Northwest Oregon Road Conditions
Highways with no adverse conditions do not show up on this report.
Current Travel Conditions By Route
Closure
HWY100, 2 miles East of Troutdale MP 3
The Stark Street bridge is closed at Historic Columbia River Highway. Use alternate route.
- Updated
- 10/22/2024 7:19:00 AM
Closure
ORE141, Tigard MP 5
Shoulder, bicycle lane closures and pedestrian detours.
- Updated
- 2/9/2025 1:05:00 PM
Closure
HWY100, 5 miles West of Ainsworth State Park MP 18
A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025.
- Updated
- 2/9/2025 10:56:00 AM
Closure with Detour
ORE99E, Canby MP 20 - 22
Road construction has closed the road. Follow detour.
- Updated
- 2/18/2025 10:12:00 PM
Estimated delay of 2 hours or greater
ORE8, Hillsboro MP 10
Maintenance has traffic control in place WB and EB between 45th-44th. Prepare to slow or move over for worker safety.
- Updated
- 2/20/2025 9:01:00 AM
I-205: SB MP 8.32 to 11.06
I-205, West Linn
Construction Work
Estimated delay under 20 minutes
- Comments
- Nighttime lane closures on OR 99E both directions 8 pm to 6 am Thursday, 8 pm to 8 am Friday and 8 pm to 9 am Saturday. Project Description: The I-205 Improvements Project is part of a regional Urban Mobility Strategy to comprehensively reduce congestion and crashes, while also making travel times shorter and more predictable. The first phase of the project will upgrade the Abernethy Bridge to withstand a major earthquake, improve interchanges at OR 43 and OR 99E, along with improving on- and off- ramps to improve safety. Abernethy Bridge will also be widened to accommodate a third lane in each direction. Final lane configuration will be completed in a future phase. Traffic Impacts: Nighttime lane closures on OR 99E both directions 8 pm to 6 am Thursday, 8 pm to 8 am Friday and 8 pm to 9 am Saturday. Single lane open in both directions. Nighttime ramp closure from OR99E to I-205 northbound 8 pm to 6 am Thursday, 8 pm to 8 am Friday and Saturday and 8 pm to 9 am Saturday. Single lane closures on Clackamette Drive, Willamette Falls Drive. Auxiliary lane closure on OR 99E north. Pedestrian detours on OR 43 and OR 99E.
- Last Updated
- 2/09/2025 10:16 AM
I-205: MP 9.56 to 8.821
I-205, 1 mile North of Abernethy Bridge
Commercial Vehicle Information
Informational only
- Details
- I-205 SB MP 9.56 to MP 8.80 (Oregon City) Effective March 10, 2025, this section of I-205 southbound will be intermittently restricted to 12 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 7, 2025.
- Last Updated
- 2/21/2025 7:00 PM
I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 1/17/2025 2:04 PM
I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
Off Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 1/17/2025 2:03 PM
I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 1/17/2025 2:05 PM
I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem
Construction Work
Informational only
On Ramp
- Comments
- Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
- Last Updated
- 1/17/2025 2:04 PM
I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem
Commercial Vehicle Information
Informational only
- Details
- I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is July 31, 2025.</tag
- Last Updated
- 2/21/2025 7:00 PM
I-5: SB MP 262 to 240.15
I-5, 8 miles North of Intersection with ORE22, in Salem
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You'll see crews working on the shoulder preparing for the VMS boards and camera installation. Please drive with caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21553)
- Last Updated
- 12/04/2024 6:46 AM
I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
- Last Updated
- 1/09/2025 1:32 AM
I-5: SB MP 295.9 to 296.1
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway
Construction Work
Estimated delay under 20 minutes
- Comments
- No traffic impacts. Project Description: Improves the I-5 bridge over SW 26th Avenue in Southwest Portland with a new structure and upgrades SW 26th Avenue with better lighting, bike lanes, and sidewalks.
- Last Updated
- 2/09/2025 10:32 AM
I-5: MP 302.8 to 302.92
I-5, 1 mile North of I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- I-5 NB MP 302.75 to MP 302.95 (Portland) Effective February 21, 2025, this section of I-5 northbound will be restricted to 14 feet 00 inches in width between the hours of 3 AM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 21, 2025.
- Last Updated
- 2/21/2025 7:00 PM
I-5: MP 308.38 to 308
I-5, Oregon Washington Border
Commercial Vehicle Information
Informational only
- Details
- I-5 SB MP 308.38 to MP 308.00 (Interstate Bridge - Portland) Effective March 8, 2025, this section of I-5 southbound will be closed at night between the hours of 11 PM & 7 AM. The estimated completion date for this work is March 9, 2025.
- Last Updated
- 2/21/2025 7:00 PM
I-84: MP 13.03 to 77
Snow Zone
Informational only
- Affected Area
- NE 181st in Troutdale east to just west of the Rowena Exit
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
I-84: MP 13.03 to 44
TROUTDALE - CASCADE LOCKS REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Partly Cloudy
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 46 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 2/21/2025 8:29 PM
I-84: MP 41.25 to 41.51
I-84, 4 miles West of Cascade Locks
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 41.00 to MP 41.55 (Cascade Locks) Effective March 3, 2025, this section of I-84 eastbound will be restricted to 12 feet 00 inches in width between the hours of 8 AM and 2 PM. The estimated completion date for this work is March 4, 2025.
- Last Updated
- 2/21/2025 7:00 PM
I-84: MP 41.25
I-84, 4 miles West of Cascade Locks
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 41.25 (Tooth Rock Tunnel - Cascade Locks) Effective March 3, 2025, this section of I-84 eastbound will be intermittently restricted to 17 feet 3 inches in height between the hours of 8 AM and 2 PM. The estimated completion date for this work is March 4, 2025.
- Last Updated
- 2/21/2025 7:00 PM
I-84: EB MP 58.39 to 59
I-84, 6 miles West of Hood River
Construction Work
Closure
Off Ramp
- Comments
- I-84 east Exit 58 closed around the clock. Ramps Affected. Project Description: The iconic Mitchell Point Tunnel was a highlight of the original Historic Highway, but the construction of Interstate 84 destroyed the tunnel. Now, we are constructing a new tunnel and Historic Highway State Trail segment adjacent to I-84 east near Exit 58. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 2/09/2025 9:54 AM
US101: MP 0 to 3.3
US101, Oregon - Washington Border
Maintenance Work
No to Minimum Delay
- Comments
- Bridge work is occurring causing minimal delay to traffic. Use caution.
- Last Updated
- 2/20/2025 2:00 PM
US101: MP 13 to 25
US101, 6 miles North of Gearhart
Maintenance Work
No to Minimum Delay
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 2/16/2025 8:18 AM
US101: MP 28.9 to 28.4
US101, Cannon Beach
Information
Future Event: Estimated delay under 20 minutes
- Expected Start Date
- 2/24/2025 8:00:00 AM
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Utility work is occurring. Prepare to slow. Tree trimming and hazard mitigation for Pacific Power power lines on a portion of Ecola State Park Rd. Expect some delay when work zone signs are present.
- Last Updated
- 2/19/2025 6:32 PM
US101: MP 40.99
US101, 4 miles North of Nehalem
Crash/Hazard
No to Minimum Delay
- Lanes Affected
- (Southbound) 1 Lane
- Comments
- A rock fall has occurred causing minimal delay to traffic. Use caution.
- Last Updated
- 2/21/2025 10:01 PM
US101: MP 55.28 to 55.97
US101, Garibaldi
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20252
- Last Updated
- 2/21/2025 9:19 AM
US101: MP 98.85 to 104.2
Snow Zone
Informational only
- Affected Area
- Cascade Head - just north of Neskowin Creek to just north of the Salmon River
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US101: MP 117.39 to 112.35
US101, Lincoln City
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 2 Lanes (Southbound) 2 Lanes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time. From SW Beach Ave to NW West Devils Lake Road. Work could happen occasionally on Fridays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
- Last Updated
- 2/05/2025 7:43 AM
US101: NB MP 124.9 to 123.42
US101, 1 mile South of Lincoln Beach
Construction Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane (Southbound) 1 Lane
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time from North Fogarty Creek State Park (Road) to Lancer Street/Seagrove Drive. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
- Last Updated
- 2/08/2025 6:03 PM
US101: MP 134
US101, 7 miles North of Newport
Crash/Hazard
No to Minimum Delay
- Comments
- Sunken pavement is causing minimal delay to traffic. Use caution.
- Last Updated
- 1/04/2025 6:09 PM
US101B: MP 7.1 to 5.7
US101B, Astoria
Maintenance Work
Estimated delay under 20 minutes
- Comments
- Bridge work is occurring. Prepare to slow. We plan to start work in January 2025. When construction starts, you can expect: Crews working day and night. Nighttime single lane and shoulder closures as needed Sunday through Friday from 6 p.m. to 6 a.m. Flaggers helping direct traffic as needed. We're planning to start work first on the Old Youngs Bay Bridge, then the Astoria-Megler Bridge and finish on the New Youngs Bay Bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21587)
- Last Updated
- 1/02/2025 6:04 PM
US101B: MP 7.1 to 6.74
US101B, Astoria
Maintenance Work
No to Minimum Delay
- Comments
- Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
- Last Updated
- 2/19/2025 10:47 AM
US26: MP 2.73 to 2.74
US26, 3 miles East of I-405
Construction Work
Estimated delay under 20 minutes
- Comments
- Eastbound and westbound single lane closures from 8 a.m. to 4 p.m. Project Description: We are improving safety for people walking, biking or rolling at the existing, striped crosswalk east of the intersection of U.S. 26 (SE Powell Boulevard) and SE 36th Avenue. Starting in early 2025, we begin construction to upgrade the currently unsignalized crosswalk on SE Powell Boulevard at SE 36th Avenue with a new pedestrian activated beacon, also known as a Rectangular Rapid Flashing Beacon, or RRFB. <!--Links Start Here--> [Link to Additional Information](https://www.tinyurl.com/SEPowellandSE36thAve)
- Last Updated
- 2/09/2025 1:39 PM
US26: MP 5.56 to 5.62
US26, Portland
Construction Work
Estimated delay under 20 minutes
- Comments
- Eastbound and westbound single lane closures from 8 a.m. to 4 p.m. Project description: We are creating safer and more accessible highway connections for all sidewalk users on U.S. 26 (SE Powell Boulevard). We are bringing sidewalk curb ramps into compliance with Americans with Disabilities Act (ADA) standards on highways throughout Oregon, including on all corners of the intersection of U.S. 26 (SE Powell Boulevard) at SE 92nd Avenue. <!--Links Start Here--> [Link to Additional Information](https://tinyurl.com/SEPowellandSE92ndAve)
- Last Updated
- 2/09/2025 1:42 PM
US26: MP 5.85 to 9.96
US26, Portland
Construction Work
Informational only
- Comments
- Lane and shoulder closures, traffic shifts, and up to 20-min. traffic holds 8 a.m. to 5 p.m., weekdays. Flaggers directing traffic periodically. Project Description: We are constructing safety improvements to help people travel Outer SE Powell Boulevard more safely from SE 99th Avenue to SE 122nd Avenue and SE 136th Avenue to just east of SE 174th Avenue (the Portland/Gresham city limits). The first phase, from SE 122nd Avenue to SE 136th Avenue, is complete. The overall Outer Powell Project will add a center turn lane, sidewalks and bike lanes. These improvements reduce the frequency and severity of crashes as well as help people driving, taking transit, walking and biking share the road with fewer conflicts. Pre-construction activities are underway. Road construction is expected to begin spring 2025 and last five years.
- Last Updated
- 2/09/2025 10:10 AM
US26: MP 9.72 to 35.11
Snow Zone
Informational only
- Affected Area
- David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 13
US26, 4 miles East of Necanicum
Crash/Hazard
Estimated delay under 20 minutes
- Comments
- Sunken grade. Prepare to slow.
- Last Updated
- 12/28/2024 2:49 PM
US26: MP 25.12 to 42.5
Snow Zone
Informational only
- Affected Area
- Sandy to Zigzag
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 37.73 to 45.43
Snow Zone
Informational only
- Affected Area
- Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 37.73 to 45.43
SUNSET SUMMIT REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Ground Fog
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 36 F
- New Snow
- 0 in.
- Last Updated
- 2/21/2025 8:55 PM
US26: MP 42.5 to 60
GOVERNMENT CAMP REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 38 F
- New Snow
- 0 in.
- Roadside Snow
- 40 in.
- Last Updated
- 2/21/2025 8:28 PM
US26: MP 59.57 to 75.5
Snow Zone
Informational only
- Affected Area
- Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 59.57 to 67
BLUE BOX PASS REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Clear, no precipitation
- Pavement Condition
- Spots of Ice
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 31 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 2/21/2025 8:05 PM
US30: MP 3.94 to 6.51
US30, Portland
Construction Work
Estimated delay under 20 minutes
- Comments
- Periodic daytime lane closures. Pedestrian detours. Bicycles use roadway travel lanes. Project Description: We are making safety improvements for travelers on U.S. 30 (NW St. Helens Road), between NW Bridge Avenue and NW Kittridge Avenue. We are repaving the roadway, replacing traffic signals, adjusting vehicle lane widths, building curb ramps to meet Americans with Disabilities Act (ADA) requirements and improving conditions for people biking.
- Last Updated
- 2/09/2025 10:28 AM
US30: MP 11.93
HWY100, 5 miles East of Corbett
Commercial Vehicle Information
Informational only
- Details
- US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
- Last Updated
- 2/21/2025 7:00 PM
US30: MP 18.37 to 65.99
CLATSKANIE REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Rain
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 45 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 2/21/2025 8:56 PM
US30: MP 23.15
US30, 2 miles East of Warren
Commercial Vehicle Information
Informational only
- Details
- US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
- Last Updated
- 2/21/2025 7:00 PM
US30: MP 48.31 to 61.01
Snow Zone
Informational only
- Affected Area
- Rainier to Clatskanie
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US30: MP 72.32 to 76.76
Snow Zone
Informational only
- Affected Area
- Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. Project Description: We are improving the long-term safety and lifespan of the St. Johns Bridge by repairing the concrete on the pier columns and arches under the bridge. Repairing the concrete will protect the bridge's steel internal frame and reinforcements from corrosion, maintaining the service life of this beloved Portland Historic Landmark. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
- Last Updated
- 2/09/2025 10:29 AM
US30BY: MP 1.29 to 14.7
US30BP, 1 mile East of Intersection with Lower Columbia River Highway US30
Construction Work
No to Minimum Delay
- Comments
- No impacts. Project Description: This project rebuilds 300 sidewalk curb ramps at unsignalized intersections along U.S. 30 Bypass in Portland between N. Syracuse Street and NE 165th Avenue to meet ADA accessibility standards. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/regions/pages/r1adacurbramps.aspx)
- Last Updated
- 2/09/2025 1:07 PM
ORE131: MP 1.5
ORE131, 2 miles East of Oceanside
Construction Work
Informational only
- Comments
- Road construction is or will be occurring. Use caution.
- Last Updated
- 2/21/2025 1:59 PM
ORE131: MP 8.33
ORE131, Tillamook
Commercial Vehicle Information
Informational only
- Details
- OR131 MP 8.33 (Trask River Bridge - Tillamook) Effective July 23, 2024, OR131 crossing Trask River Bridge at MP 8.33 is restricted to 14 tons for all vehicles.
- Last Updated
- 2/21/2025 7:00 PM
ORE141: MP 4.25 to 4.44
ORE141, Tigard
Commercial Vehicle Information
Informational only
- Details
- OR141 (Hall Blvd) NB & SB MP 4.25 to MP 4.50 (Tigard) Effective March 4, 2024, this section of OR141 (Hall Boulevard) will be closed at all hours. The estimated completion date for this work is January 15, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE141: MP 4.69 to 4.73
ORE141, Tigard
Construction Work
Closure
- Lanes Affected
- (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
- Comments
- Shoulder, bicycle lane closures and pedestrian detours. Project Description: We are making a series of pedestrian and bicycle improvements on Hall Boulevard in Tigard between SW Locust Street and SW Durham Road and at the intersection with SW Greenburg Road. Improvements include a new enhanced crosswalk at the intersection of Hall Boulevard and SW Ashford Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
- Last Updated
- 2/09/2025 1:05 PM
ORE141: MP 7.07 to 3.3
ORE141, Tigard
Construction Work
No to Minimum Delay
- Comments
- Shoulder, bicycle lane closures and pedestrian detours. Project Description: We are making a series of pedestrian and bicycle improvements on Hall Boulevard in Tigard between SW Locust Street and SW Durham Road and at the intersection with SW Greenburg Road. Improvements include a new enhanced crosswalk at the intersection of Hall Boulevard and SW Ashford Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
- Last Updated
- 2/09/2025 1:37 PM
ORE164: MP 6.27
ORE164, Jefferson
Maintenance Work
No to Minimum Delay
- Comments
- Bridge construction is occurring. Prepare to slow. Watch for workers. Be aware of pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21731)
- Last Updated
- 12/06/2024 6:21 PM
ORE173: MP 0.12 to 5.49
Snow Zone
Informational only
- Affected Area
- Timberline - US26/Government Camp to Timberline Lodge
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE173: MP 0.12 to 5.49
TIMBERLINE LODGE REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 36 F
- New Snow
- 0 in.
- Roadside Snow
- 122 in.
- Last Updated
- 2/21/2025 8:28 PM
ORE18: MP 12 to 18
Snow Zone
Informational only
- Affected Area
- Van Duzer Corridor - (Murphy Hill Summit Elev. 760') Just west of Bear Creek thru the Van Duzer Corridor
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE18: MP 44.25 to 45.19
ORE18, McMinnville
Commercial Vehicle Information
Informational only
- Details
- OR18 EB & WB MP 44.00 to MP 45.25 (McMinnville) Effective February 24, 2025, this section of OR18 eastbound and westbound will be intermittently restricted to 11 feet 00 inches in width at night between the hours of 7 PM & 7 AM. Loads over 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 28, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE211: MP 11.8
ORE211, Molalla
Construction Work
No to Minimum Delay
- Comments
- Shoulder closures and pedestrian detours. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
- Last Updated
- 2/09/2025 1:09 PM
ORE211: MP 14 to 22
ORE211, Molalla
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. Project Description: The Oregon Department of Transportation designated eight miles of OR 211 from Molalla to Colton (milepost 14.0 to 22.0) as a Safety Corridor in October 2021 in response to high crash rates. ODOT builds safety improvements in 2024 to reduce crashes with new signage, striping, lighting and rumble strips. Website: tinyurl.com/OR211SafetyCorridor
- Last Updated
- 2/09/2025 1:28 PM
ORE213: MP 2.23
ORE213, Portland
Commercial Vehicle Information
Informational only
- Details
- OR213 (82nd Ave/Old Hwy 213) MP 2.24 crossing over railroad and light rail (Portland) Effective July 23, 2024, the state owned bridge on a city street (82nd Ave.) crossing over railroad and light rail is restricted to the following weights: 29 tons for SU5 & SU6 (5 and 6 axle single-unit truck); 31 tons for SU7 (7 axle single-unit truck).
- Last Updated
- 2/21/2025 7:00 PM
ORE213: MP 7.23 to 7.41
ORE213, Portland
Construction Work
Informational only
- Comments
- No traffic impacts. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
- Last Updated
- 2/09/2025 10:54 AM
ORE213: MP 7.25 to 8.41
ORE213, Portland
Commercial Vehicle Information
Informational only
- Details
- OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective April 1, 2025, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 14, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE213: MP 7.25 to 8.41
ORE213, Portland
Commercial Vehicle Information
Informational only
- Details
- OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective April 1, 2025, this section of OR213 northbound and southbound will be intermittently restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM, Friday and Saturday nights between the hours of 9 PM and 8 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 14, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26
Construction Work
No to Minimum Delay
- Comments
- No new traffic impacts. Project Description: This project will address long-standing congestion on OR 217 between Beaverton-Hillsdale Highway and OR 99W due to too many closely spaced interchanges: 10 interchanges in just over seven miles! This is some of the shortest merging spacing in the region. Ongoing closures: Hall Boulevard over OR 217 in Tigard is temporarily closed until early 2025 to replace the bridge. Auxiliary lane closures on OR 217 south from Scholls Ferry Road to OR 99W and on OR 217 north from Scholls Ferry Road to Denney Road. Expect shoulder closures on OR 217, various on- and off-ramps, and on local roads near the highway ramps. Various on- and off-ramps temporarily narrowed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
- Last Updated
- 2/09/2025 10:32 AM
ORE217: MP 2.26
ORE217, 2 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 2B on- and off-ramps to/from Allen Blvd (Beaverton) Effective January 1, 2022, the OR217 southbound Exit 2B on- and off-ramps to/from Allen Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is February 28, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE217: MP 3.56
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 4A off-ramp to Hall Blvd (Beaverton) Effective January 24, 2022, the OR217 southbound Exit 4A off-ramp to Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 30, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE217: MP 3.83
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB on-ramp from Hall Blvd (Beaverton) Effective January 19, 2022, the OR217 southbound on-ramp from Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 29, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE217: MP 4.12 to 4.51
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Rd (Beaverton) Effective January 19, 2022, the OR217 southbound Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is January 29, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE217: MP 4.741
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 NB Exit 5 on-ramp from Greenburg Rd (Tigard) Effective August 15, 2023, the OR217 northbound Exit 5 on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 30, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE217: MP 4.78 to 5.17
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB on-ramp from Greenburg Rd (Beaverton) Effective January 26, 2022, the OR217 southbound on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE217: MP 5.69
ORE217, 6 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 6 off-ramp to OR99W (Tigard) Effective November 4, 2022, the OR217 southbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is August 31, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE22: MP 32 to 73
Snow Zone
Informational only
- Affected Area
- Gates City Limit to Marion Forks
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE22: MP 66.23 to 73
MARION FORKS REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 37 F
- New Snow
- 0 in.
- Roadside Snow
- 2 in.
- Last Updated
- 2/21/2025 8:33 PM
ORE223: MP 0 to 4.83
ORE223, Intersection with Willamina - Salem Highway ORE22
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Traffic Impact - Expect shoulder and lane closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
- Last Updated
- 11/08/2024 5:18 PM
ORE224: MP 49.911
ORE224, Ripplebrook Ranger Station
Commercial Vehicle Information
Informational only
- Details
- OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 2/21/2025 7:00 PM
ORE35: EB MP 57.47 to 57.68
US26, Intersection with Mount Hood Highway OR35
Construction Work
Informational only
- Comments
- No traffic impacts. Construction is paused for winter. Project Description: This project will resurface the bridge deck on the Oregon Highway 35 overpass at U.S. 26 (Mt. Hood Highway) interchange in Mt. Hood, east of Government Camp. Making these repairs now increases the service life of the road and provides a smoother, safer ride for travelers. <!--Links Start Here--> [Link to Additional Information](https://tinyurl.com/OR35atUS26)
- Last Updated
- 10/27/2024 12:02 PM
ORE35: MP 60 to 83.56
Snow Zone
Informational only
- Affected Area
- White River - Jct US26 to ODOT Maintenance Station
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE35: MP 60 to 62
WHITE RIVER REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Overcast
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 36 F
- New Snow
- 0 in.
- Roadside Snow
- 50 in.
- Last Updated
- 2/21/2025 8:28 PM
ORE43: MP 2.08
ORE43, Portland
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Northbound) 1 Lane
- Comments
- Road work has the NB left lane closed at Nevada. Prepare to slow or move over for worker safety.
- Last Updated
- 2/21/2025 9:30 PM
ORE43: MP 8 to 9
ORE43, 6 miles South of Portland
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. Project Description: This project will reduce conflicts and improve safety on OR 43 (Willamette Drive) for travelers at the Marylhurst Drive intersection.
- Last Updated
- 2/09/2025 1:51 PM
ORE47: MP 0 to 11.71
Snow Zone
Informational only
- Affected Area
- OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE47: MP 88.05
ORE47, 1 mile North of Forest Grove
Commercial Vehicle Information
Informational only
- Details
- OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
- Last Updated
- 2/21/2025 7:00 PM
ORE53: MP 17.76
ORE53, 1 mile North of Intersection with Oregon Coast Highway US101
Commercial Vehicle Information
Informational only
- Details
- OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 2/21/2025 7:00 PM
ORE551: MP 3
ORE551, 3 miles North of Intersection with Pacific Highway East ORE99E
Crash/Hazard
Estimated delay under 20 minutes
- Comments
- A crash has occurred. Prepare to slow or move over for worker safety.
- Last Updated
- 2/21/2025 10:10 PM
ORE6: MP 16.06 to 37.5
Snow Zone
Informational only
- Affected Area
- Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE6: MP 16.06 to 37.5
WILSON RIVER SMT REPORTING STATION
Weather Warning
Informational only
- Weather Condition
- Ground Fog
- Pavement Condition
- Bare Pavement
- Chain Restrictions
- Carry Chains or Traction Tires
- Current Temp
- 36 F
- New Snow
- 0 in.
- Roadside Snow
- 0 in.
- Last Updated
- 2/21/2025 8:55 PM
ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. Project Description: We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue in Aloha?to?OR 217 in Beaverton. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
- Last Updated
- 2/09/2025 1:53 PM
ORE8: MP 4.9 to 6.45
ORE8, 2 miles West of Highway 217
Construction Work
No to Minimum Delay
- Comments
- No traffic impacts. Project Description: This project improves safety for people walking, rolling and bicycling by installing a crosswalk with a pedestrian-activated flashing beacon at the intersection of OR 8 at SW 174th Avenue in Aloha and a buffered bicycle lane from SW 153rd Drive to SW 182nd Avenue. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/pages/project-details.aspx?project=20328)
- Last Updated
- 1/25/2025 7:31 PM
ORE8: MP 10.01 to 10.11
ORE8, Hillsboro
Maintenance Work
Estimated delay of 2 hours or greater
- Lanes Affected
- (Eastbound) 1 Lane (Westbound) 2 Lanes
- Comments
- Maintenance has traffic control in place WB and EB between 45th-44th. Prepare to slow or move over for worker safety.
- Last Updated
- 2/20/2025 9:01 AM
ORE99: MP -0.36
ORE99W, Portland
Commercial Vehicle Information
Informational only
- Details
- OR99W MP -0.36 (Steel Bridge - Portland) Effective July 23, 2024, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
- Last Updated
- 2/21/2025 7:00 PM
ORE99: MP 1.41
ORE99W, I-405 South Interchange
Commercial Vehicle Information
Informational only
- Details
- OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 2/21/2025 7:00 PM
ORE99: MP 11.81
ORE99E, Oregon City
Commercial Vehicle Information
Informational only
- Details
- OR99E NB off-ramp to I-205 NB (Oregon City) Effective September 30, 2023, the OR99E Northbound off-ramp to I-205 northbound will be restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 31, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE99: MP 15.93 to 16.67
ORE99W, Sherwood
Commercial Vehicle Information
Informational only
- Details
- OR99W NB & SB MP 16.00 to MP 16.60 (Sherwood) Effective March 7, 2025, this section of OR99W northbound and southbound will be closed all weekend, beginning Friday at 9 PM through Monday at 5 AM. The estimated completion date for this work is March 10, 2025.
- Last Updated
- 2/21/2025 7:00 PM
ORE99E: NB MP 5.72 to 8
ORE99E, 1 mile South of Milwaukie
Construction Work
No to Minimum Delay
- Comments
- No impacts. Project Description: This project installs an overhead RRFB with a pedestrian refuge island median, ADA compliant curb ramps with push buttons, speed feedback signs and illumination. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23521)
- Last Updated
- 2/09/2025 1:35 PM
ORE99E: MP 20.3 to 21.8
ORE99E, Canby
Construction Work
Closure with Detour
- Lanes Affected
- (Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
- Comments
- Road construction has closed the road. Follow detour. Project Description: This project will repave and reconstruct sections of Oregon 99E between South Pine Street and Southwest Berg Parkway in Canby and make safety improvements. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18775)
- Last Updated
- 2/18/2025 10:12 PM
ORE99EB: NB MP 4.36 to 4.84
99EBus, Salem, Intersection with Market St
Construction Work
Estimated delay under 20 minutes
- Comments
- Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21572)
- Last Updated
- 2/03/2025 8:37 AM
ORE99W: MP 7.7 to 10.4
ORE99W, Tigard (north city limits)
Construction Work
Estimated delay under 20 minutes
- Comments
- No traffic impacts. Project Description: The project area begins where OR 99W crosses Interstate 5 near SW 64th Avenue. It continues along OR 99W south to SW McDonald Street in Tigard. It will create a fully connected sidewalk network in the corridor, smoother and safer road surface, increase bike lane connectivity, and reconstruct sidewalk curbs so they comply with Americans with Disabilities Act standards. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20435)
- Last Updated
- 2/09/2025 10:53 AM
ORE99W: MP 57.49 to 57.81
ORE99W, Intersection with Willamina - Salem Highway ORE22
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Traffic Impact - Expect shoulder and lane closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
- Last Updated
- 11/08/2024 5:18 PM
ORE99W: MP 58.9 to 60.31
ORE99W, 1 mile South of Rickreall
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 45MPH Reduced Speed Zone in effect. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21374)
- Last Updated
- 2/03/2025 2:33 PM
HWY100: MP 2.55
HWY100, 2 miles East of Troutdale
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Eastbound) 1 Lane
- Comments
- Road crews have the EB lane closed near the Stark St Bridge with signaling devices controlling traffic. Prepare to move over for worker safety. The Stark Street Bridge is closed. Temporary signals are directing traffic on the Historic Columbia River Highway at the bridge.
- Last Updated
- 1/13/2025 6:22 AM
HWY100: MP 2.55
HWY100, 2 miles East of Troutdale
Crash/Hazard
Closure
- Comments
- The Stark Street bridge is closed at Historic Columbia River Highway. Use alternate route.
- Last Updated
- 10/22/2024 7:19 AM
HWY100: MP 14.05
HWY100, 7 miles East of Corbett
Construction Work
Estimated delay under 20 minutes
- Comments
- Periodic lane closures with flaggers directing traffic on U.S. 30/Historic Highway weekdays. Project Description: We are repairing a bridge on the Historic Columbia River Highway between Shepperd’s Dell State Park and Bridal Veil Falls to continue carrying traffic over the creek. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 2/09/2025 1:44 PM
HWY100: MP 17.5 to 17.68
HWY100, 5 miles West of Ainsworth State Park
Construction Work
Closure
- Lanes Affected
- (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
- Comments
- A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025. Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The west viaduct will be closed fall 2024 through spring 2025. The east viaduct will be closed fall 2025 through spring 2026. Traffic Impacts: A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle or bicycle access to Multnomah Falls heading eastbound on the Historic Highway. The Wahkeena-Multnomah Falls return trail #442 is open to hikers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 2/09/2025 10:56 AM