Statewide Oregon Local Events
Current Events By Agency
Due to an increase in fire behavior, this road is closed per the USFS
Hazard - Closed
- Comments
- Public Contact
- USFS Nicola Swanson
- USFS
- Phone: (541) 228-5610
- Email: nicola.swanson@usda.gov
- Event Id
- 6053
- Updated
- 7/27/2026 8:21 PM
Dodge Island Road, From Old River Rd to Dodge Island Bridge
Construction - Closed
- Direction Impacted
- Both
- Comments
Dodge Island Road will be closed from the intersection of Old River Road to the Dodge Island bridge starting June 22, 2026 through January 2027 for the replacement of the bridge. Closure dates and times are subject to change based on weather and site conditions.
- Public Contact
- Benton County Public Works
- Benton County, Oregon
- Phone: (541) 766-6824
- Email: Michael.Johnson@bentoncountyor.gov
- Event Id
- 5885
- Updated
- 7/08/2026 3:56 PM
Harris Road Covered Bridge; Vehicle Restrictions: Weight limit 16 tons, height limit 10 ft. 8 inches, width limit 16 ft 3 inches
Vehicle Restriction - Moderate Impact
- Direction Impacted
- Both
- Comments
Harris Road Covered Bridge; Vehicle Restrictions: weight limit 16 tons, height limit 10 ft. 8 inches, width limit 16 ft 3 inches
5 miles of narrow gravel road with tight corners
- Public Contact
- Benton County Public Works
- Benton County, Oregon
- Phone: (541) 766-6821
- Email: pwinfo@bentoncountyor.gov
- Event Id
- 5193
- Updated
- 7/01/2026 10:47 AM
MP 10.7, Lobster Valley Road, Alsea
Vehicle Restriction - High Impact
- Comments
One Lane traffic only. Truck traffic through the corridor is discouraged and over-dimensional loads are prohibited indefinitely.
- Public Contact
- Benton County Public Works
- Benton County, Oregon
- Phone: (541) 766-6821
- Email: pwinfo@bentoncountyor.gov
- Event Id
- 3102
- Updated
- 12/24/2025 1:15 PM
USFS NF-11: Semi truck traffic prohibited on NF-11 from US-20 to Quartzville. Road not maintained for snow and ice. Narrow roadways and tight corners.
Vehicle Restriction - Closed
- Comments
Semi Truck traffic prohibited on NF-11 through to US-20. The road is not maintained for snow and ice; Road is impassable to semi’s due to narrow roadways and tight corners.
- Public Contact
- USFS: Sweet Home Ranger District
- USFS: Sweet Home Ranger District
- Phone: (541) 367-5168
- Email: chelsea.chytka@bentoncountyor.gov
- Event Id
- 4710
- Updated
- 12/18/2025 10:44 AM
USFS NF-11: Semi truck traffic prohibited on NF-11 from US-20 to Quartzville. Road not maintained for snow and ice. Narrow roadways and tight corners.
Vehicle Restriction - Closed
- Comments
Semi Truck traffic prohibited on NF-11 through to US-20. The road is not maintained for snow and ice; Road is impassable to semi’s due to narrow roadways and tight corners.
- Public Contact
- Chelsea Chytka
- Benton County, Oregon
- Phone: (541) 760-2521
- Email: Chelsea.chytka@bentoncountyor.gov
- Event Id
- 4635
- Updated
- 1/06/2025 3:20 PM
13th Ave and Hilyard St
Construction - Low Impact
- Comments
Monday 10/12/2026 through Friday 10/16/2026
- Construction of a University of Oregon Student Housing project opening late 2028. Traffic impacts are expected to be long-term.
- Hilyard St. right lane closed from E13th Ave. to E11th Ave. Protected Bike Lane will remain open with intermittent construction closures as required.
- Hilyard St. East sidewalk closed from E13th Ave. to E11th Ave. Pedestrian traffic detoured to west sidewalk from E13th Ave. to E12th Ave.
- Pedestrian crossing on Hilyard St. at E12th Ave., is now a Stop sign controlled intersection for north and sound bound pedestrian traffic
- Pedestrian crossing east and west at E12th Ave. and Hilyard St., is not stop controlled at this intersection. All vehicular and pedestrian signals are currently not in operation. Exercise extreme caution when crossing Hilyard St. at this location.
- Public Contact
- Josh Pinkham
- City of Eugene
- Phone: (541) 501-0374
- Email: JPinkham@eugene-or.gov
- Event Id
- 6281
- Updated
- 10/09/2026 10:34 AM
11th Ave. and Willamette Street
Construction - Moderate Impact
- Comments
Monday 10/12/2026 through Friday 10/16/2026
- Construction of a Housing project opening 2028. Traffic impacts are expected to be long-term.
- Lane closures on 11th Ave. will separate through & left motor vehicle traffic into a single travel lane while bus, bicycle, and right turning traffic will be merged into another lane.
- Willamette St. parking lane closed between 11th Ave. and E10th Alley.
- Sidewalks are closed on the north side of 11th Ave at Oak Alley and at the east side of Willamette St. near E10th Alley.
- Pedestrians may detour around the construction by using the south side of 11th Ave. between Oak St and Willamette St. and the west side of Willamette between 10th Ave. and 11th Ave. Access to all nearby businesses is maintained.
- Public Contact
- Josh Pinkham
- City of Eugene
- Phone: (541) 501-0374
- Email: jpinkham@eugene-or.gov
- Event Id
- 6279
- Updated
- 10/09/2026 10:31 AM
W 5th Avenue and Adams Street
Construction - Closed
- Comments
- Adams from W 6th Ave to W 5th Ave parking is closed on the west side of Adams St and from the W 5th Ally north on the east side of Adams St.
- W 5th Alley is closed from Monroe St to Adam St.
- Pedestrian traffic on the east side of Adams St is closed at the W 5th Alley and on the south side of W 5th Ave from Adams to midblock heading towards Monroe St.
- Pedestrians traveling west on the south side of W 5th St are to detour to the northside of W 5th Ave at Monroe St. Mid bock closures exist on the south sidewalk on W 5th Ave.
- Eastbound bike lane on W 5th Ave is closed between Adams St just past the construction site. Bicyclists are encouraged to detour north on Adams St to W 4th Ave travel east to Monroe St then south to W 5th Ave to avoid construction activities.
- Public Contact
- Donna Stark
- City of Eugene
- Phone: (541) 729-4638
- Email: DStark@eugene-or.gov
- Event Id
- 5731
- Updated
- 10/09/2026 10:24 AM
Maxwell Rd & Prairie Rd Improvements
Construction - Closed
- Direction Impacted
- Both
- Comments
For the week of 10/12/26, Pacific Excavation construction crews will be onsite constructing concrete sidewalks and permanent striping at the Hwy 99 and Prairie Rd intersection on both sides of Hwy 99. Landscaping crews will be working on Maxwell in and around the new storm water planter systems.
Prairie Rd will be CLOSED for the week of October 12, 2026. Detour routes include Irving Rd, Beltline, and or Chambers Rd. Please continue to watch for cones and signage as needed.
- Public Contact
- Bryan Root
- City of Eugene
- Phone: (541) 501-0378
- Email: broot@eugene-or.gov
- Event Id
- 5781
- Updated
- 10/09/2026 10:24 AM
18th at Hilyard St.
Construction - Moderate Impact
- Comments
For the week of October 12th, there will be construction near the corners of the intersection.
Please expect delays as crews work. Roadways may be narrowed to a single lane. Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: rnaud@eugene-or.gov
- Event Id
- 5892
- Updated
- 10/09/2026 10:22 AM
Willamette St. & W 52nd Ave Parking Lot
Construction - Low Impact
- Comments
For the week of October 12th, there will be limited construction within the parking lot area as the project nears completion.
Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: rnaud@eugene-or.gov
- Event Id
- 5894
- Updated
- 10/09/2026 10:21 AM
Prairie Mountain School Crossing
Construction - Low Impact
- Comments
For the week of October 12th, crews may be on site to finish installing the electrical, lighting and may start work on the punchlist.
Please use caution and remain aware of large trucks, construction equipment, and crews working on-site and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
- Public Contact
- Sam Casto
- City of Eugene
- Phone: (541) 735-0996
- Email: scasto@eugene-or.gov
- Event Id
- 5898
- Updated
- 10/09/2026 10:20 AM
Bethal Paving
Construction - Moderate Impact
- Comments
For the week of October 12th, construction is on Bethel Road and adjacent walkways.
Please expect delays as crews work. Roadways may be narrowed to a single lane or closed as required. Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
· Bikes are encouraged to use caution as well. Ensure heavy equipment operators can see you as you pass near active equipment.
· Pedestrians are encouraged to follow detours around closed paths and access ramps. Construction workers are available to answer questions and help direct pedestrians as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: rnaud@eguene-or.gov
- Event Id
- 5904
- Updated
- 10/09/2026 10:18 AM
W 30th Ave. & Portland St.
Construction - Moderate Impact
- Comments
Monday 10/12/2026 through Friday 10/16/2026
- Construction of a new Cascade Manor retirement community facility opening Spring of 2027.
- Portland St from W 30th Ave to W 29th Pl west side on street parking and portions of parking north of W 29th Pl to W 28th Ave are closed for the duration of the project construction.
- Pedestrian traffic on the west side of Portland St from W 30th Ave to W 29th Pl is closed. West side pedestrians heading north on Portland St can cross at the NW corner of W 30th Ave and Portland St to the east temporary ADA ramp and sidewalk.
- Pedestrians on W 30th Ave west of Portland St are encouraged to use the Temporary Pedestrian channelization on the north side of W 30th Ave to access Portland St.
- Please be aware of large trucks, construction equipment, and construction personnel on W 30th, Portland St while work continues.
- Public Contact
- Donna Stark
- City of Eugene
- Phone: (541) 729-4638
- Email: DStark@eugene-or.gov
- Event Id
- 5897
- Updated
- 10/09/2026 10:17 AM
Columbia St. @ E. 17th Ave.
Construction - High Impact
- Comments
Monday 10/12/2026 through Friday 10/16/2026
- Installation of new storm, wastewater, electrical service connections, and surface improvements will affect portions of E 17th Ave, east of Agate St to Columbia St. E 17th Ave to Moss Ave, and portions of Columbia St and Columbia Alley through the summer of 2027.
- Detours for vehicular traffic will be set at Agate St, E 17th Ave, Columbia St, Moss St, and E 19th Ave as work progresses.
- Pedestrian access will also be impacted and detoured on all affected streets during construction.
- Bike lanes will be closed and merged with shared use in traffic lanes on Agate St to the west and Moss St to the east.
- Please be aware of large trucks and equipment in the area while construction continues.
- Public Contact
- Josh Pinkham
- City of Eugene
- Phone: (541) 501-0374
- Email: jpinkham@eugene-or.gov
- Event Id
- 5896
- Updated
- 10/09/2026 10:17 AM
Broadway Paving - Phase 2
Construction - High Impact
- Comments
For the week of 10/12/26 construction crews will continue doing night work, 7pm to 6am.
Construction crews will be on the south side of Broadway from Mill St to Patterson St constructing pavement repairs along the south curb. Pipe crews will be working on the north side of Broadway at the NW corner of Hilyard and Broadway as well as across from Alder Alley doing pipe repairs in the west bound travel lanes.
Broadway east bound will have two lanes open to traffic during daytime hours.
Patterson is CLOSED TO TRUCKS , BUSES, AND OTHER LARGE VEHICLES at Broadway. Large vehicles will need to detour at Alder St.
- Public Contact
- Bryan Root
- City of Eugene
- Phone: (541) 501-0378
- Email: broot@eugen-or.gov
- Event Id
- 5972
- Updated
- 10/09/2026 10:15 AM
McLean Blvd. Paving
Construction - Moderate Impact
- Comments
For the week of October 12th, crews are working on sidewalk repairs. During these repairs the roadway will be open, but flagging may be present. These repairs are scheduled to be largely completed this week, but one ramp repair at the McLean cul-de-sac is scheduled to be completed next week. The week of the 19th the remaining erosion control and traffic control are scheduled to be removed, at which point the project will be largely completed.
- Public Contact
- Sam Casto
- City of Eugene
- Phone: (541) 735-0996
- Email: scasto@eugene-or.gov
- Event Id
- 5976
- Updated
- 10/09/2026 10:14 AM
Vine Maple Street, Spring Boulevard, Pine Canyon Drive, Huckleberry Street and South Ridge Drive Paving
Construction - Moderate Impact
- Comments
For the week of October 12th, construction is within Vine Maple Street, Spring Boulevard, Pine Canyon Drive, Huckleberry Street and South Ridge Drive including adjacent walkways.
Please expect delays as crews work. Roadways may be narrowed to a single lane or closed. Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
· Bikes are encouraged to use caution as well. Ensure heavy equipment operators can see you as you pass near active equipment.
· Construction workers are available to answer questions and help direct pedestrians as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: pwadmin@ci.eugene.or.us
- Event Id
- 5977
- Updated
- 10/09/2026 10:13 AM
Vine Maple Street, Spring Boulevard, Pine Canyon Drive, Huckleberry Street and South Ridge Drive Paving
Construction - Moderate Impact
- Comments
For the week of October 12th, construction is within Vine Maple Street, Spring Boulevard, Pine Canyon Drive, Huckleberry Street and South Ridge Drive including adjacent walkways.
Please expect delays as crews work. Roadways may be narrowed to a single lane or closed. Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
· Bikes are encouraged to use caution as well. Ensure heavy equipment operators can see you as you pass near active equipment.
· Construction workers are available to answer questions and help direct pedestrians as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: rnaud@eugene-or.gov
- Event Id
- 5978
- Updated
- 10/09/2026 10:13 AM
Old Coburg Rd Stormwater Retrofit Project
Construction - No Impact
- Comments
For the week of 10/12/26 – No work on site.
Crews have finished the remaining clean-up and corrective work. City of Eugene staff may be on site to check on the establishment of grass seeding in landscaped areas.
- Public Contact
- Joshua Spaht
- City of Eugene
- Phone: (541) 852-1736
- Email: jspaht@eugene-or.gov
- Event Id
- 5999
- Updated
- 10/09/2026 10:12 AM
River Rd Paving from Randy Pape Beltline to Green Ln
Construction - Low Impact
- Comments
River Road paving is scheduled to start Sunday the 11th. This paving is night work and with no road closures, though there will be single lane shifts and closures present throughout the paving process. Please drive with caution at night as there will be workers in the roadway. Paving is currently scheduled to finish Thursday the 22nd.
- Public Contact
- Sam Casto
- City of Eugene
- Phone: (541) 735-0996
- Email: scasto@eugene-or.gov
- Event Id
- 6069
- Updated
- 10/09/2026 10:12 AM
Awbrey Park Safe Routes to School Project
Construction - No Impact
- Comments
For the week of 10/12/26 – No work on site.
Work is now substantially complete for this project. There will be no traffic impacts for the week of 10/12/26.
- Public Contact
- Josh Spaht
- City of Eugene
- Phone: (541) 852-1736
- Email: jspaht@eugene-or.gov
- Event Id
- 6088
- Updated
- 10/09/2026 10:10 AM
W 11th & Crow Rd. Utility Extension
Construction - Closed
- Comments
For the week of 10/12/26, the excavation work will continue on Crow Rd for the wastewater manhole and main pipelines. The work has started at the intersection of Crow Rd and Hwy 126 (W 11th). The crews will work west on Crow Rd. The pipe mainline is close to 30 ft deep with bedrock material causing the progress to feel slower to the traveling public. We appreciate your patience and understanding. Due to the complexity of the work, Crow Rd will be closed east of La Porte to Hwy 126. Access to La Porte remains open but must be accessed via Greenhill Rd.
- Public Contact
- Bryan Root
- City of Eugene
- Phone: (541) 501-0378
- Email: broot@eugene-or.gov
- Event Id
- 6168
- Updated
- 10/09/2026 10:10 AM
100 Year Wastewater Pipe Rehabilitation
Construction - Moderate Impact
- Comments
For the week of 10/12/26 – No work will take place except on Saturday 10/17.
The crew will be working at South Eugene High School on Saturday 10/17. There will be no impact on traffic for this work. In the coming weeks, the crew will finish lining a few remaining sections of pipe at various locations in the city.
- Public Contact
- Josh Spaht
- City of Eugene
- Phone: (541) 852-1736
- Email: JSpaht@eugene-or.gov
- Event Id
- 6190
- Updated
- 10/09/2026 10:09 AM
South Garden Way
Construction - Moderate Impact
- Comments
Monday 10/12/2026 through Friday 10/16/2026
- Median, driveway and walk removal and re-installation will affect traffic on South Garden Way from north of Kinsrow Ave to Commons Drive.
- Southbound lane to be closed. Flaggers will be detouring all traffic into the northbound lane while work is being done.
- Pedestrian access will also be impacted and detoured to the east walk on South Garden way
- The southbound Bike Lane will be closed. Bikes are to merge with all southbound traffic past the construction area.
- Northbound Bike Lane to remain open.
- Please be aware of large trucks and equipment in the area while construction continues.
- Public Contact
- Josh Pinkham
- City of Eugene
- Phone: (541) 501-0374
- Email: jpinkham@eugene-or.gov
- Event Id
- 6191
- Updated
- 10/09/2026 10:07 AM
Patterson St Safety Pilot Project
Construction - Low Impact
- Comments
For the week of 10/12/26 – Construction crews may be on site between E 18th Ave and E 24th Ave to maintain traffic control.
Crews have finished installing the new striping and signs on Patterson St and will be returning for corrective work. For the week of 10/12, crews may be on site to maintain the barricades that are in place where the new bollards will be installed. No traffic impacts are expected. Crews will be returning later this year to install bollards.
- Public Contact
- Joshua Spaht
- City of Eugene
- Phone: (541) 852-1736
- Email: JSpaht@eugene-or.gov
- Event Id
- 6265
- Updated
- 10/09/2026 10:06 AM
NE 25th - Lane Closures
Construction - Moderate Impact
- Comments
Beginning September 30 through approximately October 16, drivers should expect single-lane closures on NE 25th Avenue approx. 1000 ft south of NE Evergreen Rd.
Flaggers will direct traffic through the work area, and the roadway will remain open. Please plan for delays and consider using an alternate route when possible.
Thank you for your patience while this work is underway.
- Public Contact
- Jeannie Little
- City of Hillsboro
- Phone: (503) 681-5315
- Email: jeannie.little@hillsboro-oregon.gov
- Event Id
- 6274
- Updated
- 9/22/2026 3:30 PM
NE 60th Ave between NE Glisan and NE Halsey ST
Construction - Closed
- Comments
Northbound 60th Ave closure for sidewalk construction.
- Public Contact
- Halsey Construction
- City of Portland
- Phone: (971) 313-9293
- Email: halseyconstruction@portlandoregon.gov
- Event Id
- 5287
- Updated
- 8/29/2025 10:18 AM
42nd Ave Bridge Closure
Construction - Closed
- Direction Impacted
- Both
- Comments
42nd Ave Bridge closure for two (2) years for PBOT's NE 42nd Avenue Bridge Replacement Project.
- Public Contact
- Winston Sandino
- City of Portland
- Phone: (503) 278-6277
- Email: winston.sandino@portlandoregon.gov
- Event Id
- 5286
- Updated
- 8/29/2025 10:12 AM
Aspen Street Overlay (Centennial Blvd. to Tamarack St.) - GO Bond Street Repair Project
Construction - Low Impact
- Comments
Construction is expected to begin the week of June 15, 2026. Most work is anticipated to be completed by September 4, 2026, before the start of school, with the full project scheduled for completion by October 31, 2026.
Local access to homes will be maintained during construction, though temporary lane closures, driveway closures, and no parking zones will occur. You may experience changes to normal travel routes, along with construction noise, dust, and heavy equipment. Advance notice will be provided before any driveway, parking, or lane closures.
- Public Contact
- Kristi Krueger
- City of Springfield
- Phone: (541) 726-4584
- Email: kkrueger@springfield-or.gov
- Event Id
- 5833
- Updated
- 5/14/2026 7:50 AM
SE Courtney Ave between SE Schroeder Ave and SE Laurie Ave is closed Oct. 13-16, 2026 for waterline installation.
Construction - Closed
- Comments
- Public Contact
- Jason Gomez
- Clackamas County
- Phone: (971) 930-6297
- Email: jgomez@clackamas.us
- Event Id
- 6282
- Updated
- 10/12/2026 11:22 AM
Youngs River Road -- Miles Crossing to Tucker Creek Lane
Vehicle Restriction - Low Impact
- Comments
Youngs River Road is closed to all truck traffic over 26,000 LBS from Miles Crossing to Tucker Creek Lane.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@co.clatsop.or.us
- Event Id
- 2810
- Updated
- 5/06/2026 8:30 AM
Lewis and Clark Road milepost 3.43 at McEwan Slough Bridge Load Restriction
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Specialized Hauling Vehicles (SHVs)
SU6 Vehicles (6 Axles) 31 Ton Max GVW
SU7 Vehicles (7 Axles) 32 Ton Max GVW
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 1990
- Updated
- 3/17/2026 7:18 AM
Youngs River Road -- Miles Crossing to Tucker Creek Lane Closed to All Trucks Over 26,000 LBS
Vehicle Restriction - Low Impact
- Comments
Youngs River Road is closed (North & Southbound Lanes) to all truck traffic over 26,000 LBS from Miles Crossing through Tucker Creek Lane.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 2811
- Updated
- 3/17/2026 7:18 AM
Walluski Loop Road at Milepost 2.0 One Lane Traffic Only
Hazard - Moderate Impact
- Direction Impacted
- Both
- Comments
Due to a landslide at milepost 2.0 on Walluski Loop Road, traffic is reduced to one lane. Use caution and yield to oncoming traffic while passing through the slide area.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendrxy@clatsopcounty.gov
- Event Id
- 5733
- Updated
- 3/17/2026 7:16 AM
Dolphin Road Bridge
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Type 3 Truck - 10 Ton Max GVW
Type 3S2 Truck - 20 Ton Max GVW
Type 3-3 Truck - 35 Ton Max GVW
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 626
- Updated
- 2/15/2024 8:01 AM
Rippett Road Milepost 0.12 at Circle Creek Bridge
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Type EV3 truck - 32 tons
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 4025
- Updated
- 2/01/2024 11:55 AM
North Fork Klaskanine River Bridge, Olney Cutoff Road
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Type 3 Truck - 25 Tons
Type 3S2 Truck - 31 Tons
Type 3-3 Truck - 30 Tons
SHVs
SU4 - 22 Tons
SU5 & SU6 - 21 Tons
SU7 - 22 Tons
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 3730
- Updated
- 9/19/2023 1:45 PM
Pengra Rd/5th St/Walker Rd/3rd St
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Road work from 9/14 to 10/14. Expect delays of up to 20 minutes.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: roadprojects@deschutescounty.gov
- Event Id
- 6086
- Updated
- 9/11/2026 7:58 AM
6th St
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Road work 9/14 to 10/14. Expect delays of up to 20 minutes.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: roadprojects@deschutescounty.gov
- Event Id
- 6085
- Updated
- 9/03/2026 12:49 PM
Dorrance Meadow Rd
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Road work from 9/14 to 10/14. Expect delays of up to 20 minutes.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: roadprojects@deschutescounty.gov
- Event Id
- 6084
- Updated
- 9/03/2026 12:48 PM
HUNNELL RD
Construction - Closed
- Direction Impacted
- Both
- Comments
Hunnell Rd closed to traffic between Loco Rd and Bowery Ln. Use alternate route.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: road@deschutes.org
- Event Id
- 4177
- Updated
- 6/03/2024 8:54 AM
Quines Creek Rd / BLM Road 33-5-1.1
Hazard - Closed
- Direction Impacted
- Both
- Comments
Road Closed. Large berm of debris blocking access from both directions of travel.
- Public Contact
- Larissa May
- Douglas County
- Phone: (541) 464-6307
- Email: Larissa.May@douglascountyor.gov
- Event Id
- 2882
- Updated
- 11/09/2024 4:17 PM
Dead Indian Memorial Road, Length Restricted for Semis with Trailers
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
Length-restricted road, maximum overall length 60' for semis with trailers.
- Public Contact
- James Philp - County Engineer
- Jackson County Roads
- Phone: (541) 774-8184
- Email: jcroadsadmin@jacksoncountyor.gov
- Event Id
- 1295
- Updated
- 9/23/2026 8:37 AM
Dead Indian Memorial Road, Length Restricted for Semis with Trailers
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
Length-restricted road, maximum overall length 60' for semis with trailers.
- Public Contact
- James Philp
- Jackson County Roads
- Phone: (541) 774-8184
- Email: jcroadsadmin@jacksoncountyor.gov
- Event Id
- 4800
- Updated
- 9/23/2026 8:36 AM
Dead Indian Memorial Road, Length Restricted for Semis with Trailers
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
Length-restricted road, maximum overall length 60' for semis with trailers.
- Public Contact
- James Philp - County Engineer
- Jackson County Roads
- Phone: (541) 774-8184
- Email: jcroadsadmin@jacksoncountyor.gov
- Event Id
- 4772
- Updated
- 9/23/2026 8:36 AM
Colestin Road - Mt. Ashland Ski Road to California Border
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
DO NOT USE THIS ROUTE AS AN I-5 BYPASS - NARROW STEEP WINDING ROADWAY WITH LIMITED CELL SERVICE.
This route is STRONGLY NOT ADVISED for use as an I-5 bypass when Interstate 5 is closed. Road is a steep, winding, narrow, gravel road with limited turnaround areas and limited cell phone coverage.
- Public Contact
- James Philp - County Engineer
- Jackson County Roads
- Phone: (541) 774-8184
- Email: jcroadsadmin@jacksoncountyor.gov
- Event Id
- 1240
- Updated
- 8/07/2026 9:50 AM
Homedale Road (Sturdivant to Bartlett)
Construction - Moderate Impact
- Comments
City waterline replacement project. Expect day/night lane closures. Contact city staff for additional information (541-883-4950).
- Public Contact
- City Engineering
- City of Klamath Falls
- Phone: (541) 883-4950
- Email: devservices@klamathfalls.city
- Event Id
- 6280
- Updated
- 10/05/2026 9:25 AM
Summers Lane south of Southside Bypass, Hwy 140.
Vehicle Restriction - Closed
- Comments
This section of road is not a through street. Delivery trucks should not enter, as it will be difficult to turn around.
- Public Contact
- Jeremy Morris
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: jmorris@klamathcounty.org
- Event Id
- 5759
- Updated
- 9/11/2026 7:21 AM
Stewart Covered Bridge on Garoutte Rd M.P. 0.012
Construction - Low Impact
- Comments
Lane County will be performing bridge rehabilitation construction work on the Historic Stewart Covered Bridge on Garoutte Rd M.P. 0.012. The bridge is closed to the public. There won’t be any full road closures. Traffic will be controlled by flaggers, as needed.
- Public Contact
- Derek Jensen
- Lane County Public Works Engineering & Construction Services
- Phone: (541) 682-6929
- Email: ecs-construction@lanecountyor.gov
- Event Id
- 6276
- Updated
- 9/29/2026 9:10 AM
Currin Covered Bridge on Layng Rd M.P. 1.424
Construction - Low Impact
- Comments
Lane County will be performing bridge rehabilitation construction work on the Historic Currin Covered Bridge on Layng Rd M.P. 1.424. The bridge is closed to the public. There won’t be any full road closures. Traffic will be controlled by flaggers, as needed.
- Public Contact
- Derek Jensen
- Lane County Public Works Engineering & Construction Services
- Phone: (541) 682-6929
- Email: ecs-construction@lanecountyor.gov
- Event Id
- 6275
- Updated
- 9/29/2026 9:05 AM
North Jetty Rd M.P. 0.109 - M.P. 1.010
Construction - Closed
- Direction Impacted
- Both
- Comments
Lane County will be reconstructing the parking lots for North Jetty Park and the Dive Park along N. Jetty Rd.
Construction work is expected to be completed by end of October 2026.
- Public Contact
- Derek Jensen
- Lane County Public Works Engineering & Construction Services
- Phone: (541) 682-6929
- Email: ecs-construction@lanecountyor.gov
- Event Id
- 5846
- Updated
- 9/08/2026 11:49 AM
Big Creek Rd M.P. 12.434 to M.P. 8.933
Construction - Closed
- Direction Impacted
- Both
- Comments
Lane County will be replacing culvert on Big Creek Rd at M.P. 10.94. The road will be CLOSED from M.P. 12.434 to M.P. 8.933, 24 hours a day, 7 days a week. Construction work is expected to be completed by December 31, 2026.
- Public Contact
- Derek Jensen
- Lane County Public Works Engineering & Construction Services
- Phone: (541) 682-6929
- Email: ecs-construction@lanecountyor.gov
- Event Id
- 5859
- Updated
- 7/01/2026 10:17 AM
Shaff Rd sidewalk ramps
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Mid-Valley Construction is constructing sidewalk ramps from July 1st through October.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6098
- Updated
- 9/28/2026 9:43 AM
Buena Vista Rd S
Construction - Closed
- Comments
The portion of Buena Vista Rd between Talbot Rd and the Willamette River will be closed while Marion County Bridge Crews dry dock the Buena Vista Ferry. The closure is scheduled to begin on Wednesday, September 9th, 2026 at 8:00am. The date the road will reopen is currently TBD.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: MCLDEP@co.marion.or.us
- Event Id
- 6188
- Updated
- 9/10/2026 8:38 AM
Timber Trail Guardrail
Construction - No Impact
- Comments
A contractor will install guardrail in the fall of 2026
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6106
- Updated
- 8/11/2026 8:47 AM
Sunnyview Rd Curve Signing
Construction - No Impact
- Direction Impacted
- Both
- Comments
Mid Valley Excavation will install new and updated advisory curve signing in the fall of 2026.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6105
- Updated
- 8/11/2026 8:34 AM
State St Curve Signing
Construction - No Impact
- Comments
Mid Valley Excavation will install new and updated advisory curve signing in the fall of 2026.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6104
- Updated
- 8/11/2026 8:32 AM
Crooked Finger Rd Curve Signing
Construction - No Impact
- Direction Impacted
- Both
- Comments
Mid Valley Excavation will install new and updated advisory curve signing in the fall of 2026.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6103
- Updated
- 8/11/2026 8:30 AM
Windsor Isle-Simon-9th-Salmon-Ravena Curve Signing
Construction - No Impact
- Direction Impacted
- Both
- Comments
Mid Valley Excavation will install new and updated advisory curve signing in the fall of 2026.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6102
- Updated
- 8/11/2026 8:26 AM
Meridian RD Curve Signing
Construction - No Impact
- Direction Impacted
- Both
- Comments
Mid Valley Excavation will install new and updated advisory curve signing in the fall of 2026.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6101
- Updated
- 8/11/2026 8:23 AM
Lakeside Dr Curve Signing
Construction - No Impact
- Direction Impacted
- Both
- Comments
Mid Valley Excavation will install new and updated advisory curve signing in the fall of 2026.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6100
- Updated
- 8/11/2026 8:19 AM
Bishop Rd Curve Signing
Construction - No Impact
- Direction Impacted
- Both
- Comments
Mid Valley Excavation will install new and updated advisory curve signing in the fall of 2026.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6099
- Updated
- 8/11/2026 8:18 AM
French Prairie Rd NE
Detour - Low Impact
- Comments
Oregon State Bridge, on behalf of Marion County Capital Projects, will be closing the portion of French Prairie Rd NE located south approximately 1,000 ft. of the Mahony Rd NE/Highway 219 NE intersection.The closure is scheduled to begin on Tuesday, August 18th, 2026 as early as 7:00 am
and end on Monday, November 30th, 2026 at 5:00 pm.
Because the bridge is being replaced this will be a hard closure. Local and emergency vehicles, as well as through traffic, will be required to use the approved detour.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: mcldep@co.marion.or.us
- Event Id
- 6083
- Updated
- 8/04/2026 5:10 PM
French Prairie Rd NE
Construction - Closed
- Direction Impacted
- Both
- Comments
Oregon State Bridge, on behalf of Marion County Capital Projects, will be closing the portion of French Prairie Rd NE located south approximately 1,000 ft. of the Mahony Rd NE/Highway 219 NE intersection.The closure is scheduled to begin on Tuesday, August 18th, 2026 as early as 7:00 am
and end on Monday, November 30th, 2026 at 5:00 pm.
Because the bridge is being replaced this will be a hard closure. Local and emergency vehicles, as well as through traffic, will be required to use the approved detour.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: mcldep@co.marion.or.us
- Event Id
- 6082
- Updated
- 8/04/2026 5:08 PM
North Fork Road
Construction - No Impact
- Comments
North Santiam Paving will construct a turnout for purchasing parking parking passes and corridor information.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5808
- Updated
- 5/04/2026 2:21 PM
North Fork Rd
Detour - Low Impact
- Comments
K&E Excavating, on behalf of Marion County Capital Projects, will be closing the portion of North Fork Rd that lies approximately between House Mountain Rd and Multiclum Rd (MP 4.9 to MP 5.2). House Mountain Rd and Multiclum Rd will remain open through the closure. The closure will begin Monday, May 4th, 2026 at 7:00 am and end on Friday, October 30th, 2026 at 5:00 pm. Emergency services will be allowed through the closure until the road is completely excavated and rendered unsafe or impassible. The road is expected to be completely impassible for a period of approximately three weeks towards the end of the project, likely in October.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: MCLDEP@co.marion.or.us
- Event Id
- 5795
- Updated
- 4/17/2026 8:53 AM
North Fork Rd
Construction - Closed
- Comments
K&E Excavating, on behalf of Marion County Capital Projects, will be closing the portion of North Fork Rd that lies approximately between House Mountain Rd and Multiclum Rd (MP 4.9 to MP 5.2). House Mountain Rd and Multiclum Rd will remain open through the closure. The closure will begin Monday, May 4th, 2026 at 7:00 am and end on Friday, October 30th, 2026 at 5:00 pm. Emergency services will be allowed through the closure until the road is completely excavated and rendered unsafe or impassible. The road is expected to be completely impassible for a period of approximately three weeks towards the end of the project, likely in October.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: MCLDEP@co.marion.or.us
- Event Id
- 5763
- Updated
- 4/17/2026 8:50 AM
Niagara Park Closed Due to Wildfire Damage
Hazard - Closed
- Comments
Marion County anticipates it will take two to three years to fully rebuild county parks following the Beachie Creek and Lionshead fires. We appreciate the public's partnership as we make the park safe for visitors.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 588-5036
- Email: jogden@co.marion.or.us
- Event Id
- 1503
- Updated
- 3/25/2026 2:12 PM
Low Clearance RxR Underpass - 9 ft. 4 in.
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Low clearance Railroad underpass in S-curve with no turnaround. Trucks taller than 9' 4" will not pass under.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5470
- Updated
- 11/17/2025 3:47 PM
Low Clearance RxR Underpass - 10 ft. 11 in.
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Low clearance Railroad underpass in S-curve with no turnaround. Trucks taller than 10'11" will not pass under.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5469
- Updated
- 11/17/2025 3:41 PM
Low Clearance RxR Underpass - 12 ft. 9 in.
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Low clearance Railroad underpass in S-curve with no turnaround. Trucks taller than 12'9" will not pass under.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5468
- Updated
- 11/17/2025 3:40 PM
Low Clearance RxR Underpass - 12 ft. 3 in.
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Low clearance Railroad underpass in S-curve with no turnaround. Trucks taller than 12'3" will not pass under.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5467
- Updated
- 11/17/2025 3:29 PM
Connecticut Av Sidewalks
Construction - No Impact
- Direction Impacted
- Both
- Comments
The project involves the completion of urban bicycle and ADA compliant pedestrian facilities along Connecticut Avenue SE between Macleay Road/Pennsylvania Avenue and Rickey Street/Macleay Road.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4123
- Updated
- 10/27/2025 4:10 PM
Oxbow Drive/Altman Road Intersection Closure
Construction - High Impact
- Comments
Oxbow Drive/Altman Road intersection 24/7 closure with through traffic detoured to Pipeline, Lusted, and Hosner roads.
- Public Contact
- Bonita Oswald
- Portland Water Bureau Filtration Project
- Phone: (503) 823-1505
- Email: bullrunprojects@portlandoregon.gov
- Event Id
- 6164
- Updated
- 10/01/2026 2:29 PM
Dodge Park Blvd (east of Cottrell) Single-Lane
Construction - Moderate Impact
- Comments
Dodge Park Boulevard (Cottrell Road to 1500 feet east of intersection) single-lane with two-way flagging 7 a.m. to 6 p.m. Monday through Saturday. Regular traffic outside work hours.
- Public Contact
- Bonita Oswald
- Portland Water Bureau Filtration Project
- Phone: (503) 823-1505
- Email: bullrunprojects@portlandoregon.gov
- Event Id
- 6163
- Updated
- 8/26/2026 9:43 AM
Carpenter Lane Altman Road to Cottrell
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
No through traffic. Local Traffic only.
- Public Contact
- Bonita Oswald
- Portland Water Bureau Filtration Project
- Phone: (503) 823-1505
- Email: bullrunprojects@portlandoregon.gov
- Event Id
- 5324
- Updated
- 11/06/2025 3:05 PM
Wilson River Loop E-W is OPEN to One lane w/ Signals
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
Wilson River Loop E-W is now open to one lane with signalized traffic control for local traffic only.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 5544
- Updated
- 3/17/2026 9:56 AM
Big Trout Bridge is CLOSED
Vehicle Restriction - Closed
- Direction Impacted
- Both
- Comments
Big Trout Bridge is CLOSED due to high water damage.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 662
- Updated
- 12/18/2025 10:54 PM
Prince (Blum) Bridge Load Rated
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
The Prince Bridge over the Dougherty Slough on Blum Lane is Load Rated to 13 Tons.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 5347
- Updated
- 9/29/2025 7:15 AM
Boquist Bridge is Loate Rated to 13 Tons.
Vehicle Restriction - High Impact
- Comments
The Boquist Bridge has been load rated for 13 tons.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 5307
- Updated
- 9/15/2025 7:13 AM
Powder Creek Bridge Load Rated
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
The Browning Bridge over the Nestucca River on Powder Creek Road is weight limited to 32 Tons.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 5292
- Updated
- 9/02/2025 2:57 PM
Salmonberry Bridge Weight Restriction
Vehicle Restriction - Moderate Impact
- Comments
Salmonberry Bridge is load rated at 14 tons for all vehicles.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 751
- Updated
- 6/16/2025 3:25 PM
Old Wheeler-Mohler Road CLOSED!
Vehicle Restriction - Closed
- Direction Impacted
- Both
- Comments
Old Wheeler-Mohler Road is CLOSED due to an active landslide. The road has been repaired but is gated for emergency use only.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 4950
- Updated
- 6/11/2025 7:38 AM
Savage Road - Active Slide Zone
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Savage Road is an active slide area and is load limited to 22.5 Tons
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 4200
- Updated
- 6/17/2024 12:28 PM
China Hat Road 18 Closed
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4845
- Updated
- 4/21/2025 3:05 PM
Horse Butte Road 1815/Forest Boundary
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4844
- Updated
- 4/01/2025 9:01 AM
Horse Butte Road (1815) Closed-Forest Boundary
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4846
- Updated
- 4/01/2025 9:00 AM
Forest Boundary-Road 18 China Hat
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4842
- Updated
- 4/01/2025 8:56 AM
Road 18 China Hat South
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4843
- Updated
- 4/01/2025 8:55 AM
Bonita Road and Sequoia Parkway Traffic Signal Installation
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Expect delays 9 a.m.-3:30 p.m.
- Public Contact
- Heather Sturgill
- Washington County
- Phone: (503) 846-7822
- Email: heather_sturgill@washingtoncountyor.gov
- Event Id
- 5881
- Updated
- 9/30/2026 4:28 PM
Willamette Water Supply
Construction - Moderate Impact
- Comments
Traffic detours in place. Plan for short delays and turn restrictions.
- Public Contact
- Marlys Mock
- Willamette Water Supply Program
- Phone: (971) 235-7336
- Email: marlys@tvwd.org
- Event Id
- 6153
- Updated
- 8/23/2026 9:59 AM