Northwest Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

ORE229, 10 miles North of Siletz MP 14 - 15

A landslide has occurred. Use an alternate route.

<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx)

Updated
9/5/2026 3:03:00 PM

Weather Alert

Clatsop County Coast

Coastal Flood Advisory

NOAA Issue Date: 11/23/2026 01:33:00 PM What Tidal overflow flooding. Where Clatsop county coast. When Until 10 PM PST Thursday during periods of high tide. Impacts Minor flooding, up to one foot above ground level, during high tides is expected in the low lying areas near bays, sloughs, and the lower reaches of the coastal rivers. Additional details Coastal Flood Advisory means that tidal overflow flooding of low-lying areas is expected due to high tides. Coastal residents in the warned area should be alert for rising water, and take appropriate action to protect life and property. For the Clatsop county coast, total tides at Astoria will be 11.2 feet at Tuesday November 24th at 1153 AM PST, 11.7 feet Wednesday November 25th at 1238 PM PST, and 11.6 feet Thursday November 26th at 125 PM PST. Precautionary/preparedness actions... A coastal Flood Advisory means that tidal overflow flooding is expected. Coastal residents in the warned area should be alert for rising water, and take appropriate action to protect life and property.

Weather Alert

Tillamook County Coast

Coastal Flood Advisory

NOAA Issue Date: 11/23/2026 01:33:00 PM What Tidal overflow flooding expected. Where Tillamook county coast. When From 7 AM Tuesday to 10 PM PST Thursday during periods of high tide. Impacts Minor flooding, up to one foot above ground level, during high tides is expected in the low lying areas near bays, sloughs, and the lower reaches of the coastal rivers. Additional details Coastal Flood Advisory means that tidal overflow flooding of low-lying areas is expected due to high tides. Coastal residents in the warned area should be alert for rising water, and take appropriate action to protect life and property. For the Tillamook county coast, total tides at Garibaldi will be 11.2 feet at Tuesday November 24th at 1138 AM PST, 11.5 feet Wednesday November 25th at 1223 PM PST, and 11.4 feet Thursday November 26th at 111 PM PST. Precautionary/preparedness actions... A coastal Flood Advisory means that tidal overflow flooding is expected. Coastal residents in the warned area should be alert for rising water, and take appropriate action to protect life and property.

Weather Alert

Central Coast of Oregon

Coastal Flood Advisory

NOAA Issue Date: 11/23/2026 01:33:00 PM What Tidal overflow flooding expected. Where Central coast of Oregon. When From 7 AM Tuesday to 2 PM PST Wednesday during periods of high tide. Impacts Minor flooding, up to one foot above ground level, during high tides is expected in the low lying areas near bays, sloughs, and the lower reaches of the coastal rivers. Additional details Coastal Flood Advisory means that tidal overflow flooding of low-lying areas is expected due to high tides. Coastal residents in the warned area should be alert for rising water, and take appropriate action to protect life and property. For the central coast of Oregon, total tides at South Beach yaquina road will be 11.8 feet at Tuesday November 24th at 1052 AM PST, 12.0 feet Wednesday November 25th at 1136 PM PST. Precautionary/preparedness actions... A coastal Flood Advisory means that tidal overflow flooding is expected. Coastal residents in the warned area should be alert for rising water, and take appropriate action to protect life and property.

I-205: MP 8.5 to 9.56
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 NB MP 8.50 to MP 9.56 (Oregon City) Effective November 20, 2026, this section of I-205 northbound will be closed all weekend beginning Friday night at 11 PM till Monday morning at 7 AM. The estimated completion date for this work is November 23, 2026.
Last Updated
11/23/2026 4:00 PM

I-205: MP 8.5 to 9.56
I-205, OR 99E

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
12/11/2026 12:00:00 AM
Details
Alert: I-205 SB MP 8.50 to MP 9.56 (Oregon City) Effective December 11, 2026, this section of I-205 southbound will be closed all weekend beginning Friday night at 10 PM till Monday morning at 5 AM. The estimated completion date for this work is December 14, 2026.
Last Updated
11/23/2026 4:00 PM

I-205: MP 8.56 to 9.9
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 SB MP 8.56 to MP 9.90 (Oregon City) Effective July 17, 2026, this section of I-205 southbound will be intermittently restricted to 18 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5 AM and Friday thru Saturday nights between the hours of 10 PM and 7 AM. The estimated completion date for this work is December 19, 2026.
Last Updated
11/23/2026 4:00 PM

I-205: MP 8.56 to 9.56
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 NB MP 8.56 to MP 9.56 (Oregon City) Effective, July 6, 2026, this section of I-205 northbound will be restricted to 18 feet 00 inches in width Saturday through Sunday nights through Thursday between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. The estimated completion date for this work is December 11, 2026.
Last Updated
11/23/2026 4:00 PM

I-205: SB MP 8.8 to 9.3
I-205, OR 99E

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: Nighttime lane and ramp closures. • I-205 Northbound lane(s) Monday through Tuesday from 10:00 pm to 5:00 am. • I-205 Southbound lane(s) Monday through Tuesday from 10:00 pm to 5:00 am. • OR43 Southbound Monday through Tuesday from 8:00 pm to 6:00 am. Nighttime ramp closure • I-205 Southbound to OR43 Off Ramp Monday through Tuesday from 7:00 pm to 5:00 am. <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
Last Updated
11/23/2026 6:37 AM

I-205: MP 9.01
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective July 2, 2026, the I-205 southbound Exit 8 off-ramp to OR43 southbound will be intermittently closed Monday through Thursday nights between the hours of 7 PM and 5 AM. The estimated completion date for this work is December 18, 2026.
Last Updated
11/23/2026 4:00 PM

I-205: MP 9.23
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 NB Exit 9 off-ramp to OR99E (Oregon City) Effective, September 27, 2026, the I-205 northbound Exit 9 off-ramp to OR99E will be closed at all hours beginning Sunday at 10 PM through Friday at 5 AM. The estimated completion date for this work is December 4, 2026.
Last Updated
11/23/2026 4:00 PM

I-205: NB MP 23 to 12
I-205, NE Prescott St

Construction Work
Informational only
Comments
Traffic Impacts: No work scheduled. Project Description: ODOT is improving safety at ramp intersections along I-205 between the Columbia River and SE 82nd Drive improving signals, lighting, striping and updating signs. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22772)
Last Updated
11/06/2026 9:39 PM

I-405: NB MP 3.3
I-405, Intersection with US30

Crash/Hazard
Estimated delay of 20 minutes - 2 hours
Lanes Affected
(Southbound) 2 Lanes
Comments
A crash has the SB right lanes blocked. Use an alternate route. Prepare to slow or move over for worker safety.
Last Updated
11/23/2026 6:47 PM

I-5: MP 235.53
I-5, 2 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 SB Exit 235 off-ramp to Old Salem Road (Millersburg) Effective March 1, 2027, the I-5 southbound Exit 235 off-ramp to Old Salem Road will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 235.76
I-5, 2 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 NB Exit 235 off-ramp to Century Drive NE (Albany) Effective March 1, 2027, the I-5 northbound Exit 235 off-ramp to Albany will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 237.85
I-5, 4 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 SB Exit 237 off-ramp to Viewcrest Lane (Millersburg) Effective March 1, 2027, the I-5 southbound Exit 237 off-ramp to Viewcrest Lane will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 238.25
I-5, 4 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 NB Exit 238 off-ramp to OR164 (Millersburg) Effective March 1, 2027, the I-5 northbound Exit 238 off-ramp to OR164 will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 238.58
I-5, 5 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 SB Exit 238 off-ramp to OR164 (Millersburg) Effective March 1, 2027, the I-5 southbound Exit 238 off-ramp to OR164 will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 239
I-5, 5 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 NB Exit 239 off-ramp to Santiam Bluffs Road NE (Dever-Conner) Effective March 1, 2027, the I-5 northbound Exit 239 off-ramp to Santiam Bluffs Road NE will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 239.84
I-5, 6 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 SB Exit 239 off-ramp to Dever-Conner Rd NE (Dever-Conner) Effective March 1, 2027, the I-5 southbound Exit 239 off-ramp to Dever-Conner Rd will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 242.13
I-5, 8 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 SB Exit 242 off-ramp to Westside Lane S (Jefferson) Effective March 1, 2027, the I-5 southbound Exit 242 off-ramp to Westside Lane S will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 242.14
I-5, 8 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 NB Exit 242 off-ramp to Talbot Rd SE (Jefferson) Effective March 1, 2027, the I-5 northbound Exit 242 off-ramp to Talbot Rd SE will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 243
I-5, 9 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 SB Exit 243 off-ramp to Ankeny Hill Rd SE (Jefferson) Effective March 1, 2027, the I-5 southbound Exit 243 off-ramp to Ankeny Hill Rd SE will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 243.35
I-5, 9 miles North of Albany

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 NB Exit 243 off-ramp to Ankeny Hill Rd SE (Jefferson) Effective March 1, 2027, the I-5 northbound Exit 243 off-ramp to Ankeny Hill Rd SE will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 244
I-5, 10 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 NB Exit 244 off-ramp to OR164/Jefferson Hwy SE (Jefferson) Effective March 1, 2027, the I-5 northbound Exit 244 off-ramp to OR164 will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 244.88
I-5, 9 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 SB Exit 244 off-ramp to OR164/Jefferson Hwy SE (Jefferson) Effective March 1, 2027, the I-5 southbound Exit 244 off-ramp to OR164 will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 248.22
I-5, 6 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 NB Exit 248 off-ramp to Delaney Rd (Sunnyside/Turner) Effective March 1, 2027, the I-5 northbound Exit 248 off-ramp to Delaney Rd will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 248.62
I-5, 5 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 SB Exit 248 off-ramp to Delaney Rd SE (Sunnyside/Turner) Effective March 1, 2027, the I-5 southbound Exit 248 off-ramp to Delaney Rd SE will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
11/13/2026 1:02 PM

I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 263
I-5, 9 miles South of Woodburn

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 NB Exit 263 off-ramp to Brooklake Road (Brooks/Salem) Effective March 1, 2027, the I-5 northbound Exit 263 off-ramp to Brooklake Road will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: MP 263
I-5, 9 miles South of Woodburn

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
3/1/2027 12:00:00 AM
Details
Alert: I-5 SB Exit 263 off-ramp to Brooklake Road (Brooks/Salem) Effective March 1, 2027, the I-5 southbound Exit 263 off-ramp to Brooklake Road will be closed, at night, between the hours of 9:00 pm and 5:00 am. The estimated completion date for this work is March 2, 2027.
Last Updated
11/23/2026 4:00 PM

I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
Last Updated
10/12/2026 10:10 AM

I-5: SB MP 284 to 291
I-5, Wilsonville

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No traffic impacts. Project Description: This project improves system operations in the region by replacing and upgrading equipment that is beyond its service life. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22867)
Last Updated
11/20/2026 2:49 PM

I-5: MP 301.35 to 300.89
I-5, Interstate 84

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 301.35 to MP 300.89 (Portland) Effective July 14, 2026, this section of I-5 southbound will be restricted to 14 feet 11 inches in height Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is December 30, 2026.
Last Updated
11/23/2026 4:00 PM

I-5: SB MP 301.5 to 303
I-5, 1 mile South of I-405 North Interchange

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No impacts anticipated on I-5. Project Description: We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5, completing a seismic retrofit, beginning work to extend an existing merging lane on SB I-5 and constructing a new sign structure. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
Last Updated
11/20/2026 2:33 PM

I-5: MP 301.5 to 302.7
I-5, 1 mile South of I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 302.70 to MP 301.50 (Portland) Effective September 28, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday night thru Friday night between the hours of 10 PM and 5 AM and Saturday night between the hours of 10 PM and 8 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 30, 2026.
Last Updated
11/23/2026 4:00 PM

I-5: MP 301.58
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 301.58 (Portland) Effective May 7, 2026, this section of I-5 southbound will be restricted to 14 feet 7 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 14 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 30, 2026.
Last Updated
11/23/2026 4:00 PM

I-5: MP 301.59 to 301.96
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB MP 301.59 to MP 301.96 (Portland) Effective June 17, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 30, 2026.
Last Updated
11/23/2026 4:00 PM

I-5: MP 301.91
I-5, I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
12/8/2026 12:00:00 AM
Details
Alert: I-5 SB Exit 301 off-ramp to I-84 EB (Portland) Effective December 8, 2026, the I-5 southbound Exit 301 off-ramp to I-84 eastbound will be closed Tuesday through Thursday night between the hours of 10 PM & 5 AM. The estimated completion date for this work is December 11, 2026.
Last Updated
11/23/2026 4:00 PM

I-5: MP 302.09
I-5, I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
12/4/2026 12:00:00 AM
Details
Alert: I-5 NB Exit 302A off-ramp to Broadway-Weidler St/Moda Center (Portland) Effective December 4, 2026, the I-5 northbound Exit 302A off-ramp to Broadway-Weidler Street/Moda Center will be closed from 11 PM to 7 AM. The estimated completion date for this work is December 5, 2026.
Last Updated
11/23/2026 4:00 PM

I-5: MP 302.33
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 302.33 (Portland) Effective May 7, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 30, 2026.
Last Updated
11/23/2026 4:00 PM

I-5: MP 302.98 to 303.45
I-5, 1 mile North of I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB MP 302.98 to MP 303.45 (Portland) Effective August 28, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Sunday night thru Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 30, 2026.
Last Updated
11/23/2026 4:00 PM

I-5: MP 303.15
I-5, 1 mile South of Portland, Intersection with Going St

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB MP 303.15 (Portland) Effective August 28, 2026, this section of I-5 northbound will be restricted to 15 feet 7 inches in height Sunday night thru Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. Loads over 15 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 30, 2026.
Last Updated
11/23/2026 4:00 PM

I-5: SB MP 306
I-5, 1 mile South of Portland, Intersection with Victory Blvd

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No traffic impacts. Project Description: This project improves system operations in the region by replacing and upgrading equipment that is beyond its service life. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22867)
Last Updated
11/20/2026 2:49 PM

I-84: WB MP 0 to 16
I-84, Interstate 5

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No traffic impacts. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
11/20/2026 2:35 PM

I-84: EB MP 0 to 16
I-84, Interstate 5

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No traffic impacts. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
11/20/2026 2:36 PM

I-84: WB MP 0.2
I-84, Interstate 5

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Project Description: We're improving safety at multiple I-84 interchange ramps between downtown Portland and Hood River by installing or upgrading lights, signals and signs and trimming overgrown vegetation. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22773)
Last Updated
11/16/2026 4:09 PM

I-84: WB MP 0.43
I-84, Interstate 5

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
A crash has the WB lane blocked. Prepare to slow or move over for worker safety.
Last Updated
11/23/2026 6:11 PM

I-84: WB MP 1.2
I-84, Portland, Intersection with Lloyd Blvd

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Project Description: We're improving safety at multiple I-84 interchange ramps between downtown Portland and Hood River by installing or upgrading lights, signals and signs and trimming overgrown vegetation. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22773)
Last Updated
11/16/2026 4:12 PM

I-84: MP 13.03 to 77

Snow Zone
Informational only
Affected Area
NE 181st in Troutdale east to just west of the Rowena Exit
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: MP 13.03 to 44
TROUTDALE - CASCADE LOCKS REPORTING STATION

Weather Warning
Informational only
Weather Condition
Overcast
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
38 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
11/23/2026 3:32 PM

I-84: WB MP 13.3
I-84, Gresham, Intersection with 181st Ave

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Project Description: We're improving safety at multiple I-84 interchange ramps between downtown Portland and Hood River by installing or upgrading lights, signals and signs and trimming overgrown vegetation. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22773)
Last Updated
11/16/2026 4:16 PM

I-84: WB MP 18
I-84, 1 mile East of Troutdale

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Daytime periodic lane closures on Jordan Road, with flaggers directing traffic. We're building a new multi-use path parallel to Jordan Road (near I-84 at Exit 18) from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
10/30/2026 11:09 AM

I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls

Construction Work
Estimated delay under 20 minutes
Comments
Traffic impacts: No lane closures expected on I-84 at McCord Creek Bridge. We are working on a construction project to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale through fall 2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
Last Updated
11/20/2026 2:34 PM

US101: MP 22.72 to 22.74
US101, 2 miles South of Seaside

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Utility work is occurring. Prepare to slow. Utility work is scheduled from 8 a.m. to 4 p.m., Monday through Thursday.
Last Updated
11/03/2026 8:11 AM

US101: MP 34.96 to 35.12
US101, 5 miles South of Cannon Beach

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
11/16/2026 9:01 AM

US101: MP 43
US101, 2 miles North of Nehalem

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
11/18/2026 8:23 AM

US101: MP 98.85 to 104.2

Snow Zone
Informational only
Affected Area
Cascade Head - just north of Neskowin Creek to just north of the Salmon River
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US101: MP 112.92 to 113.4
US101, Lincoln City

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
11/30/2026 8:00:00 AM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work starting on 11/30/26. Expect lane shifts in the NB direction between 39th st and Holmes Rd. Work to be done mostly during daytime hours. Businesses open during construction. Expect minor delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23431)
Last Updated
11/21/2026 11:52 AM

US101: MP 127.61
US101, Depoe Bay

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday. Most lane closures will occur during nighttime hours, with a few exceptions that will happen during the day between the hours of 7AM and 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
Last Updated
10/12/2026 10:12 AM

US101: MP 134
US101, 7 miles North of Newport

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
9/26/2026 8:40 AM

US26: MP 5.6 to 5.8
US26, 3 miles West of Necanicum

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Paving Operation. Currently Scheduled from 7 a.m. to 5 p.m., Monday through Thursday.
Last Updated
11/18/2026 6:38 AM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Traffic Impacts: Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8 a.m. to 5 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. Possible nighttime work with closures. Travelers can expect congestion during construction. Alternate routes are available. Flaggers may be directing traffic. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/Outer%20Powell%20Transportation%20Safety%20Improvements.aspx)
Last Updated
11/20/2026 2:41 PM

US26: MP 5.87 to 7.9
US26, Portland

Commercial Vehicle Information
Informational only
Details
Alert: US26 EB & WB MP 5.87 to MP 7.9 (Portland) Effective July 13, 2025, this section of US26 eastbound and westbound will be restricted to 10 feet 00 inches in width at night half an hour after sunset to half an hour before sunrise. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 4, 2027.
Last Updated
11/23/2026 4:00 PM

US26: MP 7.9 to 9.96
US26, Portland

Commercial Vehicle Information
Informational only
Details
Alert: US26 Powell Blvd EB & WB 7.90 to MP 9.96 (Portland) Effective November 21, 2025, this section of US26 eastbound and westbound will be continuously restricted to 10 feet 00 inches in width at all hours. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 3, 2027.
Last Updated
11/23/2026 4:00 PM

US26: MP 9.72 to 35.11

Snow Zone
Informational only
Affected Area
David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 13
US26, 4 miles East of Necanicum

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 1 Lane
Comments
Sunken grade. Prepare to slow.
Last Updated
9/15/2026 4:58 PM

US26: EB MP 15.53
US26, Gresham

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of hazardous debris has been received. Use caution.
Last Updated
11/23/2026 7:04 PM

US26: MP 25.12 to 42.5

Snow Zone
Informational only
Affected Area
Sandy to Zigzag
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 37.73 to 45.43

Snow Zone
Informational only
Affected Area
Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 37.73 to 45.43
SUNSET SUMMIT REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
11/23/2026 3:39 PM

US26: MP 42.5 to 60
GOVERNMENT CAMP REPORTING STATION

Weather Warning
Informational only
Weather Condition
Overcast
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
35 F
New Snow
0 in.
Roadside Snow
1 in.
Last Updated
11/23/2026 3:31 PM

US26: MP 59.57 to 75.5

Snow Zone
Informational only
Affected Area
Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 59.57 to 67
BLUE BOX PASS REPORTING STATION

Weather Warning
Informational only
Weather Condition
Overcast
Pavement Condition
Bare Pavement
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
30 F
New Snow
0 in.
Roadside Snow
1 in.
Last Updated
11/23/2026 3:02 PM

US26: MP 72.5 to 74
US26, Portland, Zoo

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
12/10/2026 12:00:00 AM
Details
Alert: US26 EB MP 72.50 to MP 74.00 (Portland) Effective December 10, 2026 this section of US26 eastbound will be restricted to 22 feet 00 inches in width between the hours of 9:00 PM and 5:00 AM. The estimated completion date is December 11, 2026.
Last Updated
11/23/2026 4:00 PM

US26: MP 74.5 to 73
US26, Intersection with Pacific Highway West ORE99W

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
12/17/2026 12:00:00 AM
Details
Alert: US26 WB MP 74.50 to MP 73.00 (Portland) Effective December 17, 2026, this section of US26 westbound will be restricted to 22 feet 00 inches in width at night between the hours of 9:00 PM and 5:00 AM. The estimated completion date is December 18, 2026.
Last Updated
11/23/2026 4:00 PM

US30: MP 18.37 to 65.99
CLATSKANIE REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
11/23/2026 3:40 PM

US30: MP 48.31 to 61.01

Snow Zone
Informational only
Affected Area
Rainier to Clatskanie
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 72.32 to 76.76

Snow Zone
Informational only
Affected Area
Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: WB MP 98 to 99
US30, Astoria

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
11/18/2026 7:46 AM

US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No traffic impacts. We are improving the long-term safety and lifespan of the St. Johns Bridge by repairing the concrete on the pier columns and arches under the bridge. Repairing the concrete will protect the bridge's steel internal frame and reinforcements from corrosion, maintaining the service life of this beloved Portland Historic Landmark. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/Pages/OR8-Construction.aspx)
Last Updated
11/20/2026 2:42 PM

US30BY: MP 1.32 to 12.13
US30BP, 1 mile East of Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
Expect lane and sidewalk closures on U.S. 30 Bypass at NE 60th Avenue, NE Columbia Parkway and NE Ainsworth Street. We are bringing approximately 260 sidewalk curb ramps into compliance with Americans with Disabilities Act (ADA) accessibility standards on U.S. 30 Bypass between N. Ivanhoe Street and NE 162nd Avenue in Portland. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23458)
Last Updated
11/20/2026 2:42 PM

US30BY: MP 8.19 to 8.41
US30BP, 3 miles West of Intersection with East Portland Highway I-205

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: NE Lombard Street reduced to one lane in each direction Project Description: Closures are required for PBOT’s NE 42nd Avenue Bridge Replacement, which will make a seismically safe crossing for an emergency route and provide better access for freight, pedestrians, and people biking on the bridge and NE Lombard Street below the span. <!--Links Start Here--> [Link to Additional Information](https://www.portland.gov/transportation/pbot-projects/construction/ne-42nd-avenue-bridge-replacement-over-lombard-street?utm_medium=email&utm_source=govdelivery)
Last Updated
11/20/2026 2:41 PM

ORE141: MP 5.59 to 5.88
ORE141, Tigard

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: Shoulder and lane closures with flagging Monday-Friday 9:00 am to 3:00 pm. We're improving safety for people walking, biking or rolling by installing a new pedestrian-activated crossing, known as a Rectangular Rapid Flashing Beacon, on Hall Boulevard (OR 141) at SW Omara Street and upgrading the existing signalized crosswalk at SW Fanno Creek Trail. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23509)
Last Updated
11/20/2026 2:46 PM

ORE141: MP 5.59 to 5.88
ORE141, Tigard

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: Shoulder and lane closures with flagging Monday-Friday 9:00 am to 3:00 pm. We're improving safety for people walking, biking or rolling by installing a new pedestrian-activated crossing, known as a Rectangular Rapid Flashing Beacon, on Hall Boulevard (OR 141) at SW Omara Street and upgrading the existing signalized crosswalk at SW Fanno Creek Trail. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23509)
Last Updated
11/20/2026 2:46 PM

ORE141: MP 5.59 to 5.88
ORE141, Tigard

Commercial Vehicle Information
Informational only
Details
Alert: OR141/Hall Blvd NB & SB MP 5.59 to MP 5.88 (Tigard) Effective July 27, 2026, this section of OR141/Hall Boulevard will be restricted to 12 feet 00 inches in width Monday through Friday between the hours of 9 AM and 3 PM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 8, 2027.
Last Updated
11/23/2026 4:00 PM

ORE173: MP 0.12 to 5.49

Snow Zone
Informational only
Affected Area
Timberline - US26/Government Camp to Timberline Lodge
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE173: MP 0.12 to 5.49
TIMBERLINE LODGE REPORTING STATION

Weather Warning
Informational only
Weather Condition
Overcast
Pavement Condition
Spots of Ice
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
29 F
New Snow
0 in.
Roadside Snow
1 in.
Last Updated
11/23/2026 3:31 PM

ORE18: MP 12 to 18

Snow Zone
Informational only
Affected Area
Van Duzer Corridor - (Murphy Hill Summit Elev. 760') Just west of Bear Creek thru the Van Duzer Corridor
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE18B: MP 2 to 2.67
ORE18B, Willamina

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=ADA)
Last Updated
11/07/2026 11:53 AM

ORE18B: MP 5.94 to 7.6
ORE18B, Sheridan

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=ADA)
Last Updated
11/09/2026 6:02 AM

ORE202: MP 36 to 38
ORE202, 5 miles North of Birkenfeld

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Timber felling is occurring, prepare to slow or stop. Watch for workers, use caution, and prepare to slow down in the work zone.
Last Updated
11/03/2026 3:58 PM

ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution. Bridge construction is occurring. Prepare to slow. Watch for workers. 3/11/26 - 11/30/26: MP 38.5 to MP 38.63 (Bridge structure ID: 03113A) portable traffic signal in place with 24-hour lane closure. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23117)
Last Updated
11/10/2026 8:20 AM

ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld

Commercial Vehicle Information
Informational only
Details
Alert: OR202 EB & WB MP 38.5 to 38.63 (Vesper) Effective March 11, 2026, this section of OR202 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this work is November 27, 2026.
Last Updated
11/23/2026 4:00 PM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Periodic daytime and nighttime single lane closures on SE 82 Ave. (OR 213) between SE Foster Rd. and SE Lindy St. We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
11/20/2026 2:47 PM

ORE219: MP 18.35 to 20.8
ORE219, Newberg

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
11/10/2026 8:23 AM

ORE22: MP 11.7 to 12.95
ORE22, 12 miles East of Intersection with Salmon River Highway ORE18

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Use caution through the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21566)
Last Updated
10/21/2026 4:11 AM

ORE22: MP 30.17
ORE22, Mill City

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
11/15/2026 11:17 PM

ORE22: MP 32 to 73

Snow Zone
Informational only
Affected Area
Gates City Limit to Marion Forks
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE22: MP 66.23 to 73
MARION FORKS REPORTING STATION

Weather Warning
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Spots of Ice
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
36 F
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
11/23/2026 3:24 PM

ORE223: MP 2.92 to 3.86
ORE223, Dallas

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
12/5/2026 12:00:00 AM
Details
Alert: OR223 NB & SB MP 2.92 to MP 3.86 (Dallas) Effective Saturday, December 5, 2026, this section of OR223 northbound and southbound will be closed between the hours of 3 PM & 6 PM for the Christmas Light Parade. The estimated completion date is December 5, 2026.
Last Updated
11/23/2026 4:00 PM

ORE224: MP 49.9
ORE224, Ripplebrook Ranger Station

Crash/Hazard
Informational only
Comments
A fire is in the area and has many forest service roads closed. Use caution. For more information visit Mt. Hood National Forest | Closure in place for Clackamas River Rd Fires | Forest Service at www.fs.usda.gov. <!--Links Start Here--> [Link to Additional Information](https://www.fs.usda.gov/r06/mthood/alerts/clackamas-river-rd-fires)
Last Updated
11/02/2026 9:02 AM

ORE229: MP 14.1 to 14.3
ORE229, 10 miles North of Siletz

Commercial Vehicle Information
Informational only
Details
Alert: OR229 NB & SB MP 14.18 (Siletz) Effective December 12, 2025, this section of OR229 northbound and southbound will be closed due to a landslide. There is no estimated date that the road will reopen at this time.
Last Updated
11/23/2026 4:00 PM

ORE229: MP 14.2 to 15.1
ORE229, 10 miles North of Siletz

Crash/Hazard
Closure
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
A landslide has occurred. Use an alternate route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx)
Last Updated
9/05/2026 3:03 PM

ORE35: MP 60 to 83.56

Snow Zone
Informational only
Affected Area
White River - Jct US26 to ODOT Maintenance Station
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE35: MP 60 to 62
WHITE RIVER REPORTING STATION

Weather Warning
Informational only
Weather Condition
Partly Cloudy
Pavement Condition
Spots of Ice
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
30 F
New Snow
0 in.
Roadside Snow
1 in.
Last Updated
11/23/2026 3:32 PM

ORE43: MP 11.08
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 SB off-ramp to I-205 NB (West Linn) Effective August 26, 2026, the OR43 southbound off-ramp to I-205 northbound will be closed Sunday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. The estimated completion date for this work is December 11, 2026.
Last Updated
11/23/2026 4:00 PM

ORE43: MP 11.13 to 11.18
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 NB MP 11.13 to MP 11.18 (West Linn) Effective March 2, 2026, this section of OR43 northbound will be closed Sunday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 9 AM. The estimated completion date for this work is December 11, 2026.
Last Updated
11/23/2026 4:00 PM

ORE43: MP 11.13 to 11.18
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 SB MP 11.13 to MP 11.18 (West Linn) Effective, March 2, 2026, this section of OR43 southbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 8 AM. The estimated completion date for this work is December 11, 2026.
Last Updated
11/23/2026 4:00 PM

ORE47: MP 0 to 11.71

Snow Zone
Informational only
Affected Area
OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE47: MP 82.85 to 83.49
ORE47, 1 mile North of Banks

Information
Future Event: Estimated delay of 20 minutes - 2 hours
Expected Start Date
12/6/2026 6:00:00 PM
Comments
A special event is taking place. Prepare to slow.
Last Updated
10/22/2026 10:54 PM

ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. 1/26/26 - 5/15/27: MP 1.01 to MP 51.58 (Entire length of OR6) single lane and shoulder closure as needed with flagging. Beginning 1/26/26 crews will start working at MP1.01 and work their way east. Crews working 7 days a week 24 hours a day, use caution, watch for workers and slowdown in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
Last Updated
11/21/2026 11:55 AM

ORE6: MP 4.4 to 9
ORE6, 4 miles East of Tillamook

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Paving and striping is complete. Expect day or nighttime lane closures to allow the contractor to finish the remaining work. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22787)
Last Updated
10/12/2026 10:29 AM

ORE6: MP 16.06 to 37.5

Snow Zone
Informational only
Affected Area
Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE6: MP 16.06 to 37.5
WILSON RIVER SMT REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
11/23/2026 3:39 PM

ORE6: MP 23 to 24
ORE6, 16 miles West of Glenwood

Construction Work
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. 24 hour flagging, use caution and watch for workers.
Last Updated
11/23/2026 6:22 PM

ORE6: MP 49.9 to 50.2
ORE6, 2 miles West of Intersection with Sunset Highway ORE47

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect crews working during the day with shoulder closures as needed. OR 6 traffic will use the roundabout. Traffic entering and exiting the north side of NW Aerts Road will use the roundabout. The south side of NW Aerts Road will temporarily close at the roundabout. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=OR6-Aerts)
Last Updated
11/05/2026 11:47 AM

ORE8: WB MP 13.82 to 17.67
ORE8, Hillsboro

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No lane closures expected on OR 8/SW Baseline Street in Hillsboro. Project Description: This safety improvement project in three locations on OR 8 in Hillsboro and Forest Grove includes new sidewalks, an enhanced pedestrian crosswalk, new lighting and upgraded traffic signals. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21608)
Last Updated
11/20/2026 2:43 PM

ORE99E: MP 10.5
ORE99E, 1 mile North of Gladstone

Construction Work
Informational only
Comments
Traffic Impacts: Daytime lane closures on OR 99E in Gladstone south of Glen Echo Avenue. Project Description: We are installing a new crossing on OR 99E south of Glen Echo Avenue in Gladstone to improve safety. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22867)
Last Updated
11/20/2026 2:44 PM

ORE99E: MP 11.6 to 11.9
ORE99E, Oregon City

Commercial Vehicle Information
Informational only
Details
Alert: OR99E NB & SB MP 11.60 to MP 11.90 (Oregon City) Effective December 4, 2026, this section of OR99E northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Friday nights between the hours of 8 PM and 6 AM, Saturday and Sunday nights between the hours of 8 PM & 9 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 19, 2026.
Last Updated
11/23/2026 4:00 PM

ORE99E: MP 11.63
ORE99E, Oregon City

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
12/7/2026 12:00:00 AM
Details
Alert: OR99E SB off-ramp to I-205 SB (Oregon City) Effective December 7, 2026, the OR99E southbound off-ramp to I-205 southbound will be intermittently closed Monday through Wednesday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is December 16, 2026.
Last Updated
11/23/2026 4:00 PM

ORE99E: MP 24.95 to 25.56
ORE99E, Aurora

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is being performed to upgrade pedestrian crossings with new curb ramps, sidewalk, Rectangular Rapid Flashing Beacons and lighting through Aurora on the east and west sides of the roadway.
Last Updated
10/20/2026 1:05 PM

ORE99E: MP 28.9 to 29
ORE99E, Hubbard

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Shoulder work M-F. Limited flagging as needed.
Last Updated
10/20/2026 5:43 AM

ORE99EB: MP 1.54
99EBus, Salem, Intersection with Hyacinth St NE (East)/Verda Ln (West)

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Single lane closures Monday through Friday, 8:30 a.m. to 4 p.m. Intermittent Saturday and night work may be needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20741)
Last Updated
10/07/2026 6:01 AM

ORE99W: NB MP 23.23 to 24.49
ORE99W, Intersection with Hillsboro - Silverton Highway ORE214

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
11/10/2026 8:23 AM

ORE99W: MP 36.36 to 39.06
ORE99W, McMinnville

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=ADA)
Last Updated
11/18/2026 1:16 PM