Cache Test: 7/23/2019 8:15:57 PM

Statewide Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure with Detour

ORE140, 1 mile West of Intersection with Crater Lake Highway ORE62 MP -1

Road construction has closed the road; a detour is in place. Use an alternate route.

Hwy 140 West extension will have a road closure with detour the week of July 22th starting at 7am on Monday, until Saturday at 5pm July 27th. The detour will be off Ave. G to Agate, turning onto Antelope, than Table Rock. There are also a few other local detour streets off of Antelope such as 11th to F St. and Pacific Ave. However we will be suggesting the detour route be the main streets of Agate/Antelope and Table Rock Rd. This is for the installation of a new water line across Ave. G at 11th St. for the Scala building currently under construction.

Updated
7/22/2019 2:38:00 AM

I-105: WB MP 0.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) Median , 1 Lane
Comments
Westbound, 2 lanes are open. The 6th Avenue off-ramp is open. In a two year project, I-105 bridges and ramps between the Delta Highway interchange and downtown Eugene are being repaired, repaved, and receiving seismic upgrades.
Last Updated
7/19/2019 2:31 PM

I-105: MP 0.44

Commercial Vehicle Information
Informational only
Details
I-105 EB MP 0.44 (Eugene) Effective June 17, 2019, this section of I-105 eastbound will be restricted to 18 feet 7 inches in height at all hours. The estimated completion date for this project is August 2, 2019.
Last Updated
7/23/2019 10:00 AM

I-105: MP 0.44

Commercial Vehicle Information
Informational only
Details
I-105 WB MP 0.44 to MP 0.08 (Eugene) Effective July 29, 2019, this section of I-105 westbound will be restricted to 18 feet 00 inches in height at all hours. The estimated completion date for this project is August 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-105: MP 0.44

Commercial Vehicle Information
Informational only
Details
I-105 EB MP 0.44 (Eugene) Effective June 17, 2019, this section of I-105 eastbound will be restricted to 18 feet 7 inches in height at all hours. The estimated completion date for this project is August 2, 2019.
Last Updated
7/23/2019 10:00 AM

I-105: MP 0.44

Commercial Vehicle Information
Informational only
Details
I-105 WB MP 0.44 to MP 0.08 (Eugene) Effective July 29, 2019, this section of I-105 westbound will be restricted to 18 feet 00 inches in height at all hours. The estimated completion date for this project is August 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 0.58

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit to I-5 SB (Portland) Effective July 30, 2019, the I-205 southbound off-ramp to I-5 southbound will be restricted to 17 feet 06 inches in width between the hours of 9 PM & 5:30 AM. The estimated completion date is August 4, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 12.94

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR212/OR224 (Estacada) Effective February 11, 2019, the I-205 northbound on-ramp from OR212/OR224 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. The estimated completion date for this project is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: SB MP 13.45 to 14.17

Construction Work
No to Minimum Delay
Comments
No traffic impacts. Nighttime lane closures from 8 p.m. to 5 a.m. and closures of the on-ramp to OR 224 and the Exit 14 off-ramp to Sunnybrook Sunday through Monday nights. Follow signed detours.
Last Updated
7/19/2019 3:14 PM

I-205: MP 13.6

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR224/Sunrise Expressway (Milwaukie) Effective February 11, 2019, the I-205 northbound on-ramp from OR224/Sunrise Expressway will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. The estimated completion date for this project is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 13.95

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 14 to Sunnybrook Blvd (Milwaukie) Effective February 11, 2019, the I-205 northbound Exit 14 to Sunnybrook Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. The estimated completion date for this project is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 13.45 to MP 14.17 (Clackamas) Effective February 11, 2019, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-base basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2020.
Last Updated
7/23/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 13.39 to MP 14.1 (Clackamas) Effective February 11, 2019, this section of I-205 northbound crossing under SE 82nd Dr will be restricted to 18 feet 06 inches in height and 18 feet 10 inches in height crossing under Sunnybrook Blvd Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is May 31, 2020.
Last Updated
7/23/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 13.45 to MP 14.17 (Clackamas) Effective February 11, 2019, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-base basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2020.
Last Updated
7/23/2019 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 13.39 to MP 14.1 (Clackamas) Effective February 11, 2019, this section of I-205 northbound crossing under SE 82nd Dr will be restricted to 18 feet 06 inches in height and 18 feet 10 inches in height crossing under Sunnybrook Blvd Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is May 31, 2020.
Last Updated
7/23/2019 10:00 AM

I-205: MP 14.32 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 14.17 to MP 13.45 (Clackamas) Effective February 11, 2019, this section of I-205 southbound crossing under SE 82nd Dr will be restricted to 17 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. The estimated completion date for this project is May 31, 2020.
Last Updated
7/23/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 16 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound will be restricted to 16 feet 7 inches in height and 16 feet 5 inches in height southbound Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads higher than 16 feet 7 inches northbound or 16 feet 5 inches southbound may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 16.2

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from Johnson Creek Blvd (Portland) Effective May 21, 2019, the I-205 NB on-ramp from Johnson Creek Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 16 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound will be restricted to 16 feet 7 inches in height and 16 feet 5 inches in height southbound Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads higher than 16 feet 7 inches northbound or 16 feet 5 inches southbound may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 16.2

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from Johnson Creek Blvd (Portland) Effective May 21, 2019, the I-205 NB on-ramp from Johnson Creek Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: SB MP 16.3 to 25.6

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime I-205 southbound closures at Airport Way week of July 21. Northbound Exit 23B to Killingsworth closed. I-205 southbound closed up to three nights beginning July 21 from midnight to 5 a.m. Traffic continuing southbound will detour onto Airport Way (Exit 24) to get back onto I-205 southbound. Periodic nighttime ramp closures at the northbound Exit 20 toward Washington and Stark Streets, the southbound Washington Street on-ramp, and northbound Exit 23B to Killingsworth Street/U.S. 30 Bypass. 24/7 closure of northbound Exit 23B to Killingsworth Street/U.S. 30 Bypass for two weeks. Periodic daytime single lane closures in both directions on Glisan Street and on Washington and Stark.
Last Updated
7/19/2019 3:13 PM

I-205: MP 16.8 to 16.23

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 17 to MP 16 (Portland) Effective July 16, 2019, this section of I-205 southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is August 4, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 18.1 to 17.49

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 17 on- and off-ramps to/from Foster Rd (Portland) Effective May 21, 2019, the I-205 northbound Exit 17 off- and on-ramps to/from Foster Rd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 19.58 to 18.89

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from US26 (Portland) Effective June 3, 2019, I-205 NB and SB Exit 19 on- and off-ramps to/from US26 EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 19.82 to 19.12

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 20 to MP 19 (Portland) Effective July 11, 2019, this section of I-205 southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is July 28, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 19.87 to 18.89

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 19 off- and on-ramps to/from US26/Powell Blvd/Division St (Portland) Effective August 2, 2019, the I-205 northbound Exit 19 off- and on-ramps to/from US26/Powell Blvd/Division St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 20.02

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 19 (US26/Powell Blvd/Division St - Portland) Effective April 1, 2019, the I-205 southbound Exit 19 off-ramp to US26/Division St/Powell Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 20.31

Commercial Vehicle Information
Informational only
Details
I-205 SB on-ramp from Stark St/Washington St (Portland) Effective May 21, 2019, the I-205 SB on-ramp from Stark St/Washington St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 20.33

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 20 off-ramp to Washington St/Stark St (Portland) Effective May 21, 2019, the I-205 northbound Exit 20 off-ramp to Washington St/Stark St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 20.33

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 20 off-ramp to Washington St/Stark St (Portland) Effective August 2, 2019, the I-205 northbound Exit 20 off-ramp to Washington St/Stark St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 20.33

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 20 off-ramp to Washington St/Stark St (Portland) Effective May 21, 2019, the I-205 northbound Exit 20 off-ramp to Washington St/Stark St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 20.33

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 20 off-ramp to Washington St/Stark St (Portland) Effective August 2, 2019, the I-205 northbound Exit 20 off-ramp to Washington St/Stark St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 20.63

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 21A off-ramp to Glisan St (Portland) Effective August 2, 2019, the I-205 northbound Exit 21A off-ramp to Glisan St will be closed at all hours beginning at 10 PM. The estimated date of completion for this project is 5 AM on August 5, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 21.49 to 20.63

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 21A on- and off-ramps to/from Glisan St (Portland) Effective May 21, 2019, the I-205 northbound Exit 17 off- and on-ramps to/from Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 21.66 to 17.12

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 17 to MP 22 (Portland) Effective August 2, 2019, this section of I-205 northbound will be closed at all hours beginning at 10 PM. The estimated completion date for this project is 5 AM on August 5, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 22.63

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 EB (Portland) Effective June 18, 2018, the I-205 northbound on-ramp from I-84 eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 22.86

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 WB (Portland) Effective June 19, 2018, the I-205 northbound on-ramp from I-84 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 22.86 to 20.99

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from I-84 (Portland) Effective June 3, 2019, I-205 NB and SB Exits 21/22 on- and off-ramps to/from I-84 EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 22.86

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 WB (Portland) Effective June 19, 2018, the I-205 northbound on-ramp from I-84 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 22.86 to 20.99

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from I-84 (Portland) Effective June 3, 2019, I-205 NB and SB Exits 21/22 on- and off-ramps to/from I-84 EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 22.93 to 20.02

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 23 to MP 20 (Portland) Effective July 19, 2019, this section of I-205 southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is August 11, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 23.21

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23A to US30 Bypass EB (Portland) Effective June 19, 2018, I-205 northbound Exit 23A ramp to US30 Bypass eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: SB MP 23.4

Crash/Hazard
No to Minimum Delay
Comments
Debris has been reported SB near Sandy. Use caution.
Last Updated
7/05/2019 4:18 PM

I-205: NB MP 23.62

Maintenance Work
Estimated delay under 20 minutes
Off Ramp
Comments
Roadwork has the Northbound exit 23B closed until 7/29/19, use alternate route. Ramps Affected.
Last Updated
7/15/2019 8:02 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective June 20, 2018, the I-205 northbound Exit 23B ramp to US30 Bypass westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective July 12, 2019, the I-205 northbound Exit 23B to US30 Bypass westbound will be closed at all hours beginning at 9 PM. The estimated date of completion for this project is July 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective June 20, 2018, the I-205 northbound Exit 23B ramp to US30 Bypass westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective July 12, 2019, the I-205 northbound Exit 23B to US30 Bypass westbound will be closed at all hours beginning at 9 PM. The estimated date of completion for this project is July 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 23.98 to 23.21

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from US30 Bypass (Portland) Effective June 3, 2019, I-205 NB and SB Exit 23 on- and off-ramps to/from US30 Bypass EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 23.98 to 23.02

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 23 to MP 24 (Portland) Effective June 25, 2019, this section of I-205 northbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 23.98 to 20.05

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 20 to MP 24 (Portland) Effective August 2, 2019, this section of I-205 northbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 23.98 to 23.02

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 23 to MP 24 (Portland) Effective June 25, 2019, this section of I-205 northbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 23.98 to 23.21

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB on- and off-ramps to/from US30 Bypass (Portland) Effective June 3, 2019, I-205 NB and SB Exit 23 on- and off-ramps to/from US30 Bypass EB and WB will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; and Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 3, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 24.31

Commercial Vehicle Information
Informational only
Details
I-205 SB on-ramp from Airport Way EB (Portland) Effective May 21, 2019, the I-205 SB on-ramp from Airport Way EB will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday night between the hours of 10 PM & 7 AM; Saturday night between the hours of 10 PM & 8 AM. Estimated date of completion is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 24.97 to 24.18

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 25 to MP 24 (Portland) Effective June 18, 2019, this section of I-205 southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is July 25, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18th, 2019, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18, 2019, this section of I-205 northbound will be restricted to 16 feet 10 inches in height and 16 feet 05 inches southbound Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads higher than 16 feet 10 inches northbound or higher than 16 feet 05 inches southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 25 to MP 26 (Portland) Effective July 8, 2019 this section of I-205 northbound and southbound will be intermittently closed for up to 2 nights total between the hours of 12 AM & 5 AM. Estimated date of completion is July 28, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18th, 2019, this section of I-205 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-205: MP 25.58 to 16.57

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 16.30 to MP 25.60 (Portland) Effective February 18, 2019, this section of I-205 northbound will be restricted to 16 feet 10 inches in height and 16 feet 05 inches southbound Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM. Loads higher than 16 feet 10 inches northbound or higher than 16 feet 05 inches southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 0.951

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 1C off-ramp to 6th Ave (Portland) Effective July 25, 2019, the I-405 northbound exit 1C off-ramp to 6th Ave will be closed Thursday, Friday, Monday, and Tuesday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is July 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 1.03

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Broadway/6th Ave (Portland) Effective April 8, 2019, the I-405 northbound on-ramp from Broadway/6th Ave will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 1.24

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 1D to US26 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 1D off-ramp to US26 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: SB MP 1.46 to 3.98

Construction Work
No to Minimum Delay
Comments
Friday night, July 19, the ramp from U.S. 30 to I-405 northbound will be closed from 8 p.m. to 5 a.m. No work on Saturday or Sunday. Monday through Friday nights, July 22 to July 26 (the morning of July 27), the ramp from U.S. 30 to I-405 southbound will be closed from 8 p.m. to 5 a.m. No work on Saturday or Sunday. Nighttime lane and ramp closures from 8 p.m. to 5 a.m. weekdays Intermittent nighttime ramp closures of the Couch Street and Glisan Street ramps to I-405 north, the N Kerby/N Cook on-ramp to I-405 south and U.S. 30 eastbound to I-405 southbound, Monday through Friday nights. Intermittent nighttime lane closures on I-405 northbound from Couch Street to the Fremont Bridge, I-405 southbound from the Fremont Bridge to Glisan Street and on the ramp from U.S.30 eastbound to I-405 northbound and southbound. Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020. Work may be rescheduled due to weather and site conditions.
Last Updated
7/19/2019 3:15 PM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound and southbound will be restricted to 16 feet 00 inches in width on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective March 7, 2019, this section of I-405 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound and southbound will be restricted to 16 feet 00 inches in width on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound and southbound will be restricted to 16 feet 00 inches in width on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 2.00 to MP 4.20 (Portland) Effective May 3, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.02 to 4.14

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.00 to MP 4.20 (Portland) Effective March 7, 2019, this section of I-405 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective May 1, 2019, the I-405 northbound on-ramp from Couch St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective March 25, 2019, the I-405 northbound on-ramp from Couch St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective May 1, 2019, the I-405 northbound on-ramp from Couch St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective March 25, 2019, the I-405 northbound on-ramp from Couch St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.25

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from Couch St (Portland) Effective May 1, 2019, the I-405 northbound on-ramp from Couch St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.451 to 2.12

Commercial Vehicle Information
Informational only
Details
I-405 NB & SB MP 2.12 to MP 2.45 (Portland) Effective March 7, 2019, this section of I-405 northbound will be restricted to 15 feet 08 inches in height and 15 feet 11 inches in height southbound Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.62

Commercial Vehicle Information
Informational only
Details
I-405 NB on-ramp from NW Glisan St (Portland) Effective March 27, 2019, the I-405 northbound on-ramp from NW Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective May 1, 2019, the I-405 southbound Exit 2B off-ramp to Glisan St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective May 1, 2019, the I-405 southbound Exit 2B off-ramp to Glisan St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective May 1, 2019, the I-405 southbound Exit 2B off-ramp to Glisan St will be closed at all hours Friday nights at 9 PM through Monday mornings at 10 AM. The estimated completion date for this project is May 15, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.64

Commercial Vehicle Information
Informational only
Details
I-405 SB Exit 2B off-ramp to Glisan St (Portland) Effective March 25, 2019, the I-405 southbound exit 2B off-ramp to Glisan St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective May 3, 2019 , the I-405 northbound Exit 3 off-ramp to US30 westbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 3 off-ramp to US30 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective May 3, 2019 , the I-405 northbound Exit 3 off-ramp to US30 westbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective April 8, 2019, the I-405 northbound exit 3 off-ramp to US30 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 2.76

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 3 off-ramp to US30 WB (Portland) Effective May 3, 2019 , the I-405 northbound Exit 3 off-ramp to US30 westbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: NB MP 2.9

Construction Work
No to Minimum Delay
Comments
Friday night, July 19, the ramp from U.S. 30 to I-405 northbound will be closed from 8 p.m. to 5 a.m. No work on Saturday or Sunday. Monday through Friday nights, July 22 to July 26 (the morning of July 27), the ramp from U.S. 30 to I-405 southbound will be closed from 8 p.m. to 5 a.m. No work on Saturday or Sunday. Nighttime lane and ramp closures from 8 p.m. to 5 a.m. weekdays Intermittent nighttime ramp closures of the Couch Street and Glisan Street ramps to I-405 north, the N Kerby/N Cook on-ramp to I-405 south and U.S. 30 eastbound to I-405 southbound, Monday through Friday nights. Intermittent nighttime lane closures on I-405 northbound from Couch Street to the Fremont Bridge, I-405 southbound from the Fremont Bridge to Glisan Street and on the ramp from U.S.30 eastbound to I-405 northbound and southbound. Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020. Work may be rescheduled due to weather and site conditions.
Last Updated
7/19/2019 3:16 PM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective June 14, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective June 14, 2019, the I-405 northbound off-ramp to I-5 southbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective June 14, 2019, the I-405 northbound off-ramp to I-5 southbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective June 14, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 northbound off-ramp to Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective April 2, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 6 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB off-ramp to I-5 SB (Portland) Effective June 14, 2019, the I-405 northbound off-ramp to I-5 southbound will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 SB on-ramp from Cook St/Kerby Ave (Portland) Effective June 14, 2019, the I-405 southbound on-ramp from Cook St/Kerby Ave will be intermittently closed starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is July 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 3.57

Commercial Vehicle Information
Informational only
Details
I-405 NB to I-5 SB (Portland) Effective April 02, 2019, the I-405 northbound off-ramp to I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: NB MP 3.7

Construction Work
No to Minimum Delay
Comments
Friday night, July 19, the ramp from U.S. 30 to I-405 northbound will be closed from 8 p.m. to 5 a.m. No work on Saturday or Sunday. Monday through Friday nights, July 22 to July 26 (the morning of July 27), the ramp from U.S. 30 to I-405 southbound will be closed from 8 p.m. to 5 a.m. No work on Saturday or Sunday. Nighttime lane and ramp closures from 8 p.m. to 5 a.m. weekdays Intermittent nighttime ramp closures of the Couch Street and Glisan Street ramps to I-405 north, the N Kerby/N Cook on-ramp to I-405 south and U.S. 30 eastbound to I-405 southbound, Monday through Friday nights. Intermittent nighttime lane closures on I-405 northbound from Couch Street to the Fremont Bridge, I-405 southbound from the Fremont Bridge to Glisan Street and on the ramp from U.S.30 eastbound to I-405 northbound and southbound. Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020. Work may be rescheduled due to weather and site conditions.
Last Updated
7/19/2019 3:16 PM

I-405: MP 4.14 to 3.2

Commercial Vehicle Information
Informational only
Details
I-405 NB MP 4.14 to MP 3.20 (Portland) Effective March 7, 2019, this section of I-405 northbound will be restricted to 16 feet 03 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-405: MP 4.2 to 3.07

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 3.07 (Portland) Effective March 7, 2019, this section of I-405 southbound will be restricted to 18 feet 01 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-405: MP 4.2 to 0.77

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 0.77 (Portland) Effective August 11, 2019, this section of I-405 southbound will be closed between the hours of 4 AM & 12 PM (noon) for one day only for the Providence Bridge Pedal. In addition, the following ramps will be closed during the same time: on-ramp from I-5 northbound and I-5 southbound; on-ramp from Kerby Ave; on-ramp from US26 eastbound; on-ramp from NW Couch St; on-ramp from NW Taylor St; on-ramp from SW Montgomery St; on-ramp from SE Broadway St; and the on-ramp from SW 5th Ave.
Last Updated
7/23/2019 10:00 AM

I-405: MP 4.2 to 2.02

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 2.00 (Portland) Effective May 3, 2019, this section of I-405 southbound will be restricted to 15 feet 11 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 4.2 to 3.07

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 3.07 (Portland) Effective March 7, 2019, this section of I-405 southbound will be restricted to 18 feet 01 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-405: MP 4.2 to 2.02

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 2.00 (Portland) Effective May 3, 2019, this section of I-405 southbound will be restricted to 15 feet 11 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 4.2 to 0.77

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 0.77 (Portland) Effective August 11, 2019, this section of I-405 southbound will be closed between the hours of 4 AM & 12 PM (noon) for one day only for the Providence Bridge Pedal. In addition, the following ramps will be closed during the same time: on-ramp from I-5 northbound and I-5 southbound; on-ramp from Kerby Ave; on-ramp from US26 eastbound; on-ramp from NW Couch St; on-ramp from NW Taylor St; on-ramp from SW Montgomery St; on-ramp from SE Broadway St; and the on-ramp from SW 5th Ave.
Last Updated
7/23/2019 10:00 AM

I-405: MP 4.2 to 3.07

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 3.07 (Portland) Effective March 7, 2019, this section of I-405 southbound will be restricted to 18 feet 01 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-405: MP 4.2 to 2.02

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 2.00 (Portland) Effective May 3, 2019, this section of I-405 southbound will be restricted to 15 feet 11 inches in height on the weekends starting Friday night at 9 PM at all hours until 10 AM Monday morning. The estimated completion date for this project is May 13, 2019.
Last Updated
7/23/2019 10:00 AM

I-405: MP 4.2 to 0.77

Commercial Vehicle Information
Informational only
Details
I-405 SB MP 4.20 to MP 0.77 (Portland) Effective August 11, 2019, this section of I-405 southbound will be closed between the hours of 4 AM & 12 PM (noon) for one day only for the Providence Bridge Pedal. In addition, the following ramps will be closed during the same time: on-ramp from I-5 northbound and I-5 southbound; on-ramp from Kerby Ave; on-ramp from US26 eastbound; on-ramp from NW Couch St; on-ramp from NW Taylor St; on-ramp from SW Montgomery St; on-ramp from SE Broadway St; and the on-ramp from SW 5th Ave.
Last Updated
7/23/2019 10:00 AM

I-5: MP 9.42

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 9.42 (Ashland) Effective July 8, 2019, this section of I-5 northbound will be restricted to 17 feet 1 inch in height at all hours. The estimated date of completion is October 15, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 10.33

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 9 to MP 11.40 (Ashland) Effective July 8, 2019, this section of I-5 northbound will be restricted to 19 feet 00 inches in width and southbound will be restricted to 17 feet 00 inches in width at all hours. The estimated date of completion is October 15, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 11.54

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from OR99 (Ashland) Effective August 15, 2019, the I-5 southbound on-ramp from OR99 will be closed at all hours. The estimated completion date for this work is October 15, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: NB MP 28

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes
Comments
Road construction is occurring. Use caution. Beginning July 22, 8 p.m.-6 a.m. Monday-Friday nights. Night time work zone speeds reduced to 40 mph and will be enforced by OSP. This project repairs the deck and adds a new polymer deck surface. View work zone video: https://www.youtube.com/watch?v=ZwaexuXEVgQ
Last Updated
7/22/2019 3:36 AM

I-5: MP 28.19 to 28.93

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 28 to MP 29 (Medford) Effective July 8, 2019, this section of I-5 northbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 6 AM. Loads wider than 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 85.94 to 86.52

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 85 to MP 87 (Azalea) Effective August 11, 2019, this section of I-5 northbound will be restricted to 17 feet 00 inches in width Sunday night between the hours of 7 PM & 7 AM. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 86.36

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Quines Creek Rd (Azalea) Effective August 11, 2019, the I-5 northbound on-ramp from Quines Creek Rd will be closed Sunday night between the hours of 7 PM & 7 AM. The estimated completion date for this project is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 94.91

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 95 off-ramp to Canyon Creek (Canyonville) Effective July 12, 2019, the I-5 northbound exit 95 off-ramp to Canyon Creek will be closed at all hours. Oversize loads may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 9, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: NB MP 95

Construction Work
Closure with Detour
Off Ramp
Comments
Road construction has closed the road; a detour is in place. Use an alternate route. Ramps Affected. This project will repair a culvert that conveys water under the northbound off-ramp at Exit 95 (Canyon Creek), a few miles south of Canyonville. The northbound off-ramp at Exit 95 is closed until August 9. Northbound I-5 traffic will be detoured to Exit 98 (Canyonville) in order to turn around and reach Exit 95 from the southbound direction. Detour signs will be posted along the route.
Last Updated
7/22/2019 3:32 AM

I-5: MP 104.85

Commercial Vehicle Information
Informational only
Details
I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Last Updated
7/23/2019 10:00 AM

I-5: SB MP 118 to 113

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane , Shoulder (Northbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Construction will continue until summer 2021. On Roberts Mountain (MP 118-116), the speed limit has been reduced to 55 mph in the southbound direction. The southbound shoulder is closed in this area. Trucks should use the right lane in both northbound and southbound directions. Throughout the work zone, watch for intermittent lane and shoulder closures, and for construction vehicles entering and exiting the travel lanes. For more information, visit: www.RobertsMountain.com.
Last Updated
7/22/2019 3:31 AM

I-5: MP 119.75

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 119 off-ramp to OR42 (Green) Effective August 18, 2019, the I-5 southbound exit 119 off-ramp to OR42 will be closed Sunday night between the hours of 7 PM & 7 AM. The estimated date of completion is August 19, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 120.13

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Old Hwy 99 (Green) Effective August 18, 2019, the I-5 southbound on-ramp from Old Hwy 99 will be closed Sunday night between the hours of 7 PM & 7 AM. The estimated date of completion is August 19, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 120.57 to 119.18

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 121 to MP 119 (Green) Effective August 18, 2019, this section of I-5 southbound will be restricted to 17 feet 00 inches in width Sunday night between the hours of 7 PM & 7 AM. Loads wider than 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 19, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 123.91

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from OR138/Harvard Ave (Roseburg) Effective June 11, 2019, the I-5 southbound on-ramp from OR138/Harvard Ave will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated date of completion is August 11, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: NB MP 124

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
Road construction is occurring. Use caution. Ramps Affected. This project will replace the traffic signals at both sides of the Harvard interchange (Exit 124), realign the southbound ramps and Bellows Street, add turn lanes, replace sidewalks and make other improvements. From now until August, 10, watch for intermittent nighttime lane closures on Bellows Street and Harvard Avenue. Pedestrians should watch for intermittent sidewalk closures throughout the work area. Alternate routes will be identified and marked. From August 11-25, the southbound ramps at the Harvard interchange (Exit 124) will be closed. During the closures, detours will be in place. Harvard Avenue motorists will take I-5 north to Exit 125 (Garden Valley), then turn around to reach southbound I-5. Meanwhile, motorists traveling south on I-5 will continue to Exit 123 (Fairgrounds) and turn around to reach the northbound off-ramp at the Harvard interchange. The south end of Bellows street will also be closed from August 11-25. Residents of the Bellows Street neighborhood will detour through the Roseburg High School parking lot to reach Harvard Avenue.
Last Updated
7/22/2019 3:34 AM

I-5: NB MP 124

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Pedestrians should watch for construction activity north of the bridge, from Gaddis Park to the pedestrian bridge.
Last Updated
7/22/2019 3:31 AM

I-5: MP 124.16

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 124 on- and off-ramps to/from OR138 (Roseburg) Effective August 11, 2019, the I-5 southbound exit 124 on- and off-ramps to/from OR138 will be closed at all hours. The estimated completion date for this project is August 25, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 124.16

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 124 off-ramp to OR138 (Roseburg) Effective May 30, 2019, the I-5 southbound exit 124 off-ramp to OR138 will be restricted to 16 feet 00 inches in width between the hours of 6 AM & 7 PM. The estimated completion date for this project is August 11, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 124.5

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from OR138 WB (Roseburg) Effective July 24, 2019, the I-5 northbound on-ramp from OR138 westbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this project is August 5, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: NB MP 135 to 169

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Tree & slide removal work will require intermittent lane and shoulder closures, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
7/22/2019 3:41 AM

I-5: MP 151.81

Commercial Vehicle Information
Informational only
Details
I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/23/2019 10:00 AM

I-5: NB MP 161

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/08/2019 8:54 AM

I-5: SB MP 164

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/02/2019 12:46 PM

I-5: SB MP 165.9

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
6/26/2019 9:21 AM

I-5: MP 242.13 to 242.14

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 242.13 to MP 242.24 (Jefferson) Effective July 21, 2019, this section of I-5 northbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated date of completion is July 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 242.14

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 242 off-ramp to Talbot Rd (Jefferson) Effective July 21, 2019, the I-5 northbound Exit 242 off-ramp will be closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated date of completion is July 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: NB MP 253 to 261

Construction Work
No to Minimum Delay
Off Ramp
Comments
Road construction is occurring causing no to minimum delays. Use caution. Ramps Affected. Motorist should expect single and double lane closures, including some off and on Ramps with detours, nightly Sunday through Friday, 9:00 p.m. to 5:00 a.m
Last Updated
7/22/2019 7:31 AM

I-5: MP 254.74 to 257.53

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 254.74 to MP 257.53 (Salem) Effective May 13, 2019, this section of I-5 northbound will be restricted to 17 feet 3 inches in height between the hours of 9 PM & 5 AM. Loads higher than 17 feet 3 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 20, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 255.95

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 256 on- and off-ramps to/from Market St (Salem) Effective July 15, 2019, the I-5 NB & SB Exit 256 on- and off-ramps to/from Market St will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 256.62

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 256 on- and off-ramps to/from Market St (Salem) Effective May 13, 2019, the I-5 NB & SB Exit 256 on- and off-ramps to/from Market St will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is August 20, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 258.4

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 258 on- and off-ramps to/from OR99E (Salem) Effective July 15, 2019, the I-5 NB & SB Exit 258 on- and off-ramps to/from OR99E will be intermittently closed Sunday to Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is July 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: SB MP 259 to 271

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Motorist should anticipate nightly lane closures, Sunday night through Friday morning, 7:00 p.m. to 9:00 a.m. In addition, the ramps at the Chemawa Rd. Interchange, Brooks Interchange and the southbound Woodburn onramp to I-5 will be closed on various dates throughout the life of the project
Last Updated
7/22/2019 5:34 AM

I-5: MP 259.03 to 272

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 259.03 to MP 272 (Woodburn) Effective May 13, 2019, this section of I-5 northbound will be intermittently restricted to 16 feet 04 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads higher than 16 feet 04 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 off-ramp to Chemawa Rd (Salem) Effective August 4, 2019, the I-5 northbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 on-ramp from Chemawa Rd (Salem) Effective August 4, 2019, the I-5 northbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 off-ramp to Chemawa Rd (Salem) Effective August 4, 2019, the I-5 northbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 259.7

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 on-ramp from Chemawa Rd (Salem) Effective August 4, 2019, the I-5 northbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B off-ramp to Chemawa Rd (Salem) Effective August 4, 2019, the I-5 southbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B on-ramp from Chemawa Rd (Salem) Effective August 4, 2019, the I-5 southbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B off-ramp to Chemawa Rd (Salem) Effective August 4, 2019, the I-5 southbound off-ramp to Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 260.57

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 260B on-ramp from Chemawa Rd (Salem) Effective August 4, 2019, the I-5 southbound on-ramp from Chemawa Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 263.23

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 263 on-ramp from Brooklake Rd (Salem) Effective August 4, 2019, the I-5 southbound Exit 263 on-ramp from Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 263.28

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 263 off-ramp to Brooklake Rd (Salem) Effective August 4, 2019, the I-5 northbound Exit 263 off-ramp to Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 263.49 to 259.1

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 263.49 to MP 259.1 (Woodburn) Effective May 13, 2019, this section of I-5 southbound will be intermittently restricted to 16 feet 02 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads higher than 16 feet 02 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 263.69

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 263 off-ramp to Brooklake Rd (Salem) Effective August 4, 2019, the I-5 southbound Exit 263 off-ramp to Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 263.76

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 263 on-ramp from Brooklake Rd (Salem) Effective August 4, 2019, the I-5 northbound Exit 263 on-ramp from Brooklake Rd will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 271.85 to 259.1

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 259 to MP 272 (Woodburn) Effective May 13, 2019, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 271.85 to 263.69

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 271.85 to MP 263.69 (Woodburn) Effective May 13, 2019, this section of I-5 southbound will be intermittently restricted to 16 feet 04 inches in height Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads higher than 16 feet 04 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 288.21

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 288 off-ramp to I-205 (Portland) Effective July 30, 2019, the I-5 northbound Exit 288 off-ramp to I-205 will be restricted to 17 feet 06 inches in width between the hours of 9 PM & 5:30 AM. The estimated completion date is August 4, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: SB MP 294.21 to 288.55

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane and ramp closures in both directions. Periodic shoulder closures. The southbound on- and off-ramps at Lower Boones Ferry (exit 290) will be closed at night between 10 p.m. and 5 a.m. Shoulder closures.
Last Updated
7/12/2019 12:33 PM

I-5: MP 300.26 to 300.36

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 300.26 to MP 300.36 (Marquam Bridge - Portland) Effective August 11, 2019, this section of I-5 northbound will be closed between the hours of 4 AM & 11 AM for one day only for the Providence Bridge Pedal.
Last Updated
7/23/2019 10:00 AM

I-5: SB MP 301.45 to 301.92

Construction Work
Informational only
Comments
No traffic impacts.
Last Updated
5/31/2019 10:50 AM

I-5: MP 301.911

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 301 off-ramp to I-84 EB (Portland) Effective July 24, 2019, the I-5 southbound exit 301 off-ramp to I-84 eastbound will be intermittently closed nightly between the hours of 10 PM & 5 AM. The estimated completion date for this project is August 7, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: NB MP 302 to 303

Construction Work
Estimated delay under 20 minutes
Comments
Daytime restriction to bus-only lane along NE Wheeler Avenue. Bus traffic will be routed around the work zone on July 22 and 23. Daytime restriction of N Williams Avenue travel lane on July 25 and 26. Traffic will be shifted into the bike lanes and bike lanes shifted into parking lanes around the work area. Daytime restriction in the right lane of N Vancouver Ave on July 26 and 29 (no work will be performed on Saturday or Sunday). The right lane will be closed and traffic will be diverted into the left lane around the work zone.
Last Updated
7/19/2019 2:29 PM

I-5: MP 302.011

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from N/Vancouver Ave/N Wheeler Ave (Portland) Effective September 12, 2019, the I-5 southbound on-ramp from N Vancouver Ave/N Wheeler Ave will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is September 19, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: SB MP 302.36 to 302.29

Construction Work
Informational only
Comments
Morrison Bridge is closed 6 a.m. to 6 p.m. on Saturday and Sunday, July 20 and 21. Sidewalks and bike lanes also closed. Morrison Bridge closed for bridge operation control system testing and upgrades. The bridge will also be closed 6 a.m. to 6 p.m. Saturday and Sunday, July 27 and 28.
Last Updated
7/19/2019 3:05 PM

I-5: MP 302.68

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from N Williams & N Broadway Ave (Portland) Effective September 16, 2019, the I-5 northbound on-ramp from N Williams & N Broadway Ave will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is September 20, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 302.68

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from NE Broadway St (Portland) Effective August 11, 2019, the I-5 northbound on-ramp from NE Broadway St will be closed between the hours of 4 AM & 12 PM (noon) for one day only for the Providence Bridge Pedal.
Last Updated
7/23/2019 10:00 AM

I-5: MP 302.68

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from N Williams & N Broadway Ave (Portland) Effective September 16, 2019, the I-5 northbound on-ramp from N Williams & N Broadway Ave will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is September 20, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 302.68

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from NE Broadway St (Portland) Effective August 11, 2019, the I-5 northbound on-ramp from NE Broadway St will be closed between the hours of 4 AM & 12 PM (noon) for one day only for the Providence Bridge Pedal.
Last Updated
7/23/2019 10:00 AM

I-5: MP 302.68

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from N Williams & N Broadway Ave (Portland) Effective September 16, 2019, the I-5 northbound on-ramp from N Williams & N Broadway Ave will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is September 20, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 302.68

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from NE Broadway St (Portland) Effective August 11, 2019, the I-5 northbound on-ramp from NE Broadway St will be closed between the hours of 4 AM & 12 PM (noon) for one day only for the Providence Bridge Pedal.
Last Updated
7/23/2019 10:00 AM

I-5: MP 302.74 to 303.98

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 302.70 to MP 304.00 (Portland) Effective March 7, 2019, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound on-ramp from Greeley Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound on-ramp from Greeley Ave will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound on-ramp from Greeley Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound on-ramp from Greeley Ave will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound on-ramp from Greeley Ave will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM and 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.08

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Greeley Ave (Portland) Effective May 10, 2019, the I-5 southbound on-ramp from Greeley Ave will be closed weekends starting Friday night at 9 PM at all hours until Monday morning at 10 AM. The estimated completion date for this project is May 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.15 to 303.98

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 303.15 to MP 303.98 (Portland) Effective March 7, 2019, I-5 northbound will be restricted to 15 feet 06 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.47

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 302B to I-405 SB (Portland) Effective April 8, 2019, the I-5 southbound exit 302B off-ramp to I-405 southbound will be intermittently restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.81

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from N Going St (Portland) Effective March 27, 2019, the I-5 southbound on-ramp from N Going St will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM, Friday nights between the hours of 9 PM & 7 AM, and Saturday nights between the hours of 9 PM & 8 AM. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 303.98 to 303.16

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 303.98 to MP 303.16 (Portland) Effective March 7, 2019, this section of I-5 southbound will be restricted to 15 feet 05 inches in height Sunday through Thursday nights between the hours of 10 PM and 5:00 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is November 30, 2020.
Last Updated
7/23/2019 10:00 AM

I-5: NB MP 305 to 307.97

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
No traffic impacts. Nighttime ramp closures at Broadway/Weidler, Going Street, Rosa Parks Way, Lombard Boulevard, Victory Boulevard, Marine Drive and Jantzen Beach from 9 p.m. to 5 a.m.
Last Updated
7/12/2019 12:33 PM

I-5: MP 306.12 to 308

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 306 to MP 308 (Portland) Effective August 16, 2019, this section of I-5 northbound will be restricted to 17 feet 11 inches in height Friday through Saturday nights between the hours of 11 PM & 7 AM. Loads higher than 17 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated date of completion is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 306.12 to 308

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 306 to MP 308 (Portland) Effective August 16, 2019, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Friday through Saturday nights between the hours of 11 PM & 7 AM. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated date of completion is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 306.12 to 308

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 306 to MP 308 (Portland) Effective August 18, 2019, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday night between the hours of 11 PM & 5 AM. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 19, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 306.12 to 307.34

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 306.12 to MP 307.34 (Portland) Effective August 18, 2019, this section of I-5 northbound will be restricted to 17 feet 11 inches in height Sunday night between the hours of 11 PM & 5 AM. Loads higher than 17 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 19, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 306.12 to 308

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 306 to MP 308 (Portland) Effective August 18, 2019, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday night between the hours of 11 PM & 5 AM. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 19, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 306.12 to 307.34

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 306.12 to MP 307.34 (Portland) Effective August 18, 2019, this section of I-5 northbound will be restricted to 17 feet 11 inches in height Sunday night between the hours of 11 PM & 5 AM. Loads higher than 17 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 19, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 306.12 to 308

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 306 to MP 308 (Portland) Effective August 16, 2019, this section of I-5 northbound will be restricted to 17 feet 11 inches in height Friday through Saturday nights between the hours of 11 PM & 7 AM. Loads higher than 17 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated date of completion is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 306.12 to 308

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 306 to MP 308 (Portland) Effective August 16, 2019, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Friday through Saturday nights between the hours of 11 PM & 7 AM. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated date of completion is August 18, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 307.76

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 307.76 (Portland) Effective August 18, 2019, this section of I-5 northbound will be restricted to 18 feet 9 inches in height Sunday night between the hours of 11 PM & 5 AM. Loads higher than 18 feet 9 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 19, 2019.
Last Updated
7/23/2019 10:00 AM

I-5: MP 308.38 to 308

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 308.38 to MP 308 (Portland) Effective August 24, 2019, this section of I-5 southbound will be closed Saturday night between the hours of 10 PM & 7 AM. The estimated completion date for this work is August 25, 2019.
Last Updated
7/23/2019 10:00 AM

I-82: MP 0.61 to 1.81

Commercial Vehicle Information
Informational only
Details
I-82 NB & SB MP 0.50 to MP 3.00 (Umatilla) Effective March 25, 2019, this section of I-82 northbound and southbound will be restricted to 18 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-82: EB MP 1 to 2

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 2 Lanes (Eastbound) Median , 2 Lanes
Comments
Road construction is occurring causing no to minimum delay. Speed limits may be reduced in the work zone. This project includes replacement of bridge end panels and paving.
Last Updated
7/21/2019 9:24 AM

I-84: MP 0.2

Commercial Vehicle Information
Informational only
Details
I-84 WB off-ramp to 1st Ave/Convention Center Effective September 16, 2019, the I-84 westbound off-ramp to 1st Ave/Convention Center will be closed Monday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this project is September 20, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 0.37

Commercial Vehicle Information
Informational only
Details
I-84 WB off-ramp to I-5 SB (Portland) Effective July 24, 2019, the I-84 westbound off-ramp to I-5 southbound will be intermittently closed nightly between the hours of 10 PM & 5 AM. The estimated completion date for this project is August 7, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: WB MP 1.21

Crash/Hazard
No to Minimum Delay
Comments
A crash has been reported WB at Lloyd. Use caution.
Last Updated
7/13/2019 5:33 PM

I-84: WB MP 17 to 17.6

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane closures from 10 p.m. to 5:30 a.m. Nighttime single lane closures on I-84 and daytime and nighttime lane closures on Graham Road.
Last Updated
7/19/2019 3:11 PM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM &5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height and 18 feet 02 inches in height westbound Sunday through Thursday nights between the hours of 10 PM & 5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is August 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM &5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height and 18 feet 02 inches in height westbound Sunday through Thursday nights between the hours of 10 PM & 5 AM; and Friday and Saturday nights between the hours of 10 PM & 1/2 hour before sunrise. The estimated completion date for this project is August 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 42.08 to 31.14

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 43 to MP 31 (Cascade Locks) Effective July 30, 2019, this section of I-84 westbound will be restricted to 16 feet 00 inches in width Tuesday through Thursday between the hours of 5 AM & 10 PM. The estimated date of completion is August 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: WB MP 51 to 53

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Single lane closure for eastbound I-84 and shoulder closures from 6 a.m. to 6 p.m. Monday through Thursday.
Last Updated
7/19/2019 3:12 PM

I-84: WB MP 79

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of hazardous debris has been received. Use caution.
Last Updated
7/23/2019 6:21 PM

I-84: MP 85.3

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB Exit 85 on- and off-ramps to City Center (The Dalles) Effective July 15, 2019 , the I-84 eastbound and westbound Exit 85 on- and off-ramps to/from City Center will be closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. The estimated completion date for this project is August 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: EB MP 85.51

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Intermittent on and off ramp closures will be in place for construction operations Sunday-Friday from 7PM-7AM at the Exit 85 Interchange. Ramps Affected.
Last Updated
7/22/2019 8:32 PM

I-84: MP 85.51

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 85.51 (The Dalles) Effective May 23, 2019, this section of I-84 eastbound crossing under Exit 85 will be restricted to 16 feet 09 inches in height between the hours of 7 PM & 10 AM. Loads higher than 16 feet 09 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 85.72 to 85.3

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 85 to MP 86 (The Dalles) Effective May 23, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 7 PM & 10 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 85.75

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 85.75 (The Dalles) Effective May 23, 2019, this section of I-84 westbound crossing under Exit 85 will be restricted to 17 feet 02 inches in height between the hours of 7 PM & 10 AM. Loads higher than 17 feet 02 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: EB MP 100.61 to 103.71

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place for cable barrier installation. No to minimal delay.
Last Updated
7/21/2019 11:06 AM

I-84: EB MP 109.17 to 110.77

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place for cable barrier installation. No to minimal delay.
Last Updated
7/21/2019 11:07 AM

I-84: EB MP 125.5 to 137.78

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Intermittent lane closures may be in place both EB and WB in the construction zone. No to minimum delay.
Last Updated
7/21/2019 9:26 AM

I-84: EB MP 131.61 to 136.9

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place for cable barrier installation. No to minimal delay.
Last Updated
7/21/2019 11:07 AM

I-84: EB MP 146.46 to 148.18

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place for cable barrier installation. No to minimal delay.
Last Updated
7/21/2019 11:07 AM

I-84: MP 159.3

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 159.30 (Boardman) Effective March 18, 2019, this section of I-84 westbound crossing under Exit 159 is restricted to 16 feet 1 inch in height Monday through Friday at all hours. Loads higher than 16 feet 1 inch in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 167.94 to 156.32

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 154 to MP 174 (Boardman) Effective March 18, 2019 this section of I-84 eastbound and westbound will be restricted to 20 feet 00 inches in width Monday through Friday at all hours. Loads wider than 20 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 1, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: WB MP 188

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of an animal that has been struck creating a hazard has been received. Use caution.
Last Updated
7/23/2019 12:57 AM

I-84: MP 195.15

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 194.90 to MP 195.5 (Echo) Effective August 5, 2019, this section of I-84 westbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this project is August 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 195.15

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 194.90 to MP 195.5 (Echo) Effective May 31, 2019, this section of I-84 westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is August 4, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 195.15

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 194.90 to MP 195.5 (Echo) Effective August 5, 2019, this section of I-84 westbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this project is August 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 195.15

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 194.90 to MP 195.5 (Echo) Effective May 31, 2019, this section of I-84 westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this project is August 4, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: WB MP 195.16

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes
Comments
Lane closures and speed reductions are in place in the construction zone. Expect no to minimal delay.
Last Updated
7/21/2019 9:25 AM

I-84: EB MP 206.75 to 209.91

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median (Eastbound) Median
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place for cable barrier installation. No to minimal delay.
Last Updated
7/21/2019 11:08 AM

I-84: MP 207.47

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 207.47 (Pendleton) Effective April 12, 2019, this section of I-84 eastbound will be restricted to 18 feet 01 inches in height between the hours of 5 AM & 10 PM. Loads higher than 18 feet 01 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 210.96 to 207.1

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 205 to MP 211 (Pendleton) Effective April 12, 2019, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width between the hours of 5 AM & 10 PM. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 26, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: EB MP 214 to 259.97

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Speed reductions and intermittent single lane closures may be in place both EB and WB in the construction zone. Expect delays. This safety improvement project includes installation of new variable message signs, road/weather sensors, improved lighting and reflectors, and additional cable barrier. Work also includes trenching, grading, and signing.
Last Updated
7/23/2019 8:04 AM

I-84: MP 214.001 to 259.35

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 214 to MP 259.97 (Pendleton) Effective April 1, 2019 , this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 214.001 to 259.35

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 214 to MP 259.97 (Pendleton) Effective April 1, 2019 , this section of I-84 eastbound and westbound will be restricted to 15 feet 11 inches in height at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: WB MP 226

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes
Comments
Speed reductions and intermittent single lane closures may be in place both EB and WB in the construction zone. Expect delays. This safety improvement project includes installation of new variable message signs, road/weather sensors, improved lighting and reflectors, and additional cable barrier. Work also includes trenching, grading, and signing.
Last Updated
7/23/2019 8:03 AM

I-84: EB MP 226.04

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
A vehicle fire has occurred causing no to minimum delays. Use caution.
Last Updated
7/23/2019 7:22 PM

I-84: EB MP 232.5

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
A vehicle fire has occurred causing no to minimum delays. Use caution.
Last Updated
7/23/2019 1:00 PM

I-84: MP 256.4

Commercial Vehicle Information
Informational only
Details
I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry) Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/23/2019 10:00 AM

I-84: WB MP 259.97

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes
Comments
Speed reductions and intermittent single lane closures may be in place both EB and WB in the construction zone. Expect delays. This safety improvement project includes installation of new variable message signs, road/weather sensors, improved lighting and reflectors, and additional cable barrier. Work also includes trenching, grading, and signing.
Last Updated
7/23/2019 8:03 AM

I-84: EB MP 260.32 to 272.71

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Intermittent lane closures may be in place EB and WB for construction operations. Ramps Affected. This project includes grading, drainage, structures, paving, illumination, and roadside development.
Last Updated
7/21/2019 10:33 AM

I-84: MP 270.74 to 270.87

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 270.39 to MP 272.71 (La Grande) Effective July 16, 2019, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 280.53

Commercial Vehicle Information
Informational only
Details
I-84 MP 280.53 McCanse Rd crossing over I-84 (west of Baker City) Effective March 5, 2018, McCanse Rd crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
7/23/2019 10:00 AM

I-84: MP 291.65

Commercial Vehicle Information
Informational only
Details
I-84 MP 291.65 Charles Green Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Charles Green Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
7/23/2019 10:00 AM

I-84: MP 295.67

Commercial Vehicle Information
Informational only
Details
I-84 MP 295.67 Culley Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Culley Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
7/23/2019 10:00 AM

I-84: WB MP 316

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/15/2019 10:33 AM

I-84: MP 345.61 to 362.36

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 345 to MP 363 (Huntington) Effective August 12, 2019 this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width Monday through Friday between the hours of 5 AM and 10 PM. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 16, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 369.99 to 376.98

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 369 to MP 378 (Ontario) Effective April 30, 2019, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width Monday through Friday between the hours of 5 AM & 10 PM. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 2, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: EB MP 370.5 to 377.62

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Intermittent closures of the fast lanes and shoulders EB and WB may be in place for cable barrier installation. No to minimal delay.
Last Updated
7/21/2019 11:09 AM

I-84: MP 373.08

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 369 to MP 378 (Ontario) Effective April 30, 2019, this section of I-84 westbound will be restricted to 16 feet 4 inches in height Monday through Friday between the hours of 5 AM & 10 PM. Loads higher than 16 feet 4 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 2, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 373.08

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 369 to MP 378 (Ontario) Effective April 30, 2019, this section of I-84 eastbound will be restricted to 16 feet 4 inches in height Monday through Friday between the hours of 5 AM & 10 PM. Loads higher than 16 feet 4 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 2, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: WB MP 376 to 378

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 2 Lanes (Eastbound) Median , 2 Lanes
Comments
Lane closures are in place EB and WB in the construction zone for bridge work. No to minimal delays. A detour is in place for oversize loads.
Last Updated
7/21/2019 9:25 AM

I-84: MP 377.9

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 377.9 (Ontario) Effective April 15, 2019, this section of I-84 westbound will be restricted to 18 feet 6 inches in height at all hours. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

I-84: MP 378.01

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 377.75 to MP 378.25 (Ontario) Effective April 15, 2019, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

US101: MP 4.53 to 5.33

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments
Road construction is occurring. Use caution. US 101: Young’s Bay (New Youngs Bay) Bridge Repair Project (Oregon Coast Highway, mileposts 4.53 to 5.33) This project consists of the following: • Raising the left span tower bracing above the high route clearance requirement; • replacing rocker bearings; • repairing the damaged concrete with cathodic protection; and • replacing compression joint seals. Initially in mid March, the traveling public will notice the contractor building the containment structure which will be attached to the sides of the bridge, and a barge in the water with support boats bringing crew and materials to and from the barge. Once the containment structure is in place, actual construction will begin. Most of the construction will be performed below the bridge from the barge. The traveling public can expect periodic single lane closures at night to allow the contractor to move equipment. The lane closures will be Sunday night through Friday morning, 9 p.m. to 5:30 a.m. A complete two week night time closure of the bridge is scheduled in 2021 toward the end of the project. An alternative route during periods of lane closures and the full night time closure is U.S. 101B over the Old Youngs Bay and Lewis and Clark River Bridges. The public is encouraged to sign up for project updates to be delivered via email by copying an pasting the following link into your web browser and following the steps to enroll: https://public.govdelivery.com/accounts/ORDOT/subscriber/new?topic_id=ORDOT_126
Last Updated
7/01/2019 11:54 AM

US101: MP 4.78

Commercial Vehicle Information
Informational only
Details
US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
7/23/2019 10:00 AM

US101: MP 4.91

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 4.53 to MP 5.33 (New Young's Bay Bridge - Astoria) Effective February 15, 2019, this section of US101 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is November 30, 2021.
Last Updated
7/23/2019 10:00 AM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Last Updated
7/23/2019 10:00 AM

US101: MP 19 to 21

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
6/20/2019 10:02 AM

US101: MP 22.04 to 25.27

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 22 to MP 25.50 (Seaside) Effective May 5, 2019, this section of US101 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM until June 31, 2019. Starting July 1, 2019 this width restriction will be Sunday through Thursday nights between the hours of 8 PM & 6 AM. Loads wider than 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for more information. The estimated completion date for this project is October 30, 2019.
Last Updated
7/23/2019 10:00 AM

US101: MP 22.52 to 24.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Night road work is occuring Sunday though Friday, 7:00 PM to 7:00 AM. Traffic controlled by flaggers. Use caution. US 101: Dooley Bridge – JCT US 26 SEC. (Clatsop County) (Oregon Coast Highway, mileposts 22.52 to 24.95) This project includes work as follows: • Soft spot repairs; • asphalt grinding/inlay; • installing centerline rumble strips north of Beerman Creek; and • New permanent striping. The traveling public can expect single lane closures at night to allow the contractor to perform work. The lane closures will be Sunday night through Friday morning, 7:00 p.m. to 7:00 a.m. During the summer months of July and August the lane closures will be Sunday night through Friday morning, 8:00 p.m. to 6:00 am. A pedestrian transport vehicle will be available during working hours to accommodate pedestrian and bicycle traffic.
Last Updated
7/15/2019 8:46 PM

US101: NB MP 24.4 to 24.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
7/22/2019 8:00 AM

US101: MP 79.61

Commercial Vehicle Information
Informational only
Details
US101 MP 79.61 (Beaver Creek Bridge - Beaver) Effective January 4, 2019, US101 crossing Beaver Creek Bridge at MP 76.61 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/23/2019 10:00 AM

US101: MP 80.5

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
7/24/2019 2:00:00 AM
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
7/22/2019 9:22 AM

US101: MP 114.88

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. At D River Outlet Night work is complete for the season and work will continue during the day underneath the bridge. Short duration lane closures are allowed from 7 p.m. to 9:30 p.m. but will only be needed on occasion. Work is expected to last until the spring of 2020. This project includes the following improvements: • Repair damaged concrete • Install zinc anodes to the structures to protect them from the harsh coastal climate • Replace bridge railings to meet current crash standards • Install steel and titanium rebar to strengthen bridges
Last Updated
7/20/2019 6:10 AM

US101: MP 118.17

Maintenance Work
Estimated delay under 20 minutes
Comments
Bridge work is occurring. Use caution. Expect minor delays. Work at Schooner Creek Bridge begins the week of July 22 with the installation of temporary signs and a temporary pedestrian crossing on the south side of the bridge. Initial work will be under the bridge with night work and lane closures expected to start in August. Expect minor delays. This project includes the following improvements: • Repair damaged concrete • Install zinc anodes to the structures to protect them from the harsh coastal climate • Replace bridge railings to meet current crash standards • Install steel and titanium rebar to strengthen bridges
Last Updated
7/20/2019 6:24 AM

US101: MP 141.44 to 141.83

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. The eastern sidewalk is closed for the duration of the project. A temporary pedestrian crossing at the south end of the bridge will allow pedestrians to cross U.S. 101. At the north end, pedestrians can use the existing sidewalks under the bridge, which will be signed as the pedestrian detour route. This project is expected to last until October 2019. Expect minor delays. Most of the work is under the bridge with no impact to traffic. There will be occasional nighttime lane closures to set up containment under the bridge and move equipment. Intermittent night work will continue with lane closures allowed from 8 p.m. to 6 a.m. This project is painting the steel bridge members under the roadway deck in two spans of the steel structure. These members are in need of additional protection from the harsh coastal environment.
Last Updated
7/20/2019 6:28 AM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
7/23/2019 10:00 AM

US101: MP 166.48

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Cape Perpetua Half Viaduct (South of Yachats): A new cathodic protection system is being installed, including installing a wind turbine generator under the bridge to power the system. Crews are fabricating the walkway platform underneath the bridge. Bridge work is expected to be completed by the end of December 2020.
Last Updated
7/04/2019 6:57 AM

US101: MP 178.33

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Cape Creek Bridge (North of Florence): Installation of a new cathodic protection system and bridge repairs are underway. Crews are working on surface prep of the concrete, which will be followed by bridge repair work and the protective coating installation. Single lane closures for some of the work. Bridge work is expected to be completed by the end of December 2020.
Last Updated
7/04/2019 7:01 AM

US101: MP 190.17 to 190.89

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. No work is expected Thursday or Friday, July 4-5. Expect day work on U.S. 101 between U.S. 101/OR126 Jct and the Siuslaw River Bridge. Crews are clearing and prepping subgrade on northbound U.S. 101 starting at Old Town Way and working north. Expect single lane closures on northbound U.S. 101 and side street closures. Crews are finishing sidewalk and ADA improvements on southbound U.S. 101. Crews will begin work on sidewalk improvements at Rhododendron the week of July 8, working north and south of the intersection. This project is a partnership with the City of Florence to improve the streetscape and pave. ADA facilities along U.S.101 will also be improved. The project includes: Work along U.S.101 –south from the U.S.101/OR 126 Junction to the Siuslaw River Bridge & OR 126 –east from the U.S. 101/OR 126 Junction to Spruce Street ADA ramps, colored concrete plazas, art plinths, street lighting, underground overhead utilities, bike lanes, parking spaces along U.S. 101, and landscaping and irrigation improvements. U.S. 101 paving from the U.S.101/OR 126 Junction south to the Siuslaw River Bridge. The project is to be completed by the end of October
Last Updated
7/04/2019 6:50 AM

US101: MP 190.98

Commercial Vehicle Information
Informational only
Details
US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Last Updated
7/23/2019 10:00 AM

US101: MP 233.4 to 234.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. This project will paint the steel truss section of McCullough Bridge, replace rivets, remove rust and repair damaged steel. Construction is scheduled for completion in fall 2021. For more information, visit: www.McCulloughBridge.com. Watch for intermittent nighttime (7 p.m. to 7 a.m.) lane closures each Sunday night to Friday morning. Pedestrians should watch for intermittent sidewalk closures. At all times, at least one of the bridge’s sidewalks will remain open.
Last Updated
7/22/2019 3:27 AM

US101: MP 233.99

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 233.48 to MP 233.49 (North Bend) Effective April 15, 2019, this section of US101 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 1, 2021.
Last Updated
7/23/2019 10:00 AM

US101: MP 233.99

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 233.48 to MP 233.49 (North Bend) Effective April 15, 2019, this section of US101 northbound and southbound will be restricted to 16 feet 00 inches in height Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads higher than 16 feet 00 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 1, 2021.
Last Updated
7/23/2019 10:00 AM

US101: MP 234 to 235

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Watch for intermittent lane and shoulder closures on both sides of U.S. 101 (Sherman Ave.) at the Union, Michigan and Colorado Ave. Intersections in North Bend. Flaggers will provide traffic control as needed. Access for pedestrians, including those with disabilities, will be maintained at all intersections throughout the work zone.
Last Updated
7/22/2019 3:28 AM

US101: MP 250.8

Information
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
7/01/2019 7:50 PM

US101: MP 251

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
7/06/2019 3:28 PM

US101: MP 255.5

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/08/2019 1:19 PM

US101: MP 295 to 300

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project will pave five miles of U.S. 101 and repair four bridges between the Sixes area and the north end of Port Orford. The speed limit has been reduced to 40 mph at milepost 295, the one-mile section of highway between Crystal Creek and Sixes River. Watch for intermittent weekday lane closures and brief delays throughout the project area as the contractor continues with road work. Flaggers will provide traffic control as needed. Paving will begin on Monday, June 17, and continue for approximately two weeks. Expect brief delays.
Last Updated
7/22/2019 3:30 AM

US101: SB MP 304

Information
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken pavement is causing no to minimum delays. Use caution.
Last Updated
7/19/2019 7:02 PM

US101: MP 311.4

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic.
Last Updated
7/23/2019 10:00 AM

US101: MP 312

Information
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken grade, use caution.
Last Updated
7/08/2019 4:45 PM

US101: MP 316

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
6/30/2019 9:11 PM

US101: MP 316

Information
No to Minimum Delay
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
6/30/2019 10:52 PM

US101: MP 326.47

Commercial Vehicle Information
Informational only
Details
US101 MP 326.47 (Connector Road Bridge - Gold Beach) Effective January 14, 2019, US101 crossing Connector Road Bridge at MP 326.47 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 vehicles (7 axle single-unit trucks).
Last Updated
7/23/2019 10:00 AM

US101: MP 332.2

Information
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken grade, use caution.
Last Updated
7/15/2019 9:04 AM

US101: MP 333.75

Information
No to Minimum Delay
Lanes Affected
(Southbound) 1 Lane
Comments
Sunken pavement is causing no to minimum delays, use caution.
Last Updated
7/22/2019 12:08 PM

US101: MP 335.7

Information
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Sunken grade, use caution.
Last Updated
6/28/2019 9:45 AM

US101: MP 347.78

Commercial Vehicle Information
Informational only
Details
US101 MP 347.78 NB & SB (north of Brookings) Effective July 31, 2017, this section of US101 will be restricted to 16 feet 00 in. in width. The estimated completion date for this project is August 31, 2019.
Last Updated
7/23/2019 10:00 AM

US20: MP 13.14 to 13.45

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 13.14 to MP 13.45 (Lebanon) Effective December 1, 2019, this section of US20 eastbound and westbound between Vine St and Oak St will be closed for one day only between the hours of 5 PM & 6 PM for a parade.
Last Updated
7/23/2019 10:00 AM

US20: MP 13.27 to 13.45

Commercial Vehicle Information
Informational only
Details
US20 EB MP 13.27 to MP 13.45 (Lebanon) On Saturday, September 7, 2019, this section of US20 eastbound between Sherman Street and Oak Street in Lebanon will be closed between the hours of 10 AM and 10 PM for the annual Lebanon Community Block Party Event.
Last Updated
7/23/2019 10:00 AM

US20: WB MP 50.79

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. U.S. 20 / OR 34: Philomath Blvd Apartments highway improvements. A left turn lane, a right turn lane and a pedestrian crossing are being constructed as part of the new apartment complex development between Corvallis and Philomath. Work not impacting travel lanes can be expected during the day. Lane closures may occur between 7 p.m. and 6 a.m. Watch for flaggers controlling traffic.
Last Updated
7/20/2019 6:06 AM

US20: MP 51.4 to 52.2

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays, use caution. A left turn lane, a right turn lane and a pedestrian crossing are being constructed as part of the new apartment complex development between Corvallis and Philomath. Work not impacting travel lanes can be expected during the day. Lane closures may occur between 7 p.m. and 6 a.m. Watch for flaggers controlling traffic.
Last Updated
7/19/2019 6:25 AM

US20: MP 79

Crash/Hazard
No to Minimum Delay
Comments
Rock fall has occurred causing no to minimum delays. Use caution.
Last Updated
7/10/2019 6:26 AM

US20: MP 99.94

Commercial Vehicle Information
Informational only
Details
US20 MP 99.94 EB & WB (Sisters) Effective November 28, 2017, this section of US20 is restricted to 14 feet 00 inches in width and/or 154 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
7/23/2019 10:00 AM

US20: MP 128 to 62.05

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
A chip seal is occurring, traffic will be controlled by flaggers and a pilot car. Expect delays up to 20 minutes.
Last Updated
7/23/2019 11:53 AM

US20: MP 131.37

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delay. Use caution. This project includes sidewalk and curb ramp reconstruction.
Last Updated
7/21/2019 10:28 AM

US26: MP 0.94 to 0.59

Commercial Vehicle Information
Informational only
Details
US26 WB MP 0.94 to MP 0.59 (Ross Island Bridge - Portland) Effective August 11, 2019, this section of US26 westbound will be closed between the hours of 4 AM & 11 AM for one day only for the Providence Bridge Pedal.
Last Updated
7/23/2019 10:00 AM

US26: MP 1.15

Commercial Vehicle Information
Informational only
Details
US26 WB on-ramp from OR99E NB/Woodward St (Portland) Effective August 11, 2019, the US26 westbound on-ramp from OR99E northbound/Woodward St will be closed between the hours of 4 AM & 11 AM for one day only for the Providence Bridge Pedal.
Last Updated
7/23/2019 10:00 AM

US26: WB MP 1.76

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. Traffic signal turned off at Powell Blvd & E 26th Ave at night. Intersection will be under control of flaggers in all four directions.
Last Updated
7/19/2019 3:17 PM

US26: MP 7.21

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations have the traffic signals off at 122nd, with flagging in place. Use caution.
Last Updated
7/23/2019 8:09 PM

US26: MP 7.5 to 7.95

Construction Work
No to Minimum Delay
Comments
Weekday shoulder closures. Watch for crews and equipment. Nighttime single lane closures from 8 p.m. to 6 a.m. Monday through Thursday. The Oregon Department of Transportation (ODOT) will construct roadway improvements on Powell Boulevard(US Highway 26) from SE 122nd Avenue to SE 136th Avenue. This project will address the high rate of collisions on Outer Powell for the past several years. The purpose of this project is to increase safety for people who walk, drive, take the bus and ride bikes, making Outer Powell a safer place for everyone.
Last Updated
7/19/2019 3:18 PM

US26: MP 8.22

Commercial Vehicle Information
Informational only
Details
US26 MP 8.22 (Little Humbug Creek Bridge - Necanicum Jct) Effective January 4, 2019, US26 crossing Little Humbug Creek Bridge at MP 8.22 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 30 tons for SU6 vehicles (6axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/23/2019 10:00 AM

US26: MP 22

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
7/15/2019 7:48 AM

US26: MP 32.47 to 30.43

Commercial Vehicle Information
Informational only
Details
US26 WB MP 32.47 to MP 30.43 (Cherryville) (Hood to Coast) Effective August 23, 2019 this section of US26 will be restricted to 12 feet 00 inches in width between the hours of 6 AM & 7:45 PM. The estimated completion date for this project is August 24, 2019.
Last Updated
7/23/2019 10:00 AM

US26: EB MP 58.62

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris has been reported WB near Jackson School Road. Use caution.
Last Updated
7/11/2019 7:14 PM

US26: EB MP 73.42

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
A crash has occurred EB near the zoo. Use caution.
Last Updated
7/23/2019 1:01 PM

US26: EB MP 73.42

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
A crash has occoured, causing no to minimal delay. Use caution.
Last Updated
7/23/2019 1:01 PM

US26: EB MP 73.42

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
A crash has occurred EB near the zoo. Use caution.
Last Updated
7/23/2019 1:01 PM

US26: EB MP 73.42

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
A crash has occoured, causing no to minimal delay. Use caution.
Last Updated
7/23/2019 1:01 PM

US26: EB MP 73.42

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
A crash has occurred EB near the zoo. Use caution.
Last Updated
7/23/2019 1:01 PM

US26: EB MP 73.42

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
A crash has occoured, causing no to minimal delay. Use caution.
Last Updated
7/23/2019 1:01 PM

US26: MP 91.12 to 103.09

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project includes rock fall mitigation and the installation of drainage, guardrail, pavement markings, and permanent signing.
Last Updated
7/21/2019 10:05 AM

US26: MP 115.58

Commercial Vehicle Information
Informational only
Details
US26 MP 115.58 (North Unit Canal Bridge - Madras) Effective February 5, 2019, US26 crossing North Unit Canal Bridge at MP 115.58 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/23/2019 10:00 AM

US26: MP 125 to 124.5

Information
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder
Comments
There are no to minimum delays due to erosion of the highway. Use caution.
Last Updated
7/04/2019 7:35 AM

US26: MP 154

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution.
Last Updated
7/22/2019 8:18 AM

US30: MP 0.03

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Last Updated
7/23/2019 10:00 AM

US30: MP 0.46

Commercial Vehicle Information
Informational only
Details
US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/23/2019 10:00 AM

US30: EB MP 0.87

Maintenance Work
No to Minimum Delay
Comments
Road work will close the ramp from EB US-30 to SB I-405 from 8 p.m. to 5 a.m. Use I-405 NB to I-5 SB.
Last Updated
7/23/2019 7:50 PM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

US30: MP 1.54 to 0.87

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 SB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 southbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

US30: MP 1.54 to 1.36

Commercial Vehicle Information
Informational only
Details
US30 EB off-ramp to I-405 NB (Portland) Effective March 11, 2019, the off-ramp from US30 eastbound to I-405 northbound will be intermittently closed Sunday through Thursday nights between the hours of 8 PM & 5 AM; and Friday and Saturday nights between the hours of 8 PM & 1/2 hour before sunrise. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

US30: MP 2.1 to 1.65

Commercial Vehicle Information
Informational only
Details
US30 MP 1.65 to MP 2.10 (La Grande) Effective August 2, 2019, this section of US30 (Adams Ave) northbound and southbound between 4th St and Hemlock St will be closed for one day only between the hours of 4 PM & 8 PM for the Union County Fair Parade.
Last Updated
7/23/2019 10:00 AM

US30: MP 12.59 to 12.69

Commercial Vehicle Information
Informational only
Details
US30 WB MP 12.5 to MP 12.7 (Burlington) (Hood to Coast) Effective August 23, 2019 this section of US30 will be restricted to 14 feet 00 inches in width between the hours of 4:30 AM & 5:00 AM. The estimated completion date for this project is August 24, 2019.
Last Updated
7/23/2019 10:00 AM

US30: MP 13.14

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
7/23/2019 10:00 AM

US30: MP 13.19 to 13.18

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures from 8 p.m. to 4:30 a.m. Monday through Friday and until 7 a.m. Saturday.
Last Updated
6/07/2019 2:35 PM

US30: MP 13.22

Commercial Vehicle Information
Informational only
Details
US30 EB & WB Exits to Cornelius Pass Rd (Portland) Effective July 8, 2019, US30 eastbound and westbound exits to Cornelius Pass Rd will be closed at all hours. Estimated date of completion is September 21, 2019.
Last Updated
7/23/2019 10:00 AM

US30: MP 17.68

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Last Updated
7/23/2019 10:00 AM

US30: MP 20.39

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
7/23/2019 10:00 AM

US30: MP 30.42

Commercial Vehicle Information
Informational only
Details
US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.
Last Updated
7/23/2019 10:00 AM

US30: MP 48.67

Commercial Vehicle Information
Informational only
Details
US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Last Updated
7/23/2019 10:00 AM

US30: MP 51.56 to 51.98

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.56 to MP 51.98 (Baker City) Effective August 3, 2019, this section of US30 northbound and southbound will be closed between the hours of 9 AM & 1 PM for one day only.
Last Updated
7/23/2019 10:00 AM

US30: WB MP 98.13 to 98.5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. 6th Through 11th Street: Waterfront Bridges (Astoria) Project (Clatsop County) (Various Streets) This project consists of performing work as follows: - Install and remove temporary traffic control and pedestrian routes (TPAR) - Install and remove temporary potable water and sanitary sewer systems - Perform earthwork - Install storm sewer systems and water quality structures - Remove and reconstruct six bridges and trolley crossings (Including tracks) - Construct roadway, sidewalks and ADA ramps - Install permanent signs and illumination systems - Perform additional and incidental work and called for by the Plans and Specifications This Project replaces six aging bridges at the Astoria Waterfront, at 6th through 11th Streets and to install drainage and water quality facilities at the intersection of Highway 30 and 30th Street in Astoria. Streets will be closed while construction is occurring except for Highway 30. Flaggers will control single lane traffic while construction is occurring at 30th St. The odd numbered streets (7th, 9th and 11th) are scheduled to begin bridge demolition mid-October 2018, and are to be completed by June 15, 2019. The remaining work is to be completed no later than June 30, 2020. Temporary Pedestrian Access Routes (TPAR) will be maintained throughout the work zones and will be ADA compliant.
Last Updated
5/05/2019 2:06 AM

US395: MP 3 to 65

Information
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
There are no to minimum delays due to erosion of the highway. Use caution.
Last Updated
7/22/2019 8:05 AM

US395: MP 36.9

Crash/Hazard
No to Minimum Delay
Comments
A landslide has occurred causing no to minimum delays. Southbound has abrupt edge, shoulder closed. Use caution.
Last Updated
7/15/2019 8:15 AM

US97: MP 0.27 to 6.98

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Intermittent single lane closures may be in place for construction operations. Expect minor delays for night work. This project includes bridge upgrades and structure replacement on Highway 97 over Spanish Hollow Creek and Trout Creek.
Last Updated
7/21/2019 9:55 AM

US97: MP 56.72 to 74.9

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Flaggers will control traffic Sunday-Friday from 7PM-7AM for nighttime construction operations. Expect delays up to 20 minutes.
Last Updated
7/21/2019 10:02 AM

US97: MP 58.13 to 68.66

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 56.72 to MP 74.90 (Shaniko) Effective May 5, 2019, this section of US97 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2019.
Last Updated
7/23/2019 10:00 AM

US97: MP 141.09

Commercial Vehicle Information
Informational only
Details
US97 NB Exit 141 off-ramp to 3rd St (Bend) Effective August 25, 2019, the US97 northbound exit 141 off-ramp to 3rd St will be closed Sunday through Thursday nights between the hours of 8 PM & 5 AM. The estimated completion date for this project is October 18, 2019.
Last Updated
7/23/2019 10:00 AM

US97: NB MP 145.5

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/22/2019 11:50 AM

US97: MP 265.65 to 280.51

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Paving, bridge, concrete curb, and striping work. Work zone controlled with flagging and pilot car, expect 20 minute delays.
Last Updated
7/23/2019 3:34 AM

US97: NB MP 272.99

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/13/2019 3:53 PM

US97B: EB MP -5.5

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/19/2019 11:05 AM

ORE104: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Last Updated
7/23/2019 10:00 AM

ORE120: MP 0.38

Commercial Vehicle Information
Informational only
Details
OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) Effective February 12, 2019, OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to the following weights: 18 tons Type 3, 18 tons SU4, SU5, SU6, & SU7, 28 tons Type 3S2, 35 tons Type 3-3.
Last Updated
7/23/2019 10:00 AM

ORE126: MP 2 to 14

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
7/22/2019 7:39 PM

ORE126: MP 15.84

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 15.84 (Prineville) Effective June 21, 2018, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width and 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet or 135 feet in overall length may be accommodated on a case by case basis. Contact the OD Permit Unit for information.
Last Updated
7/23/2019 10:00 AM

ORE126: MP 31.56 to 32.36

Construction Work
Informational only
Comments
Road construction has been postponed until late August 2019. Most construction activities are suspended until August, at which point 24-hour flagging will be needed to install a large culvert and finish paving. There may be intermittent work during this time with minimal impacts to traffic. A westbound passing lane is being installed from mp 32.36 to mp 31.56, just west of Walton. The road is being widened on both sides to make room for the additional lane. The project also includes new pavement, signs, striping, guardrail, and water quality features.
Last Updated
7/04/2019 7:20 AM

ORE126: MP 32.4 to 31.56

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 31.56 to MP 32.36 (Walton) Effective February 6, 2019, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 11 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 31, 2019.
Last Updated
7/23/2019 10:00 AM

ORE126: MP 48.43

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. OR126: Cornerstone Dr. to Terry St. Paving Project. One lane is closed Sunday through Thursday nights from 7 p.m. to 6 a.m. Crews are repairing and repaving the roadway, adding two bus pullouts and a westbound right turn lane at Ellmaker Road, widening the north shoulder between Shady Rest Dr. and Lake Side Dr., replacing bridge rail at MP 51.7, installing new guardrail, and installing centerline and edge line rumble strips.This project is scheduled to be complete by September 16.
Last Updated
7/04/2019 7:24 AM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
7/23/2019 10:00 AM

ORE130: MP 3.6

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
7/23/2019 10:00 AM

ORE130: MP 3.82

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
7/23/2019 10:00 AM

ORE130: MP 4.15

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
7/23/2019 10:00 AM

ORE130: MP 4.76

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
7/23/2019 10:00 AM

ORE138: MP 0.6 to 1.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Watch for intermittent lane and shoulder closures in both directions of Diamond Lake Blvd. between NE Bogard Street and NE Patterson Street. Flaggers will provide traffic control as needed. Access for pedestrians, including those with disabilities, will be maintained at all intersections throughout the work zone. Construction is scheduled for completion June 30.
Last Updated
7/22/2019 3:35 AM

ORE138: MP 71.2

Crash/Hazard
No to Minimum Delay
Comments
Hazardous tree or vegetation is causing no to minimum delays. Use caution.
Last Updated
7/23/2019 7:56 PM

ORE155: MP 8.58 to 9.19

Commercial Vehicle Information
Informational only
Details
OR155 EB & WB MP 8.58 to MP 9.19 (Dayton) Effective July 26, 2019, this section of OR155 will be closed between the hours of 5:45 PM & 7 PM, for one day only.
Last Updated
7/23/2019 10:00 AM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/23/2019 10:00 AM

ORE18: MP 50 to 52.6

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
6/03/2019 7:01 PM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/23/2019 10:00 AM

ORE18: MP 52.59 to 50.1

Commercial Vehicle Information
Informational only
Details
OR18 EB & WB MP 50 to MP 52.6 (Dayton) Effective March 11, 2019, this section of OR18 eastbound and westbound will be restricted to 14 feet 00 inches in width Mondays between the hours of 12 midnight & 5 AM; and Monday through Thursday nights between the hours of 7 PM & 5 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

ORE194: MP 7.56 to 7.5

Commercial Vehicle Information
Informational only
Details
OR194 EB & WB MP 7.5 to MP 7.56 (Monmouth) Effective August 5, 2019, this section of OR194 (Main Street West) eastbound and westbound between Catron Street and OR99W will be closed at all hours. The estimated date of completion is August 12, 2019.
Last Updated
7/23/2019 10:00 AM

ORE207: MP 24

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
The road surface has collapsed. Use caution. Expect delays.
Last Updated
7/15/2019 10:02 AM

ORE217: MP 2.78

Commercial Vehicle Information
Informational only
Details
OR217 NB & SB Exit 3 on- and off-ramps to/from Denney Rd (Beaverton) Effective September 22, 2019 the OR217 northbound and southbound exit 3 on-and off-ramps to/from Denney Rd will be closed between the hours of 6:30 AM & 1 PM for one day only.
Last Updated
7/23/2019 10:00 AM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
7/23/2019 10:00 AM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 NB & SB MP 23.45 (Newberg) Effective September 15, 2019, this section of OR219 northbound and southbound will be restricted to 16 feet 00 inches in width Monday through Thursday nights between the hours of 7 PM & 5 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 26, 2019.
Last Updated
7/23/2019 10:00 AM

ORE22: MP 1.07 to 1.31

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
6/30/2019 6:06 AM

ORE22: MP 1.47

Commercial Vehicle Information
Informational only
Details
OR22 MP 1.47 (Cedar Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Cedar Creek Bridge at MP 1.47 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/23/2019 10:00 AM

ORE22: MP 5.81

Commercial Vehicle Information
Informational only
Details
OR22 MP 5.81 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 5.81 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/23/2019 10:00 AM

ORE22: MP 7.19

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.19 (Buck Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Buck Creek Bridge at MP 7.19 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/23/2019 10:00 AM

ORE22: MP 7.32

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.32 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 7.32 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/23/2019 10:00 AM

ORE22: MP 10.49

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
7/23/2019 10:00 AM

ORE22: MP 10.66

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
7/23/2019 10:00 AM

ORE22: MP 10.96 to 11.88

Commercial Vehicle Information
Informational only
Details
OR22 EB & WB MP 11.33 (Dolph) Effective May 29, 2019, this section of OR22 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this project is October 31, 2019.
Last Updated
7/23/2019 10:00 AM

ORE22: MP 11.3

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. A failing culvert is being replaced with a new structure at MP 11.3. The new structure will be constructed one half at a time. Due to limited working space one lane of traffic will be closed for the duration of the project. Traffic will be controlled using flaggers 24 hours/day. There will be several full weekend road closures. Closures are currently scheduled to take place 5/31-6/2, 6/7- 6/9, and 6/15 -6/16. These closures will be from Friday at 7PM to Monday at 6AM. During closures a signed detour will be in place along US 101 and OR 18. More information can be found at https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19935
Last Updated
7/07/2019 6:34 AM

ORE22: MP 49.84

Commercial Vehicle Information
Informational only
Details
OR22 EB & WB MP 49.84 (Detroit) Effective August 15, 2019, this section of OR22 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 9 AM & 2 PM for one day only. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for information. The estimated completion date for this project is August 15, 2019.
Last Updated
7/23/2019 10:00 AM

ORE221: MP 0.34 to 0.48

Commercial Vehicle Information
Informational only
Details
OR221 NB & SB MP 0.34 to MP 0.48 (Dayton) Effective July 26, 2019, this section of OR221 will be closed between the hours of 5:45 PM to 7 PM, for one day only.
Last Updated
7/23/2019 10:00 AM

ORE223: MP 2.91 to 3.56

Commercial Vehicle Information
Informational only
Details
OR223 NB & SB MP 2.91 to MP 3.56 (Dallas) Effective July 27, 2019, this section of OR223 will be closed between the hours of 8 AM & 2 PM, for one day only.
Last Updated
7/23/2019 10:00 AM

ORE223: MP 10.11

Commercial Vehicle Information
Informational only
Details
OR223 MP 10.11 (Little Luckiamute River Bridge - south of Dallas) Effective November 29, 2018, OR223 crossing Little Luckiamute River Bridge at MP 10.11 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
7/23/2019 10:00 AM

ORE230: MP 16

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
7/08/2019 6:59 AM

ORE234: MP 0.04

Commercial Vehicle Information
Informational only
Details
OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
7/23/2019 10:00 AM

ORE237: MP 12

Crash/Hazard
No to Minimum Delay
Comments
Hazardous tree or vegetation is causing no to minimum delays. Use caution.
Last Updated
7/23/2019 7:58 PM

ORE237: MP 13.52 to 12.85

Commercial Vehicle Information
Informational only
Details
OR237 EB & WB MP 12.62 to MP 13.72 (Cove) Effective August 17, 2019, this section of OR237 eastbound and westbound between the Artesian Blue Bottling Plant and Church St will be closed for one day only between the hours of 9:30 AM & 11 AM for the Cove Cherry Festival Parade.
Last Updated
7/23/2019 10:00 AM

ORE237: MP 16.71 to 16.32

Commercial Vehicle Information
Informational only
Details
OR237 NB & SB MP 16.32 to MP 16.71 (Union) Effective August 10, 2019, this section of OR237 (S Main St) northbound and southbound between E Ash St and Fulton St will be closed for one day only between the hours of 7 AM & 11 AM for the Grassroots Festival Parade.
Last Updated
7/23/2019 10:00 AM

ORE241: MP 0.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring, use caution. Watch for intermittent lane closures and brief delays. Flaggers will provide traffic control as needed. For more information, visit: www.IsthmusSloughBridge.com.
Last Updated
7/22/2019 3:30 AM

ORE241: MP 0.51

Commercial Vehicle Information
Informational only
Details
OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Last Updated
7/23/2019 10:00 AM

ORE244: MP 31.03

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
7/21/2019 9:23 AM

ORE27: MP 1.9

Commercial Vehicle Information
Informational only
Details
OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/23/2019 10:00 AM

ORE27: MP 2.88

Commercial Vehicle Information
Informational only
Details
OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/23/2019 10:00 AM

ORE27: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/23/2019 10:00 AM

ORE27: MP 27.23

Commercial Vehicle Information
Informational only
Details
OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.
Last Updated
7/23/2019 10:00 AM

ORE281: MP 2.75

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. ODOT and Hood River County are constructing intersection improvements, including widening the roadway at the intersections to better accommodate truck turning movements at two locations in Hood River County: OR 281, also known as Tucker Road, at Guignard Drive and Country Club Road at Barrett Drive.
Last Updated
7/19/2019 3:28 PM

ORE3: MP 13

Crash/Hazard
No to Minimum Delay
Comments
Hazardous tree or vegetation is causing no to minimum delays. Use caution.
Last Updated
7/23/2019 7:42 PM

ORE334: MP 17.34

Commercial Vehicle Information
Informational only
Details
OR334 NB & SB MP 17.34 to MP 17.42 (Athena) Effective August 2, 2019, this section of OR334 northbound and southbound will be closed between the hours of 3 PM & 11 PM, for one day only.
Last Updated
7/23/2019 10:00 AM

ORE339: MP 2.76

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/23/2019 10:00 AM

ORE339: MP 3.16

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/23/2019 10:00 AM

ORE339: MP 3.31

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
7/23/2019 10:00 AM

ORE34: MP 0.13

Commercial Vehicle Information
Informational only
Details
Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.
Last Updated
7/23/2019 10:00 AM

ORE34: MP 1.62

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. OR 34: McKinney Slough Bridge replacement Bridge is substantially complete and roadway has been paved. Road is open to traffic in both directions. Crews are striping, and doing miscellaneous cleanup work for several more weeks. Expect daytime flagging and minor delays. An existing bridge near milepost 1.5 is being replaced with a new structure.
Last Updated
7/20/2019 6:08 AM

ORE35: MP 63.73 to 72.9

Construction Work
Estimated delay under 20 minutes
Comments
Northbound OR 35 lane closures at MP 73 near Polallie Creek/Cooper Spur Rd with flaggers controlling traffic, daily 6:30 a.m. to 8 p.m. ODOT is addressing rockfall concerns on OR 35 at two locations, at milepost 63 near the Mt. Hood Meadows exit and at milepost 73 near Polallie Creek/Cooper Spur Road. Daytime lane closures, flagging and delays expected.
Last Updated
7/19/2019 11:04 AM

ORE35: MP 64 to 66

Construction Work
Estimated delay under 20 minutes
Comments
Single lane closures in both directions of OR 35 24/7 with a temporary traffic signal beginning July 9. Project Description: This project is constructing safety improvements with lane widening and dedicated right and left turn lanes accessing the ski area. This project will also construct a box culvert under OR 35. Construction will occur through summer 2019.
Last Updated
7/19/2019 3:18 PM

ORE35: MP 64.99

Commercial Vehicle Information
Informational only
Details
OR35 EB & WB MP 64.81 to MP 65.08 (Government Camp) Effective July 5, 2019 this section of OR35 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated date of completion is September 1, 2019.
Last Updated
7/23/2019 10:00 AM

ORE35: MP 73

Commercial Vehicle Information
Informational only
Details
OR35 EB & WB MP 72.81 to MP 73.19 (Mt Hood) Effective July 15, 2019, this section of OR35 eastbound and westbound will be restricted to 13 feet 00 inches in width Monday through Friday between the hours of 6:30 AM & 8 PM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated date of completion is August 30, 2019.
Last Updated
7/23/2019 10:00 AM

ORE35: MP 101.82

Commercial Vehicle Information
Informational only
Details
OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Last Updated
7/23/2019 10:00 AM

ORE38: MP 6.4 to 16.3

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Tree and slide removal work will require intermittent lane closures controlled by flagging, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
7/22/2019 3:42 AM

ORE38: MP 6.42 to 10.67

Commercial Vehicle Information
Informational only
Details
OR38 EB & WB MP 8.76 to MP 8.82 (Reedsport) Effective August 5, 2019, this section of OR38 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated date of completion is August 19, 2019.
Last Updated
7/23/2019 10:00 AM

ORE38: MP 6.42 to 10.67

Commercial Vehicle Information
Informational only
Details
OR38 EB & WB MP 7.5 to MP 7.55 (Reedsport) Effective August 20, 2019, this section of OR38 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated date of completion is September 3, 2019.
Last Updated
7/23/2019 10:00 AM

ORE38: MP 7.5 to 9

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring. Use caution. This project will replace two culverts along Highway 38 with reinforced concrete box culverts. Watch for intermittent flagging and shoulder closures. On Monday, July 29, construction is expected to begin at MP 8.8. The highway will be limited to a single lane, with flaggers providing 24-hour traffic control.
Last Updated
7/22/2019 3:34 AM

ORE38: MP 16.5 to 36

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Tree and slide removal work will require intermittent lane closures controlled by flagging, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
7/22/2019 3:42 AM

ORE38: MP 36.4 to 43

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Tree and slide removal work will require intermittent lane closures controlled by flagging, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
7/22/2019 3:42 AM

ORE38: MP 43 to 57

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Tree and slide removal work will require intermittent lane closures controlled by flagging, so it is recommended that the traveling public use caution when traveling these roads.
Last Updated
7/22/2019 3:43 AM

ORE42: MP 21

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Watch for intermittent lane and shoulder closures on both sides of Oregon 42 between Stover Lane and Oak Street in Myrtle Point. Flaggers will provide traffic control as needed. Access for pedestrians, including those with disabilities, will be maintained at all intersections throughout the work zone.
Last Updated
7/22/2019 3:28 AM

ORE42: MP 26.4

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Oregon 42 traffic at milepost 26.4 is limited to a single lane six days a week (Monday-Saturday, 7 a.m. to 6 p.m.) until the end of July. Flaggers will provide traffic control and motorists should expect delays. The lane closures will allow workers to install soil nails to stabilize the slope on the eastbound shoulder.
Last Updated
7/22/2019 3:29 AM

ORE42: MP 45

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution.
Last Updated
7/22/2019 3:40 AM

ORE42: MP 72.52

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Watch for intermittent lane closures at the Lower Lookingglass Creek Bridge, located near Douglas High School at the west end of Winston. Flaggers will provide traffic control as needed.
Last Updated
7/22/2019 3:35 AM

ORE42: MP 72.7 to 72.4

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Watch for intermittent lane and shoulder closures in both directions of Oregon 42 (Douglas Blvd.) in Winston between Brantley Drive and Old Highway 99 (Cheetah intersection). Flaggers will provide traffic control as needed. Access for pedestrians, including those with disabilities, will be maintained at all intersections throughout the work zone.
Last Updated
7/22/2019 3:36 AM

ORE43: MP 0.31

Commercial Vehicle Information
Informational only
Details
OR43 NB off-ramp to I-5 NB (Portland) Effective August 11, 2019, the OR43 northbound off-ramp to I-5 northbound will be closed between the hours of 4 AM & 11 AM for one day only for the Providence Bridge Pedal.
Last Updated
7/23/2019 10:00 AM

ORE43: MP 11.43

Commercial Vehicle Information
Informational only
Details
OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
7/23/2019 10:00 AM

ORE47: MP 37.6 to 38.2

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
7/29/2019 8:00:00 AM
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
7/01/2019 2:20 PM

ORE47: MP 88.05

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
7/23/2019 10:00 AM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Last Updated
7/23/2019 10:00 AM

ORE6: MP 48 to 50

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
7/23/2019 7:28 PM

ORE66: MP 7 to 25

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Expect single lane traffic with short delays Mon.-Wed. of next week, 7 a.m. - 4 p.m.
Last Updated
7/22/2019 3:21 AM

ORE66: MP 32 to 44

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Expect single lane traffic with short delays Mon.-Wed. of next week, 7 a.m. - 4 p.m.
Last Updated
7/22/2019 3:23 AM

ORE66: MP 57 to 58

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing no to minimum delays. Use caution.
Last Updated
6/27/2019 8:01 AM

ORE8: MP 3.18 to 10

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts.
Last Updated
7/19/2019 3:18 PM

ORE82: MP 30.02 to 32.58

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Flaggers will control traffic during construction operations. Expect delays up to 20 minutes. This project includes grading, paving, and bank stabilization.
Last Updated
7/21/2019 10:32 AM

ORE82: MP 71.28 to 71.42

Commercial Vehicle Information
Informational only
Details
OR82 EB & WB MP 71.28 to MP 71.42 (Joseph) Effective July 26, 2019, this section of OR82 eastbound and westbound will be closed between the hours of 7 AM & 1 PM for one day only.
Last Updated
7/23/2019 10:00 AM

ORE82: MP 71.28 to 71.42

Commercial Vehicle Information
Informational only
Details
OR82 EB & WB MP 71.28 to MP 71.42 (Joseph) Effective July 27, 2019, this section of OR82 eastbound and westbound will be closed between the hours of 7 AM & 1 PM for one day only.
Last Updated
7/23/2019 10:00 AM

ORE86: MP 40.64

Commercial Vehicle Information
Informational only
Details
OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Last Updated
7/23/2019 10:00 AM

ORE99: SB MP -0.87

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
7/22/2019 3:41 AM

ORE99: SB MP 2 to 2.74

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. Awaiting signal pole arrival and installation in mid-July, then final lift of paving and striping. Project builds new signal and highway connection across the railroad tracks into Twin Creek development.
Last Updated
7/22/2019 3:38 AM

ORE99: MP 22.03 to 21.86

Commercial Vehicle Information
Informational only
Details
OR99E SB MP 21.86 to MP 22.10 (Canby) Effective July 31, 2019, this section of OR99E southbound crossing the Molalla River Bridge will be restricted to 12 feet 00 inches in width between the hours of 9:30 PM & 5 AM. The estimated completion date is August 5, 2019.
Last Updated
7/23/2019 10:00 AM

ORE99: MP 24.67

Commercial Vehicle Information
Informational only
Details
OR99E NB & SB MP 24.67 (Aurora) Effective August 14, 2019, this section of OR99E northbound and southbound will be restricted to 14 feet 00 inches in width between the hours of 9 AM & 3 PM for one day only. Mobile homes with eaves over 14 feet 00 inches in width are not allowed. The estimated completion date for this project is August 14, 2019.
Last Updated
7/23/2019 10:00 AM

ORE99: MP 24.67

Commercial Vehicle Information
Informational only
Details
OR99E NB & SB MP 24.67 (Aurora) Effective August 14, 2019, this section of OR99E northbound and southbound will be restricted to 15 feet 03 inches in height between the hours of 9 AM & 3 PM for one day only. The estimated completion date for this project is August 14, 2019.
Last Updated
7/23/2019 10:00 AM

ORE99: MP 49.72 to 50.63

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB MP 49.69 to MP 51.23 (Amity) Effective September 23, 2019, this section of OR99W northbound and southbound will be restricted to 17 feet 00 inches in width at all hours. The estimated date of completion is September 30, 2019.
Last Updated
7/23/2019 10:00 AM

ORE99: MP 62.31 to 63.79

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB MP 62.03 to MP 63.90 (Monmouth) Effective August 1, 2018, this section of OR99W northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 6 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. The estimated completion date for this project is December 31, 2019.
Last Updated
7/23/2019 10:00 AM

ORE99: MP 63.49 to 63.35

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB left turn lanes to Main St (OR51 & OR194) (Monmouth) Effective July 8, 2019, the OR99W northbound and southbound left turn lanes to Main Street (OR51 and OR194) will be closed at all hours. The estimated date of completion is August 29, 2019.
Last Updated
7/23/2019 10:00 AM

ORE99E: MP 12.73

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime lane closures with flaggers directing traffic near the tunnel from 7 p.m. to 6 a.m. Sunday through Thursday nights. Possible nighttime closures on northbound and southbound McLoughlin Blvd Sunday through Thursday. Daytime single lane closures in both directions 9 a.m. to 3 p.m. Monday through Thursday.
Last Updated
7/19/2019 3:28 PM

ORE99W: MP 49.7 to 51.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Use caution. Motorist should expect intermittent delays between 9:00 a.m. and 4:00 p.m., Monday through Thursday; and possibly nights between 6:00 p.m. and 6:00 a.m., Monday through Friday morning.
Last Updated
6/30/2019 2:30 AM

ORE99W: MP 62 to 64

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median (Southbound) Median
Comments
Road construction is occurring. Use caution. Between July 8 and August 16, 2019, OR99W Traffic will be prohibited from making left turns onto Main St. (OR51 & OR194). Motorist should expect intermittent lane closures nightly Sunday through Friday, 7:00 p.m. to 6:00 a.m https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19132
Last Updated
7/20/2019 8:04 AM

ORE99W: MP 63.42

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Between July 8 and August 16, 2019, OR99W Traffic will be prohibited from making left turns onto Main St.
Last Updated
7/21/2019 6:59 AM

HWY487: MP 7.32

Weather Impact
Unconfirmed
Comments
An unconfirmed report of limited visibility has been received. Use caution.
Last Updated
7/23/2019 7:26 PM