Statewide Oregon Local Events
Current Events By Agency
Due to an increase in fire behavior, this road is closed per the USFS
Hazard - Closed
- Comments
- Public Contact
- USFS Nicola Swanson
- USFS
- Phone: (541) 228-5610
- Email: nicola.swanson@usda.gov
- Event Id
- 6053
- Updated
- 7/27/2026 8:21 PM
Dodge Island Road, From Old River Rd to Dodge Island Bridge
Construction - Closed
- Direction Impacted
- Both
- Comments
Dodge Island Road will be closed from the intersection of Old River Road to the Dodge Island bridge starting June 22, 2026 through January 2027 for the replacement of the bridge. Closure dates and times are subject to change based on weather and site conditions.
- Public Contact
- Benton County Public Works
- Benton County, Oregon
- Phone: (541) 766-6824
- Email: Michael.Johnson@bentoncountyor.gov
- Event Id
- 5885
- Updated
- 7/08/2026 3:56 PM
Harris Road Covered Bridge; Vehicle Restrictions: Weight limit 16 tons, height limit 10 ft. 8 inches, width limit 16 ft 3 inches
Vehicle Restriction - Moderate Impact
- Direction Impacted
- Both
- Comments
Harris Road Covered Bridge; Vehicle Restrictions: weight limit 16 tons, height limit 10 ft. 8 inches, width limit 16 ft 3 inches
5 miles of narrow gravel road with tight corners
- Public Contact
- Benton County Public Works
- Benton County, Oregon
- Phone: (541) 766-6821
- Email: pwinfo@bentoncountyor.gov
- Event Id
- 5193
- Updated
- 7/01/2026 10:47 AM
MP 10.7, Lobster Valley Road, Alsea
Vehicle Restriction - High Impact
- Comments
One Lane traffic only. Truck traffic through the corridor is discouraged and over-dimensional loads are prohibited indefinitely.
- Public Contact
- Benton County Public Works
- Benton County, Oregon
- Phone: (541) 766-6821
- Email: pwinfo@bentoncountyor.gov
- Event Id
- 3102
- Updated
- 12/24/2025 1:15 PM
USFS NF-11: Semi truck traffic prohibited on NF-11 from US-20 to Quartzville. Road not maintained for snow and ice. Narrow roadways and tight corners.
Vehicle Restriction - Closed
- Comments
Semi Truck traffic prohibited on NF-11 through to US-20. The road is not maintained for snow and ice; Road is impassable to semi’s due to narrow roadways and tight corners.
- Public Contact
- USFS: Sweet Home Ranger District
- USFS: Sweet Home Ranger District
- Phone: (541) 367-5168
- Email: chelsea.chytka@bentoncountyor.gov
- Event Id
- 4710
- Updated
- 12/18/2025 10:44 AM
USFS NF-11: Semi truck traffic prohibited on NF-11 from US-20 to Quartzville. Road not maintained for snow and ice. Narrow roadways and tight corners.
Vehicle Restriction - Closed
- Comments
Semi Truck traffic prohibited on NF-11 through to US-20. The road is not maintained for snow and ice; Road is impassable to semi’s due to narrow roadways and tight corners.
- Public Contact
- Chelsea Chytka
- Benton County, Oregon
- Phone: (541) 760-2521
- Email: Chelsea.chytka@bentoncountyor.gov
- Event Id
- 4635
- Updated
- 1/06/2025 3:20 PM
1863 Moss St and E 19th Ave
Construction - Low Impact
- Comments
Monday, September 21 – Friday, September 25, 7:30am to 3:00pm. Sidewalk repair. Traffic control includes: Flaggers, Crew Working, Sidewalk Closed Ahead, Directional A Frames, and orange cones. No delays expected. Door hangers were distributed.
- Public Contact
- Marion Suitor-Barnes
- City of Eugene
- Phone: (541) 682-5523
- Email: pwadmin@ci.eugene.or.us
- Event Id
- 6272
- Updated
- 9/18/2026 10:49 AM
Chambers St between Roosevelt Blvd and W 2nd Ave
Construction - High Impact
- Comments
Thursday, September 24 – Friday, September 25,7:00am to 3:00 pm. Road repairs. Traffic control includes: signs, barricades. Expect up to 20-minute delays.
- Public Contact
- Marion Suitor-Barnes
- City of Eugene
- Phone: (541) 682-5523
- Email: pwadmin@ci.eugene.or.us
- Event Id
- 6271
- Updated
- 9/18/2026 10:45 AM
W 5th Avenue and Adams Street
Construction - Closed
- Comments
- Adams from W 6th Ave to W 5th Ave parking is closed on the west side of Adams St and from the W 5th Ally north on the east side of Adams St.
- W 5th Alley is closed from Monroe St to Adam St.
- Pedestrian traffic on the east side of Adams St is closed at the W 5th Alley and on the south side of W 5th Ave from Adams to midblock heading towards Monroe St.
- Pedestrians traveling west on the south side of W 5th St are to detour to the northside of W 5th Ave at Monroe St. Mid bock closures exist on the south sidewalk on W 5th Ave.
- Eastbound bike lane on W 5th Ave is closed between Adams St just past the construction site. Bicyclists are encouraged to detour north on Adams St to W 4th Ave travel east to Monroe St then south to W 5th Ave to avoid construction activities.
- Public Contact
- Donna Stark
- City of Eugene
- Phone: (541) 729-4638
- Email: DStark@eugene-or.gov
- Event Id
- 5731
- Updated
- 9/18/2026 10:34 AM
Maxwell Rd & Prairie Rd Improvements
Construction - Closed
- Direction Impacted
- Both
- Comments
For the week of 9/21/26, Pacific Excavation construction crews will be onsite with the railroad contractor replacing the railroad crossing on Prairie at Hwy 99. Pacific Excavation will also be reconstructing the eastern portion of the intersection leading up to the crossing. Prairie Road will be closed to all traffic from Hwy 99 to Maxwell Rd. The closure is anticipated to last approximately 4 weeks. Currently, Prairie Rd is single lane in each direction from Hwy 99 to Maxwell Rd. Please continue to watch for cones and signage as needed.
Prairie Rd will be CLOSED from Hwy 99 to Maxwell Rd from August 17th to approximately October 5th, 2026.
Detour routes include Irving Rd, Beltline, and or Chambers Rd.
- Public Contact
- Bryan Root
- City of Eugene
- Phone: (541) 501-0378
- Email: broot@eugene-or.gov
- Event Id
- 5781
- Updated
- 9/18/2026 10:33 AM
18th at Hilyard St.
Construction - Moderate Impact
- Comments
For the week of September 21st, there will be construction near the corners of the intersection.
Please expect delays as crews work. Roadways may be narrowed to a single lane. Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: rnaud@eugene-or.gov
- Event Id
- 5892
- Updated
- 9/18/2026 10:32 AM
Willamette St. & W 52nd Ave Parking Lot
Construction - Moderate Impact
- Comments
For the week of September 21st, limited construction within the parking lot area as the project nears completion.
Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: rnaud@eugene-or.gov
- Event Id
- 5894
- Updated
- 9/18/2026 10:30 AM
Prairie Mountain School Crossing
Construction - Moderate Impact
- Comments
For the week of September 21st, crews may be on site to finish installing the electrical, lighting and may start work on the punchlist.
Please use caution and remain aware of large trucks, construction equipment, and crews working on-site and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
- Public Contact
- Sam Casto
- City of Eugene
- Phone: (541) 735-0996
- Email: scasto@eugene-or.gov
- Event Id
- 5898
- Updated
- 9/18/2026 10:27 AM
Bethal Paving
Construction - Moderate Impact
- Comments
For the week of September 21st, construction is on Bethel Road and adjacent walkways.
Please expect delays as crews work. Roadways may be narrowed to a single lane. Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: rnaud@eguene-or.gov
- Event Id
- 5904
- Updated
- 9/18/2026 10:25 AM
W 30th Ave. & Portland St.
Construction - Moderate Impact
- Comments
- Portland St from W 30th Ave to W 29th Pl west side on street parking and portions of parking north of W 29th Pl to W 28th Ave are closed for the duration of the project construction.
- Pedestrian traffic on the west side of Portland St from W 30th Ave to W 29th Pl is closed. West side pedestrians heading north on Portland St can cross at the NW corner of W 30th Ave and Portland St to the east temporary ADA ramp and sidewalk.
- Pedestrians on W 30th Ave west of Portland St are encouraged to use the Temporary Pedestrian channelization on the north side of W 30th Ave to access Portland St.
- Please be aware of large trucks, construction equipment, and construction personnel on W 30th, Portland St while work continues.
- Public Contact
- Donna Stark
- City of Eugene
- Phone: (541) 729-4638
- Email: DStark@eugene-or.gov
- Event Id
- 5897
- Updated
- 9/18/2026 10:24 AM
Columbia St. @ E. 17th Ave.
Construction - High Impact
- Comments
Monday 9/21/2026 through Friday 9/25/2026
- Installation of new storm, wastewater, electrical service connections, and surface improvements will affect portions of E 17th Ave, east of Agate St to Columbia St. E 17th Ave to Moss Ave, and portions of Columbia St and Columbia Alley through the summer of 2027.
- Detours for vehicular traffic will be set at Agate St, E 17th Ave, Columbia St, Moss St, and E 19th Ave as work progresses.
- Pedestrian access will also be impacted and detoured on all affected streets during construction.
- Bike lanes will be closed and merged with shared use in traffic lanes on Agate St to the west and Moss St to the east.
- Please be aware of large trucks and equipment in the area while construction continues.
- Public Contact
- Josh Pinkham
- City of Eugene
- Phone: (541) 501-0374
- Email: jpinkham@eugene-or.gov
- Event Id
- 5896
- Updated
- 9/18/2026 10:23 AM
Broadway Paving - Phase 2
Construction - High Impact
- Comments
For the week of 9/21/26 construction crews are moving back to night work, 7pm to 6am.
Construction crews will be on the south side of Broadway at Patterson. Sunday night they will excavate the western half of Patterson at Broadway. Monday morning they will pour the first half of the concrete raised crosswalk toward the east side of Patterson.
Patterson is CLOSED TO TRUCKS , BUSES, AND OTHER LARGE VEHICLES at Broadway. Large vehicles will need to detour at Alder St. This closure will last at least two weeks.
The lane configuration will remain the same with the right lane closed. The lane closure will move east to start at Ferry Ln. Vehicles need to use the zipper method to merge. Single lane from Ferry Ln to Patterson St.
To complete the work and work safely, crews will be utilizing the center lane of east bound traffic. The traveling public will reduce to a single lane through this section of road.
- Public Contact
- Bryan Root
- City of Eugene
- Phone: (541) 501-0378
- Email: broot@eugen-or.gov
- Event Id
- 5972
- Updated
- 9/18/2026 10:21 AM
McLean Blvd. Paving
Construction - Closed
- Comments
Final paving is scheduled for Monday the 21st. Once paving is completed the McLean road closure and detours will be removed. For the remainder of the week crews will be working on utility adjustments in the roadway and concrete sidewalk and ramp repairs. During this work there will be flaggers present.
Until the closure is opened on Monday, two traffic detours will be in place during the utility adjustments. The first detour will reroute through traffic approaching from before Graham Drive to Lasater → Randy → 29th, returning to McKendrick Street and McLean Boulevard, and vice versa. The second detour will route Graham Drive traffic to Chambers Street via 28th Street.
- Public Contact
- Sam Casto
- City of Eugene
- Phone: (541) 735-0996
- Email: scasto@eugene-or.gov
- Event Id
- 5976
- Updated
- 9/18/2026 10:19 AM
Vine Maple Street, Spring Boulevard, Pine Canyon Drive, Huckleberry Street and South Ridge Drive Paving
Construction - Moderate Impact
- Comments
For the week of September 14th, construction is within Vine Maple Street, Spring Boulevard, Pine Canyon Drive, Huckleberry Street and South Ridge Drive including adjacent walkways.
Please expect delays as crews work. Roadways may be narrowed to a single lane or closed. Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: pwadmin@ci.eugene.or.us
- Event Id
- 5977
- Updated
- 9/18/2026 10:17 AM
Vine Maple Street, Spring Boulevard, Pine Canyon Drive, Huckleberry Street and South Ridge Drive Paving
Construction - Moderate Impact
- Comments
For the week of September 21st, construction is within Vine Maple Street, Spring Boulevard, Pine Canyon Drive, Huckleberry Street and South Ridge Drive including adjacent walkways.
Please expect delays as crews work. Roadways may be narrowed to a single lane or closed. Please watch for your neighbors and drive with caution. Construction cones and signs will be in place to direct traffic as needed.
- Public Contact
- Robert Naud
- City of Eugene
- Phone: (541) 603-5474
- Email: rnaud@eugene-or.gov
- Event Id
- 5978
- Updated
- 9/18/2026 10:17 AM
Old Coburg Rd Stormwater Retrofit Project
Construction - No Impact
- Comments
This project will upgrade existing stormwater facilities by replacing concrete splash pads along Old Coburg Rd and will add new improvements in the form of stormwater planters. Concrete mow pads will also be installed in planters to improve ease of maintenance.
For the week of 9/21/26 – No crews will be working on site.
Crews have finished clean-up work and will now be waiting to return in the fall for planting/seeding.
- Public Contact
- Joshua Spaht
- City of Eugene
- Phone: (541) 852-1736
- Email: jspaht@eugene-or.gov
- Event Id
- 5999
- Updated
- 9/18/2026 10:04 AM
River Rd Paving from Randy Pape Beltline to Green Ln
Construction - Moderate Impact
- Comments
For the week of September 20th, crews will be installing a ramp and Santa Clara Ave & River Road intersection and installing the bus stops North of Santa Clara on River Road. Pedestrian detours will be in place at all closures to ensure safe crossings.
Lane Closures on River Road are anticipated to be removed Friday the 18th pending concrete cure results. The road closures may stay up for a portion of the week of the 20th if the concrete needs more time to cure.
- Public Contact
- Sam Casto
- City of Eugene
- Phone: (541) 735-0996
- Email: scasto@eugene-or.gov
- Event Id
- 6069
- Updated
- 9/18/2026 10:03 AM
Awbrey Park Safe Routes to School Project
Construction - Low Impact
- Comments
For the week of 9/21/26 – Crews will be working on Spring Creek Dr between River Rd and Awbrey Park Elementary School.
Crews have finished constructing all elements of the project and will now be returning to do any corrective or clean-up work.
- Public Contact
- Josh Spaht
- City of Eugene
- Phone: (541) 852-1736
- Email: jspaht@eugene-or.gov
- Event Id
- 6088
- Updated
- 9/18/2026 10:02 AM
W 11th & Crow Rd. Utility Extension
Construction - Closed
- Comments
For the week of Sept 21st, the excavation work will continue on Crow Rd for the wastewater manhole and main pipelines. The work has started at the intersection of Crow Rd and Hwy 126 (W 11th). The crews will work west on Crow Rd. The pipe mainline is close to 30 ft deep with bedrock material causing the progress to feel slower to the traveling public. We appreciate your patience and understanding. Due to the complexity of the work, Crow Rd will be closed east of La Porte to Hwy 126. Access to La Porte remains open but must be accessed via Greenhill Rd.
- Public Contact
- Bryan Root
- City of Eugene
- Phone: (541) 501-0378
- Email: broot@eugene-or.gov
- Event Id
- 6168
- Updated
- 9/18/2026 10:02 AM
100 Year Wastewater Pipe Rehabilitation
Construction - Low Impact
- Comments
For the week of 9/21/26 – Construction crews will be working at E 4th Ave between High and Mill St, W 7th Alley east of Van Buren St, W 6th Alley on the west side of Blair Blvd, and on E 24th Ave between Willamette St and Amazon Parkway.
Sidewalk access will be closed on the north side of E 4th Ave between High St and Mill St on 9/21. On Van Buren St between W 7th Ave and W 8th Ave, a lane shift will occur at W 7th Alley on 9/22. There will also be a lane shift on E 23rd Ave between Willamette St and Amazon Parkway on 9/24. Access will be closed to W 6th Alley between Van Buren St and Blair Blvd on 9/23.
- Public Contact
- Josh Spaht
- City of Eugene
- Phone: (541) 852-1736
- Email: JSpaht@eugene-or.gov
- Event Id
- 6190
- Updated
- 9/18/2026 10:01 AM
South Garden Way
Construction - Moderate Impact
- Comments
South Garden Way – Monday 9/21/2026 through Friday 9/25/2026
- Median, driveway and walk removal and re-installation will affect traffic on South Garden Way from north of Kinsrow Ave to Commons Drive.
- Southbound lane to be closed . Flaggers will be detouring all traffic into the northbound lane while work is being done.
- Pedestrian access will also be impacted and detoured to the east walk on South Garden way
- The southbound Bike Lane will be closed. Bikes are to merge with all southbound traffic past the construction area.
- Northbound Bike Lane to remain open.
- Please be aware of large trucks and equipment in the area while construction continues.
- Public Contact
- Josh Pinkham
- City of Eugene
- Phone: (541) 501-0374
- Email: jpinkham@eugene-or.gov
- Event Id
- 6191
- Updated
- 9/18/2026 10:00 AM
1912 Moss St and E 19th Ave
Construction - High Impact
- Comments
Monday, September 21 – Friday, September 25, 7:30am to 3:00pm. Sidewalk repair. Traffic control includes: Flaggers, Crew Working, Sidewalk Closed Ahead, Directional A Frames, and orange cones. No delays expected. Door hangers were distributed.
- Public Contact
- Marion Suitor-Barnes
- City of Eugene
- Phone: (541) 682-5523
- Email: pwadmin@ci.eugene.or.us
- Event Id
- 6266
- Updated
- 9/18/2026 9:59 AM
Patterson St Safety Pilot Project
Construction - Low Impact
- Comments
For the week of 9/21/26 – Construction crews will be working between E 18th Ave and E 24th Ave.
Crews will be on site to begin removing the existing striping and will start to install new striping later in the week. Traffic will be reduced to one lane on the side of the road opposite the work zone.
- Public Contact
- Joshua Spaht
- City of Eugene
- Phone: (541) 852-1736
- Email: JSpaht@eugene-or.gov
- Event Id
- 6265
- Updated
- 9/18/2026 9:59 AM
NE 60th Ave between NE Glisan and NE Halsey ST
Construction - Closed
- Comments
Northbound 60th Ave closure for sidewalk construction.
- Public Contact
- Halsey Construction
- City of Portland
- Phone: (971) 313-9293
- Email: halseyconstruction@portlandoregon.gov
- Event Id
- 5287
- Updated
- 8/29/2025 10:18 AM
42nd Ave Bridge Closure
Construction - Closed
- Direction Impacted
- Both
- Comments
42nd Ave Bridge closure for two (2) years for PBOT's NE 42nd Avenue Bridge Replacement Project.
- Public Contact
- Winston Sandino
- City of Portland
- Phone: (503) 278-6277
- Email: winston.sandino@portlandoregon.gov
- Event Id
- 5286
- Updated
- 8/29/2025 10:12 AM
NE 9th ST - HWY 126 to E Antler Ave
Construction - Closed
- Comments
Full closure. Please use detour.
- Public Contact
- Jake Sherman
- City of Redmond
- Phone: (541) 504-2000
- Email: jake.sherman@redmondoregon.gov
- Event Id
- 6192
- Updated
- 9/04/2026 4:08 PM
36th Street Overlay (Main St. to Commercial Ave.) - GO Bond Street Repair Project
Construction - Low Impact
- Comments
Construction started the week of April 27 and is scheduled to be completed no later than September 30, 2026.
Local access to homes will be maintained during construction, though temporary lane closures, driveway closures, and no parking zones will occur. You may experience changes to normal travel routes, along with construction noise, dust, and heavy equipment. Advance notice will be provided before any driveway, parking, or lane closures.
- Public Contact
- Kristi Krueger
- City of Springfield
- Phone: (541) 726-4584
- Email: kkrueger@springfield-or.gov
- Event Id
- 5832
- Updated
- 5/14/2026 8:01 AM
Aspen Street Overlay (Centennial Blvd. to Tamarack St.) - GO Bond Street Repair Project
Construction - Low Impact
- Comments
Construction is expected to begin the week of June 15, 2026. Most work is anticipated to be completed by September 4, 2026, before the start of school, with the full project scheduled for completion by October 31, 2026.
Local access to homes will be maintained during construction, though temporary lane closures, driveway closures, and no parking zones will occur. You may experience changes to normal travel routes, along with construction noise, dust, and heavy equipment. Advance notice will be provided before any driveway, parking, or lane closures.
- Public Contact
- Kristi Krueger
- City of Springfield
- Phone: (541) 726-4584
- Email: kkrueger@springfield-or.gov
- Event Id
- 5833
- Updated
- 5/14/2026 7:50 AM
Johnson Road CLOSED at Stafford
Construction - Closed
- Direction Impacted
- Both
- Comments
Johnson Road is CLOSED to all traffic, including pedestrians and emergency vehicles.
- Public Contact
- Mike Ward
- Clackamas County
- Phone: (503) 742-4688
- Email: mward@clackamas.us
- Event Id
- 6185
- Updated
- 9/01/2026 8:54 AM
Stafford Road closed between Childs & Pattulo Way
Construction - Closed
- Direction Impacted
- Both
- Comments
Stafford Road is closed to ALL TRAFFIC, including pedestrians and emergency vehicles, between Childs Road and Pattulo Way.
- Public Contact
- Mike Ward
- Clackamas County
- Phone: (503) 742-4688
- Email: mward@clackamas.us
- Event Id
- 6184
- Updated
- 9/01/2026 7:04 AM
Pipeline Road Closed
Construction - Closed
- Comments
Pipeline Road is closed between the gates at James Street (west end) and Mary’s Creek (east end) as depicted on the map, due to logging operations.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 5819
- Updated
- 5/06/2026 8:36 AM
Youngs River Road -- Miles Crossing to Tucker Creek Lane
Vehicle Restriction - Low Impact
- Comments
Youngs River Road is closed to all truck traffic over 26,000 LBS from Miles Crossing to Tucker Creek Lane.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@co.clatsop.or.us
- Event Id
- 2810
- Updated
- 5/06/2026 8:30 AM
Lewis and Clark Road milepost 3.43 at McEwan Slough Bridge Load Restriction
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Specialized Hauling Vehicles (SHVs)
SU6 Vehicles (6 Axles) 31 Ton Max GVW
SU7 Vehicles (7 Axles) 32 Ton Max GVW
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 1990
- Updated
- 3/17/2026 7:18 AM
Youngs River Road -- Miles Crossing to Tucker Creek Lane Closed to All Trucks Over 26,000 LBS
Vehicle Restriction - Low Impact
- Comments
Youngs River Road is closed (North & Southbound Lanes) to all truck traffic over 26,000 LBS from Miles Crossing through Tucker Creek Lane.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 2811
- Updated
- 3/17/2026 7:18 AM
Walluski Loop Road at Milepost 2.0 One Lane Traffic Only
Hazard - Moderate Impact
- Direction Impacted
- Both
- Comments
Due to a landslide at milepost 2.0 on Walluski Loop Road, traffic is reduced to one lane. Use caution and yield to oncoming traffic while passing through the slide area.
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendrxy@clatsopcounty.gov
- Event Id
- 5733
- Updated
- 3/17/2026 7:16 AM
Dolphin Road Bridge
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Type 3 Truck - 10 Ton Max GVW
Type 3S2 Truck - 20 Ton Max GVW
Type 3-3 Truck - 35 Ton Max GVW
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 626
- Updated
- 2/15/2024 8:01 AM
Rippett Road Milepost 0.12 at Circle Creek Bridge
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Type EV3 truck - 32 tons
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 4025
- Updated
- 2/01/2024 11:55 AM
North Fork Klaskanine River Bridge, Olney Cutoff Road
Vehicle Restriction - Low Impact
- Comments
Weight restriction on bridge as follows:
Type 3 Truck - 25 Tons
Type 3S2 Truck - 31 Tons
Type 3-3 Truck - 30 Tons
SHVs
SU4 - 22 Tons
SU5 & SU6 - 21 Tons
SU7 - 22 Tons
- Public Contact
- Terry Hendryx
- Clatsop County Public Works
- Phone: (503) 325-8631
- Email: thendryx@clatsopcounty.gov
- Event Id
- 3730
- Updated
- 9/19/2023 1:45 PM
Pengra Rd/5th St/Walker Rd/3rd St
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Road work from 9/14 to 10/14. Expect delays of up to 20 minutes.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: roadprojects@deschutescounty.gov
- Event Id
- 6086
- Updated
- 9/11/2026 7:58 AM
6th St
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Road work 9/14 to 10/14. Expect delays of up to 20 minutes.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: roadprojects@deschutescounty.gov
- Event Id
- 6085
- Updated
- 9/03/2026 12:49 PM
Dorrance Meadow Rd
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Road work from 9/14 to 10/14. Expect delays of up to 20 minutes.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: roadprojects@deschutescounty.gov
- Event Id
- 6084
- Updated
- 9/03/2026 12:48 PM
Lower Bridge Way Closure
Construction - Closed
- Direction Impacted
- Both
- Comments
Beginning on Monday April 27, Lower Bridge Way will be closed to traffic for roundabout construction work between NW 19th St and US 97. This closure is anticipated to remain through October. A signed detour route is in place along NW 19th St and NW Davidson Way.
- Public Contact
- Aron Sturko
- ODOT
- Phone: (541) 410-3795
- Email: Aron.STURKO@odot.oregon.gov
- Event Id
- 5801
- Updated
- 4/27/2026 11:11 AM
HUNNELL RD
Construction - Closed
- Direction Impacted
- Both
- Comments
Hunnell Rd closed to traffic between Loco Rd and Bowery Ln. Use alternate route.
- Public Contact
- Deschutes County Road Department
- Deschutes County Road Department
- Phone: (541) 388-6581
- Email: road@deschutes.org
- Event Id
- 4177
- Updated
- 6/03/2024 8:54 AM
Quines Creek Rd / BLM Road 33-5-1.1
Hazard - Closed
- Direction Impacted
- Both
- Comments
Road Closed. Large berm of debris blocking access from both directions of travel.
- Public Contact
- Larissa May
- Douglas County
- Phone: (541) 464-6307
- Email: Larissa.May@douglascountyor.gov
- Event Id
- 2882
- Updated
- 11/09/2024 4:17 PM
Dead Indian Memorial Road, Length Restricted for Semis with Trailers
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
Length-restricted road, maximum overall length 60' for semis with trailers.
- Public Contact
- James Philp - County Engineer
- Jackson County Roads
- Phone: (541) 774-8184
- Email: jcroadsadmin@jacksoncountyor.gov
- Event Id
- 1295
- Updated
- 9/23/2026 8:37 AM
Dead Indian Memorial Road, Length Restricted for Semis with Trailers
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
Length-restricted road, maximum overall length 60' for semis with trailers.
- Public Contact
- James Philp
- Jackson County Roads
- Phone: (541) 774-8184
- Email: jcroadsadmin@jacksoncountyor.gov
- Event Id
- 4800
- Updated
- 9/23/2026 8:36 AM
Dead Indian Memorial Road, Length Restricted for Semis with Trailers
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
Length-restricted road, maximum overall length 60' for semis with trailers.
- Public Contact
- James Philp - County Engineer
- Jackson County Roads
- Phone: (541) 774-8184
- Email: jcroadsadmin@jacksoncountyor.gov
- Event Id
- 4772
- Updated
- 9/23/2026 8:36 AM
Colestin Road - Mt. Ashland Ski Road to California Border
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
DO NOT USE THIS ROUTE AS AN I-5 BYPASS - NARROW STEEP WINDING ROADWAY WITH LIMITED CELL SERVICE.
This route is STRONGLY NOT ADVISED for use as an I-5 bypass when Interstate 5 is closed. Road is a steep, winding, narrow, gravel road with limited turnaround areas and limited cell phone coverage.
- Public Contact
- James Philp - County Engineer
- Jackson County Roads
- Phone: (541) 774-8184
- Email: jcroadsadmin@jacksoncountyor.gov
- Event Id
- 1240
- Updated
- 8/07/2026 9:50 AM
Homedale Road from Sturdivant to Gatewood Dr.
Construction - Moderate Impact
- Comments
Night work: 7:00 pm-6:00 am.
Construction crews will be working in this area. Please use caution and watch for flaggers. Use an alternate route if possible.
- Public Contact
- John Claybaugh
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: Jclaybaugh@klamathcounty.org
- Event Id
- 6137
- Updated
- 9/11/2026 7:22 AM
Summers Lane south of Southside Bypass, Hwy 140.
Vehicle Restriction - Closed
- Comments
This section of road is not a through street. Delivery trucks should not enter, as it will be difficult to turn around.
- Public Contact
- Jeremy Morris
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: jmorris@klamathcounty.org
- Event Id
- 5759
- Updated
- 9/11/2026 7:21 AM
East Langell Valley Road between Jones Road and Bunn Way
Construction - Closed
- Comments
Full closure beginning Monday, April 20, 2026, at 7:00 am through Friday, September 11, 2026.
East Langell Valley Road will be reduced to one lane, then fully closed at the construction site as crews remove and replace the East Langell Valley Road over the Lost River bridge near Bunn Way.
- Public Contact
- Jeremy Morris
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: jmorris@klamathcounty.org
- Event Id
- 5760
- Updated
- 9/11/2026 7:08 AM
East Langell Valley Bridge Detour Route.
Detour - Low Impact
- Comments
Traffic will be directed to the posted detour route. Please use caution when traveling in the area and watch for construction personnel and equipment.
- Public Contact
- Jeremy Morris
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: jmorris@klamathcounty.org
- Event Id
- 5761
- Updated
- 9/11/2026 7:08 AM
Hazard @ Bliss Road to Sprague River Road. -- Impact: Moderate
Hazard - Moderate Impact
- Comments
Be aware of work personnel while traveling in the area. Expect intermittent and ongoing tree and vegetation removal, utility work, drainage work, and fire recovery/restoration in the coming weeks.
- Public Contact
- John Claybaugh
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: Jclaybaugh@klamathcounty.org
- Event Id
- 6255
- Updated
- 9/08/2026 7:36 AM
Bliss Road to Sprague River Road.
Hazard - Moderate Impact
- Comments
Be aware of work personnel while traveling in the area. Expect intermittent and ongoing tree and vegetation removal, utility work, drainage work, and fire recovery/restoration in the coming weeks.
- Public Contact
- John Claybaugh
- Klamath County Public Works
- Phone: (541) 883-4696
- Email: Jclaybaugh@klamathcounty.org
- Event Id
- 6186
- Updated
- 9/01/2026 8:40 AM
North Jetty Rd M.P. 0.109 - M.P. 1.010
Construction - Closed
- Direction Impacted
- Both
- Comments
Lane County will be reconstructing the parking lots for North Jetty Park and the Dive Park along N. Jetty Rd.
Construction work is expected to be completed by end of October 2026.
- Public Contact
- Derek Jensen
- Lane County Public Works Engineering & Construction Services
- Phone: (541) 682-6929
- Email: ecs-construction@lanecountyor.gov
- Event Id
- 5846
- Updated
- 9/08/2026 11:49 AM
Big Creek Rd M.P. 12.434 to M.P. 8.933
Construction - Closed
- Direction Impacted
- Both
- Comments
Lane County will be replacing culvert on Big Creek Rd at M.P. 10.94. The road will be CLOSED from M.P. 12.434 to M.P. 8.933, 24 hours a day, 7 days a week. Construction work is expected to be completed by December 31, 2026.
- Public Contact
- Derek Jensen
- Lane County Public Works Engineering & Construction Services
- Phone: (541) 682-6929
- Email: ecs-construction@lanecountyor.gov
- Event Id
- 5859
- Updated
- 7/01/2026 10:17 AM
Buena Vista Rd S
Construction - Closed
- Comments
The portion of Buena Vista Rd between Talbot Rd and the Willamette River will be closed while Marion County Bridge Crews dry dock the Buena Vista Ferry. The closure is scheduled to begin on Wednesday, September 9th, 2026 at 8:00am. The date the road will reopen is currently TBD.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: MCLDEP@co.marion.or.us
- Event Id
- 6188
- Updated
- 9/10/2026 8:38 AM
Shaff Rd sidewalk ramps
Construction - Low Impact
- Direction Impacted
- Both
- Comments
Mid-Valley Construction is constructing sidewalk ramps from July 1st through September.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 6098
- Updated
- 8/25/2026 1:13 PM
French Prairie Rd NE
Detour - Low Impact
- Comments
Oregon State Bridge, on behalf of Marion County Capital Projects, will be closing the portion of French Prairie Rd NE located south approximately 1,000 ft. of the Mahony Rd NE/Highway 219 NE intersection.The closure is scheduled to begin on Tuesday, August 18th, 2026 as early as 7:00 am
and end on Monday, November 30th, 2026 at 5:00 pm.
Because the bridge is being replaced this will be a hard closure. Local and emergency vehicles, as well as through traffic, will be required to use the approved detour.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: mcldep@co.marion.or.us
- Event Id
- 6083
- Updated
- 8/04/2026 5:10 PM
French Prairie Rd NE
Construction - Closed
- Direction Impacted
- Both
- Comments
Oregon State Bridge, on behalf of Marion County Capital Projects, will be closing the portion of French Prairie Rd NE located south approximately 1,000 ft. of the Mahony Rd NE/Highway 219 NE intersection.The closure is scheduled to begin on Tuesday, August 18th, 2026 as early as 7:00 am
and end on Monday, November 30th, 2026 at 5:00 pm.
Because the bridge is being replaced this will be a hard closure. Local and emergency vehicles, as well as through traffic, will be required to use the approved detour.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: mcldep@co.marion.or.us
- Event Id
- 6082
- Updated
- 8/04/2026 5:08 PM
North Fork Road
Construction - No Impact
- Comments
North Santiam Paving will construct a turnout for purchasing parking parking passes and corridor information.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5808
- Updated
- 5/04/2026 2:21 PM
North Fork Rd
Detour - Low Impact
- Comments
K&E Excavating, on behalf of Marion County Capital Projects, will be closing the portion of North Fork Rd that lies approximately between House Mountain Rd and Multiclum Rd (MP 4.9 to MP 5.2). House Mountain Rd and Multiclum Rd will remain open through the closure. The closure will begin Monday, May 4th, 2026 at 7:00 am and end on Friday, October 30th, 2026 at 5:00 pm. Emergency services will be allowed through the closure until the road is completely excavated and rendered unsafe or impassible. The road is expected to be completely impassible for a period of approximately three weeks towards the end of the project, likely in October.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: MCLDEP@co.marion.or.us
- Event Id
- 5795
- Updated
- 4/17/2026 8:53 AM
North Fork Rd
Construction - Closed
- Comments
K&E Excavating, on behalf of Marion County Capital Projects, will be closing the portion of North Fork Rd that lies approximately between House Mountain Rd and Multiclum Rd (MP 4.9 to MP 5.2). House Mountain Rd and Multiclum Rd will remain open through the closure. The closure will begin Monday, May 4th, 2026 at 7:00 am and end on Friday, October 30th, 2026 at 5:00 pm. Emergency services will be allowed through the closure until the road is completely excavated and rendered unsafe or impassible. The road is expected to be completely impassible for a period of approximately three weeks towards the end of the project, likely in October.
- Public Contact
- Zach Inman
- Marion County Public Works
- Phone: (503) 584-7714
- Email: MCLDEP@co.marion.or.us
- Event Id
- 5763
- Updated
- 4/17/2026 8:50 AM
Niagara Park Closed Due to Wildfire Damage
Hazard - Closed
- Comments
Marion County anticipates it will take two to three years to fully rebuild county parks following the Beachie Creek and Lionshead fires. We appreciate the public's partnership as we make the park safe for visitors.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 588-5036
- Email: jogden@co.marion.or.us
- Event Id
- 1503
- Updated
- 3/25/2026 2:12 PM
Low Clearance RxR Underpass - 9 ft. 4 in.
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Low clearance Railroad underpass in S-curve with no turnaround. Trucks taller than 9' 4" will not pass under.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5470
- Updated
- 11/17/2025 3:47 PM
Low Clearance RxR Underpass - 10 ft. 11 in.
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Low clearance Railroad underpass in S-curve with no turnaround. Trucks taller than 10'11" will not pass under.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5469
- Updated
- 11/17/2025 3:41 PM
Low Clearance RxR Underpass - 12 ft. 9 in.
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Low clearance Railroad underpass in S-curve with no turnaround. Trucks taller than 12'9" will not pass under.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5468
- Updated
- 11/17/2025 3:40 PM
Low Clearance RxR Underpass - 12 ft. 3 in.
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Low clearance Railroad underpass in S-curve with no turnaround. Trucks taller than 12'3" will not pass under.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 5467
- Updated
- 11/17/2025 3:29 PM
Connecticut Av Sidewalks
Construction - No Impact
- Direction Impacted
- Both
- Comments
The project involves the completion of urban bicycle and ADA compliant pedestrian facilities along Connecticut Avenue SE between Macleay Road/Pennsylvania Avenue and Rickey Street/Macleay Road.
- Public Contact
- Jill Ogden
- Marion County Public Works
- Phone: (503) 365-3152
- Email: jogden@co.marion.or.us
- Event Id
- 4123
- Updated
- 10/27/2025 4:10 PM
Dodge Park Blvd (east of Cottrell) Single-Lane
Construction - Moderate Impact
- Comments
Dodge Park Boulevard (Cottrell Road to 1500 feet east of intersection) single-lane with two-way flagging 7 a.m. to 6 p.m. Monday through Saturday. Regular traffic outside work hours.
- Public Contact
- Bonita Oswald
- Portland Water Bureau Filtration Project
- Phone: (503) 823-1505
- Email: bullrunprojects@portlandoregon.gov
- Event Id
- 6163
- Updated
- 8/26/2026 9:43 AM
Altman Road south-only traffic between Oxbow and Pipeline
Construction - Low Impact
- Comments
Altman Road 24/7 south-only traffic between Oxbow Drive and Pipeline Road
- Public Contact
- Bonita Oswald
- Portland Water Bureau Filtration Project
- Phone: (503) 823-1505
- Email: bullrunprojects@portlandoregon.gov
- Event Id
- 6152
- Updated
- 8/21/2026 2:07 PM
Carpenter Lane Altman Road to Cottrell
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
No through traffic. Local Traffic only.
- Public Contact
- Bonita Oswald
- Portland Water Bureau Filtration Project
- Phone: (503) 823-1505
- Email: bullrunprojects@portlandoregon.gov
- Event Id
- 5324
- Updated
- 11/06/2025 3:05 PM
Wilson River Loop E-W is OPEN to One lane w/ Signals
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
Wilson River Loop E-W is now open to one lane with signalized traffic control for local traffic only.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 5544
- Updated
- 3/17/2026 9:56 AM
Big Trout Bridge is CLOSED
Vehicle Restriction - Closed
- Direction Impacted
- Both
- Comments
Big Trout Bridge is CLOSED due to high water damage.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 662
- Updated
- 12/18/2025 10:54 PM
Prince (Blum) Bridge Load Rated
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
The Prince Bridge over the Dougherty Slough on Blum Lane is Load Rated to 13 Tons.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 5347
- Updated
- 9/29/2025 7:15 AM
Boquist Bridge is Loate Rated to 13 Tons.
Vehicle Restriction - High Impact
- Comments
The Boquist Bridge has been load rated for 13 tons.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 5307
- Updated
- 9/15/2025 7:13 AM
Powder Creek Bridge Load Rated
Vehicle Restriction - High Impact
- Direction Impacted
- Both
- Comments
The Browning Bridge over the Nestucca River on Powder Creek Road is weight limited to 32 Tons.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 5292
- Updated
- 9/02/2025 2:57 PM
Salmonberry Bridge Weight Restriction
Vehicle Restriction - Moderate Impact
- Comments
Salmonberry Bridge is load rated at 14 tons for all vehicles.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 751
- Updated
- 6/16/2025 3:25 PM
Old Wheeler-Mohler Road CLOSED!
Vehicle Restriction - Closed
- Direction Impacted
- Both
- Comments
Old Wheeler-Mohler Road is CLOSED due to an active landslide. The road has been repaired but is gated for emergency use only.
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 4950
- Updated
- 6/11/2025 7:38 AM
Savage Road - Active Slide Zone
Hazard - High Impact
- Direction Impacted
- Both
- Comments
Savage Road is an active slide area and is load limited to 22.5 Tons
- Public Contact
- Gregory Cickavage
- Tillamook County Public Works
- Phone: (503) 842-3419
- Email: gcickvav@co.tillamook.or.us
- Event Id
- 4200
- Updated
- 6/17/2024 12:28 PM
China Hat Road 18 Closed
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4845
- Updated
- 4/21/2025 3:05 PM
Horse Butte Road 1815/Forest Boundary
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4844
- Updated
- 4/01/2025 9:01 AM
Horse Butte Road (1815) Closed-Forest Boundary
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4846
- Updated
- 4/01/2025 9:00 AM
Forest Boundary-Road 18 China Hat
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4842
- Updated
- 4/01/2025 8:56 AM
Road 18 China Hat South
Construction - Closed
- Comments
Road Closed-Cabin Butte Area Closure
- Public Contact
- Marcos Romero
- USDA, Forest Service - Deschutes NF
- Phone: (541) 383-5624
- Email: marcos.romero@usda.gov
- Event Id
- 4843
- Updated
- 4/01/2025 8:55 AM
No Trucks Old Cornelius Pass Road
Hazard - High Impact
- Comments
No heavy trucks allowed on Old Cornelius Pass while the route is a bicycle detour.
Trucks:
Use route: Cornelius Pass Road at Rock Creek bike and vehicle detour map. No Trucks | Washington County, OR
Trucks with hazardous cargo:
Use route: Cornelius Pass Road at Rock Creek truck detour map | Washington County, OR
- Public Contact
- Heather Sturgill
- Washington County
- Phone: (503) 846-7822
- Email: heather_sturgill@washingtoncountyor.gov
- Event Id
- 6124
- Updated
- 9/22/2026 3:48 PM
Cornelius Pass Road (OR-127) at Rock Creek
Construction - Closed
- Direction Impacted
- Both
- Comments
Bridge replacement
Trucks:
Use route: Cornelius Pass Road at Rock Creek bike and vehicle detour map. No Trucks | Washington County, OR
Trucks with hazardous cargo:
Use route: Cornelius Pass Road at Rock Creek truck detour map | Washington County, OR
- Public Contact
- Heather Sturgill
- Washington County
- Phone: (503) 846-7800
- Email: lutproj@washingtoncountyor.gov
- Event Id
- 5957
- Updated
- 9/22/2026 3:46 PM
Vadis Road
Construction - Closed
- Comments
Vadis Road is closed from Dersham Road to Milne Road for construction. Use detour.
- Public Contact
- Diane Overstreet
- Diane Overstreet
- Phone: (503) 846-6436
- Email: diane_overstreet@washingtoncountyor.gov
- Event Id
- 6131
- Updated
- 8/12/2026 4:22 PM
Turk Road Bridge
Construction - Closed
- Comments
Project to replace bridge. Please use Sell Road and Pihl Road for Detour. Call LUT at 503-846-7800 or more information on our website www.washingtoncountyor.gov/lut/projects/turk-road-bridge-replacement
- Public Contact
- Melissa De Lyser
- Washington County
- Phone: (503) 846-4963
- Email: melissa_de_lyser@co.washington.or.us
- Event Id
- 5899
- Updated
- 6/24/2026 10:50 AM
Bonita Road and Sequoia Parkway Traffic Signal Installation
Construction - Moderate Impact
- Direction Impacted
- Both
- Comments
Expect delays 9 a.m.-3:30 p.m.
- Public Contact
- Heather Sturgill
- Washington County
- Phone: (503) 846-7822
- Email: heather_sturgill@washingtoncountyor.gov
- Event Id
- 5881
- Updated
- 6/11/2026 2:49 PM
Willamette Water Supply
Construction - Moderate Impact
- Comments
Traffic detours in place. Plan for short delays and turn restrictions.
- Public Contact
- Marlys Mock
- Willamette Water Supply Program
- Phone: (971) 235-7336
- Email: marlys@tvwd.org
- Event Id
- 6153
- Updated
- 8/23/2026 9:59 AM