Statewide Oregon Local Events

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Events By Agency

Fish Lake Road Detour

Detour - Low Impact
Comments
Public Contact
Nolan "Noodle" Perkins
Baker County Road Department
Phone: (541) 523-6417
Email: bcroad@bakercounty.org
Event Id
767
Updated
6/30/2020 4:29 PM

Fish Lake Rd

Construction - Closed
Direction Impacted
Both
Comments
Public Contact
Nolan "Noodle" Perkins
Baker County Road Department
Phone: (541) 523-6417
Email: bcroad@bakercounty.org
Event Id
766
Updated
6/30/2020 4:29 PM

Sundance Street:

Construction - Moderate Impact
Comments

Additional storm sewer installation will be starting on Monday, July 6, 2020. Single lanes and driveways may be temporary closed for work. Sidewalk closures and pedestrian detours will be in place to assist foot traffic through the work zone. Parking on Sundance Street will be limited, seek alternate parking on Sundial Road and walk to your residence if possible. Watch for construction workers, trucks, and equipment in the street and surrounding area.

Public Contact
Jordan Vesper
City of Eugene
Phone: (541) 246-0019
Email: JVesper@eugene-or.gov
Event Id
770
Updated
7/03/2020 2:04 PM

Roosevelt Boulevard (Hwy 99 to N. Garfield St.):

Construction - Moderate Impact
Direction Impacted
Both
Comments

Wastewater rehab work will be underway on and south of Roosevelt Boulevard between Foch Street and North Garfield Street. Work will continue Monday through Friday between the hours of 7 AM and 5 PM. Expect brief delays, lane closures, flaggers, and trucks in the roadway.

Public Contact
David Starns
City of Eugene
Phone: (541) 682-8306
Email: DStarns@eugene-or.gov
Event Id
612
Updated
7/03/2020 2:00 PM

South Bank Path Closed - between EWEB headquarters and Steam Plant

Construction - Closed
Comments

Starting Monday, July 22, 2019, the South Bank Path will be closed for the construction of the Downtown Riverfront Park. The closure is expected to last until spring 2021. The Frohnmayer and DeFazio bridges will remain open throughout the construction project.


People are urged to detour through Alton Baker Park. There will also be a detour through downtown.

Public Contact
Brian Richardson
City of Eugene
Phone: (541) 682-8421
Email: pwadmin@ci.eugene.or.us
Event Id
244
Updated
7/19/2019 2:58 PM

South Bank Path - between the Steam Plant and EWEB Headquarter

Construction - Closed
Comments

Starting Monday, July 22, 2019, the South Bank Path will be closed for the construction of the Downtown Riverfront Park. The closure is expected to last until spring 2021. The Frohnmayer and DeFazio bridges will remain open throughout the construction project.


People are urged to detour through Alton Baker Park. There will also be a detour through downtown.

Public Contact
Brian Richardson
City of Eugene
Phone: (541) 682-8421
Email: pwadmin@ci.eugene.or.us
Event Id
245
Updated
7/19/2019 2:58 PM

Posted detour for construction on SE 190th Dr and SE Richey Rd

Detour - Low Impact
Direction Impacted
Both
Comments
Public Contact
Jessica Snodgrass
City of Gresham
Phone: (503) 618-2277
Email: jessica.snodgrass@greshamoregon.gov
Event Id
765
Updated
6/26/2020 1:37 PM

SE Richey Rd between SE 190th Dr and SE 182nd

Construction - Closed
Direction Impacted
Both
Comments

SE Richey Rd will be closed for an extended period of time while underground utilities are being installed and road widening is being constructed.

Public Contact
Jessica Snodgrass
City of Gresham
Phone: (503) 618-2277
Email: jessica.snodgrass@greshamoregon.gov
Event Id
764
Updated
6/26/2020 1:29 PM

SE 190th Dr from SE Butler/Giese to SE Richey Rd

Construction - Closed
Direction Impacted
Both
Comments

SE 190th Dr will be closed for an extended period of time while underground utilities are being installed and road widening is being constructed.

Public Contact
Jessica Snodgrass
City of Gresham
Phone: (503) 618-2277
Email: jessica.snodgrass@greshamoregon.gov
Event Id
763
Updated
6/26/2020 1:24 PM

SW Boones Ferry & SW Stephenson St

Detour - Low Impact
Direction Impacted
Both
Comments

Recommended detour route for SW Boones Ferry Road Closure.

Public Contact
Stefanus Gunawan
City of Portland Environmental Services
Phone: (503) 823-5759
Email: stefanus.gunawan@portlandoregon.gov
Event Id
553
Updated
2/05/2020 3:14 PM

SW Boones ferry Rd & Arnold

Construction - Closed
Direction Impacted
Both
Comments

Starting March 19, 2020 and lasting for up to seven months, SW Boones Ferry Road will be completely closed from SW Arnold to SW Comus court.


www.portlandoregon.gov/bes/BoonesFerry

Public Contact
Stefanus Gunawan
City of Portland Environmental Services
Phone: (503) 823-5759
Email: Stefanus.Gunawan@portlandoregon.gov
Event Id
552
Updated
2/05/2020 3:07 PM

S Canal Blvd from SW Badger Ave to S Heights Ave

Construction - Moderate Impact
Comments

S Canal will experience single lane closures from SW Badger Ave to SW Heights Ave from 7:00 a.m. to 3:30 p.m. daily while McKernan Enterprises constructs a new waterline and street improvements. Local access will be maintained. Please use caution and follow traffic control devices. 

Public Contact
Julie Lovrien
City of Redmond
Phone: (541) 504-2000
Email: julie.lovrien@ci.redmond.or.us
Event Id
643
Updated
5/27/2020 6:39 PM

NW Hemlock Ave from NW 19th St to NW 23rd St

Construction - Closed
Direction Impacted
Both
Comments

NW Hemlock Ave will be closed from NW 19th St to NW 23rd St while McKenzie Cascade Heavy Excavation constructs a new waterline and completes street improvements. Please use detours or an alternate route.

Public Contact
Julie Lovrien
City of Redmond
Phone: (541) 504-2000
Email: julie.lovrien@ci.redmond.or.us
Event Id
642
Updated
5/27/2020 6:32 PM

River Glenn Neighborhood (north of Hayden Bridge Road):

Construction - Moderate Impact
Comments

River Glenn Neighborhood (north of Hayden Bridge Road): Crews will be performing crack sealing. To effectively accomplish the job all vehicles, trailers, campers, and other objects must be moved off the streets. Residents will be notified via a door hanger when their specific street will receive the treatment. Watch for signs, equipment, and crews in the street.

Public Contact
Loralyn Spiro
City of Springfield
Phone: (541) 726-2233
Email: lspiro@springfield-or.gov
Event Id
758
Updated
6/22/2020 9:30 AM

I-205 nighttime closures at the Sunnyside Road exit in the Clackamas Regional Center area intermittently this summer, 10 p.m., to 5 a.m., to relocate utilities in preparation of widening the Sunnyside Road bridge over I-205.

Construction - Moderate Impact
Comments

I-205 nighttime closures at the Sunnyside Road exit in the Clackamas Regional Center area intermittently this summer, 10 p.m., to 5 a.m., to relocate utilities in preparation of widening the Sunnyside Road bridge over I-205 to add a 10-foot wide combined sidewalk and bike lane on each side and install a new bridge railing and LED lighting. The detour route will be on the I-205 on- and off-ramps at Sunnyside Road.


June 28 and 29 (2 nights): Full freeway closure for utility crossing.

June 30 and July 1 (2 nights): Southbound only freeway closure for bridge work

July 7 and 8 (2 nights): Northbound only freeway closure for bridge work


Project updates will be posted at www.bit.ly/roadClosures.

Public Contact
Terry Mungenast
Clackamas County
Phone: (503) 742-4656
Email: terrymun@clackamas.us
Event Id
567
Updated
6/25/2020 8:47 AM

Lane closures

Construction - High Impact
Comments
Public Contact
Paving hotline
Clackamas County
Phone: (503) 650-3744
Email: roadconcerns@clackamas.us
Event Id
646
Updated
5/28/2020 2:54 PM

Upper Highland Road lane closures between Beavercreek Road to Highway 211, June 11, through Sept. 30

Construction - Moderate Impact
Direction Impacted
Both
Comments

Clackamas County will resurface approximately 18 miles of roadway in the Beavercreek and Colton areas beginning Thursday, June 11, through Sept. 30.  


  • Upper Highland Road: Beavercreek Road to Highway 211
  • Lower Ferguson Road: Beavercreek Road to Upper Highland Road
  • Ferguson Road: Beavercreek Road to dead end (1 mile north of Henrici Road) 
  • Carus Road: Beavercreek Road to Lower Highland Road


Work will take place during daylight hours, Monday through Friday. There is a possibility of additional weekend or night work depending on weather and other conditions. The road will remain open during construction, but there will be lane closures with delays of up to 20 minutes at a time.

Public Contact
Paving hotline
Clackamas County
Phone: (503) 650-3744
Email: roadconcerns@clackamas.us
Event Id
645
Updated
5/28/2020 2:48 PM

SE River Mill Road, between Hwy 224 and SE Eagle Creek Road in the Estacada area from 7 a.m., June 8, 2020, through 5 p.m., July 27 for sewer line installation. This is a 24/7 closure; local traffic and emergency vehicles will have access.

Construction - Closed
Comments

SE River Mill Road, between Hwy 224 and SE Eagle Creek Road in the Estacada area from 7 a.m., June 8, 2020, through 5 p.m., July 27 for sewer line installation. This is a 24/7 closure; local traffic and emergency vehicles will have access.


Project updates will be posted at www.bit.ly/roadClosures.

Public Contact
Jonny Gish
Clackamas County
Phone: (503) 742-4707
Email: jgish@clackamas.us
Event Id
644
Updated
5/28/2020 1:59 PM

Clackamas River Drive lane closures from 13300 Clackamas Rive Drive to Carver Bridge/S Springwater Road, April 22 through Aug. 31, Monday - Friday during daylight hours in the Beavercreek area for paving.

Construction - High Impact
Comments

Clackamas River Drive lane closures from 13300 Clackamas Rive Drive to Carver Bridge/S Springwater Road, April 22 through Aug. 31, Monday - Friday during daylight hours in the Beavercreek area for paving. This is a daily lane closure; local traffic and emergency vehicles will have access.


For project updates and to sign up for an email list, visit www.clackamas.us/roads/workprogram.html.

Public Contact
Paving Hotline
Clackamas County
Phone: (503) 650-3744
Email: roadconcerns@clackamas.us
Event Id
601
Updated
4/15/2020 3:10 PM

SE 80th Ave, will be closed between SE Harmony Road and SE Southgate Street in the Clackamas area from 9 a.m., Jan. 10 through 5 p.m., Sept. 31, 2020.

Construction - Closed
Comments

SE 80th Ave, will be closed between SE Harmony Road and SE Southgate Street in the Clackamas area from 9 a.m., Jan. 10 through 5 p.m., Sept. 31, 2020. Local traffic and emergency vehicles will have access. This is a Clackamas Regional Center Mobility Improvements project to improve safety and traffic flow, funded by the Clackamas County Development Agency.


Project updates will be posted at www.bit.ly/roadClosures.

Public Contact
Terry Mungenast
Clackamas County
Phone: (503) 742-4656
Email: terrymun@clackamas.us
Event Id
534
Updated
12/23/2019 4:05 PM

SE 84th Ave, will be closed between SE Sunnybrook Boulevard and SE Sunnyside Road in the Clackamas area from 9 a.m., Jan. 10 through 5 p.m., Aug. 31, 2021.

Construction - Closed
Comments

SE 84th Ave, will be closed between SE Sunnybrook Boulevard and SE Sunnyside Road in the Clackamas area from 9 a.m., Jan. 10 through 5 p.m., Aug. 31, 2021. The work zone on 84th Avenue will be completely closed to all traffic, but local traffic and emergency vehicles will be able to access the driveways and the sidewalks will remain open. This is a Clackamas Regional Center Mobility Improvements project to improve safety and traffic flow, funded by the Clackamas County Development Agency.


Project updates will be posted at www.bit.ly/roadClosures.

Public Contact
Terry Mungenast
Clackamas County
Phone: (503) 742-4656
Email: terrymun@clackamas.us
Event Id
533
Updated
12/23/2019 3:41 PM

SE 79th Ave, will be closed at SE Luther Road intersection in the Milwaukie area from 7 a.m., Nov. 19, 2019 to 5 p.m., Aug. 20, 2020 for road construction (connecting SE 79th Ave to SE Lindy Street).

Construction - Closed
Comments

SE 79th Ave, will be closed at SE Luther Road intersection in the Milwaukie area from 7 a.m., Nov. 19, 2019 to 5 p.m., Aug. 20, 2020 for road construction (connecting SE 79th Ave to SE Lindy Street). This is a 24/7 road closure; local traffic and emergency vehicles will not have access.


Project updates will be posted at www.bit.ly/roadClosures.

Public Contact
Bruce Brown
Clackamas County
Phone: (503) 742-4714
Email: bbrown@clackamas.us
Event Id
505
Updated
11/15/2019 9:22 AM

SE Dolphin Road Bridge

Vehicle Restriction - Low Impact
Comments

Weight restriction on timber bridge as follows:

Type 3 Truck - 10 Ton Max GVW

Type 3S2 Truck - 20 Ton Max GVW

Type 3-3 Truck - 35 Ton Max GVW

Public Contact
Terry Hendryx
Clatsop County Public Works
Phone: (503) 325-8631
Email: thendryx@co.clatsop.or.us
Event Id
626
Updated
5/11/2020 12:47 PM

Sunset Beach Road at Sunset Lake Bridge load restriction 14 tons

Vehicle Restriction - Moderate Impact
Comments

Sunset Lake Bridge load reduction to 14 tons for all vehicles, until repairs can be completed.

Public Contact
Terry Hendryx
Clatsop County Public Works
Phone: (503) 325-8631
Email: thendryx@co.clatsop.or.us
Event Id
482
Updated
5/11/2020 9:14 AM

Youngs River Road milepost 10.6 at Klaskanine River Bridge

Vehicle Restriction - Moderate Impact
Comments

The Klaskanine River Bridge Located at milepost 10.6 on Youngs River Road (Olney Bridge) closed to all loads exceeding 105,000 pounds until further notice. Utilize HWY 202 and Olney Cutoff Lane as detour around site.

Public Contact
Terry Hendryx
Clatsop County Public Works
Phone: (503) 325-8631
Email: thendryx@co.clatsop.or.us
Event Id
526
Updated
12/17/2019 8:06 AM

Svensen Island Road at Svensen Island Bridge load reduction to 3 tons

Vehicle Restriction - Moderate Impact
Comments

Svensen Island Bridge load reduction to 3 tons for all vehicles, until repairs can be completed.

Public Contact
Terry Hendryx
Clatsop County Public Works
Phone: (503) 325-8631
Email: thendryx@co.clatsop.or.us
Event Id
483
Updated
10/14/2019 12:27 PM

Sisemore Rd Bridge Closure

Detour - Low Impact
Comments

Beginning Tuesday, June 2nd, Sisemore Rd at the Bull Springs Bridge will be closed to allow for construction of the Sisemore Rd Bridge Rehabilitation project. The road closure will be in effect for the duration of the project and is anticipated to be completed by September 18, 2020. Road users should utilize the marked detour route via Collins Rd and Couch Market Rd to avoid the project area.  

The project will include concrete repair, drainage improvements, strengthening, and other rehabilitation work on the historic Bull Springs Bridge, which was originally constructed in 1914. The project will continue the service life of the structure while maintaining and restoring the structure's historic nature and appearance. The $499,000 project will be constructed by the County's contractor, Marcum & Sons, LLC. 

Please visit deschutes.org/news for current project information.

Public Contact
Cody Smith
Deschutes County Road Department
Phone: (541) 322-7113
Email: cody.smith@deschutes.org
Event Id
649
Updated
5/29/2020 9:44 AM

Sisemore Rd Bridge

Construction - Closed
Comments

Beginning Tuesday, June 2nd, Sisemore Rd at the Bull Springs Bridge will be closed to allow for construction of the Sisemore Rd Bridge Rehabilitation project. The road closure will be in effect for the duration of the project and is anticipated to be completed by September 18, 2020. Road users should utilize the marked detour route via Collins Rd and Couch Market Rd to avoid the project area.  

The project will include concrete repair, drainage improvements, strengthening, and other rehabilitation work on the historic Bull Springs Bridge, which was originally constructed in 1914. The project will continue the service life of the structure while maintaining and restoring the structure's historic nature and appearance. The $499,000 project will be constructed by the County's contractor, Marcum & Sons, LLC. 

Please visit deschutes.org/news for current project information.

Public Contact
Cody Smith
Deschutes County Road Department
Phone: (541) 322-7113
Email: cody.smith@deschutes.org
Event Id
648
Updated
5/29/2020 9:44 AM

E Pine Street from NB I-5 Ramps to near Bear Creek Bridge

Construction - Low Impact
Direction Impacted
Both
Comments

Occasional night work will be performed from 7PM to 6AM. Expect minor delays during striping of travel lanes and final project work. Watch for temporary lane changes and construction workers.

Public Contact
Construction Engineer
Jackson County Roads
Phone: (541) 774-8184
Email: jcroadsadmin@jacksoncounty.org
Event Id
694
Updated
7/02/2020 9:59 AM

Intersection of Corey Road and Foothill Road

Construction - No Impact
Comments

Use caution at intersection.

Public Contact
Construction Manager
Jackson County Roads
Phone: (541) 774-8184
Email: roadsinfo@jacksoncounty.org
Event Id
651
Updated
7/02/2020 9:52 AM

Elder Mill Bridge over Trail Creek

Construction - Low Impact
Direction Impacted
Both
Comments

Bridge reconstruction beginning 7/6/20. Expect longer delays during daytime work periods. Bridge will be temporarily configured to one-lane with traffic controlled at both ends of project throughout the duration of the project. Expected completion is late 2020.

Public Contact
Construction Engineer
Jackson County Roads
Phone: (541) 774-8184
Email: jcroadsadmin@jacksoncounty.org
Event Id
760
Updated
6/23/2020 9:59 AM

Lynx Hollow Milepost 3.9

Construction - Moderate Impact
Comments

A single-lane bypass road will be available while a culvert is being replaced. Vehicles are expected to yield ahead to one-way traffic when using the bypass. Expect minimal delays.

Public Contact
Devon Ashbridge
Lane County Government
Phone: (541) 682-4526
Email: publicinformation@lanecountyor.gov
Event Id
745
Updated
6/12/2020 1:15 PM

Tanglewood Ct SE from 49th Av to Cul-de-sac

Construction - Closed
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline, Inc

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
721
Updated
7/07/2020 9:04 AM

Springdale Ct SE from Elkhorn Dr to Cul-de-sac

Construction - Closed
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
720
Updated
7/07/2020 9:04 AM

Shenandoah Dr SE from Shawnee Dr to Pennsylvania Av

Construction - Closed
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
718
Updated
7/07/2020 9:03 AM

Munkers St SE from Munkers Ct to Meadowlawn Dr

Construction - Closed
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
716
Updated
7/07/2020 9:03 AM

Munkers Ct SE from Cul-de-sac to Cul-de-sac

Construction - Closed
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
715
Updated
7/07/2020 9:03 AM

Morgan Av NE from End to Auburn Rd

Construction - Closed
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
714
Updated
7/07/2020 9:03 AM

Indian Ct SE from Buffalo Dr to Cul-de-sac

Construction - Closed
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline, Inc

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
726
Updated
7/07/2020 9:02 AM

Glenwood Lp NE

Construction - Closed
Comments

Slurry Seal


Contractor: Blackline, Inc

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
762
Updated
7/07/2020 9:02 AM

Fontana Ct SE from 49th Av to Cul-de-sac

Construction - Closed
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline, Inc

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
713
Updated
7/07/2020 9:01 AM

Babcock Wy SE from 46th Pl to 47th Pl

Construction - Closed
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
710
Updated
7/07/2020 9:00 AM

47th Pl SE from Babcock Wy to Pennsylvania Av

Construction - Closed
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
709
Updated
7/07/2020 9:00 AM

36th Av NE from Monroe Av to Salem City Limit

Construction - Closed
Comments

Slurry Seal


Contractor: Blackline, Inc

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
706
Updated
7/07/2020 9:00 AM

North Fork Rd SE from St Hy 22 to End of Pavement

Construction - High Impact
Direction Impacted
Both
Comments

North Fork & Gates Hill Rd Double Chip Seal


Federal Land Access Program funds have been awarded for Marion County crews to construct a double chip seal on North Fork and Gates Hill Roads.  Weather dependent.


Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
743
Updated
7/06/2020 3:19 PM

Feller Rd NE from Butteville Rd to Boones Ferry Rd

Construction - High Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving, shoulder rock


Contractor: RL Houck

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
702
Updated
7/06/2020 11:13 AM

Gates Hill Rd SE from St Hy 22 to North Fork Rd

Construction - No Impact
Direction Impacted
Both
Comments

North Fork & Gates Hill Rd Double Chip Seal


Federal Land Access Program funds have been awarded for Marion County crews to construct a double chip seal on North Fork and Gates Hill Roads.  Weather dependent.

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
744
Updated
7/01/2020 4:28 PM

Boones Ferry Rd NE from Crosby Rd to Broadacres Rd

Construction - Low Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving, shoulder rock


Contractor: RL Houck

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
698
Updated
7/01/2020 4:26 PM

Elkhorn Ct SE from Pennsylvania Av to Cul-de-sac

Construction - Low Impact
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline, Inc

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
725
Updated
6/23/2020 11:46 AM

46th Pl SE from Pennsylvania Av to Babcock Wy

Construction - No Impact
Direction Impacted
Both
Comments

Slurry Seal


Contractor: Blackline, Inc

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
723
Updated
6/23/2020 11:45 AM

Burntwood Ct SE from 49th Av to Cul-de-sac

Construction - No Impact
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline, Inc

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
724
Updated
6/23/2020 11:45 AM

Shores St NE from Center St to Salem City Limit

Construction - Low Impact
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
719
Updated
6/23/2020 11:43 AM

Ochoco Ct SE from Elkhorn Dr to Cul-de-sac

Construction - Low Impact
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
717
Updated
6/23/2020 11:43 AM

Chinook Ct SE from Shenandoah Dr to Cul-de-sacs - both

Construction - Low Impact
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
712
Updated
6/23/2020 11:41 AM

Buckboard Ct SE from Pennsylvania Av to Cul-de-sac

Construction - Low Impact
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
711
Updated
6/23/2020 11:41 AM

April Ct NE from Clarmar Dr to Cul-de-sac

Construction - Low Impact
Direction Impacted
Both
Comments

Slurry Seal


Contractor:  Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
708
Updated
6/23/2020 11:40 AM

Clarmar Dr NE from Auburn Rd to Center St

Construction - Low Impact
Direction Impacted
Both
Comments

Slurry Seal


Contractor: Blackline

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
707
Updated
6/23/2020 11:40 AM

45th Avenue NE from Silverton Road to Ward Drive

Construction - Moderate Impact
Direction Impacted
Both
Comments

Construction of sidewalks and bike lanes on 45th Avenue NE. Included in the project will be ADA improvements, an upgrade to the stormwater system, and a turn lane at Fire Protection Way.  Contractor:  Carter & Co.

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
696
Updated
6/11/2020 7:14 AM

Oak St from Central Av to Sorbin Av

Construction - No Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving and shoulder rock for the City of Gates.


Contractor:  Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
737
Updated
6/09/2020 3:04 PM

Louisa Dr from Central Av to Dead End

Construction - No Impact
Comments

Asphalt repairs, paving and shoulder rock for the City of Gates.


Contractor:  Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
736
Updated
6/09/2020 3:03 PM

Dogwood Dr from Louisa Dr to End of Pavement

Construction - No Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving and shoulder rock for the City of Gates.


Contractor:  Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
735
Updated
6/09/2020 2:58 PM

River Rd SE from St Hy 22 to NW Alder St

Construction - No Impact
Comments

Asphalt repairs, paving and shoulder rock.


Contractor:  Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
734
Updated
6/09/2020 2:52 PM

Golf Club Rd SE 200' north and south of Bridge 47C208

Construction - No Impact
Direction Impacted
Both
Comments

Mill and pave.


Contractor:  Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
733
Updated
6/09/2020 2:48 PM

Fern Ridge Rd SE from Siegmund Rd to St Hy 22

Construction - No Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving and shoulder rock.


Contractor:  Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
732
Updated
6/09/2020 2:43 PM

Willamette Av from Rogue Av to Deschutes Dr

Construction - Low Impact
Comments

Mill and pave for City of Stayton.


Contractor:  Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
731
Updated
6/09/2020 2:34 PM

Deschutes Dr from Wilco Rd to Rogue Av

Construction - No Impact
Direction Impacted
Both
Comments

Mill and pave for City of Stayton.


Contractor:  Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
730
Updated
6/09/2020 2:33 PM

Rogue Av from Stayton Rd to Deschutes Dr

Construction - No Impact
Direction Impacted
Both
Comments

Mill and pave for City of Stayton.


Contractor: Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
729
Updated
6/09/2020 2:32 PM

Mill Creek Rd SE from Marion Rd to Aumsville City Limit

Construction - No Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving, shoulder rock


Contractor: Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
728
Updated
6/09/2020 2:07 PM

70th Av SE from Marion/Shaff Rd to Mill Creek Rd

Construction - No Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving, shoulder rock


Contractor: Salem Road & Driveway

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
727
Updated
6/09/2020 2:00 PM

Waconda Rd from Wheatland Rd to River Rd

Construction - No Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving, shoulder rock


Contractor: RL Houck

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
705
Updated
6/09/2020 10:52 AM

French Prairie Rd from River Rd to St Hy 219

Construction - No Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving, shoulder rock


Contractor: RL Houck

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
703
Updated
6/09/2020 10:21 AM

St Louis Rd from French Prairie Rd to Gervais City Limit

Construction - No Impact
Direction Impacted
Both
Comments

Asphalt repairs, paving, shoulder rock


Contractor: RL Houck

Public Contact
Jill Ogden
Marion County Public Works
Phone: (503) 365-3152
Email: jogden@co.marion.or.us
Event Id
704
Updated
6/09/2020 10:21 AM

Salmonberry Bridge Weight Restriction

Vehicle Restriction - Moderate Impact
Comments

Salmonberry Bridge is load rated at 14 tons for all vehicles.

Public Contact
Gregory Cickavage
Tillamook County Public Works
Phone: (503) 842-3419
Email: gcickvav@co.tillamook.or.us
Event Id
751
Updated
6/16/2020 3:57 PM

Cape Meares Loop Road - Closure

Hazard - Closed
Comments

Historic Landslide has closed Cape Meares Loop Road until further notice.


Public Contact
Gregory Cickavage
Tillamook County Public Works
Phone: (503) 842-3419
Email: gcickvav@co.tillamook.or.us
Event Id
750
Updated
6/16/2020 3:54 PM

Old Wheeler-Mohler Road Closure

Hazard - Closed
Comments

A portion of Old Wheeler-Mohler Road is closed due to a landslide. Will remain closed until repairs can be made.

Public Contact
Gregory Cickavage
Tillamook County Public Works
Phone: (503) 842-3419
Email: gcickvav@co.tillamook.or.us
Event Id
663
Updated
6/16/2020 3:52 PM

Savage Road - One Lane Closure

Hazard - Moderate Impact
Comments

Potential Slide area.

Public Contact
Gregory Cickavage
Tillamook County Public Works
Phone: (503) 842-3419
Email: gcickvav@co.tillamook.or.us
Event Id
749
Updated
6/16/2020 3:46 PM

Big Trout Bridge Weight Restriction

Vehicle Restriction - High Impact
Comments

Big Trout Bridge has been load rated at 3 tons for all vehicles, until repairs can be made.

Public Contact
Gregory Cickavage
Tillamook County Public Works
Phone: (503) 842-3419
Email: gcickvav@co.tillamook.or.us
Event Id
662
Updated
6/04/2020 4:39 PM

Cape Meares Loop Road - Gate Closure

Hazard - Closed
Comments

Cape Meares Loop Road is closed at this point due to landslide.No opening date determined.

Public Contact
Gregory Cickavage
Tillamook County Public Works
Phone: (503) 842-3419
Email: gcickvav@co.tillamook.or.us
Event Id
657
Updated
6/04/2020 12:31 PM

Jenck Road - Bridge Construction Road Closure @ MP 0.7

Construction - Closed
Comments

Construction Scheduled to begin June 22nd and extend to March 2021

Public Contact
Ron Newton
Tillamook County Public Works
Phone: (503) 842-3419
Email: rnewton@co.tillamook.or.us
Event Id
690
Updated
6/04/2020 12:17 PM

East Beaver Creek Road - Bridge Construction With Traffic Bypass @ MP 1.8

Construction - Moderate Impact
Comments

Construction anticipated to begin in late August and extend through March 2021

Public Contact
Ron Newton
Tillamook County Public Works
Phone: (503) 842-3419
Email: rnewton@co.tillamook.or.us
Event Id
689
Updated
6/04/2020 12:16 PM

Miami-Foley Road - Bridge Construction @ MP 4 with Traffic Bypass

Construction - Moderate Impact
Comments

Traffic Bypass - Expect Delays and Slow Construction Speed

Public Contact
Ron Newton
Tillamook County Public Works
Phone: (503) 842-3419
Email: rnewton@co.tillamook.or.us
Event Id
691
Updated
6/04/2020 12:16 PM

Elwert and Kruger Roads at Sunset Boulevard

Construction - Closed
Comments

Access is closed between Elwert and Kruger roads and Highway 99W at Sunset Boulevard.

Public Contact
Heather Sturgill
Washington County
Phone: (503) 846-7822
Email: heather_sturgill@co.washington.or.us
Event Id
611
Updated
6/29/2020 11:22 AM

SW Scholls Ferry Road

Construction - Low Impact
Comments

Willamette Water Supply pipeline construction. Reduced speed construction zone.

Public Contact
Marlys Mock
Willamette Water Supply Program
Phone: (503) 941-4570
Email: marlys@tvwd.org
Event Id
513
Updated
11/25/2019 10:45 AM

N Broadway between NE 2nd Ave and N Wheeler Ave

Construction - Low Impact
Comments

Project Description: This project will conduct pavement exploration and utility work in the I-5 Rose Quarter Improvement Project area including nearby local streets between NE Multnomah Street and NE Lloyd Boulevard.

Traffic Impacts: There will be temporary nighttime (9 p.m. to 5 a.m.) partial lane closures on N Broadway between NE 2nd Ave and N Wheeler Ave and on N Vancouver Ave between N Broadway and N Weidler on July 6th and 7th. There will also be periodic short-term flaggers and shoulder closures on local roads.

Project website: www.i5RoseQuarter.org

Public Contact
I-5 Rose Quarter Admin
I-5 Rose Quarter
Phone: (503) 470-3127
Email: info@I5RoseQuarter.org
Event Id
768
Updated
6/30/2020 1:03 PM

N Vancouver Ave between N Broadway and N Weidler

Construction - Low Impact
Comments

Project Description: This project will conduct pavement exploration and utility work in the I-5 Rose Quarter Improvement Project area including nearby local streets between NE Multnomah Street and NE Lloyd Boulevard.

Traffic Impacts: There will be temporary nighttime (9 p.m. to 5 a.m.) partial lane closures on N Broadway between NE 2nd Ave and N Wheeler Ave and on N Vancouver Ave between N Broadway and N Weidler on July 6th and 7th. There will also be periodic short-term flaggers and shoulder closures on local roads.

Project website: www.i5RoseQuarter.org

Public Contact
I-5 Rose Quarter Admin
I-5 Rose Quarter
Phone: (503) 470-3127
Email: info@I5RoseQuarter.org
Event Id
769
Updated
6/30/2020 1:03 PM