Statewide Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

ORE224, 8 miles East of Estacada MP 31 - 50

OR-224 is closed from Promontory Park to Ripplebrook Rd at mile post 31. FS Road 46 is closed as well. Use alternate route.
Updated
9/21/2021 8:29:00 AM

Weather Alert

Harney Co., Baker Co., Malheur Co., Lower Treasure Valley

Air Stagnation Advisory

NOAA Issue Date: 12/2/2021 03:05:00 PM What An extended period of stagnant air, with light winds and little vertical mixing. Where Portions of southeast Oregon and southwest Idaho. When Until 8 AM MST /7 AM PST/ Saturday. Impacts Periods of air stagnation can lead to the buildup of pollutants near the surface. Additional details This product concerns itself with meteorological conditions, not pollution. For more information on air pollution in Idaho, please contact your regional deq office at www.deq.idaho.gov. in Oregon, please contact www.oregon.gov/deq/. Precautionary/preparedness actions... If possible, reduce or eliminate activities that contribute to air pollution, such as outdoor burning, and the use of residential wood burning devices. Reduce vehicle trips and vehicle idling as much as possible. Check with local agencies for possible restrictions in your area.

Weather Alert

East Curry Co. & Josephine Co., Jackson Co.

Air Stagnation Advisory

NOAA Issue Date: 12/2/2021 02:10:00 PM What Degraded air quality due to poor mixing expected. Where The rogue Valley including Medford, Grants Pass, Ashland, Eagle Point, and shady Cove. When Until 7 AM PST Monday. Impacts Air stagnation is likely to result in diminishing air quality with time, especially in and near areas with significant sources of air pollution. Diminished air quality is likely to cause health issues for people with respiratory problems if precautions are not taken. View the hazard area in detail at https://www.wrh.noaa.gov/map/?wfo=mfr Precautionary/preparedness actions... People with respiratory illness should follow their physician's advice for dealing with diminished air quality. N95 masks are effective at filtering out the majority of harmful air particulates. State air quality agencies highly recommend that no outdoor burning occur and that residential wood burning devices be limited as much as possible. According to state air quality agencies, prolonged periods of stagnant air can hold pollutants close to the ground where people live and breathe. Check with your local burn agency for any current restrictions in your area.

Weather Alert

Central & East Lake Co.

Air Stagnation Advisory

NOAA Issue Date: 12/2/2021 02:10:00 PM What Degraded air quality due to poor mixing expected. Where Valleys in central and eastern Lake county. This includes Lakeview, Summer Lake, and Valley falls. When Until 7 AM PST Monday. Impacts Air stagnation is likely to result in diminishing air quality with time, especially in and near areas with significant sources of air pollution. Diminished air quality is likely to cause health issues for people with respiratory problems if precautions are not taken. View the hazard area in detail at https://www.wrh.noaa.gov/map/?wfo=mfr Precautionary/preparedness actions... People with respiratory illness should follow their physician's advice for dealing with diminished air quality. N95 masks are effective at filtering out the majority of harmful air particulates. State air quality agencies highly recommend that no outdoor burning occur and that residential wood burning devices be limited as much as possible. According to state air quality agencies, prolonged periods of stagnant air can hold pollutants close to the ground where people live and breathe. Check with your local burn agency for any current restrictions in your area.

Weather Alert

Klamath Basin, North & East Klamath Co. & West Lake Co.

Air Stagnation Advisory

NOAA Issue Date: 12/2/2021 02:10:00 PM What Degraded air quality due to poor mixing expected. Where The Klamath basin and the highway 97 corridor. This includes Klamath Falls, Sprague River, Chiloquin, Beatty, Keno, Bonanza, and Chemult. When Until 7 AM PST Monday. Impacts Air stagnation is likely to result in diminishing air quality with time, especially in and near areas with significant sources of air pollution. Diminished air quality is likely to cause health issues for people with respiratory problems if precautions are not taken. View the hazard area in detail at https://www.wrh.noaa.gov/map/?wfo=mfr Precautionary/preparedness actions... People with respiratory illness should follow their physician's advice for dealing with diminished air quality. N95 masks are effective at filtering out the majority of harmful air particulates. State air quality agencies highly recommend that no outdoor burning occur and that residential wood burning devices be limited as much as possible. According to state air quality agencies, prolonged periods of stagnant air can hold pollutants close to the ground where people live and breathe. Check with your local burn agency for any current restrictions in your area.

I-205: SB MP 13.45 to 14.17

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
11/28/2021 9:20 AM

I-205: NB MP 19.61 to 19.77

Construction Work
No to Minimum Delay
Comments
Periodic shoulder closures. Nighttime short-term closures of the intersection at SE Division Street and SE 96th Avenue on Wednesday, July 28. Daytime lane closures on Division Street. Pedestrian detours.
Last Updated
11/28/2021 9:20 AM

I-205: MP 19.61 to 21.59

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 19.60 to MP 21.61 (Portland) Effective February 28, 2022, this section of I-205 northbound and southbound will be intermittently restricted to 18 feet 00 inches in width Monday through Friday between the hours of 10 PM & 5 AM, and Friday through Saturday between the hours of 10 PM & 6 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 27, 2022.
Last Updated
12/02/2021 10:00 AM

I-205: NB MP 21.1 to 22

Construction Work
No to Minimum Delay
Comments
Nighttime single lane closures on I-84 WB from Exit 2 to 9 beginning at 9 p.m. Shoulder closure on I-205 NB from Glisan to Exit 22, and on I-84.
Last Updated
11/28/2021 9:17 AM

I-205: MP 21.57 to 19.61

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 21.61 to 19.60 (Portland) Effective February 28, 2022, this section of I-205 southbound will be intermittently restricted to 17 feet 3 inches in height Monday through Friday between the hours of 10 PM & 5 AM, and Friday through Saturday between the hours of 10 PM & 6 AM. Loads over 17 feet 3 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 27, 2022.
Last Updated
12/02/2021 10:00 AM

I-405: SB MP 1.02

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of a disabled vehicle, creating a hazard, has been received. Use caution.
Last Updated
12/02/2021 4:20 PM

I-405: MP 1.96

Commercial Vehicle Information
Informational only
Details
I-405 MP 1.97 SW Taylor St crossing over I-405 (Portland) Effective June 18, 2020, SW Taylor Street crossing over I-405 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 GVW, Weight Table 2.
Last Updated
12/02/2021 10:00 AM

I-5: MP 1 to 11

Weather Warning - SISKIYOU SUMMIT NB
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
54 F
Last Updated
12/02/2021 3:17 PM

I-5: NB MP 10 to 10.5

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
11/21/2021 12:10 PM

I-5: MP 11 to 1

Weather Warning - SISKIYOU SUMMIT SB
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
54 F
Last Updated
12/02/2021 3:20 PM

I-5: MP 57.93

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 58 off-ramp crossing under I-5 to OR99/Scoville Rd (Grants Pass) Effective September 27, 2021, OR99/Scoville Road/6th Street southbound MP -2.6 (Grants Pass) will be intermittently restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is June 27, 2022. This restriction is NOT on the I-5 mainline.
Last Updated
12/02/2021 10:00 AM

I-5: NB MP 58

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
Road construction is occurring. Use caution. Ramps Affected. Watch for single-lane traffic on Scoville Road under the I-5 bridge. The contractor is retrofitting the bridges to better withstand an earthquake.
Last Updated
11/22/2021 12:27 AM

I-5: MP 66 to 81

Weather Warning - SEXTON PASS TO STAGE PASS NB
Informational only
Weather Condition
Ground Fog
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
44 F
Last Updated
12/02/2021 3:16 PM

I-5: SB MP 73 to 74.5

Maintenance Work
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
11/29/2021 7:23 AM

I-5: MP 78.11

Commercial Vehicle Information
Informational only
Details
I-5 MP 78.11 Speaker Rd crossing over I-5 (Canyonville) Effective March 12, 2021, Speaker Rd crossing over I-5 is restricted 21,500 lbs. single axle; 43,000 lbs. tandem axle; Weight Table 3.
Last Updated
12/02/2021 10:00 AM

I-5: NB MP 80

Construction Work
No to Minimum Delay
Off Ramp
Comments
Road construction is occurring causing no to minimum delays. Use caution. Ramps Affected. Watch for intermittent lane closures on the local road under the I-5 bridges.
Last Updated
11/22/2021 12:24 AM

I-5: MP 81 to 66

Weather Warning - SEXTON PASS TO STAGE PASS SB
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
44 F
Last Updated
12/02/2021 3:16 PM

I-5: MP 87.4 to 99.1

Weather Warning - CANYON CREEK PASS
Informational only
Weather Condition
Ground Fog
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
47 F
Last Updated
12/02/2021 3:16 PM

I-5: NB MP 88 to 90

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane (Northbound) 1 Lane
Comments
Road construction is occurring. Use caution. Watch for intermittent fast lane closures in both directions of I-5 between MP 88 and MP 90, as the work will occur in the median. Construction is scheduled to extend from November 15 to December 17. Watch for construction equipment entering and exiting the work areas.
Last Updated
11/22/2021 12:24 AM

I-5: MP 104.85

Commercial Vehicle Information
Informational only
Details
I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Last Updated
12/02/2021 10:00 AM

I-5: MP 112.57

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 112.57 (S Umpqua River Bridge - Roseburg) EffectiveMarch 6, 2022, this section of I-5 southbound will be restricted to 11 feet 00 inches in width at night between the hours of 7 PM & 7 AM. Loads over 11 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is March 8, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 113.66

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 113 on- and off-ramps to/from Clarks Branch Rd (Roseburg) Effective March 20, 2022, the I-5 northbound and southbound on- and off-ramps to/from Clarks Branch Road will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is March 27, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 115 to 118

Weather Warning - ROBERTS MT HILL
Informational only
Weather Condition
Overcast
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
48 F
Last Updated
12/02/2021 3:15 PM

I-5: MP 116.43 to 112.66

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 117.74 to MP 112.64 (Roseburg) Effective May 16, 2020, this section of I-5 southbound will be intermittently restricted to 17 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 3, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 117.74

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 117.5 to MP 119 (Roseburg) Effective May 27, 2021, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 3, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: SB MP 118 to 113

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project (www.RobertsMountain.com) will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Construction has been completed for this construction season. Watch for intermittent lane and shoulder closures as the contractor removes traffic control devices. The contractor will return in spring 2022 to finish paving the northbound lanes.
Last Updated
11/22/2021 12:29 AM

I-5: NB MP 118 to 126

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes
Comments
Road construction is occurring. Use caution. This project will pave eight miles of I-5 between the Garden Valley interchange and Roberts Creek and install or replace sidewalk ADA ramps. Watch for intermittent weeknight (Sunday night to Friday morning, 9 p.m. to 6 a.m.) ramp, lane and shoulder closures. During ramp closures, use alternate routes. At Exit 125 (Garden Valley) and Exit 123 (Fairgrounds), watch for sidewalk and shoulder closures on Garden Valley Boulevard and Portland Avenue due to sidewalk work. Also, watch for work along the northbound off-ramp of Exit 121 (McLain Avenue) due to ADA work at the Mistletoe Hill Lane intersection.
Last Updated
11/22/2021 12:22 AM

I-5: SB MP 118 to 113

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project (www.RobertsMountain.com) will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Construction has been completed for this construction season. Watch for intermittent lane and shoulder closures as the contractor removes traffic control devices. The contractor will return in spring 2022 to finish paving the northbound lanes.
Last Updated
11/22/2021 12:29 AM

I-5: MP 119.18 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 119 to MP 125.5 (Roseburg) Effective May 16, 2021, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights 1/2 hour after sunset to 1/2 before sunrise. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 3, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 119.18 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 119 to MP 125.5 (Roseburg) Effective May 16, 2021, this section of I-5 northbound will be restricted to 16 feet 00 inches in height and southbound will be restricted to 16 feet 05 inches in height Sunday through Thursday nights 1/2 hour after sunset to 1/2 before sunrise. Loads over 16 feet 00 inches in height northbound or over 16 feet 05 inches in height southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 3, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 119.65 to 119.99

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 119 on- and off-ramps to/from OR42 (Roseburg) Effective March 13, 2022, the I-5 northbound Exit 119 on- and off-ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is March 17, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 119.75 to 119.3

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 119 on- and off-ramps to/from OR42 (Roseburg) Effective December 9, 2021 the I-5 southbound Exit 119 on- and off-ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is December 17, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 120.34

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 120 on- and off-ramps to/from Old Hwy 99 (Roseburg) Effective March 13, 2022, the I-5 northbound Exit 120 on- and off-ramps to/from Old Hwy 99 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is March 17, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 120.51 to 120.13

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 120 on- and off-ramps to/from Old Hwy 99 (Roseburg) Effective March 13, 2022, the I-5 southbound Exit 120 on- and off-ramps to/from Old Hwy 99 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is March 17, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 121.09 to 121.9

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 121 on- and off-ramps to/from Mclain Ave (Roseburg) Effective December 9, 2021, the I-5 northbound Exit 121 on- and off-ramps to/from Mclain Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is December 17, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 121.87 to 121.63

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 121 on- and off-ramps to/from Mclain Ave (Roseburg) Effective December 9, 2021, the I-5 southbound Exit 121 on- and off-ramps to/from Mclain Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is December 17, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 122.76 to 123.23

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 123 on- and off-ramps to/from Portland Ave (Roseburg) Effective December 9, 2021, the I-5 northbound Exit 123 on- and off-ramps to/from Portland Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is December 17, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: NB MP 123

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
12/01/2021 9:51 PM

I-5: MP 123.2 to 122.81

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 123 on- and off-ramps to/from Portland Ave (Roseburg) Effective December 9, 2021, the I-5 southbound Exit 123 on- and off-ramps to/from Portland Avenue will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is December 17, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 123.8 to 124.2

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 124 on- and off-ramps to/from OR138 (Roseburg) Effective November 29, 2021, the I-5 northbound Exit 124 on- and off-ramps to/from OR138 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is December 3, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 124.16 to 123.91

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 124 on- and off-ramps to/from OR138 (Roseburg) Effective November 29, 2021, the I-5 southbound Exit 124 on- and off-ramps to/from OR138 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is December 3, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 124.8 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 125 on- and off-ramps to/from Garden Valley Blvd (Roseburg) Effective December 9, 2021, the I-5 northbound Exit 125 on- and off-ramps to/from Garden Valley Boulevard will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is December 17, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 125.36 to 124.87

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 125 on- and off-ramps to/from Garden Valley Blvd (Roseburg) Effective November 29, 2021, the I-5 southbound Exit 125 on- and off-ramps to/from Garden Valley Boulevard will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 6 AM. The estimated completion date for this project is December 3, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: SB MP 126

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
12/01/2021 9:48 PM

I-5: MP 146.49 to 148.49

Weather Warning - RICE HILL
Informational only
Weather Condition
Overcast
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
51 F
Last Updated
12/02/2021 3:15 PM

I-5: MP 151.81

Commercial Vehicle Information
Informational only
Details
I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
12/02/2021 10:00 AM

I-5: MP 160 to 168

Road/Weather Report - N DOUGLAS COUNTY LINE
Informational only
Weather Condition
Overcast
Pavement Condition
Bare Pavement
Current Temp
50 F
Last Updated
12/02/2021 3:15 PM

I-5: MP 234.11

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 234A off-ramp to Fair/Expo - Knox Butte Rd (Albany) Effective January 12, 2022, the I-5 southbound Exit 234A off-ramp to Fair/Expo - Knox Butte Road will be closed at night between the hours of 10 PM & 5 AM. The estimated completion date for this work is January 13, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 234.23

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 234.23 (Albany) Effective January 12, 2022, this section of I-5 southbound will be restricted to 18 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 13, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 283.11 to 285.57

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 283.00 to MP 286.00 (Wilsonville) Effective April 11, 2021, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 29, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: SB MP 283.2 to 288.6

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. Work is weather dependent. Daytime shoulder closures on I-5 and on-and off-ramps.
Last Updated
11/28/2021 9:14 AM

I-5: MP 284.88

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 284.88 (Wilsonville) Effective April 11, 2021, this section of I-5 northbound will be intermittently restricted to 17 feet 3 inches in height at night between the hours of 9 PM & 5 AM. Loads over 17 feet 3 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 29, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 285.82 to 283.11

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 286.00 to MP 283.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 6 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 29, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 286.18 to 288.98

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 286.00 to MP 289.00 (Wilsonville) Effective April 12, 2021, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 29, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 288.98 to 286.15

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 289.00 to MP 286.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 6 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 29, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 288.98 to 286.15

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 289.00 to MP 286.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 17 feet 00 inches in height at night between the hours of 10 PM & 6 AM. Loads over 17 feet 00 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 29, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 288.98 to 286.15

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 289.00 to MP 286.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 6 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 29, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 288.98 to 286.15

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 289.00 to MP 286.00 (Wilsonville) Effective April 12, 2021, this section of I-5 southbound will be intermittently restricted to 17 feet 00 inches in height at night between the hours of 10 PM & 6 AM. Loads over 17 feet 00 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 29, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 291.58 to 292.91

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 291.50 to MP 293.00 (Tigard) Effective July 5, 2021, this section of I-5 northbound will be intermittently restricted to 16 feet 2 inches in height at night between the hours of 10 PM & 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 30, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 292.12

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 292B off-ramp to Kruse Way (Tigard) Effective July 5, 2021, the I-5 northbound Exit 292B off-ramp to Kruse Way will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is December 30, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 292.2

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 292.20 (Tigard) Effective July 5, 2021, this section of I-5 southbound will be intermittently restricted to 16 feet 5 inches in height at night between the hours of 10 PM & 5 AM. Loads over 16 feet 5 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 30, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 292.86 to 291.5

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 291.50 to MP 293.00 (Tigard) Effective July 5, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 18 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 30, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: NB MP 293.73

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. 24/7 right lane closure on southbound Barbur Boulevard between Taylors Ferry Road and Capitol Highway through Oct. 14. Intermittent nighttime lane closures on I-5 south at Capitol Highway and Barbur Boulevard. Daytime lane closures weekdays on the Multnomah Boulevard on-ramp to I-5 north.
Last Updated
11/28/2021 9:14 AM

I-5: MP 295.041

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 295.041 (Portland) Effective August 11, 2021, this section of I-5 northbound will be intermittently restricted to 15 feet 3 inches in height at night between the hours of 8 PM & 5 AM. Loads over 15 feet 3 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 3,2021
Last Updated
12/02/2021 10:00 AM

I-5: MP 296.55

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 296.55 (Portland) Effective August 11, 2021, this section of I-5 northbound will be intermittently restricted to 15 feet 7 inches in height at night between the hours of 8 PM & 5 AM. Loads over 15 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 3,2021
Last Updated
12/02/2021 10:00 AM

I-5: MP 296.68 to 293.28

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 293 to MP 297 (Portland) Effective August 11, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Saturday nights between the hours of 8 PM & 5 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 3,2021
Last Updated
12/02/2021 10:00 AM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 300B off-ramp to US26/OR99E/OMSI/Oregon City/Morrison St Bridge Portland) Effective December 10, 2021 the I-5 southbound Exit 300B off-ramp towards the Morrison St Bridge, will be closed starting Friday at 10 PM to Saturday at 5:00 AM for repairs. The estimated completion date for this work is December 11, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 301.7 to 301.22

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 301.70 to MP 301.22 (Portland) Effective December 10, 2021, this section of I-5 southbound will be restricted to 17 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 17 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 11, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB off-ramp to the Morrison St Bridge (Portland) Effective December 17, 2021, the I-5 southbound off-ramp to the Morrison Street Bridge will be closed all weekend starting Friday at 10 PM through Monday at 5 AM. The estimated completion date for this work is December 20, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 300B off-ramp to US26/OR99E/OMSI/Oregon City/Morrison St Bridge Portland) Effective December 10, 2021 the I-5 southbound Exit 300B off-ramp towards the Morrison St Bridge, will be closed starting Friday at 10 PM to Saturday at 5:00 AM for repairs. The estimated completion date for this work is December 11, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 301.7 to 301.22

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 301.70 to MP 301.22 (Portland) Effective December 10, 2021, this section of I-5 southbound will be restricted to 17 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 17 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 11, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB off-ramp to the Morrison St Bridge (Portland) Effective December 17, 2021, the I-5 southbound off-ramp to the Morrison Street Bridge will be closed all weekend starting Friday at 10 PM through Monday at 5 AM. The estimated completion date for this work is December 20, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 300B off-ramp to US26/OR99E/OMSI/Oregon City/Morrison St Bridge Portland) Effective December 10, 2021 the I-5 southbound Exit 300B off-ramp towards the Morrison St Bridge, will be closed starting Friday at 10 PM to Saturday at 5:00 AM for repairs. The estimated completion date for this work is December 11, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 301.7 to 301.22

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 301.70 to MP 301.22 (Portland) Effective December 10, 2021, this section of I-5 southbound will be restricted to 17 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 17 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 11, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 301.7

Commercial Vehicle Information
Informational only
Details
I-5 SB off-ramp to the Morrison St Bridge (Portland) Effective December 17, 2021, the I-5 southbound off-ramp to the Morrison Street Bridge will be closed all weekend starting Friday at 10 PM through Monday at 5 AM. The estimated completion date for this work is December 20, 2021.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.41

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 305B off-ramp to US30 bypass/ N. Lombard St (Portland) Effective December 27, 2021, the I-5 northbound off ramp to US30 Bypass/N. Lombard will be intermittently closed Monday through Friday nights between the hours of 9 PM and 5 AM. The estimated completion date for this project is January 9, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.41

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 305B off-ramp to US30 bypass/ N. Lombard St (Portland) Effective January 24, 2022, the I-5 northbound off ramp to US30 Bypass/N. Lombard will be intermittently closed Monday through Friday nights between the hours of 9 PM and 5 AM. The estimated completion date for this project is February 16, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.41

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 305B off-ramp to US30 bypass/ N. Lombard St (Portland) Effective March 21, 2022, the I-5 northbound off ramp to US30 Bypass/N. Lombard will be intermittently closed Monday through Friday nights between the hours of 9 PM and 5 AM. The estimated completion date for this project is April 8, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.41

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 305B off-ramp to US30 bypass/ N. Lombard St (Portland) Effective December 27, 2021, the I-5 northbound off ramp to US30 Bypass/N. Lombard will be intermittently closed Monday through Friday nights between the hours of 9 PM and 5 AM. The estimated completion date for this project is January 9, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.41

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 305B off-ramp to US30 bypass/ N. Lombard St (Portland) Effective January 24, 2022, the I-5 northbound off ramp to US30 Bypass/N. Lombard will be intermittently closed Monday through Friday nights between the hours of 9 PM and 5 AM. The estimated completion date for this project is February 16, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.41

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 305B off-ramp to US30 bypass/ N. Lombard St (Portland) Effective March 21, 2022, the I-5 northbound off ramp to US30 Bypass/N. Lombard will be intermittently closed Monday through Friday nights between the hours of 9 PM and 5 AM. The estimated completion date for this project is April 8, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.44 to 304.18

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 304.18 to MP 305.44 (Portland) Effective December 27, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is April 13, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.44 to 304.18

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 304.18 to MP 305.44 (Portland) Effective December 27, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 15 feet 9 inches in height Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 15 feet 9 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is April 13, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.44 to 304.18

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 304.18 to MP 305.44 (Portland) Effective December 27, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is April 13, 2022.
Last Updated
12/02/2021 10:00 AM

I-5: MP 305.44 to 304.18

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 304.18 to MP 305.44 (Portland) Effective December 27, 2021, this section of I-5 northbound and southbound will be intermittently restricted to 15 feet 9 inches in height Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 15 feet 9 inches in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is April 13, 2022.
Last Updated
12/02/2021 10:00 AM

I-84: WB MP 2 to 9.7

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures on I-84 WB from Exit 2 to 9 beginning at 9 p.m. Shoulder closure on I-205 NB from Glisan to Exit 22, and on I-84.
Last Updated
11/28/2021 9:19 AM

I-84: MP 5.64 to 5.87

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 5.60 to MP 6.35 (Portland) Effective November 10, 2021, this section of I-84 westbound will be intermittently restricted to 13 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is January 4, 2022.
Last Updated
12/02/2021 10:00 AM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective October 30, 2021, the I-84 eastbound Exit 7 off-ramp to Halsey Street will be intermittently closed at night between the hours of 9 PM & 5 AM. The estimated completion date for this project is January 4, 2022.
Last Updated
12/02/2021 10:00 AM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective October 30, 2021, this section of I-84 westbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is January 4, 2022.
Last Updated
12/02/2021 10:00 AM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective October 30, 2021, the I-84 eastbound Exit 7 off-ramp to Halsey Street will be intermittently closed at night between the hours of 9 PM & 5 AM. The estimated completion date for this project is January 4, 2022.
Last Updated
12/02/2021 10:00 AM

I-84: MP 5.69

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective October 30, 2021, this section of I-84 westbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is January 4, 2022.
Last Updated
12/02/2021 10:00 AM

I-84: MP 6.55 to 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 6.50 to MP 7.00 (Portland) Effective July 6, 2021, this section of I-84 eastbound and westbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights from half an hour after sunset to 5 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 23, 2021.
Last Updated
12/02/2021 10:00 AM

I-84: MP 6.55

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 9 off-ramp to 102nd Ave (Portland) Effective July 6, 2021, the I-84 eastbound Exit 9 off-ramp to 102nd Avenue will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is December 23, 2021.
Last Updated
12/02/2021 10:00 AM

I-84: MP 6.55 to 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 6.50 to MP 7.00 (Portland) Effective July 6, 2021, this section of I-84 eastbound and westbound will be intermittently restricted to 13 feet 00 inches in width Monday through Thursday nights from half an hour after sunset to 5 AM. Loads over 13 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 23, 2021.
Last Updated
12/02/2021 10:00 AM

I-84: MP 6.55

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 9 off-ramp to 102nd Ave (Portland) Effective July 6, 2021, the I-84 eastbound Exit 9 off-ramp to 102nd Avenue will be intermittently closed Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is December 23, 2021.
Last Updated
12/02/2021 10:00 AM

I-84: MP 6.74

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 6.74 (Portland) Effective July 6, 2021, this section of I-84 eastbound will be intermittently restricted to 18 feet 3 inches and westbound will be intermittently restricted to 15 feet 1 inch in height Monday through Thursday nights from half an hour after sunset to 5 AM. Loads over 18 feet 3 inches eastbound and 15 feet 1 inch westbound in height will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 23, 2021.
Last Updated
12/02/2021 10:00 AM

I-84: MP 13.03 to 44

Weather Warning - TROUTDALE - CASCADE LOCKS
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
52 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:31 PM

I-84: MP 41.43

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 41 to Eagle Creek (Eagle Creek Bridge) Effective June 18, 2020, the I-84 EB Exit 41 ramp over Eagle Creek is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2. This restriction is NOT on the I-84 mainline.
Last Updated
12/02/2021 10:00 AM

I-84: MP 44 to 64

Weather Warning - CASCADE LOCKS - HOOD RIVER
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
52 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:31 PM

I-84: WB MP 58 to 59

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Rolling slowdowns Thursday, Dec. 2 between 9-11 a.m. from Cascade Locks to Memaloose State Park. Expect long delays. I-84 Exit 58 to Mitchell Point Overlook closed around-the-clock.
Last Updated
11/29/2021 9:50 AM

I-84: MP 59.84 to 61.81

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 59.75 to MP 61.30 (Hood River) Effective January 2, 2022 this section of I-84 eastbound and westbound will be intermittently restricted to 17 feet 00 inches in width at all hours. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. (If the Mitchell Point Tunnel rolling slowdowns are in effect for Tuesdays and Thursdays from 8AM to 1PM, then lane restrictions will not be). The estimated completion date for this work is February 11, 2022.
Last Updated
12/02/2021 10:00 AM

I-84: MP 60.14

Commercial Vehicle Information
Informational only
Details
I-84 WB off-ramp to Mitchell Point Rd (Hood River) Effective January 2, 2022, the I-84 westbound off-ramp to Mitchell Point Road will be restricted to 10 feet 00 inches in width between the hours of 8 AM & 5 PM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 28, 2022.
Last Updated
12/02/2021 10:00 AM

I-84: MP 64 to 87

Weather Warning - HOOD RIVER - THE DALLES
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
58 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:00 PM

I-84: MP 87 to 112

Road/Weather Report - THE DALLES - RUFUS
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
58 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:00 PM

I-84: MP 112 to 150

Road/Weather Report - ARLINGTON
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
53 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:01 PM

I-84: MP 167.58 to 193

Road/Weather Report - HERMISTON
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Current Temp
60 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:06 PM

I-84: EB MP 168 to 253.6

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 3 Lanes
Comments
Road construction is occurring causing no to minimum delays. Use caution. The work performed will be for culvert repairs and replacements.
Last Updated
11/12/2021 10:30 PM

I-84: MP 193 to 216

Road/Weather Report - PENDLETON
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
65 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:05 PM

I-84: MP 216 to 226

Weather Warning - CABBAGE HILL EB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
48 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:03 PM

I-84: MP 226 to 264

Weather Warning - MEACHAM EB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
50 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:06 PM

I-84: MP 226 to 216

Weather Warning - CABBAGE HILL WB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
48 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:03 PM

I-84: MP 264 to 226

Weather Warning - MEACHAM WB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
50 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:06 PM

I-84: MP 266 to 281

Weather Warning - LADD CANYON EB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
55 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:07 PM

I-84: MP 280.53

Commercial Vehicle Information
Informational only
Details
I-84 MP 280.53 McCanse Rd crossing over I-84 (west of Baker City) Effective March 5, 2018, McCanse Rd crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
12/02/2021 10:00 AM

I-84: MP 281 to 266

Weather Warning - LADD CANYON WB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
55 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:07 PM

I-84: MP 285 to 299.9

Road/Weather Report - BAKER VALLEY
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
49 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:10 PM

I-84: MP 291.65

Commercial Vehicle Information
Informational only
Details
I-84 MP 291.65 Charles Green Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Charles Green Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
12/02/2021 10:00 AM

I-84: MP 295.67

Commercial Vehicle Information
Informational only
Details
I-84 MP 295.67 Culley Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Culley Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
12/02/2021 10:00 AM

I-84: MP 300 to 328

Weather Warning - PLEASANT VALLEY EB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
46 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:10 PM

I-84: MP 328 to 300

Weather Warning - PLEASANT VALLEY WB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
46 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:11 PM

I-84: MP 347.85 to 328.1

Road/Weather Report - BURNT RIVER CANYON
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
49 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:11 PM

I-84: MP 352 to 374

Weather Warning - THREE MILE HILL
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
48 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:01 PM

I-84: MP 367 to 378

Weather Warning - ONTARIO
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
48 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:01 PM

US101: MP 4.78

Commercial Vehicle Information
Informational only
Details
US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
12/02/2021 10:00 AM

US101: MP 4.91

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 4.53 to MP 5.33 (New Young's Bay Bridge - Astoria) Effective February 15, 2019, this section of US101 northbound and southbound will be intermittently restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is January 10, 2022.
Last Updated
12/02/2021 10:00 AM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective July 1, 2020, US101 Business crossing the Old Youngs Bay Bridge is restricted to the following weights: 25 tons SU4 & SU5 (4 and 5 axle single unit trucks); 26 tons SU6 & SU7 (6 and 7 axle single-unit trucks); 20,000 single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1 for combinations.
Last Updated
12/02/2021 10:00 AM

US101: MP 77.53

Commercial Vehicle Information
Informational only
Details
US101 MP 77.53 (West Beaver Creek Bridge - Beaver) Effective October 23, 2020, US101 crossing West Beaver Creek Bridge at MP 77.53 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

US101: MP 79.61

Commercial Vehicle Information
Informational only
Details
US101 MP 79.61 (Beaver Creek Bridge - Beaver) Effective January 4, 2019, US101 crossing Beaver Creek Bridge at MP 76.61 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

US101: MP 80.32

Commercial Vehicle Information
Informational only
Details
US101 MP 80.32 (Beaver Creek Bridge - Beaver) Effective March 12, 2021, US101 crossing Beaver Creek Bridge at MP 80.32 is restricted to the following weights: 26 tons for SU5 & SU6 (5 to 6-axle single-unit trucks); 27 tons SU7 (7 axle-single-unit trucks).
Last Updated
12/02/2021 10:00 AM

US101: MP 112

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder
Comments
A landslide has occurred causing no to minimum delays. Use caution. The Northbound Shoulder is currently closed due to an active landslide. No Vehicle Travel Lanes affected.
Last Updated
11/14/2021 9:06 PM

US101: MP 114.88

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Devil’s Lake Outlet: All sidewalks are open. Minor work is taking place under the bridge. No delays are expected.
Last Updated
11/16/2021 9:44 PM

US101: MP 118.17

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution.
Last Updated
11/16/2021 9:46 PM

US101: MP 141.44 to 141.83

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Most work will take place under the bridge with little impact to traffic. Occasional night lane closures are needed to set up scaffolding and move equipment. The eastern sidewalk will be closed for the duration of the project in the near future. A pedestrian detour is in place at the south end of the bridge.
Last Updated
10/28/2021 1:46 PM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
12/02/2021 10:00 AM

US101: MP 190.98

Commercial Vehicle Information
Informational only
Details
US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Last Updated
12/02/2021 10:00 AM

US101: MP 196.94

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Siltcoos River Bridge: Concrete repair and reinforcement work is underway under the bridge. The east rail is under construction. There will be night work with intermittent lane closures. Flagger will be controlling traffic. Expect minor delays.
Last Updated
11/16/2021 9:48 PM

US101: NB MP 238.9

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. This project will make several improvements at the intersections U.S. 101 (northbound and southbound) and Johnson Avenue in south Coos Bay. Watch for intermittent lane and shoulder closures. Construction will require some sidewalk closures, but alternate pedestrian routes will be provided.
Last Updated
11/22/2021 12:19 AM

US101: MP 311.4

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic.
Last Updated
12/02/2021 10:00 AM

US101: MP 326.47

Commercial Vehicle Information
Informational only
Details
US101 MP 326.47 (Connector Road Bridge - Gold Beach) Effective January 14, 2019, US101 crossing Connector Road Bridge at MP 326.47 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 vehicles (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

US101: MP 348.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Expect intermittent weekday (Monday-Friday, 7 a.m. to 6 p.m.) lane closures and brief delays. Flaggers will provide traffic control as need. All work is scheduled to be completed by Nov. 30.
Last Updated
11/22/2021 12:21 AM

US197: MP 0.48 to 0.61

Construction Work
Informational only
Lanes Affected
(Northbound) 2 Lanes (Southbound) 1 Lane
Comments
The Dalles Bridge will be closed to all traffic and pedestrians from 8pm Thurs until Mon 6am, please follow posted detour route signs.
Last Updated
11/29/2021 6:13 AM

US197: MP 3.6

Road/Weather Report - THE DALLES
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Current Temp
54 F
New Snow
0 in.
Roadside Snow
Trace
Last Updated
12/02/2021 3:02 PM

US197: MP 45.09

Road/Weather Report - MAUPIN
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Current Temp
54 F
New Snow
0 in.
Roadside Snow
2 in.
Last Updated
12/02/2021 3:02 PM

US199: MP -0.14

Commercial Vehicle Information
Informational only
Details
US199 SB MP -0.13 (Rogue River Bridge) - Grants Pass Effective March 24, 2021, the Rogue River (Caveman) Bridge is restricted to Weight Table 3 weights. All single-trip permits over Weight Table 3 must stop traffic, straddle centerline, and be the only vehicle on the bridge when crossing.
Last Updated
12/02/2021 10:00 AM

US199: MP 14 to 17

Weather Warning - HAYES HILL SMT
Informational only
Weather Condition
Ground Fog
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
Last Updated
12/02/2021 3:17 PM

US20: MP 3.56

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. ODOT will construct a single lane roundabout at the intersection of US20 and Ward/Hamby roads
Last Updated
11/29/2021 3:17 PM

US20: MP 10.44

Commercial Vehicle Information
Informational only
Details
US20 EB MP 10.44 crossing Willamette River Ellsworth Bridge (Albany) Effective January 3, 2022, this section of US20 eastbound, crossing the Willamette River/Ellsworth bridge, will be restricted to 10 feet 00 inches in width between the hours of 10 PM & 5:30 AM for bridge inspections. The estimated completion date for this work is January 6,2022.
Last Updated
12/02/2021 10:00 AM

US20: MP 18.99 to 20.99

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane (Southbound) Median , 1 Lane
Comments
Road construction is occurring. Use caution. Work consists of updates to the sidewalks, bike lanes and ADA ramps. Updates to the signals, illumination devices, and storm water and drainage features. Updates to the bus stop locations, installation of new signs, and the installation of rapid flashing beacon crosswalks.
Last Updated
11/29/2021 3:23 PM

US20: MP 19.03 to 19.66

Commercial Vehicle Information
Informational only
Details
US20/US97 Bus EB & WB MP 18.99 to MP 19.66 (Bend) Effective November 29, 2021, this section of US20/US97 Business will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this project is May 19, 2022.
Last Updated
12/02/2021 10:00 AM

US20: MP 52.5 to 71.59

Weather Warning - TOMBSTONE
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
47 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:29 PM

US20: MP 54

Crash/Hazard
Estimated delay under 20 minutes
Comments
A crash has occurred, use caution.
Last Updated
12/02/2021 2:38 PM

US20: MP 55.5 to 56.5

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Current impacts are a 24/7 single lane closure with hard barrier and flagging through December 21st. One 15’ wide lane is available that can accommodate vehicles up to 12’ in width.
Last Updated
10/28/2021 1:35 PM

US20: MP 56.6

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 55.90 to MP 56.90 (Cascadia) Effective September 7, 2021, this section of US20 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is December 20, 2021.
Last Updated
12/02/2021 10:00 AM

US20: MP 71.59 to 88

Weather Warning - SANTIAM PASS SMT
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
42 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:31 PM

US20: MP 88.2 to 100.12

Weather Warning - SISTERS
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
56 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:01 PM

US20: MP 99.94

Commercial Vehicle Information
Informational only
Details
US20 MP 99.94 EB & WB (Sisters) Effective November 28, 2017, this section of US20 eastbound and westbound is restricted to 14 feet 00 inches in width and/or 154 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
12/02/2021 10:00 AM

US20: MP 132.51

Road/Weather Report - BURNS
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Current Temp
55 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:04 PM

US20: MP 161

Weather Warning - STINKINGWATER SUMMIT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
40 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 9:40 AM

US20: MP 166.6 to 240

Weather Warning - JUNTURA
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 9:40 AM

US20: MP 245.72 to 246.53

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
11/25/2021 8:46 PM

US20: MP 265.17 to 266.52

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
11/12/2021 10:30 PM

US26: MP 0.98

Construction Work
Informational only
Comments
24/7 right lane closure on Kruse Way over I-5.
Last Updated
11/28/2021 9:22 AM

US26: MP 8.22

Commercial Vehicle Information
Informational only
Details
US26 MP 8.22 (Little Humbug Creek Bridge - Necanicum Jct) Effective October 23, 2020, US26 crossing Little Humbug Creek Bridge at MP 8.22 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

US26: MP 10.17 to 14.14

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 9.85 to MP 15.05 (Elsie) Effective March 21, 2021, this section of US26 eastbound and westbound will be intermittently restricted to 16 feet 00 inches in width Sundays at 7 PM through Fridays at 12 PM (noon). Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 29, 2021.
Last Updated
12/02/2021 10:00 AM

US26: MP 17 to 18

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
12/02/2021 8:19 AM

US26: EB MP 24.51 to 22.89

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
9/26/2021 5:41 AM

US26: MP 30.3 to 32.49

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime single lane closures Monday through 9 a.m. Friday. Signed detours for people walking and biking.
Last Updated
11/28/2021 9:21 AM

US26: MP 37.73 to 45.43

Weather Warning - SUNSET SUMMIT
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 4:09 PM

US26: MP 42.5 to 60

Weather Warning - GOVERNMENT CAMP
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
36 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:33 PM

US26: MP 49.28 to 49.43

Commercial Vehicle Information
Informational only
Details
US26 EB & WB on- and off-ramps to/from OR47 NB & SB (Manning) Effective March 15, 2022, the US26 eastbound and westbound on- and off-ramps to/from OR47 northbound and southbound will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is March 16, 2022.
Last Updated
12/02/2021 10:00 AM

US26: MP 57.3 to 50

Weather Warning - OCHOCO SUMMIT
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
46 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:02 PM

US26: MP 59.57 to 67

Weather Warning - BLUE BOX PASS
Informational only
Weather Condition
Intermittent Showers
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
40 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:03 PM

US26: WB MP 64.28

Maintenance Work
No to Minimum Delay
Comments
Road work has the EB right lane closed near Hood River. Use caution.
Last Updated
11/21/2021 8:08 AM

US26: MP 64.91 to 65.19

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of construction of a new bridge, installation of new guardrail, signage and drainage structures.
Last Updated
11/29/2021 2:51 PM

US26: MP 67 to 75.5

Weather Warning - WARM SPRINGS JCT
Informational only
Weather Condition
Intermittent Showers
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
40 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:03 PM

US26: EB MP 70.64

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) Median , 1 Lane
Comments
A stall has the EB left lane closed at Camelot. Use caution.
Last Updated
12/02/2021 4:42 PM

US26: EB MP 71.3 to 66.5

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures in both directions Monday.
Last Updated
11/28/2021 9:20 AM

US26: MP 99 to 103

Road/Weather Report - WARM SPRINGS GRADE
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Current Temp
49 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:54 PM

US26: MP 103.02 to 111.16

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Project; Construction of new ADA ramps and an illuminated multi-use path throughout the city of Warm Springs, install pedestrian crossing safety devises across US26, update and replace the guardrail & repave the highway with new pavement marking and signage.
Last Updated
11/29/2021 2:53 PM

US26: MP 115.58

Commercial Vehicle Information
Informational only
Details
US26 MP 115.58 (North Unit Canal Bridge - Madras) Effective February 5, 2019, US26 crossing North Unit Canal Bridge at MP 115.58 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

US26: MP 190.47 to 191.3

Weather Warning - AUSTIN
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
New Snow
0 in.
Roadside Snow
3 in.
Last Updated
12/02/2021 3:02 PM

US26: MP 218.43 to 225.23

Weather Warning - ELDORADO PASS
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:02 PM

US26: MP 231.12 to 253.84

Weather Warning - BROGAN HILL
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
27 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 9:44 AM

US26: MP 277.71 to 278.21

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
11/25/2021 8:49 PM

US30: MP 0.03

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Last Updated
12/02/2021 10:00 AM

US30: MP 0.46

Commercial Vehicle Information
Informational only
Details
US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
12/02/2021 10:00 AM

US30: MP 2.82 to 4.91

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA ramps.
Last Updated
11/25/2021 8:38 PM

US30: MP 5.25 to 5.38

Commercial Vehicle Information
Informational only
Details
US30 Bypass EB MP 5.20 to MP 5.40 (Portland) Effective December 27, 2021, this section of US30 Bypass eastbound will be restricted to 13 feet 00 inches in width at all hours. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is February 25, 2022.
Last Updated
12/02/2021 10:00 AM

US30: MP 11.93

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

US30: MP 13.14

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 13.14 (Shepperd's Dell Bridge) Effective March 12, 2021, US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperd's Dell) Bridge is restricted to the following weights: 18 tons for Type 3 Vehicles (3 axle single-unit trucks); 17 tons for SU4 (4 axle single-unit trucks); 19 tons for SU5, SU6 & SU7 (5 to 7 axle single-unit trucks); 28 tons for Type 3S2 (truck tractor/semitrailer); 35 tons for Type 3-3 (truck and trailer vehicles).
Last Updated
12/02/2021 10:00 AM

US30: MP 17.68

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) Effective March 12, 2021, US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 11 tons for all vehicles.
Last Updated
12/02/2021 10:00 AM

US30: MP 18.21

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 18.21 (East Multnomah Falls Bridge) Effective March 12, 2021 , US30 (Historic Columbia River Hwy) crossing East Multnomah Falls Bridge is restricted to 20,000 lbs. single axle; 34,000 lbs. tandem axle; Weight Table 2.
Last Updated
12/02/2021 10:00 AM

US30: MP 18.37 to 65.99

Weather Warning - CLATSKANIE
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 4:10 PM

US30: MP 20.39

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
12/02/2021 10:00 AM

US30: MP 23.15

Commercial Vehicle Information
Informational only
Details
US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
Last Updated
12/02/2021 10:00 AM

US30: MP 26.96 to 25.8

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Expect delays and lane closures. Traffic on U.S. 30 will not be detoured. The intersections of U.S. 30 and Millard Road and/or U.S. 30 and Bennett Road will be impacted at various times during construction.
Last Updated
12/02/2021 1:58 PM

US30: MP 30.42

Commercial Vehicle Information
Informational only
Details
US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective October 28, 2019, Bridge of the Gods at US30 MP 30.42 is restricted to the following weights: 25 tons Type 3; 25 tons SU4 (4 axle single-unit trucks); 27 tons SU5 & SU6 (5 and 6 axle single-unit trucks); 28 tons SU7 (7 axle single-unit trucks); 40 tons Type 3S2; 40 tons Type 3-3. This bridge belongs to the Port of Cascade Locks.
Last Updated
12/02/2021 10:00 AM

US30: MP 48.67

Commercial Vehicle Information
Informational only
Details
US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Last Updated
12/02/2021 10:00 AM

US30: MP 51.79 to 52.04

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.79 (Broadway St) to MP 52.04 (Auburn Ave) (Baker City) On December 4, 2021, this section of US30 northbound and southbound will be closed between the hours of 4 PM & 8 PM for the Christmas Twilight Parade.
Last Updated
12/02/2021 10:00 AM

US30: MP 57.281

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 57.28 (Rock Creek Bridge - Mosier) Effective December 17, 2019, US30 (Historic Columbia River Hwy) crossing Rock Creek Bridge at MP 57.28 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 31 tons for SU6 vehicles (6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

US30: MP 57.84

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 57.84 (Mosier Creek Bridge - Mosier) Effective December 17, 2019, US30 (Historic Columbia River Hwy) crossing Mosier Creek Bridge at MP 57.28 is restricted to the following weights: 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

US30: EB MP 73

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Rock fall has occurred causing no to minimum delays. Use caution.
Last Updated
11/27/2021 6:57 AM

US30BY: MP 3 to 5

Construction Work
No to Minimum Delay
Comments
Nighttime lane closures with flaggers directing traffic from 8 p.m. to 6 a.m. Periodic daytime lane closures. Pedestrian detours. Periodic daytime lane closures. Pedestrian detours.
Last Updated
11/28/2021 9:21 AM

US395: MP 3 to 15

Road/Weather Report - PENDLETON SOUTH
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
65 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:05 PM

US395: MP 6.03 to 12.42

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Work consists of resurfacing the travel lanes, bridge driving surfaces, shoulders, and an update to ADA curb ramps.
Last Updated
11/25/2021 7:10 PM

US395: MP 10.3 to 18.27

Weather Warning - CANYON MOUNTAIN
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
43 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:03 PM

US395: MP 15.43 to 46.93

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Clean-up work is scheduled between MP 35-47, expect minor delays.
Last Updated
11/22/2021 8:58 PM

US395: MP 33.6 to 42.5

Weather Warning - BATTLE MT SUMMIT
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
51 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:01 PM

US395: MP 47.3 to 59.6

Weather Warning - DEVINE SUMMIT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
46 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:04 PM

US395: MP 65 to 82.9

Weather Warning - MEADOWBROOK SUMMIT
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
51 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:01 PM

US395: MP 90.49 to 97.18

Weather Warning - LONG CREEK MT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
43 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:03 PM

US395: MP 142.64

Weather Warning - LAKEVIEW
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
59 F
Last Updated
12/02/2021 3:16 PM

US730: MP 182.71 to 183.34

Commercial Vehicle Information
Informational only
Details
US730 EB & WB MP 182.71 to MP 183.34 (Umatilla) On Saturday, December 4, 2021, this section of US730 eastbound and westbound will be closed between the hours of 4 PM & 7 PM, for one day only, for the Umatilla Winter Festival.
Last Updated
12/02/2021 10:00 AM

US95: MP 0 to 22

Weather Warning - JORDAN VALLEY
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
46 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 9:43 AM

US95: MP 66.18 to 121.36

Weather Warning - BASQUE
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
57 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 12:45 PM

US97: MP 17.96

Road/Weather Report - MORO
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
48 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:04 PM

US97: MP 56.04

Road/Weather Report - SHANIKO
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
48 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:04 PM

US97: MP 67.7 to 80.9

Weather Warning - COW CANYON
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
49 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:54 PM

US97: MP 124.4 to 133.51

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Deceleration lanes at Quarry Ave and 61st St from US97 Southbound. Acceleration lane from 61st St to US97 southbound o provide greater merge distance, median barrier installation south of the Tumalo Road Interchange. A turn around from US97 southbound to northbound.
Last Updated
11/29/2021 3:17 PM

US97: MP 130 to 145.48

Road/Weather Report - BEND
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
57 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:05 PM

US97: MP 133.71 to 133.11

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
11/29/2021 2:58 PM

US97: MP 134.84 to 141.12

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
12/01/2021 11:55 PM

US97: SB MP 143.68 to 164.17

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. ODOT will be installing Road and Weather Information System (RWIS), speed sensors, travel time readers and changeable message signs.
Last Updated
11/29/2021 3:17 PM

US97: MP 145.48 to 155.5

Weather Warning - SOUTH OF BEND
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
52 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:05 PM

US97: SB MP 147

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred causing no to minimum delays. Use caution.
Last Updated
12/01/2021 7:42 AM

US97: NB MP 153.11 to 156.26

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Project: Construction of 2 lane NB alignment to extend the divided section. Construct 2 wildlife undercrossing bridges. Install wildlife fencing. Construction of new intersection of US97 and Vandevert Rd.
Last Updated
11/29/2021 3:17 PM

US97: MP 172.19 to 196.42

Weather Warning - LAPINE
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
57 F
Last Updated
12/02/2021 3:16 PM

US97: MP 196.42 to 236.66

Weather Warning - CHEMULT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
55 F
New Snow
0 in.
Last Updated
12/02/2021 3:16 PM

US97: NB MP 208

Crash/Hazard
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
11/21/2021 7:21 AM

US97: MP 240.5 to 243.4

Weather Warning - CHILOQUIN
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
54 F
Last Updated
12/02/2021 3:16 PM

US97: MP 243 to 244

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
11/24/2021 10:25 AM

US97: MP 253.9 to 280.16

Weather Warning - KLAMATH FALLS
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
55 F
Last Updated
12/02/2021 3:15 PM

US97B: WB MP -6.6

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
12/02/2021 8:40 AM

ORE104: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Last Updated
12/02/2021 10:00 AM

ORE11: MP 0 to 35.32

Road/Weather Report - PENDLETON - MILTON FREEWATER
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
65 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:05 PM

ORE120: MP 0.38

Commercial Vehicle Information
Informational only
Details
OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) Effective February 12, 2019, OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to the following weights: 18 tons Type 3, 18 tons SU4, SU5, SU6, & SU7, 28 tons Type 3S2, 35 tons Type 3-3.
Last Updated
12/02/2021 10:00 AM

ORE126: MP 1.34

Commercial Vehicle Information
Informational only
Details
OR126 Bus WB MP 1.34 (Willamette River Bridge - Springfield) Effective July 7, 2021, this section of OR126 Business westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is December 23, 2021.
Last Updated
12/02/2021 10:00 AM

ORE126: MP 2.49 to 1.66

Commercial Vehicle Information
Informational only
Details
OR126 Bus WB MP 1.66 to MP 2.49 (Springfield) Effective December 4, 2021, this section of OR126 Business westbound between 14th Street and Pioneer Parkway will be closed for one day only between the hours of 11 AM & 4 PM for the Annual Springfield Christmas Parade.
Last Updated
12/02/2021 10:00 AM

ORE126: MP 15.19

Commercial Vehicle Information
Informational only
Details
OR126 Right-of-Way MP 15.19 (Knowles Creek Bridge, east of Mapleton) Effective December 1, 2015, all vehicles must be centered on the bridge when crossing. This bridge is NOT on the OR126 mainline.
Last Updated
12/02/2021 10:00 AM

ORE126: MP 15.84

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 15.84 (Prineville) Effective August 5, 2020, this section of OR126 eastbound and westbound is restricted to 16 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 16 feet 00 inches in width. Loads wider than 16 feet and/or 135 feet in overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
12/02/2021 10:00 AM

ORE126: MP 25 to 48

Crash/Hazard
Estimated delay of 20 minutes - 2 hours
Comments
Hazardous tree or vegetation. Use caution. Wildfire recovery work zone. Hazardous tree removal, cleanup and maintenance work on-going. Expect numerous work zones and delays.
Last Updated
10/27/2021 6:11 PM

ORE126: MP 36 to 36.7

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Expect brief delays. The westbound passing lane remains closed through the project. Earth work is underway on the uphill side Monday – Thursday during the day. Flaggers are controlling traffic. Watch for trucks entering and leaving the project.
Last Updated
10/28/2021 1:46 PM

ORE126B: WB MP 1.3 to 1.4

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane
Comments
Bridge work is occurring causing no to minimum delays. Use caution.
Last Updated
10/28/2021 1:47 PM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
12/02/2021 10:00 AM

ORE130: MP 3.6

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) Effective October 23, 2020, OR130 crossing Squaw Creek Bridge at MP 3.60 is restricted to the following weights: 25 tons for SU4 vehicles (4 axle single-unit trucks); 26 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE130: MP 3.82

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
12/02/2021 10:00 AM

ORE130: MP 4.15

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
12/02/2021 10:00 AM

ORE130: MP 4.76

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
12/02/2021 10:00 AM

ORE138: WB MP 10.8

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Use caution. Watch for intermittent lane closures on Monday, Nov. 22, for pavement repairs. Flaggers will provide traffic control as needed. Expect brief delays.
Last Updated
11/22/2021 12:16 AM

ORE138: EB MP 23 to 83

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. In the Archie Creek Fire recovery area (milepost 21-38), Monday-Saturday, 7 a.m. -5 p.m., watch for intermittent lane closures with delays up to 20 minutes throughout the fall and winter. Flaggers and pilot cars will provide traffic control. Expect extended delays through the corridor due to flagging operations at multiple work zones.
Last Updated
11/22/2021 12:25 AM

ORE138: MP 58 to 83

Weather Warning - TOKETEE
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
53 F
Last Updated
12/02/2021 3:25 PM

ORE138: MP 83 to 100.82

Weather Warning - E DIAMOND LAKE SMT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
51 F
Last Updated
12/02/2021 3:25 PM

ORE140: MP 3.74 to 4.75

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Traffic change, the roundabout is open. Paving and rock work is scheduled on Brett Way, expect minor delays at the intersection of Homedale Road and Airway Drive.
Last Updated
11/22/2021 8:59 PM

ORE140: MP 4.75

Weather Warning - WARNER MT SUMMIT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
57 F
Last Updated
12/02/2021 3:16 PM

ORE140: MP 21 to 45

Weather Warning - LK OF THE WOODS
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
53 F
New Snow
0 in.
Roadside Snow
2 in.
Last Updated
12/02/2021 3:15 PM

ORE140: MP 21.5

Weather Impact
Informational only
Comments
Ice warning. Use caution.
Last Updated
11/27/2021 12:46 AM

ORE140: MP 21.5

Weather Impact
Informational only
Comments
Ice warning. Use caution.
Last Updated
11/27/2021 11:42 PM

ORE140: MP 21.5

Weather Impact
Informational only
Comments
Ice warning. Use caution.
Last Updated
11/28/2021 7:05 PM

ORE140: MP 21.5

Weather Impact
Informational only
Comments
Ice warning. Use caution.
Last Updated
12/02/2021 7:16 AM

ORE140: MP 28.03

Weather Warning - ADEL
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
50 F
Roadside Snow
0 in.
Last Updated
12/02/2021 10:05 AM

ORE140: MP 30.93

Weather Warning - BLY SUMMIT
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
55 F
New Snow
0 in.
Last Updated
12/02/2021 3:15 PM

ORE140: MP 51 to 57

Weather Warning - DOAK MT SUMMIT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
53 F
Last Updated
12/02/2021 3:15 PM

ORE140: MP 66.73

Weather Warning - QUARTZ MT SUMMIT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
52 F
Last Updated
12/02/2021 3:15 PM

ORE153: MP 5.88

Commercial Vehicle Information
Informational only
Details
OR153 (Bellevue-Hopewell Hwy) MP 5.88 (Salt Creek Bridge - west of Amity) Effective June 18, 2020, OR153 crossing Salt Creek (Ash Swale) Bridge at MP 5.88 is restricted to 9 tons for all vehicles.
Last Updated
12/02/2021 10:00 AM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
12/02/2021 10:00 AM

ORE173: MP 0.12 to 5.49

Weather Warning - TIMBERLINE LODGE
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
32 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:32 PM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
12/02/2021 10:00 AM

ORE19: MP 22.1 to 73.6

Road/Weather Report - CONDON
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
43 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 4:00 PM

ORE19: MP 119.5

Crash/Hazard
No to Minimum Delay
Comments
Rock fall has occurred causing no to minimum delays. Use caution.
Last Updated
11/20/2021 10:50 AM

ORE201: SB MP 0.02 to 0.41

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
11/25/2021 8:50 PM

ORE203: MP 16.28 to 16.71

Commercial Vehicle Information
Informational only
Details
OR203/OR237 (Main St) NB & SB MP 16.28 to MP 16.71 (Union) Effective December 4, 2021, this section of OR203/OR237 (Main Street) northbound and southbound between Birch Street and Fulton Street will be closed for one day only between the hours of 4:30 PM & 6 PM for the Union Christmas Tree Lighting and Parade.
Last Updated
12/02/2021 10:00 AM

ORE204: MP 0.4 to 39.45

Weather Warning - TOLLGATE EB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
New Snow
0 in.
Roadside Snow
2 in.
Last Updated
12/02/2021 3:09 PM

ORE204: MP 39.45 to 0.4

Weather Warning - TOLLGATE WB
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
New Snow
0 in.
Roadside Snow
2 in.
Last Updated
12/02/2021 3:09 PM

ORE204: MP 40.3 to 40.73

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA curb ramps.
Last Updated
11/25/2021 8:37 PM

ORE204: MP 40.53 to 40.84

Commercial Vehicle Information
Informational only
Details
OR204 EB & WB MP 40.38 to MP 40.84 (Elgin) Effective December 11, 2021, this section of OR204 eastbound and westbound between 17th Street and 8th Avenue/OR82 will be closed for one night only between the hours of 6 PM & 8 PM for the Elgin Light Parade.
Last Updated
12/02/2021 10:00 AM

ORE206: MP 5.99 to 6.04

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
12/02/2021 7:14 AM

ORE207: MP 4.3 to 36

Weather Warning - HEPPNER-SPRAY MOUNTAIN
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
48 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:02 PM

ORE211: MP 11.47 to 12

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Project Description: ODOT, in partnership with the City of Molalla, is making pedestrian and bicycle improvements in Molalla along the north side of Oregon 211 between Oregon 213 and North Hezzie Lane. This project will enhance safety, operations, and efficiency for people walking, biking, driving, rolling, and using transit in the area.
Last Updated
11/28/2021 9:21 AM

ORE211: MP 12.3 to 13.4

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
8/29/2021 8:14 AM

ORE212: MP 8.06 to 5.38

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Daytime lane closures with traffic shifts from 8 a.m. to 4 p.m. weekdays. Nighttime lane closures, traffic shifts and flaggers directing traffic from 8 p.m. to 6 a.m.
Last Updated
11/28/2021 9:22 AM

ORE213: MP 2.23

Commercial Vehicle Information
Informational only
Details
OR213 (NE 82nd Ave) MP 2.24 (UPRR Bridge - Portland) Effective November 21, 2019, OR213 crossing UPRR Bridge at MP 2.23 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE217: MP 4.95

Commercial Vehicle Information
Informational only
Details
OR217 SB MP 4.95 (Tigard) Effective December 13, 2021, this section of OR217 southbound will be restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 17, 2021.
Last Updated
12/02/2021 10:00 AM

ORE217: MP 7.16 to 7.34

Construction Work
Informational only
Comments
24/7 right lane closure on Kruse Way begins as early as September 13. Work only in one direction at a time. ODOT is installing a new bridge rail and bridge fencing on Kruse Way over I-5. Work begins in September and will last about two months. A lane will be closed on only one direction of Kruse Way at a time.
Last Updated
9/04/2021 4:54 PM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
12/02/2021 10:00 AM

ORE22: MP 1.47

Commercial Vehicle Information
Informational only
Details
OR22 MP 1.47 (Cedar Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Cedar Creek Bridge at MP 1.47 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE22: MP 5.81

Commercial Vehicle Information
Informational only
Details
OR22 MP 5.81 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 5.81 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE22: MP 7.19

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.19 (Buck Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Buck Creek Bridge at MP 7.19 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE22: MP 7.32

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.32 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 7.32 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE22: MP 10.49

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
12/02/2021 10:00 AM

ORE22: MP 10.66

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
12/02/2021 10:00 AM

ORE22: MP 33 to 63

Crash/Hazard
Estimated delay of 20 minutes - 2 hours
Comments
OR22 is open to all traffic. Hazard tree removal, clean-up, and maintenance operations will be on-going. Monday-Friday 6am to 8pm. Expect delays.
Last Updated
10/15/2021 8:19 AM

ORE22: MP 62.5

Crash/Hazard
No to Minimum Delay
Comments
Rock fall has occurred causing no to minimum delays. Use caution.
Last Updated
10/25/2021 12:00 PM

ORE22: MP 66.23 to 73

Weather Warning - MARION FORKS
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
47 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:29 PM

ORE22: MP 73 to 81.74

Weather Warning - SANTIAM JCT
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
51 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:31 PM

ORE221: MP 17.29 to 20.78

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
11/21/2021 9:04 PM

ORE223: MP 10.11

Commercial Vehicle Information
Informational only
Details
OR223 MP 10.11 (Little Luckiamute River Bridge - south of Dallas) Effective November 29, 2018, OR223 crossing Little Luckiamute River Bridge at MP 10.11 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE224: MP 31.2 to 49.97

Crash/Hazard
Closure
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
OR-224 is closed from Promontory Park to Ripplebrook Rd at mile post 31. FS Road 46 is closed as well. Use alternate route.
Last Updated
9/21/2021 8:29 AM

ORE224: MP 33.82

Commercial Vehicle Information
Informational only
Details
OR224 EB & WB MP 31.2 to MP 49.97 (Estacada) Effective February 26, 2021, this section of OR224 eastbound and westbound will be closed at all hours. The closure is due to the continuing wildfire cleanup work involving multiple work zones and lane closures.
Last Updated
12/02/2021 10:00 AM

ORE224: MP 49.911

Commercial Vehicle Information
Informational only
Details
OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE230: MP 0 to 23.8

Weather Warning - W DIAMOND LAKE SMT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
51 F
New Snow
0 in.
Roadside Snow
8 in.
Last Updated
12/02/2021 3:25 PM

ORE234: MP 0.04

Commercial Vehicle Information
Informational only
Details
OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
12/02/2021 10:00 AM

ORE237: MP 13.34 to 13.72

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA ramps.
Last Updated
11/25/2021 8:39 PM

ORE238: MP 28 to 33

Road/Weather Report - JACKSONVILLE HILL
Informational only
Weather Condition
Ground Fog
Pavement Condition
Bare Pavement
Current Temp
44 F
Last Updated
12/02/2021 3:17 PM

ORE242: MP 62 to 84

Information
Seasonal Closure
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
The highway is closed for the season. Use alternate routes.
Last Updated
11/03/2021 5:06 PM

ORE27: MP 1.9

Commercial Vehicle Information
Informational only
Details
OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
12/02/2021 10:00 AM

ORE27: MP 2.88

Commercial Vehicle Information
Informational only
Details
OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
12/02/2021 10:00 AM

ORE27: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
12/02/2021 10:00 AM

ORE27: MP 27.23

Commercial Vehicle Information
Informational only
Details
OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) Effective May 27, 2021, OR27 crossing Bear Creek Bridge is restricted to the following weights: 34 tons for SU6 vehicles (6 axle single-unit trucks); 35 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE273: MP 0 to 7.5

Weather Warning - MT ASHLAND SKI ROAD
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
48 F
New Snow
0 in.
Roadside Snow
5 in.
Last Updated
12/02/2021 3:21 PM

ORE281: MP 12.9

Commercial Vehicle Information
Informational only
Details
OR281 MP 12.90 (E Fork Hood River Bridge - Dee) Effective March 26, 2021, OR281 crossing E Fork Hood River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 36 tons for SU7 vehicles.
Last Updated
12/02/2021 10:00 AM

ORE3: MP 15.72

Road/Weather Report - FLORA
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
50 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:12 PM

ORE31: MP 60.6 to 66.2

Weather Warning - PICTURE ROCK PASS
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
Last Updated
12/02/2021 3:17 PM

ORE339: MP 3.16

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
12/02/2021 10:00 AM

ORE339: MP 3.31

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
12/02/2021 10:00 AM

ORE34: MP 0.13

Commercial Vehicle Information
Informational only
Details
Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Effective March 24, 2021, Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 12 tons for all vehicles.
Last Updated
12/02/2021 10:00 AM

ORE34: MP 15 to 27

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing no to minimum delays. Use caution.
Last Updated
12/02/2021 8:11 AM

ORE34: MP 43.03

Commercial Vehicle Information
Informational only
Details
OR34 EB & WB MP 43.03 (N Fork Alsea River Bridge - Alsea) Effective January 18, 2022, this section of OR34 eastbound and westbound will be intermittently restricted to 8 feet 6 inches in width for 2 hours between 9 AM & 4 PM. Loads over 8 feet 6 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 18, 2022.
Last Updated
12/02/2021 10:00 AM

ORE35: MP 60 to 62

Weather Warning - WHITE RIVER
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
38 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:33 PM

ORE35: MP 62 to 68

Weather Warning - BENNETT PASS/MT HOOD MEADOWS
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
37 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:32 PM

ORE35: MP 68 to 83.55

Weather Warning - PARKDALE
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:34 PM

ORE35: MP 101.82

Commercial Vehicle Information
Informational only
Details
OR35 crossing Columbia River (White Salmon) Bridge - Hood River Effective February 3, 2021, OR35 crossing the Columbia River (White Salmon) Bridge is restricted to the following weights: 24 tons for Type 3 (3 axle single-unit trucks); 22 tons for SU4 (4 axle single-unit trucks); 24 tons for SU5 (5 axle single-unit trucks); 25 tons for SU6 & SU7 (6 and 7 axle single-unit trucks); 32 tons for Type 3S2 (truck tractor/semitrailer) & Type 3-3 (truck and trailer vehicles). This bridge belongs to Port of Hood River.
Last Updated
12/02/2021 10:00 AM

ORE35: MP 101.82

Weather Warning - HOOD RIVER
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
50 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:34 PM

ORE36: MP 10.5 to 10.6

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work is occurring. Use caution. Expect minor delays. Expect a 24-7 lane closure with flagging for bridge work through mid-December.
Last Updated
11/30/2021 9:13 PM

ORE36: MP 10.55

Commercial Vehicle Information
Informational only
Details
OR36 EB & WB MP 10.55 (Indian Creek Bridge - Swisshome) Effective October 18, 2021, this section of OR36 eastbound and westbound will be restricted to 9 feet 00 inches in width at all hours. The estimated completion date for this project is December 10, 2021.
Last Updated
12/02/2021 10:00 AM

ORE370: MP 1.48 to 3.29

Commercial Vehicle Information
Informational only
Details
OR370/O'Neil Hwy EB & WB MP 1.50 to MP 3.50 (Redmond) Effective January 24, 2021, this section of OR370 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this work is April 8, 2021.
Last Updated
12/02/2021 10:00 AM

ORE370: MP 2.5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
11/17/2021 8:52 AM

ORE38: MP 17.5 to 18

Maintenance Work
Estimated delay under 20 minutes
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
12/02/2021 7:36 AM

ORE42: EB MP 1 to 2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes
Comments
Road construction is occurring. Use caution. This project will replace two culverts crossing Oregon 42, one at milepost 1.1 and the other at milepost 1.4. Watch for intermittent lanes closures between the U.S. 101 junction and milepost 3. Motorists can expect congestion and delays through the work zone.
Last Updated
11/22/2021 12:19 AM

ORE42: MP 9.6 to 15.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will repave more than 5 miles of Oregon 42 through Coquille, level the roadway between West Central Blvd. and the Oregon 42S junction (milepost 9.9-10.8), replace ADA sidewalk ramps and make other improvements. A new striping pattern has been introduced along Oregon 42 east of Coquille between Adams Street and Finley Loop. The new pattern includes two eastbound lanes, one westbound lane and one center turn lane. Drive with caution through this area as motorists become accustomed to the changes. Throughout the project area, watch for intermittent lane and shoulder closures on Oregon 42.
Last Updated
11/22/2021 12:20 AM

ORE42: MP 48 to 62

Weather Warning - CAMAS MTN
Informational only
Weather Condition
Overcast
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
Last Updated
12/02/2021 3:16 PM

ORE42: MP 72.7 to 73.3

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Watch for intermittent lane and shoulder closures along Oregon 42 through the Winston work zone. Some side street closures may be necessary and detours will be provided. Flaggers will provide traffic control as needed. Pedestrians should watch for sidewalk closures. Alternate routes will be identified.
Last Updated
11/22/2021 12:25 AM

ORE43: MP 11.43

Commercial Vehicle Information
Informational only
Details
OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) Effective September 1, 2021, OR43 crossing the Willamette River Arch Bridge is restricted to the following weights: 25 tons for Type 3 (3 axle single-unit trucks); 23 tons for SU4 (4 axle single-unit trucks); 25 tons for SU5 (5 axle single-unit trucks); 26 tons for SU6 & SU7 (6 and 7 axle single-unit trucks); 40 tons Type 3S2 (truck tractor/semitrailer); 40 tons for Type 3-3 (truck and trailer vehicles).
Last Updated
12/02/2021 10:00 AM

ORE47: MP 64.6

Commercial Vehicle Information
Informational only
Details
OR47 MP 64.60 (Beaver Creek Bridge - south of Vernonia) Effective September 23, 2019, OR47 crossing Beaver Creek Bridge at MP 64.60 is restricted to the following weights: 31 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE47: MP 88.05

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
12/02/2021 10:00 AM

ORE501: MP 0.07 to 0.12

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
11/29/2021 8:00 AM

ORE501: MP 0.07 to 0.12

Maintenance Work
Future Event: Closure
Expected Start Date
12/5/2021 8:00:00 AM
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Bridge work has the highway closed. Use alternate routes. ODOT will be replacing a steel cap support on the structure and will have the road closed at the North Fork Alsea Bridge from 8am-4pm on 12/05/21. There will be no access across the bridge during the construction. There is no detour.
Last Updated
11/22/2021 9:19 PM

ORE501: MP 0.1

Commercial Vehicle Information
Informational only
Details
OR501 NB & SB MP 0.01 (North Fork Alsea River Bridge - Alsea) Effective January 18, 2022, this section of OR501 northbound and southbound will be restricted to 10 feet 00 inches in width between the hours of 9 AM & 4 PM. The estimated completion date for this work is January 19, 2022.
Last Updated
12/02/2021 10:00 AM

ORE501: MP 0.1

Commercial Vehicle Information
Informational only
Details
OR501 NB & SB MP 0.10 (North Fork Alsea River Bridge - Alsea) Effective November 29, 2021, this section of OR501 northbound and southbound will be intermittently restricted to 12 feet 00 inches in width between the hours of 9 AM & 4 PM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 7, 2021.
Last Updated
12/02/2021 10:00 AM

ORE501: MP 0.1

Commercial Vehicle Information
Informational only
Details
OR501 NB & SB MP 0.01 (North Fork Alsea River Bridge - Alsea) Effective December 5, 2021, this section of OR501 northbound and southbound will be closed between the hours of 8 AM & 4 PM. The estimated completion date for this work is December 5, 2021.
Last Updated
12/02/2021 10:00 AM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) Effective September 23, 2019, OR53 crossing Jack Horner Creek Bridge at MP 5.98 is restricted to the following weights: 26 tons for SU4 (4 axle single-unit trucks); 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE53: MP 17.76

Commercial Vehicle Information
Informational only
Details
OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE542: MP 12

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will replace the existing culvert at Long Tom Creek with a 130-foot long concrete bridge. The project is nearly complete. Watch for intermittent lane closures. Flaggers will provide traffic control as needed.
Last Updated
11/22/2021 12:20 AM

ORE569: MP 9.53 to 9.89

Commercial Vehicle Information
Informational only
Details
OR569 EB & WB MP 9.50 to MP 10.00 (Eugene) Effective December 6, 2021, this section of OR569 eastbound and westbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 6 AM. Loads over 16 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 10, 2021.
Last Updated
12/02/2021 10:00 AM

ORE569: MP 9.89

Commercial Vehicle Information
Informational only
Details
OR569 EB off-ramp to OR132/Delta Hwy SB (Eugene) Effective December 6, 2021, the OR569 eastbound off-ramp to OR132/Delta Hwy southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM. The estimated completion date for this project is December 10, 2021.
Last Updated
12/02/2021 10:00 AM

ORE569: WB MP 10.1

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. The new intersection from eastbound Beltline to north and southbound Delta Highway is open. Traffic is controlled by a new traffic light on Delta Highway. Most work affecting traffic occurs at nights: southbound Delta to eastbound Beltline ramp closures and detours to place barrier and guardrail, and eastbound Beltline lane closures for median barrier work.
Last Updated
11/04/2021 12:46 AM

ORE58: MP 12

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder
Comments
A crash has occurred, use caution.
Last Updated
12/02/2021 2:13 PM

ORE58: MP 48 to 64

Weather Warning - WILLAMETTE PASS
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
44 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:32 PM

ORE58: MP 77.42 to 70

Weather Warning - WILLAMETTE PASS EAST
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
45 F
New Snow
0 in.
Roadside Snow
2 in.
Last Updated
12/02/2021 3:16 PM

ORE6: MP 16.06 to 37.5

Weather Warning - WILSON RIVER SMT
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 4:09 PM

ORE62: MP 6.33

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project is in its final weeks. Watch for possible lane/shoulder closures as the contractor performs corrective work and other final items.
Last Updated
11/29/2021 9:02 PM

ORE62: MP 45.32 to 55

Weather Warning - PROSPECT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
50 F
Last Updated
12/02/2021 3:21 PM

ORE62: MP 55 to 65.45

Weather Warning - UPPER CRATER LAKE BDRY
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
50 F
Last Updated
12/02/2021 3:21 PM

ORE66: MP 9 to 41

Weather Warning - GREEN SPRINGS SMT
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
51 F
Last Updated
12/02/2021 3:21 PM

ORE7: MP 0.07 to 25

Weather Warning - TIPTON SUMMIT
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
42 F
New Snow
0 in.
Roadside Snow
3 in.
Last Updated
12/02/2021 3:02 PM

ORE7: MP 33 to 36

Weather Warning - SUMPTER
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
43 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:11 PM

ORE70: MP 6.39 to 6.97

Commercial Vehicle Information
Informational only
Details
OR70 EB & WB MP 6.39 (Casebeer Rd) to MP 6.97 (Market St) (Bonanza) On December 31, 2021, this section of OR70 eastbound and westbound will be closed between the hours of 5 PM & 6 PM for the Hometown Holiday Celebration Light Parade.
Last Updated
12/02/2021 10:00 AM

ORE8: WB MP 16.3 to 17.3

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project rebuilds sidewalk curb ramps along OR 8 from N. 17th Avenue to Yew Street to meet ADA accessibility standards. Work will be complete the end of 2021.
Last Updated
11/28/2021 9:21 AM

ORE82: MP 1.29

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of upgrading ADA ramps.
Last Updated
11/25/2021 7:54 PM

ORE82: MP 1.74 to 2.49

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA ramps.
Last Updated
11/25/2021 7:56 PM

ORE82: MP 11.98 to 12.45

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. The project is for upgrades to the ADA ramps.
Last Updated
11/25/2021 7:57 PM

ORE82: MP 19.62 to 20.56

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Work consists of replacing ADA ramps.
Last Updated
11/25/2021 8:35 PM

ORE82: MP 19.62 to 20.3

Commercial Vehicle Information
Informational only
Details
OR82 EB & WB MP 19.62 to MP 20.30 (Elgin) On December 11, 2021, this section of OR82 eastbound and westbound between Hemlock Street and Division Street will be closed for one night only between the hours of 6 PM & 8 PM for the Elgin Light Parade.
Last Updated
12/02/2021 10:00 AM

ORE82: MP 33

Road/Weather Report - MINAM SUMMIT
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
50 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:09 PM

ORE82: MP 63.95

Road/Weather Report - ENTERPRISE
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
52 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:12 PM

ORE86: MP 40.64

Commercial Vehicle Information
Informational only
Details
OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Last Updated
12/02/2021 10:00 AM

ORE86: MP 47.24

Road/Weather Report - HALFWAY HILL
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Bare Pavement
Current Temp
44 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 1:36 PM

ORE99: MP -0.36

Commercial Vehicle Information
Informational only
Details
OR99W MP -0.36 (Steel Bridge - Portland) Effective October 28, 2019, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 2 & for Non-Divisible Loads 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3.
Last Updated
12/02/2021 10:00 AM

ORE99: MP 1.41

Commercial Vehicle Information
Informational only
Details
OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
12/02/2021 10:00 AM

ORE99: MP 11.11 to 10.91

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 2 Lanes
Comments
Road construction is occurring. Use caution. Monday thru Wednesday, watch for lane closures with flaggers and intermittent delays near the Coleman Creek culvert. After Thanksgiving, expect single lane traffic Monday-Friday.
Last Updated
11/22/2021 12:10 AM

ORE99: MP 29.09

Commercial Vehicle Information
Informational only
Details
OR99E NB MP 29.09 Willamette River (John B. Yeon) Bridge (Harrisburg) Effective January 10, 2022, this section of OR99e northbound, crossing the Willamette River/John B. Yeon bridge, will be restricted to 10 feet 00 inches in width between the hours of 10 PM & 5:30 AM for bridge inspections. The estimated completion date for this work is January 11,2022.
Last Updated
12/02/2021 10:00 AM

ORE99W: SB MP 25.37 to 26.54

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. On OR99W between MP 25.37 and 26.54 Motorists should expect the following: During the daytime, one lane of traffic, each direction, will be open to traffic. Expect Intermittent, lane closures with flaggers, Pacific Hwy West (OR99W), MP 25.37 to MP 26.58. Nightly, Sunday night through Friday morning, between 7:00 p.m. and 4:00 a.m.
Last Updated
10/07/2021 5:29 AM

ORE99W: MP 29.79 to 36.36

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Motorist should expect narrow lanes and long delays in the City of Lafayette. Additional lane closures may occur intermittently as follows: •MP 29.79 (OR18 Junction) to MP 31.34 (McDougall Road). Daily, Monday through Thursday, between 9:00 a.m. and 11:00 a.m. Nightly, Sunday night through Friday morning, between 6:00 p.m. and 7:00 a.m. •MP 31.34 (McDougall Road) to MP 32.97 (Mineral Springs Road). Daily, any time. •MP 32.97 (Mineral Springs Road) to MP 35.18 (Riverside Drive). Daily, Monday through Thursday, between 9:00 a.m. and 4:00 p.m. Nightly, Sunday night through Friday morning, between 6:00 p.m. and 6:00 a.m. •MP 35.18 (Riverside Drive) to MP 36.36 (McDonald Way). Nightly, Sunday night through Friday morning, between 7:00 p.m. and 10:00 a.m.
Last Updated
10/28/2021 1:46 PM

HWY372: MP 9 to 21.98

Weather Warning - MT BACHELOR
Informational only
Weather Condition
Clear, no precipitation
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
42 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
12/02/2021 3:05 PM