM
ORE241: MP 3.5 to 3.8
ORE241, 3 miles East of Coos Bay
Maintenance Work
Estimated delay under 20 minutes
- Comments
- Bridge work is occurring. Prepare to slow.
- Last Updated
- 8/25/2026 11:18 PM
ORE241: MP 3.55 to 3.82
ORE241, 3 miles East of Coos Bay
Commercial Vehicle Information
Informational only
- Details
- Alert: OR241 EB & WB MP 3.55 to MP 3.82 (Coos Bay) Effective August 13, 2025, this section of OR241 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE241: MP 17.7 to 17.8
ORE241, 4 miles East of Allegany
Commercial Vehicle Information
Informational only
- Details
- Alert: OR241 EB & WB MP 17.70 to MP 17.80 (Coos Bay) Effective August 24, 2026, this section of OR241 eastbound and westbound will be restricted to 10 feet 00 inches in width daily between the hours of 7:00 AM and 6:00 PM. The estimated completion date for this work is September 18, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE34: MP 7.7
ORE34, Tangent
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/22/2026 12:00:00 AM
- Details
- Alert: OR34 EB off-ramp to OR99E & OR99E off-ramp to OR34 WB (Tangent) Effective September 22, 2026, the OR34 eastbound off-ramp to OR99E & OR99E off-ramp to OR34 westbound will be closed at night between the hours of 9:00 PM & 5:00 AM. The estimated completion date for this work is September 23, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE35: MP 70.65
ORE35, 13 miles East of Intersection with Warm Springs Highway US26
Crash/Hazard
Informational only
- Comments
- A fire is in the area and has many forest service roads closed. Use caution. For more information visit Mt. Hood National Forest | Closure in place for Grasshopper Fire | Forest Service at www.fs.usda.gov. <!--Links Start Here--> [Link to Additional Information](https://www.fs.usda.gov/r06/mthood/alerts/closure-place-grasshopper-fire)
- Last Updated
- 9/03/2026 2:48 PM
ORE36: MP 18 to 61
ORE36, 9 miles West of Triangle Lake
Information
Informational only
- Comments
- Herbicide Application.
- Last Updated
- 9/12/2026 4:30 AM
ORE39: MP 2.72 to 2.96
ORE140, 2 miles East of Klamath Falls
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 8/13/2026 5:05 PM
ORE39: MP 5.63
ORE39, 8 miles West of Merrill
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
- Last Updated
- 9/12/2026 7:57 AM
ORE39: MP 13.63
ORE39, Merrill
Construction Work
No to Minimum Delay
- Lanes Affected
- (Westbound) , Shoulder (Eastbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 8/13/2026 5:02 PM
ORE413: MP 11.03 to 11.45
ORE413, Intersection with Pine Creek Highway
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be on-site for punchlist work for the project. Use caution, prepare to slow.
- Last Updated
- 9/08/2026 3:48 AM
ORE42: EB MP 0 to 9.7
ORE42, Intersection with Oregon Coast Highway US101
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 8/13/2026 5:07 PM
ORE42: MP 20.8 to 21.9
ORE42, Myrtle Point
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 8/13/2026 5:07 PM
ORE42: MP 35 to 42
ORE42, 2 miles West of Remote
Construction Work
No to Minimum Delay
- Lanes Affected
- (Westbound) , Shoulder (Eastbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 8/13/2026 5:14 PM
ORE42: MP 72 to 77
ORE42, 1 mile West of Winston
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 8/13/2026 5:29 PM
ORE42: MP 72.54 to 76.95
ORE42, Winston
Commercial Vehicle Information
Informational only
- Details
- Alert: OR42 EB & WB MP 72.54 to MP 76.95 (Winston) Effective April 26, 2026, this section of OR42 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours beginning Sundays at 6 PM through Fridays at 3 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 25, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE43: MP 0 to 2.72
ORE43, Intersection with Mount Hood Highway US26
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: OR43 SB MP 0 to MP 2.72 (Portland) Effective Sunday October 4, 2026, the SB Right lane will be closed in this section of OR43 as well as the SB bound exit to the Sellwood bridge(Traveling east) will be closed, they will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE43: MP 11.08
ORE43, Interstate 205
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/16/2026 12:00:00 AM
- Details
- Alert: OR43 SB off-ramp to I-205 NB (West Linn) Effective September 16, 2026, the OR43 southbound off-ramp to I-205 northbound will be closed Wednesday and Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is September 18, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE43: MP 11.08
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- Alert: OR43 SB off-ramp to I-205 NB (West Linn) Effective August 26, 2026, the OR43 southbound off-ramp to I-205 northbound will be closed Sunday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. The estimated completion date for this work is October 3, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE43: MP 11.13 to 11.18
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- Alert: OR43 NB MP 11.13 to MP 11.18 (West Linn) Effective March 2, 2026, this section of OR43 northbound will be closed Sunday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 9 AM. The estimated completion date for this work is October 3, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE43: MP 11.13 to 11.18
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- Alert: OR43 SB MP 11.13 to MP 11.18 (West Linn) Effective, March 2, 2026, this section of OR43 southbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 8 AM. The estimated completion date for this work is October 3, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE43: MP 11.15 to 11.25
ORE43, Interstate 205
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/16/2026 12:00:00 AM
- Details
- Alert: OR43 NB and SB MP 11.15 to MP 11.25 & the I-205 NB on-ramp from OR43 (West Linn) Effective September 16, 2026, this section of OR43 northbound and southbound, and the I-205 northbound on-ramp from OR43 will be closed Wednesday and Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is September 18, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE43: MP 11.15 to 11.25
ORE43, Interstate 205
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/22/2026 12:00:00 AM
- Details
- Alert: OR43 NB and SB MP 11.15 to MP 11.25 & the I-205 NB on-ramp from OR43 (West Linn) Effective September 22, 2026, this section of OR43 northbound and southbound, and the I-205 northbound on-ramp from OR43 will be closed Tuesday and Wednesday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is September 24, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE47: MP 18.37 to 19.06
ORE47, Forest Grove
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 7/31/2026 1:46 PM
ORE540: MP 1.44
ORE540, North Bend
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 2 Lanes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 8/03/2026 4:59 PM
ORE540: MP 1.7 to 2.24
ORE540, North Bend
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 8/24/2026 6:54 PM
ORE542: NB MP 0.33 to 17.38
ORE542, Intersection with Coos Bay - Roseburg Highway ORE42
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 9/10/2026 2:58 PM
ORE569: MP 8.25 to 8.74
ORE569, Eugene
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 9/13/2026 12:00:00 AM
- Details
- Alert: OR569 EB & WB Exit 8 on- and off-ramps to/from River Rd (Eugene) Effective September 13, 2026, the OR569 eastbound and westbound Exit 8 on- and off-ramps to/from River Road will be intermittently closed Sunday through Thursday nights between the hours of 9:00 PM & 5:00 AM. The estimated completion date for this work is September 18, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE569: EB MP 8.45
ORE569, Eugene
Construction Work
Future Event: Closure
- Expected Start Date
- 9/13/2026 9:00:00 PM
Off Ramp
- Comments
- Road Construction is scheduled to occur. Ramps Affected. OR-569 Beltline will remain Open. The OR-569 eastbound and westbound Exit 8 on- and off-ramps to/from River Road will be intermittently closed Sunday through Thursday nights between the hours of 9:00 PM & 5:00 AM. The estimated completion date for this work is September 16, 2026.
- Last Updated
- 9/07/2026 3:32 PM
ORE569: MP 11.4 to 11.89
ORE569, Eugene
Commercial Vehicle Information
Informational only
- Details
- Alert: OR569 EB & WB Exit 12 on- and off-ramps to/from Coburg Rd (Eugene) Effective September 8, 2026, the OR569 eastbound and westbound Exit 12 on- and off-ramps to/from Coburg Road will be intermittently closed Sunday through Thursday nights between the hours of 9:00 PM & 5:00 AM. The estimated completion date for this work is September 12, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE569: EB MP 11.67
ORE569, Eugene
Construction Work
Closure
Off Ramp
- Comments
- Road construction is occurring. Use an alternate route. Ramps Affected. OR-569 Beltline will remain Open. The OR-569 eastbound and westbound Exit 12 on- and off-ramps to/from Coburg Road will be intermittently closed Sunday through Thursday nights between the hours of 9:00 PM & 5:00 AM. The estimated completion date for this work is September 11, 2026.
- Last Updated
- 9/08/2026 9:01 PM
ORE58: MP 42 to 44
ORE58, 3 miles West of McCredie Springs
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Bridge work is occurring. Prepare to slow. Expect daytime single lane closures with an automatic flagger assistant device helping direct traffic east of Oakridge near milepost 43, construction noise and delays up to 20 minutes. Work is currently scheduled to be Monday through Friday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22557)
- Last Updated
- 1/04/2026 12:26 PM
ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Beginning 1/26/26 crews will start working at MP 1.01 and work their way east. Crews working Monday through Friday 7am to 5pm, use caution, watch for workers and slowdown in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
- Last Updated
- 9/10/2026 4:27 PM
ORE6: MP 2 to 2.2
ORE6, 2 miles East of Tillamook
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The westbound right turn lane will be closed during construction. Vehicles may use the westbound through lane to make right turns onto Wilson River Loop. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22706)
- Last Updated
- 9/10/2026 6:11 AM
ORE6: MP 4.4 to 9
ORE6, 4 miles East of Tillamook
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Paving and striping is complete. Expect day or nighttime lane closures to allow the contractor to finish the remaining work. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22787)
- Last Updated
- 8/14/2026 10:22 AM
ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737)
- Last Updated
- 9/04/2026 8:59 AM
ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood
Commercial Vehicle Information
Informational only
- Details
- Alert: OR6 EB & WB MP 32.05 to 32.1 (Devils Lake Fork Wilson River Bridge) Effective February 9, 2026, this section of OR6 eastbound and westbound will be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs GVW, Weight Table 2, for all loads at all hours. The estimated completion date for this work is October 9, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE6: MP 49.9 to 50.2
ORE6, 2 miles West of Intersection with Sunset Highway ORE47
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. This project will construct a roundabout at the intersection of OR 6 at Aerts Rd. Traffic is shifted to a diversion road during construction. Expect shoulder and lane closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=OR6-Aerts)
- Last Updated
- 9/02/2026 7:31 AM
ORE62: WB MP 19 to 13
ORE62, Shady Cove
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 9/10/2026 3:55 PM
ORE62: MP 35.23 to 35.54
ORE62, 15 miles East of Shady Cove
Commercial Vehicle Information
Informational only
- Details
- Alert: OR62 EB & WB MP 35.23 to MP 35.54 (Shady Cove) Effective April 29, 2026, this section of OR62 eastbound and westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is September 30, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE62: MP 35.41
ORE62, 15 miles East of Shady Cove
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect minor delays and allow extra travel time through the project area. Prepare to stop temporarily through the construction zone. Watch for workers. Expect single lane traffic controlled by an automated flagging system. Most delays will be less than 20 minutes. Crews working Monday – Friday, with closures in place 24/7 until Fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22629)
- Last Updated
- 8/13/2026 5:56 PM
ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217
Construction Work
No to Minimum Delay
- Comments
- Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
- Last Updated
- 12/09/2025 8:27 AM
ORE8: MP 13.51 to 14
ORE8, Hillsboro
Commercial Vehicle Information
Informational only
- Details
- Alert: OR8 WB MP 13.51 to MP 14.0 (Hillsboro) Effective June 22, 2026, this section of OR8 westbound will be restricted to 14 feet 00 inches in width at all hours. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 23, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE8: WB MP 13.58
ORE8, Hillsboro
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane
- Comments
- Road maintenance operations will have the WB left lane closed between Dennis AVE and Main ST. Prepare to slow or move over for worker safety.
- Last Updated
- 9/06/2026 12:02 PM
ORE8: WB MP 13.82 to 17.67
ORE8, Hillsboro
Construction Work
No to Minimum Delay
- Comments
- Lane closures on OR 8/SW Baseline Street in Hillsboro between SW Dennis Avenue and SW Main Street. Closure of Main Street northbound between Oak and Baseline. Project Description: This safety improvement project in three locations on OR 8 in Hillsboro and Forest Grove includes new sidewalks, an enhanced pedestrian crosswalk, new lighting and upgraded traffic signals. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21608)
- Last Updated
- 8/30/2026 6:27 AM
ORE82: MP 57.49
ORE82, 2 miles East of Lostine
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. The roadway is reduced to single lane closures controlled by portable traffic signals. Expect delays, use caution, prepare to slow.
- Last Updated
- 9/07/2026 12:09 AM
ORE86: MP 42.01 to 42.4
ORE86, Richland
Construction Work
No to Minimum Delay
- Lanes Affected
- (Westbound) , Shoulder (Eastbound) , Shoulder
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be on site for continuing work. Exercise caution and obey all traffic control signs throughout work zone(s). Prepare to slow.
- Last Updated
- 9/08/2026 3:48 AM
ORE99: SB MP -2.2
US199, Grants Pass
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken sidewalk, use caution.
- Last Updated
- 7/09/2026 3:55 PM
ORE99: MP 17.02
ORE99, 2 miles South of Talent
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers.
- Last Updated
- 8/25/2026 4:27 PM
ORE99E: MP 1.47 to 1.67
ORE99E, Portland
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: OR99E NB MP 1.47 to MP 1.67 (Portland) Effective Sunday October 4, 2026, there will be a NB Closure of the exit to Gresham/ Mt. Hood(US26E), as well as NB Closure of the exit to Ross Island Bridge(US26W). The exits will be closed on this section of OR99E between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE99E: MP 1.47 to 1.67
ORE99E, Portland
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: OR99E SB off-ramp to Holgate Blvd (Portland) Effective Sunday October 4, 2026, the OR99E southbound off-ramp to Holgate Boulevard will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE99E: MP 2.59 to 2.67
ORE99E, Portland
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: OR99E SB off-ramp to Milwaukie Ave (Portland) Effective Sunday October 4, 2026, the OR99E southbound off-ramp to Milwaukie Avenue will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE99E: MP 10.5
ORE99E, 1 mile North of Gladstone
Construction Work
Informational only
- Comments
- Construction is anticipated to begin in late July 2026. Travelers can expect lane closures on OR 99E. Construction is anticipated to begin in late July 2026. Travelers can expect lane closures on OR 99E. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22867)
- Last Updated
- 9/11/2026 12:49 PM
ORE99E: MP 11.63
ORE99E, Oregon City
Commercial Vehicle Information
Informational only
- Details
- Alert: OR99E SB off-ramp to I-205 SB (Oregon City) Effective March 2, 2026, the OR99E southbound off-ramp to I-205 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. Friday nights between the hours of 10 PM and 7 AM. The estimated completion date for this work is September 26, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE99E: MP 40.75 to 40.81
ORE99E, Brooks
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Watch for night time lane closures Sunday-Thursday from 7pm-5am.
- Last Updated
- 7/31/2026 1:39 PM
ORE99EB: MP 1.54
99EBus, Salem, Intersection with Hyacinth St NE (East)/Verda Ln (West)
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. Road work. Up to 20 minute delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20741)
- Last Updated
- 8/05/2026 7:19 AM
ORE99W: MP 0.47 to 0.34
ORE99W, Portland
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: OR99W NB off-ramp to the Steel Bridge MP -0.47 to MP -0.34 (Portland) Effective Sunday October 4, 2026, the OR99W northbound off-ramp to the Steel Bridge/Convention Center/Moda Center will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE99W: MP 1.24 to 1.71
ORE99W, I-405 South Interchange
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: OR99W SB MP 1.24 to 1.71 (Portland) Effective Sunday October 4, 2026, this section of OR99W southbound will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE99W: MP 1.24 to 1.71
ORE99W, I-405 South Interchange
Commercial Vehicle Information
Future Event: Informational only
- Expected Start Date
- 10/4/2026 12:00:00 AM
- Details
- Alert: OR99W NB MP 1.24 to 1.71 (Portland) Effective Sunday October 4, 2026, this section of OR99W northbound SW Naito Parkway will be closed between the hours of 6 AM & 2:30 PM. The estimated completion date for the Portland Marathon Event is Sunday October 4, 2026.
- Last Updated
- 9/12/2026 7:00 AM
ORE99W: NB MP 23.23 to 24.49
ORE99W, Intersection with Hillsboro - Silverton Highway ORE214
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
- Last Updated
- 7/31/2026 1:40 PM
ORE99W: MP 36.36 to 39.06
ORE99W, McMinnville
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=ADA)
- Last Updated
- 9/10/2026 7:44 PM
ORE99W: MP 49.72 to 50
ORE99W, 5 miles South of Amity
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect flagging at the OR 99W and Bethel Road intersection with delays and construction noise. Crews are working 9 a.m. to 4 p.m. Monday through Thursday and 9 a.m. to noon on Fridays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22708)
- Last Updated
- 8/11/2026 11:50 AM
ORE99W: NB MP 84.17 to 86.31
ORE99W, Intersection with Corvallis - Newport Highway US20
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Road construction is occurring. Prepare to slow. Watch for workers. Expect nighttime lane closures Sunday through Thursday nights 7:00PM to 6:00AM. Expect some noise and short delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22785)
- Last Updated
- 9/10/2026 1:32 PM