Northwest Oregon Road Conditions
Highways with no adverse conditions do not show up on this report.
Current Travel Conditions By Route
Closure with Detour
ORE131, 2 miles East of Oceanside MP 2
Road construction has closed the road. Follow detour.
- Updated
- 12/20/2024 10:06:00 AM
Closure
HWY100, 2 miles East of Troutdale MP 3
The Stark Street bridge is closed at Historic Columbia River Highway. Use alternate route.
- Updated
- 10/22/2024 7:19:00 AM
Closure
ORE141, Tigard MP 5
Hall Boulevard is closed where it passes over OR 217 in Tigard, at Pfaffle Street. Use Greenburg Road as a detour route.
- Updated
- 3/11/2024 11:33:00 AM
Closure
HWY100, 5 miles West of Ainsworth State Park MP 18
A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025.
- Updated
- 12/15/2024 6:17:00 AM
I-205: SB MP 8.32 to 11.06
I-205, West Linn
Construction Work
Estimated delay under 20 minutes
- Comments
- Nighttime ramp closure on the on-ramp from OR99E to I-205 northbound. Nighttime lane closures on northbound OR99E travel lanes, as needed, to facilitate construction installation on existing sign structure. Single lane closures on Clackamette Drive, Willamette Falls Drive. Auxiliary lane closure on OR 99E north. Pedestrian detours on OR 43 and OR 99E.
- Last Updated
- 12/15/2024 6:14 AM
I-205: MP 9.031 to 9.29
I-205, Abernethy Bridge
Commercial Vehicle Information
Informational only
- Details
- I-205 NB MP 9.00 to MP 9.40 (Oregon City) Effective December 30, 2024, this section of I-205 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 3, 2025.
- Last Updated
- 12/20/2024 7:00 PM
I-205: MP 9.58
I-205, 1 mile North of Abernethy Bridge
Commercial Vehicle Information
Informational only
- Details
- I-205 SB MP 9.60 to MP 8.65 (Oregon City) Effective December 30, 2024, this section of I-205 southbound will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 3, 2025.
- Last Updated
- 12/20/2024 7:00 PM
I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 11/25/2024 5:02 PM
I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
Off Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 11/25/2024 5:02 PM
I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 11/25/2024 4:58 PM
I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 11/25/2024 5:02 PM
I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem
Commercial Vehicle Information
Informational only
- Details
- I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is December 29, 2024.
- Last Updated
- 12/20/2024 7:00 PM
I-5: SB MP 262 to 240.15
I-5, 8 miles North of Intersection with ORE22, in Salem
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You'll see crews working on the shoulder preparing for the VMS boards and camera installation. Please drive with caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21553)
- Last Updated
- 12/04/2024 6:46 AM
I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
- Last Updated
- 11/07/2024 5:21 AM
I-5: NB MP 293.4 to 297.25
I-5, 1 mile North of Highway 217
Construction Work
Informational only
- Comments
- Four miles of I-5 will close from 9pm Friday June 28 through 5am Monday July 1 in SW Portland. Detours on I-205/I-84 or OR 217/U.S. 26/I-405. Four miles of I-5 will be closed from 9pm Friday June 28 through 5am Monday July 1 in SW Portland. Detours on I-205/I-84 or OR 217/U.S. 26/I-405. Crews are rebuilding the I-5 structure over SW 26th Avenue. <!--Links Start Here--> [I-5 over SW 26th Avenue Improvements Project](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20486)
- Last Updated
- 6/28/2024 11:10 PM
I-5: SB MP 295.9 to 296.1
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway
Construction Work
Estimated delay under 20 minutes
- Comments
- No traffic impacts.
- Last Updated
- 12/15/2024 6:12 AM
I-5: MP 301.85 to 301.66
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- I-5 SB MP 301.82 to MP 301.67 (Portland) On Friday, January 10, 2025, this section of I-5 southbound will be restricted to 13 feet 00 inches in width between the hours of 2 AM & 5 AM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
- Last Updated
- 12/20/2024 7:00 PM
I-5: MP 308 to 308.38
I-5, Oregon Washington Border
Commercial Vehicle Information
Informational only
- Details
- I-5 NB MP 308.00 to MP 308.38 (Portland) Effective January 21, 2025, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 29, 2025.
- Last Updated
- 12/20/2024 7:00 PM
I-5: MP 308.18
I-5, Oregon Washington Border
Commercial Vehicle Information
Informational only
- Details
- I-5 NB MP 308.18 (Portland) Effective January 21, 2025, this section of I-5 northbound will be intermittently restricted to 15 feet 9 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 15 feet 9 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 29, 2025.
- Last Updated
- 12/20/2024 7:00 PM
I-84: WB MP 12.52 to 16.67
I-84, Gresham, Intersection with 181st Ave
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 6/28/2024 8:13 AM
I-84: MP 13.03 to 77
Snow Zone
Informational only
- Affected Area
- NE 181st in Troutdale east to just west of the Rowena Exit
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
I-84: MP 13.03 to 44
TROUTDALE - CASCADE LOCKS REPORTING STATION
Road/Weather Report
Informational only
- Weather Condition
- No Report
- Pavement Condition
- No Report
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 12/21/2024 3:41 AM
I-84: MP 16.66
I-84, Troutdale
Commercial Vehicle Information
Informational only
- Details
- I-84 EB Exit 17 off-ramp to Marine Dr/257th Ave (Troutdale) Effective January 5, 2025, the I-84 eastbound Exit 17 off-ramp to Marine Drive/257th Avenue will be restricted to 12 feet 00 inches in width between the hours of 6 AM and 2 PM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 5, 2025.
- Last Updated
- 12/20/2024 7:00 PM
I-84: EB MP 58.39 to 59
I-84, 6 miles West of Hood River
Construction Work
Closure
Off Ramp
- Comments
- I-84 east Exit 58 closed around the clock. Ramps Affected. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 9/08/2024 7:38 AM
US101: MP 18.3
US101, 1 mile North of Gearhart
Information
Future Event: No to Minimum Delay
- Expected Start Date
- 12/23/2024 8:00:00 AM
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 12/18/2024 12:52 PM
US101: MP 55.28 to 55.97
US101, Garibaldi
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20252)
- Last Updated
- 12/12/2024 8:02 AM
US101: MP 98.85 to 104.2
Snow Zone
Informational only
- Affected Area
- Cascade Head - just north of Neskowin Creek to just north of the Salmon River
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US101: MP 114.52 to 117.39
US101, Lincoln City
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 2 Lanes (Southbound) 2 Lanes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
- Last Updated
- 11/15/2024 5:25 PM
US101: MP 121.42 to 125
US101, 3 miles North of Lincoln Beach
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time from North Fogarty Creek State Park (Road) to Lancer Street/Seagrove Drive. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
- Last Updated
- 11/25/2024 4:48 PM
US101: MP 129.74
US101, 3 miles South of Depoe Bay
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution. Occasional lane closures with flaggers helping direct. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21727)
- Last Updated
- 11/11/2024 11:23 AM
US101B: MP 7.1 to 5.7
US101B, Astoria
Maintenance Work
Future Event: No to Minimum Delay
- Expected Start Date
- 1/2/2025 6:00:00 PM
- Comments
- Bridge work is scheduled to occur. Use caution. We plan to start work in January 2025. When construction starts, you can expect: Crews working day and night. Nighttime single lane and shoulder closures as needed Sunday through Friday from 6 p.m. to 6 a.m. Flaggers helping direct traffic as needed. We're planning to start work first on the Old Youngs Bay Bridge, then the Astoria-Megler Bridge and finish on the New Youngs Bay Bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21587)
- Last Updated
- 11/25/2024 6:28 PM
US26: MP 5.85 to 9.96
US26, Portland
Construction Work
Informational only
- Comments
- Flaggers periodically directing traffic.
- Last Updated
- 12/15/2024 6:15 AM
US26: MP 9.72 to 35.11
Snow Zone
Informational only
- Affected Area
- David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 13
US26, 4 miles East of Necanicum
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 11/24/2024 12:24 PM
US26: MP 25.12 to 42.5
Snow Zone
Informational only
- Affected Area
- Sandy to Zigzag
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 37.73 to 45.43
Snow Zone
Informational only
- Affected Area
- Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 37.73 to 45.43
SUNSET SUMMIT REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 41 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 12/21/2024 4:01 AM
US26: MP 42.5 to 60
GOVERNMENT CAMP REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Partly Cloudy
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 45 F
- New Snow
- 0 in.
- Roadside Snow
- 15 in.
- Last Updated
- 12/21/2024 3:50 AM
US26: MP 59.57 to 75.5
Snow Zone
Informational only
- Affected Area
- Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 59.57 to 67
BLUE BOX PASS REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 40 F
- New Snow
- 0 in.
- Roadside Snow
- 20 in.
- Last Updated
- 12/21/2024 3:33 AM
US30: MP 3.94 to 6.51
US30, Portland
Construction Work
Estimated delay under 20 minutes
- Comments
- Periodic daytime lane closures. Pedestrian detours. Bicycles use roadway travel lanes.
- Last Updated
- 12/06/2024 10:41 AM
US30: MP 11.93
HWY100, 5 miles East of Corbett
Commercial Vehicle Information
Informational only
- Details
- US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
- Last Updated
- 12/20/2024 7:00 PM
US30: MP 18.37 to 65.99
CLATSKANIE REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 44 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 12/21/2024 3:51 AM
US30: MP 23.15
US30, 2 miles East of Warren
Commercial Vehicle Information
Informational only
- Details
- US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
- Last Updated
- 12/20/2024 7:00 PM
US30: MP 48.31 to 61.01
Snow Zone
Informational only
- Affected Area
- Rainier to Clatskanie
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US30: MP 72.32 to 76.76
Snow Zone
Informational only
- Affected Area
- Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
- Last Updated
- 8/11/2024 12:42 PM
US30BY: WB MP 0.42
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
No to Minimum Delay
- Comments
- Paving and flagging on NE Lombard St between N Syracuse and N Leavitt. 7pm-5am Sept. and Oct. N Philadelphia St closes at N Ivanhoe during nightwork. Nighttime paving and traffic holds with flagging on NE Lombard St between N Syracuse and N Leavitt Ave. 7pm-5am Sept. and Oct. N Philadelphia St closes at N Ivanhoe during nightwork.
- Last Updated
- 9/09/2024 1:33 PM
US30BY: MP 1.29 to 14.7
US30BP, 1 mile East of Intersection with Lower Columbia River Highway US30
Construction Work
No to Minimum Delay
- Comments
- Around-the-clock lane closures between NE Ainsworth Ave. and NE 165th Ave. Pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/regions/pages/r1adacurbramps.aspx)
- Last Updated
- 12/15/2024 6:18 AM
ORE131: MP 1.32 to 1.9
ORE131, 1 mile East of Oceanside
Commercial Vehicle Information
Informational only
- Details
- OR131 EB & WB MP 1.6 (Oceanside) Effective December 20, 2024, this section of OR131 eastbound and westbound will be closed at all hours. The estimated completion date for this work is January 6, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE131: MP 1.6
ORE131, 2 miles East of Oceanside
Construction Work
Closure with Detour
- Lanes Affected
- (Westbound) 1 Lane (Eastbound) 1 Lane
- Comments
- Road construction has closed the road. Follow detour. Netarts Highway 131 will be Closed for Construction due to Highway Erosion in the area. Signed Detour Route will be via Cape Meares Loop and Bayocean Rd NW.
- Last Updated
- 12/20/2024 10:06 AM
ORE131: MP 8.33
ORE131, Tillamook
Commercial Vehicle Information
Informational only
- Details
- OR131 MP 8.33 (Trask River Bridge - Tillamook) Effective July 23, 2024, OR131 crossing Trask River Bridge at MP 8.33 is restricted to 14 tons for all vehicles.
- Last Updated
- 12/20/2024 7:00 PM
ORE141: MP 4.25 to 4.44
ORE141, Tigard
Commercial Vehicle Information
Informational only
- Details
- OR141 (Hall Blvd) NB & SB MP 4.25 to MP 4.50 (Tigard) Effective March 4, 2024, this section of OR141 (Hall Boulevard) will be closed at all hours. The estimated completion date for this work is January 15, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE141: MP 4.69 to 4.73
ORE141, Tigard
Crash/Hazard
Closure
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- Hall Boulevard is closed where it passes over OR 217 in Tigard, at Pfaffle Street. Use Greenburg Road as a detour route. The Hall Boulevard overpass over OR 217 near OR 99W and Pfaffle Street in Tigard is closed for nine months, starting in March 2024. The intersection of Pfaffle Street and Hall Boulevard is also closed. Drivers are not permitted to turn onto Hall Boulevard from Pfaffle Street or turn onto Pfaffle Street from Hall Boulevard. All vehicle traffic should use the signed detour using Greenburg Road. People walking and bicycling will still be able to cross OR 217 via a temporary pedestrian bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
- Last Updated
- 3/11/2024 11:33 AM
ORE141: MP 7.07 to 3.3
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Shoulder closures near Ashford Street We are improving crosswalks, signs, signals, striping and lighting on Hall Boulevard between SW Locust Street and SW Durham Road and at the intersection with SW Greenburg Road. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
- Last Updated
- 12/08/2024 8:04 AM
ORE164: MP 6.27
ORE164, Jefferson
Maintenance Work
No to Minimum Delay
- Comments
- Bridge construction is occurring. Prepare to slow. Watch for workers. Be aware of pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21731)
- Last Updated
- 12/06/2024 6:21 PM
ORE173: MP 0.12 to 5.49
Snow Zone
Informational only
- Affected Area
- Timberline - US26/Government Camp to Timberline Lodge
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE173: MP 0.12 to 5.49
TIMBERLINE LODGE REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Partly Cloudy
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 48 F
- New Snow
- 0 in.
- Roadside Snow
- 71 in.
- Last Updated
- 12/21/2024 3:50 AM
ORE18: MP 12 to 18
Snow Zone
Informational only
- Affected Area
- Van Duzer Corridor - (Murphy Hill Summit Elev. 760') Just west of Bear Creek thru the Van Duzer Corridor
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE211: MP 11.8
ORE211, Molalla
Construction Work
No to Minimum Delay
- Comments
- Shoulder closures and pedestrian detours.
- Last Updated
- 10/20/2024 1:29 PM
ORE211: MP 14 to 22
ORE211, Molalla
Construction Work
No to Minimum Delay
- Comments
- Periodic daytime lane closures.
- Last Updated
- 12/15/2024 6:19 AM
ORE213: MP 2.23
ORE213, Portland
Commercial Vehicle Information
Informational only
- Details
- OR213 (82nd Ave/Old Hwy 213) MP 2.24 crossing over railroad and light rail (Portland) Effective July 23, 2024, the state owned bridge on a city street (82nd Ave.) crossing over railroad and light rail is restricted to the following weights: 29 tons for SU5 & SU6 (5 and 6 axle single-unit truck); 31 tons for SU7 (7 axle single-unit truck).
- Last Updated
- 12/20/2024 7:00 PM
ORE213: MP 7.23 to 7.41
ORE213, Portland
Construction Work
Informational only
- Comments
- No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
- Last Updated
- 12/01/2024 6:15 AM
ORE213: MP 7.25 to 8.41
ORE213, Portland
Commercial Vehicle Information
Informational only
- Details
- OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective April 1, 2025, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 14, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE213: MP 7.25 to 8.41
ORE213, Portland
Commercial Vehicle Information
Informational only
- Details
- OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective April 1, 2025, this section of OR213 northbound and southbound will be intermittently restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM, Friday and Saturday nights between the hours of 9 PM and 8 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 14, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26
Construction Work
Estimated delay of 20 minutes - 2 hours
- Comments
- Nighttime single lane closures on OR 217 in both directions weeknights. Ongoing closures: Hall Boulevard over OR 217 in Tigard is closed until early 2025 to replace the bridge. Auxiliary lane closures on OR 217 south from Scholls Ferry Road to OR 99W and on OR 217 north from Scholls Ferry Road to Denney Road. Expect shoulder closures on OR 217, various on- and off-ramps, and on local roads near the highway ramps. Various on- and off-ramps temporarily narrowed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
- Last Updated
- 12/08/2024 8:05 AM
ORE217: MP 2.26
ORE217, 2 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 2B on- and off-ramps to/from Allen Blvd (Beaverton) Effective January 1, 2022, the OR217 southbound Exit 2B on- and off-ramps to/from Allen Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is February 28, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE217: MP 3.56
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 4A off-ramp to Hall Blvd (Beaverton) Effective January 24, 2022, the OR217 southbound Exit 4A off-ramp to Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is January 31, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE217: MP 3.83
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB on-ramp from Hall Blvd (Beaverton) Effective January 19, 2022, the OR217 southbound on-ramp from Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is February 9, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE217: MP 4.12 to 4.51
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Rd (Beaverton) Effective January 19, 2022, the OR217 southbound Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is January 29, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE217: MP 4.741
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 NB Exit 5 on-ramp from Greenburg Rd (Tigard) Effective August 15, 2023, the OR217 northbound Exit 5 on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 31, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE217: MP 4.78 to 5.17
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB on-ramp from Greenburg Rd (Beaverton) Effective January 26, 2022, the OR217 southbound on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE217: MP 5.13
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 NB Exit 5 off-ramp to Greenburg Rd (Tigard) Effective November 4, 2022, the OR217 northbound Exit 5 off-ramp to Greenburg Road will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is January 31, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE217: MP 5.69
ORE217, 6 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 6 off-ramp to OR99W (Tigard) Effective November 4, 2022, the OR217 southbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is August 31, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE217: MP 6.19
ORE217, 6 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 NB Exit 6 off-ramp to OR99W (Tigard) Effective November 8, 2024, the OR217 northbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width between the hours of 6 AM & 3 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 31, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE22: MP 32 to 73
Snow Zone
Informational only
- Affected Area
- Gates City Limit to Marion Forks
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE22: MP 66.23 to 73
MARION FORKS REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 38 F
- New Snow
- 0 in.
- Roadside Snow
- 2 in.
- Last Updated
- 12/21/2024 4:03 AM
ORE223: MP 0 to 4.83
ORE223, Intersection with Willamina - Salem Highway ORE22
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Traffic Impact - Expect shoulder and lane closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
- Last Updated
- 11/08/2024 5:18 PM
ORE224: MP 49.911
ORE224, Ripplebrook Ranger Station
Commercial Vehicle Information
Informational only
- Details
- OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 12/20/2024 7:00 PM
ORE35: EB MP 57.47 to 57.68
US26, Intersection with Mount Hood Highway OR35
Construction Work
Informational only
- Comments
- No traffic impacts. Construction is paused for winter. Project Description: This project will resurface the bridge deck on the Oregon Highway 35 overpass at U.S. 26 (Mt. Hood Highway) interchange in Mt. Hood, east of Government Camp. Making these repairs now increases the service life of the road and provides a smoother, safer ride for travelers. <!--Links Start Here--> [Link to Additional Information](https://tinyurl.com/OR35atUS26)
- Last Updated
- 10/27/2024 12:02 PM
ORE35: MP 60 to 83.56
Snow Zone
Informational only
- Affected Area
- White River - Jct US26 to ODOT Maintenance Station
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE35: MP 60 to 62
WHITE RIVER REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Partly Cloudy
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 46 F
- New Snow
- 0 in.
- Roadside Snow
- 22 in.
- Last Updated
- 12/21/2024 3:50 AM
ORE43: MP 11.29 to 11.35
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- OR43 NB & SB MP 11.18 to MP 11.36 (West Linn) Effective December 13, 2024, this section of OR43 northbound and southbound will be restricted to 12 feet 00 inches in width at night between the hours of 8 PM & 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 20, 2024.
- Last Updated
- 12/20/2024 7:00 PM
ORE47: MP 0 to 11.71
Snow Zone
Informational only
- Affected Area
- OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE47: MP 18.37 to 18.57
ORE47, Forest Grove
Information
No to Minimum Delay
- Lanes Affected
- (Westbound) 1 Lane
- Comments
- Utility work is causing minimal delay to traffic. Use caution.
- Last Updated
- 12/10/2024 4:24 PM
ORE47: MP 88.05
ORE47, 1 mile North of Forest Grove
Commercial Vehicle Information
Informational only
- Details
- OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
- Last Updated
- 12/20/2024 7:00 PM
ORE53: MP 17.76
ORE53, 1 mile North of Intersection with Oregon Coast Highway US101
Commercial Vehicle Information
Informational only
- Details
- OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 12/20/2024 7:00 PM
ORE6: MP 16.06 to 37.5
Snow Zone
Informational only
- Affected Area
- Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE6: MP 16.06 to 37.5
WILSON RIVER SMT REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 41 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 12/21/2024 4:01 AM
ORE99: MP -0.36
ORE99W, Portland
Commercial Vehicle Information
Informational only
- Details
- OR99W MP -0.36 (Steel Bridge - Portland) Effective July 23, 2024, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
- Last Updated
- 12/20/2024 7:00 PM
ORE99: MP 1.41
ORE99W, I-405 South Interchange
Commercial Vehicle Information
Informational only
- Details
- OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 12/20/2024 7:00 PM
ORE99: MP 11.63 to 11.811
ORE99E, Oregon City
Commercial Vehicle Information
Informational only
- Details
- OR99E NB & SB MP 11.63 to MP 11.81 (Oregon City) Effective January 6, 2025, this section of OR99E northbound and southbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM. The estimated completion date for this work is January 10, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE99: MP 11.81
ORE99E, Oregon City
Commercial Vehicle Information
Informational only
- Details
- OR99E NB off-ramp to I-205 NB (Oregon City) Effective September 30, 2023, the OR99E Northbound off-ramp to I-205 northbound will be restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 31, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE99: MP 15.93 to 16.67
ORE99W, Sherwood
Commercial Vehicle Information
Informational only
- Details
- OR99W NB & SB MP 16.00 to MP 16.60 (Sherwood) Effective February 7, 2025, this section of OR99W northbound and southbound will be closed all weekend, beginning Friday at 9 PM through Monday at 5 AM. The estimated completion date for this work is February 10, 2025.
- Last Updated
- 12/20/2024 7:00 PM
ORE99E: NB MP 5.72 to 8
ORE99E, 1 mile South of Milwaukie
Construction Work
No to Minimum Delay
- Comments
- Single lane closures 9 a.m. to 3 p.m. weekdays on OR99E north of SE Maple Street. Periodic nighttime lane closures. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23521)
- Last Updated
- 12/15/2024 6:19 AM
ORE99E: MP 20.3 to 21.8
ORE99E, Canby
Construction Work
Estimated delay under 20 minutes
- Comments
- No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18775)
- Last Updated
- 11/11/2024 6:01 AM
ORE99W: MP 3.25 to 3.65
ORE99W, Intersection with Beaverton - Hillsdale Highway ORE10
Construction Work
No to Minimum Delay
- Comments
- Nighttime lane closures and flagging to pave two bridges on OR 99W.
- Last Updated
- 9/26/2024 1:46 PM
ORE99W: MP 7.7 to 10.4
ORE99W, Tigard (north city limits)
Construction Work
Estimated delay under 20 minutes
- Comments
- Nighttime single lane closures 9 p.m. to 5 a.m. Flaggers directing traffic at intersections throughout the project area. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20435)
- Last Updated
- 12/01/2024 6:14 AM
ORE99W: MP 57.49 to 57.81
ORE99W, Intersection with Willamina - Salem Highway ORE22
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Traffic Impact - Expect shoulder and lane closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
- Last Updated
- 11/08/2024 5:18 PM
ORE99W: MP 58.9 to 60.31
ORE99W, 1 mile South of Rickreall
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21374)
- Last Updated
- 12/04/2024 6:40 AM
HWY100: MP 2.55
HWY100, 2 miles East of Troutdale
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Eastbound) 1 Lane
- Comments
- Road crews have the EB lane closed near the Stark St Bridge with signaling devices controlling traffic. Prepare to move over for worker safety.
- Last Updated
- 12/16/2024 2:14 PM
HWY100: MP 2.55
HWY100, 2 miles East of Troutdale
Crash/Hazard
Closure
- Comments
- The Stark Street bridge is closed at Historic Columbia River Highway. Use alternate route.
- Last Updated
- 10/22/2024 7:19 AM
HWY100: MP 17.5 to 17.68
HWY100, 5 miles West of Ainsworth State Park
Construction Work
Closure
- Lanes Affected
- (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
- Comments
- A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle or bicycle access to Multnomah Falls heading eastbound on the Historic Highway. The Wahkeena-Multnomah Falls return trail #442 is open to hikers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 12/15/2024 6:17 AM