Statewide Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

I-105: EB MP 0.89 to 9.97
I-105, Eugene

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 6:06 AM

I-105: EB MP 1.21
I-105, Eugene

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 7:05 AM

I-205: NB MP 0 to 8.82
I-205, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/13/2026 2:35 PM

I-205: NB MP 0 to 8.82
I-205, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 2:35 PM

I-205: NB MP 0 to 8.82
I-205, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 2:31 PM

I-205: NB MP 1.2 to 8.82
I-205, 1 mile North of Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 9:59 AM

I-205: SB MP 8.8 to 9.3
I-205, OR 99E

Construction Work
Estimated delay under 20 minutes
Comments
• Traffic Impacts: Lane and ramp closures in Oregon City and West Linn. • Nighttime ramp closures: o I-205 northbound to OR99E (Exit 9 NB) Monday through Thursday from 10:00 pm to 5:00 am. o OR43 to I-205 northbound Monday through Tuesday from 10:00 pm to 5:00 am. o I-205 Southbound to OR43 (Exit 8 SB) Monday through Thursday from 10:00 pm to 5:00 am. • Nighttime lane closures: o I-205 northbound Monday and Tuesday from 10:00 pm to 5:00 am. o I-205 southbound Wednesday and Thursday from 10:00 pm to 5:00 am. o OR 99E Northbound Lanes Monday and Tuesday 10:00 pm to 5:00 am. • Flagging: o Main St Monday through Saturday 7:00 am to 5:30 pm. <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
Last Updated
5/19/2026 11:34 AM

I-205: NB MP 9
I-205, OR 99E

Construction Work
No to Minimum Delay
Off Ramp
Comments
Road construction will have the off ramp closed at Exit 9 . Use caution and watch for workers. Ramps Affected.
Last Updated
4/27/2026 10:41 PM

I-205: NB MP 16.6 to 24.5
I-205, Intersection with SE Johnson Creek Blvd

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/04/2026 3:13 PM

I-205: NB MP 23 to 12
I-205, NE Prescott St

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22772)
Last Updated
4/16/2026 10:44 AM

I-205: SB MP 24 to 16
I-205, Portland

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:20 PM

I-205: SB MP 24.8 to 16
I-205, Oregon Washington Border

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:29 PM

I-405: SB MP 0.37
I-405, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 2:43 PM

I-405: NB MP 2.2 to 2.1
I-405, Intersection with US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/13/2026 2:31 PM

I-405: NB MP 2.2 to 2.1
I-405, Intersection with US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 9:59 AM

I-405: SB MP 2.2 to 2.1
I-405, Intersection with US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:27 PM

I-405: SB MP 3.29
I-405, Intersection with US30

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 2:35 PM

I-5: NB MP 57 to 61
I-5, Grants Pass

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/20/2026 7:58 PM

I-5: NB MP 58.18 to 66.7
I-5, Intersection with Pacific Highway ORE99

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane and shoulder closures Sunday – Friday from 7 a.m. – 7 p.m. <!--Links Start Here--> [Link to additional information](https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2Fprojects%2Fpages%2Fproject-details.aspx%3Fproject%3D21674&data=05%7C02%7CCarter.B.HARPER%40odot.oregon.gov%7C317a6bfac3c14ad58b8808de0b344b86%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C638960516398910346%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=k%2FDlSc6c62l%2F5z4iMoJ%2FdoDe40RmykdT3DPFi%2BolSjY%3D&reserved=0)
Last Updated
5/21/2026 5:02 PM

I-5: SB MP 68
I-5, 8 miles South of Wolf Creek

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) , Shoulder
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/05/2026 10:09 PM

I-5: NB MP 70
I-5, 6 miles South of Wolf Creek

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
5/22/2026 5:42 AM

I-5: NB MP 103
I-5, 5 miles North of Canyonville

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 10:55 AM

I-5: SB MP 140 to 136
I-5, 4 miles North of Sutherlin

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/21/2026 10:37 PM

I-5: NB MP 168 to 135
I-5, 6 miles South of Cottage Grove

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/08/2026 2:33 PM

I-5: NB MP 174 to 209
I-5, Cottage Grove

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 5:57 AM

I-5: SB MP 176 to 169
I-5, 2 miles North of Cottage Grove

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Construction starts April 26, 2026, expect: Single lane closures, 7:00 P.M. to 8:00 A.M. Exit 172 and 174 ramp closures with detours as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22938)
Last Updated
5/21/2026 4:29 AM

I-5: NB MP 209 to 174
I-5, 14 miles North of Intersection with Beltline Highway

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 6:20 AM

I-5: NB MP 210 to 244
I-5, 15 miles North of Intersection with Beltline Highway

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:35 AM

I-5: SB MP 244 to 209
I-5, 10 miles South of Intersection with ORE22, in Salem

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:35 AM

I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
5/01/2026 8:32 PM

I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
5/01/2026 8:32 PM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Ramps Affected. Southbound Commercial Street on ramp will be closed will be 5/7/26 at 6 am to 5/9/26 6 am. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
5/07/2026 10:37 AM

I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
5/01/2026 8:33 PM

I-5: NB MP 253.89 to 259
I-5, Intersection with ORE22, in Salem

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 12:39 PM

I-5: NB MP 260 to 281
I-5, 6 miles North of Intersection with ORE22, in Salem

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 4:07 PM

I-5: NB MP 265 to 254
I-5, 7 miles South of Woodburn

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 6:46 PM

I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
Last Updated
5/22/2026 2:45 AM

I-5: NB MP 291.95
I-5, Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 12:02 PM

I-5: NB MP 293.49 to 300
I-5, 1 mile North of Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:32 PM

I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd

Construction Work
No to Minimum Delay
Comments
No traffic impacts. ODOT is installing RealTime Variable Advisory Speed (VAS) signs along a busy stretch of Interstate 5 through south Portland from the Ross Island Bridge to Terwilliger Boulevard. Realtime VAS signs give drivers notice to slow down before they reach a problem area — improving traffic flow and helping to reduce rear-end crashes and congestion. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
Last Updated
4/15/2026 4:11 PM

I-5: NB MP 299.8 to 299.9
I-5, 1 mile North of I-405 South Interchange

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 2:35 PM

I-5: SB MP 301.85 to 301.72
I-5, I-405 North Interchange

Construction Work
No to Minimum Delay
Comments
Intermittent nighttime lane closures on I-5 SB from the Convention Center to Burnside from 9 p.m. to 6 a.m. weather permitting. No detours required. We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5 completing a seismic retrofit, extending an existing merging lane on SB I-5, and constructing a new sign structure. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
Last Updated
4/03/2026 4:28 PM

I-5: SB MP 303.08 to 300.28
I-5, 1 mile South of Portland, Intersection with Going St

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/15/2026 11:57 AM

I-5: SB MP 308 to 301
I-5, Oregon Washington Border

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 3:01 PM

I-5: SB MP 308 to 301
I-5, Oregon Washington Border

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 11:40 AM

I-84: WB MP 0 to 16
I-84, Interstate 5

Construction Work
No to Minimum Delay
Comments
Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/10/2026 3:19 PM

I-84: EB MP 0 to 16
I-84, Interstate 5

Construction Work
No to Minimum Delay
Comments
Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/10/2026 3:31 PM

I-84: EB MP 0 to 9.7
I-84, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/08/2026 3:02 PM

I-84: EB MP 10 to 17
I-84, Portland, Intersection with 122nd Ave

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 2:01 PM

I-84: WB MP 17 to 9.7
I-84, Troutdale

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder
Comments
Road maintenance operations will have the WB right shoulder closed in a moving operation. Prepare to slow or move over for worker safety.
Last Updated
5/22/2026 8:34 AM

I-84: WB MP 18
I-84, 1 mile East of Troutdale

Construction Work
No to Minimum Delay
Comments
Daytime periodic lane closures on Jordan Road, with flaggers directing traffic. We're building a new multi-use path parallel to Jordan Road (near I-84 at Exit 18) from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/10/2026 3:21 PM

I-84: EB MP 18 to 64
I-84, 1 mile East of Troutdale

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 12:46 PM

I-84: EB MP 37 to 38
I-84, 6 miles East of Multnomah Falls

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) Median , 1 Lane
Comments
Road work has the EB left lane closed at mile post 37. The onramp from Warrendale to EB is closed. Prepare to slow or move over for worker safety. Ramps Affected.
Last Updated
3/01/2026 2:11 PM

I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls

Construction Work
Estimated delay under 20 minutes
Comments
Expect EB and WB lane closures on I-84 at McCord Creek BR. with one lane open each direction. Traffic revisions in place. Frontage Rd onramp closed. We are preparing to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale in 2025-2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
Last Updated
4/15/2026 5:59 PM

I-84: WB MP 38.5 to 37.5
I-84, 7 miles West of Cascade Locks

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane
Comments
Road work has the WB left lane closed at mile post 38.5. Prepare to slow or move over for worker safety.
Last Updated
3/01/2026 12:56 PM

I-84: EB MP 42 to 64
I-84, 3 miles West of Cascade Locks

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 12:09 PM

I-84: WB MP 85 to 69
I-84, The Dalles

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 10:00 AM

I-84: EB MP 87 to 138.9
I-84, The Dalles

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures 24 hours per day, 7 days per week. Watch for speed reduction throughout workzone(s). Use caution, prepare to slow.
Last Updated
5/18/2026 1:24 AM

I-84: EB MP 159.3
I-84, 5 miles West of Boardman

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. No work week of 5/18/26. Expect upcoming closure of northbound Tower Road bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22880)
Last Updated
5/18/2026 1:41 AM

I-84: WB MP 167.73 to 177
US730, Intersection with Columbia River Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 2:25 PM

I-84: EB MP 193 to 216
I-84, 16 miles West of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 12:10 PM

I-84: EB MP 216 to 193
I-84, 7 miles East of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 4:08 PM

I-84: EB MP 216 to 193
I-84, 7 miles East of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 3:45 PM

I-84: EB MP 217.77 to 238
I-84, 9 miles East of Pendleton

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
5/15/2026 8:54 AM

I-84: EB MP 221.5
I-84, 13 miles East of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 8:32 AM

I-84: WB MP 222.5 to 216
I-84, 14 miles East of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 12:59 PM

I-84: EB MP 238
I-84, 21 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 4:00 PM

I-84: WB MP 249
I-84, 10 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 4:00 PM

I-84: EB MP 249.25 to 259.3
I-84, 10 miles West of La Grande

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect single lane closures for striping operations. Watch for wet paint, use caution and prepare to slow.
Last Updated
5/21/2026 5:04 PM

I-84: WB MP 251 to 235
I-84, 8 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 5:34 PM

I-84: EB MP 261 to 263
I-84, La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:42 PM

I-84: WB MP 261 to 263
I-84, La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:42 PM

I-84: EB MP 263 to 265
I-84, 2 miles East of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:19 PM

I-84: EB MP 270.4 to 274
I-84, 9 miles East of La Grande

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/21/2026 10:36 AM

I-84: WB MP 285 to 293
I-84, 1 mile West of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 9:54 AM

I-84: EB MP 285 to 290
I-84, 1 mile West of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 3:25 PM

I-84: EB MP 285 to 293
I-84, 1 mile West of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 9:54 AM

I-84: EB MP 290 to 296
I-84, 4 miles East of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 3:50 PM

I-84: EB MP 304
I-84, Intersection with Whitney Highway ORE7

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 4:18 PM

I-84: EB MP 338 to 344
I-84, 8 miles West of Huntington

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/12/2026 7:58 AM

I-84: EB MP 352.05 to 368.16
I-84, Baker - Malheur County Line

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Crews will be onsite continuing work. All traffic has transitioned to the eastbound side of the freeway. Expect possible single lane, shoulder, on and off ramp closures throughout work zone(s). Follow traffic signs, be prepared to slow and use caution while passing through work zone(s).
Last Updated
5/20/2026 9:19 PM

I-84: WB MP 372 to 371
I-84, 5 miles West of Ontario

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
5/22/2026 9:08 AM

US101: MP 0 to 37
US101, Oregon - Washington Border

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 11:49 AM

US101: MP 26 to 36
US101, 4 miles North of Cannon Beach

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 10:20 AM

US101: MP 28.8 to 31.27
US101, Cannon Beach

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/01/2026 8:37 PM

US101: MP 35 to 21
US101, 5 miles South of Cannon Beach

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 12:23 PM

US101: MP 112.35 to 121.44
US101, Lincoln City

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect nighttime lane closures and delays for ADA curb ramp construction. No lane closures will occur over the weekend. Some night work may occur as needed. From N 34th Street to SW 51st Street / SE 51st Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
5/01/2026 8:40 PM

US101: MP 127.61
US101, Depoe Bay

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday. Most lane closures will occur during nighttime hours, with a few exceptions that will happen during the day between the hours of 7AM and 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
Last Updated
5/01/2026 8:37 PM

US101: MP 182 to 185
US101, 7 miles North of Florence

Maintenance Work
No to Minimum Delay
Comments
Utility work is causing minimal delay to traffic. Use caution. Tree trimming operations.
Last Updated
5/20/2026 4:51 PM

US101: MP 190 to 199
US101, Intersection with Florence - Eugene Highway ORE126

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:25 AM

US101: MP 190.89 to 191.11
US101, Florence

Information
No to Minimum Delay
Comments
A bridge lift is creating minimal delay to traffic. Use caution.
Last Updated
5/22/2026 9:28 AM

US101: MP 205 to 229
US101, 4 miles North of Gardiner

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 5:57 AM

US101: NB MP 236 to 236.5
US101, North Bend

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Lane closure causing minimal delay to traffic. Use caution.
Last Updated
1/17/2026 1:13 PM

US101: NB MP 239.5 to 235.09
US101, 2 miles South of Coos Bay

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 6:43 AM

US101: MP 243 to 199
US101, 1 mile North of Intersection with Coos Bay - Roseburg Highway ORE42

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 3:04 PM

US101: MP 243 to 261
US101, 1 mile North of Intersection with Coos Bay - Roseburg Highway ORE42

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 1:24 PM

US101: NB MP 244 to 240.38
US101, Intersection with Coos Bay - Roseburg Highway ORE42

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 8:50 AM

US101: MP 254 to 261
US101, 10 miles South of Intersection with Coos Bay - Roseburg Highway ORE42

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 12:54 PM

US101: MP 275 to 300
US101, Bandon

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 10:25 AM

US101: MP 312
US101, 12 miles South of Port Orford

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/21/2026 4:57 PM

US101: MP 327.4 to 329.5
US101, Wedderburn

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:57 PM

US101: MP 354.8 to 359.3
US101, Brookings

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:57 PM

US101B: MP 0 to 7
US101B, Intersection with Fort Stevens Highway

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:23 PM

US101B: NB MP 0.15 to 29
ORE202, Intersection with Oregon Coast Highway US101

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:04 PM

US199: MP 14 to 41
US199, 2 miles South of Wonder

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for daytime lane and shoulder closures in the work zone, Monday-Thursday. Flaggers and pilot cars will provide traffic control. Expect delays of up to 20 minutes.
Last Updated
5/21/2026 5:04 PM

US20: MP 1.75
US20, Albany

Construction Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
6/17/2026 6:00:00 AM
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Work is currently scheduled from 6 a.m. to 4 p.m. on 6/17/2026.
Last Updated
5/11/2026 10:22 AM

US20: MP 1.82 to 2.8
US20, N.E. Purcell Blvd. (Bend)

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22442)
Last Updated
5/18/2026 1:27 AM

US20: NB MP 14.7
US20, Tumalo

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:21 PM

US20: NB MP 14.7
US20, Tumalo

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:42 PM

US20: NB MP 84 to 84.06
ORE99W, Intersection with Corvallis - Newport Highway US20

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-corvallis)
Last Updated
3/30/2026 6:21 PM

US20: MP 92.29 to 92.7
ORE126, Sisters

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect nightly single lane closures with flaggers throughout work zone Monday - Thursday, pm to 7am. Use caution, prepare to stop.
Last Updated
5/18/2026 1:35 AM

US26: EB MP 0 to 21
US26, Intersection with Oregon Coast Highway US101

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 9:34 AM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8:00 a.m. to 5:00 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. • SE 174 Avenue will close south of SE Powell Blvd. April 19 – 26. Signed detours will be available. Possible nighttime work with closures. Travelers can expect congestion during construction. Alternate routes are available. Flaggers may be directing traffic.
Last Updated
4/19/2026 8:42 AM

US26: MP 8 to 0
US26, 1 mile West of Necanicum

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 8:45 AM

US26: MP 16 to 26.1
US26, 10 miles North of Prineville

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/08/2026 8:48 AM

US26: MP 49 to 98
US26, 17 miles West of Mitchell

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/15/2026 11:56 AM

US26: NB MP 71.5 to 87.4
US26, Warm Springs Indian Reservation

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
5/18/2026 3:50 PM

US26: MP 190 to 231
US26, 15 miles South of Prairie City

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 12:05 PM

US26: MP 191 to 231
US26, Intersection with Whitney Highway ORE7

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 12:09 PM

US26: MP 198 to 191
US26, 14 miles North of Unity

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 8:32 AM

US30: EB MP 0 to 6.6
US30, Intersection with Columbia River Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:31 PM

US30: EB MP 2.81 to 3.61
US30, Pendleton

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be onsite to continue work on an ADA Curb Ramp project. Use caution, obey all signs while passing through the work zone.
Last Updated
5/20/2026 1:48 AM

US30: WB MP 6.49 to 0
US30, Umatilla Indian Reservation

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:30 PM

US30: MP 9.24 to 18.37
US30, Portland

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:50 PM

US30: MP 70 to 85
US30, Columbia - Clatsop County Line

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 3:42 PM

US30: MP 70 to 18
US30, Columbia - Clatsop County Line

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 4:24 PM

US30: MP 96 to 85
US30, Astoria

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 11:49 AM

US30: EB MP 98.45 to 100
US30, Astoria

Maintenance Work
No to Minimum Delay
Comments
Utility work is causing minimal delay to traffic. Use caution.
Last Updated
4/27/2026 7:46 AM

US30: MP 99 to 99.34
US30, Astoria

Maintenance Work
No to Minimum Delay
Comments
Utility work is causing minimal delay to traffic. Use caution.
Last Updated
4/27/2026 7:47 AM

US30: MP 99.15 to 99.05
US30, Astoria

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Utility work is occurring. Prepare to slow. NW Natural Utility Work.
Last Updated
4/29/2026 7:43 AM

US30BY: WB MP 0.25 to 0.26
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Project Description: This project restores the bridge on NW Bridge Ave. northwest of the St. Johns Bridge, connecting to U.S. 30 <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21704)
Last Updated
4/19/2026 8:43 AM

US30BY: MP 6.14 to 9.21
US30BP, 1 mile East of Intersection with Pacific Highway I-5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:27 PM

US395: MP 1.57 to 24
US395, Intersection with Old Oregon Trail Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:29 AM

US395: MP 4.33 to 6.03
US395, Hermiston

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite conducting work along side the highway. Traffic control devices will be in place while work is being performed. Exercise caution and obey all traffic control signs while passing through the work zone(s). <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23430)
Last Updated
5/20/2026 1:47 AM

US395: MP 27 to 40
US395, 12 miles South of Pilot Rock

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:53 PM

US395: MP 37 to 44
US395, 22 miles South of Pilot Rock

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:30 PM

US395: MP 73.2
US395, 16 miles North of Long Creek

Information
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder
Comments
Highway erosion is causing minimal delay to traffic. Use caution.
Last Updated
5/18/2026 6:28 AM

US395: MP 90 to 70
US395, 1 mile South of Long Creek

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:39 PM

US395: MP 145 to 157
US395, 2 miles South of Lakeview

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 12:57 AM

US730: EB MP 168 to 203
US730, Intersection with Columbia River Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:50 PM

US97: MP 114.56 to 116.56
US97, 1 mile North of Terrebonne

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Beginning Monday, April 27 at 7am, the Lower Bridge Way intersection at U.S. 97 will be closed to all traffic. There will be no access to or from Lower Bridge Way at U.S. 97, but U.S. 97 will remain open. Follow posted detours. Access to 11th Street will be closed on the north end of Terrebonne, use Central Avenue. Access to 11th St at south end of Terrebonne will be limited, use Smith Rock Way, Central Avenue and C Street. Prepare to slow, use caution, follow detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21162)
Last Updated
5/18/2026 1:25 AM

US97: MP 119 to 124
US97, 3 miles North of Redmond

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 8:44 AM

US97: NB MP 135.98 to 140.06
US97, Intersection with McKenzie - Bend Highway US20

Construction Work
No to Minimum Delay
Off Ramp
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Ramps Affected. Crews may be onsite for shoulder work. Expect shoulder as well as on and off ramp closures. Use caution, prepare to slow.
Last Updated
5/18/2026 1:33 AM

ORE10: SB MP 1.44 to 7.65
ORE99W, I-405 South Interchange

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:33 PM

ORE103: MP 0 to 9
ORE103, Intersection with Nehalem Highway ORE202

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:02 AM

ORE104: MP 0 to 6
ORE104, Fort Stevens State Park

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:23 PM

ORE126: EB MP 3.93 to 7.11
ORE126, Springfield

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-springfield)
Last Updated
5/01/2026 8:35 PM

ORE126: MP 16 to 15
ORE126, Prineville

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Utility work is causing minimal delay to traffic. Use caution.
Last Updated
5/22/2026 6:08 AM

ORE126: MP 16 to 55
ORE126, Prineville

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/08/2026 4:05 PM

ORE126: MP 45 to 52
ORE126, 1 mile West of Veneta

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:14 AM

ORE126: MP 47 to 0.02
ORE126, Veneta

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 4:29 AM

ORE126: MP 109.6 to 110.6
ORE126, 1 mile West of Redmond

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 9:32 AM

ORE126: MP 110.65 to 111.97
ORE126, Redmond

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures between 5th and 15th to construct new ADA ramps and enhance signal operations. Various corners will be closed to pedestrian traffic during this time. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
Last Updated
5/18/2026 1:25 AM

ORE126B: WB MP 1.3 to 1.5
ORE126B, Springfield

Maintenance Work
Estimated delay under 20 minutes
Comments
Bridge work is occurring. Prepare to slow. Week of the May 4th the contractor will be doing single lane closures at night from 7 PM - 5 AM. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21762)
Last Updated
5/01/2026 8:39 PM

ORE138: MP 0.5 to 1.4
ORE138, Roseburg

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/21/2026 5:00 PM

ORE138: MP 19 to 21
ORE138, 2 miles East of Glide

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/21/2026 9:49 AM

ORE138: MP 19 to 21
ORE138, 5 miles North of Sutherlin

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
5/22/2026 7:42 AM

ORE138: MP 26 to 0
ORE138, 9 miles East of Glide

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/15/2026 9:37 AM

ORE138: MP 26
ORE138, 9 miles East of Glide

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 5:40 AM

ORE140: MP 54 to 61
ORE140, Bly

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/04/2026 2:17 PM

ORE140: MP 95 to 85
ORE140, 1 mile West of Lakeview

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 12:15 PM

ORE141: MP 3.8 to 4.44
ORE141, Tigard

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: No impacts. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647)
Last Updated
10/19/2025 6:14 AM

ORE141: MP 7.07 to 3.3
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
Last Updated
6/08/2025 6:59 AM

ORE141: MP 7.07 to 5.01
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
Last Updated
11/09/2025 5:54 PM

ORE18B: MP 2 to 2.67
ORE18B, Willamina

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
Last Updated
5/01/2026 8:37 PM

ORE18B: MP 5.94 to 7.6
ORE18B, Sheridan

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
Last Updated
5/18/2026 11:22 AM

ORE19: MP 117 to 105
ORE19, 8 miles North of Intersection with US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:28 PM

ORE202: MP 29 to 0.15
ORE202, Jewell

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:02 AM

ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution. Bridge construction is occurring. Prepare to slow. Watch for workers. 3/11/26 - 10/28/26: MP 38.5 to MP 38.63 (Bridge structure ID: 03113A) portable traffic signal in place with 24-hour lane closure. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23117)
Last Updated
5/13/2026 5:20 AM

ORE202: MP 45 to 27
ORE202, 1 mile North of Mist

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 3:11 PM

ORE203: MP 6 to 7
ORE203, 6 miles South of Union

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:55 PM

ORE203: MP 9 to 10
ORE203, 2 miles North of Hot Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 8:08 AM

ORE206: MP 73 to 54
ORE206, Intersection with Heppner - Spray Highway ORE207

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 4:27 PM

ORE206: MP 73.3 to 54.85
ORE206, Intersection with Heppner - Spray Highway ORE207

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:32 PM

ORE207: MP 0 to 5
ORE207, Intersection with Heppner Highway ORE74

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 3:29 PM

ORE207: MP 0 to 20
ORE207, Intersection with Heppner Highway ORE74

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 3:29 PM

ORE207: MP 0 to 24
ORE207, Intersection with Wasco - Heppner Highway ORE206

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 4:19 PM

ORE207: MP 0 to 3
ORE207, Intersection with Wasco - Heppner Highway ORE206

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 3:34 PM

ORE207: MP 1 to 16
ORE207, 1 mile South of Intersection with John Day Highway ORE19

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/15/2026 4:05 PM

ORE207: MP 3.5 to 0
ORE207, 4 miles East of Lexington

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 8:24 AM

ORE207: MP 7 to 20
ORE207, 7 miles East of Lexington

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 9:12 AM

ORE207: MP 24 to 36
ORE207, 15 miles South of Hardman

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:44 PM

ORE207: MP 35 to 25
ORE207, 6 miles North of Intersection with John Day Highway ORE19

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:01 PM

ORE207: MP 40.96 to 24
ORE207, Intersection with John Day Highway ORE19

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 2:23 PM

ORE211: MP 11.8
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Lane shifts and sidewalk closures expected. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
Last Updated
9/28/2025 8:36 AM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
5/05/2026 4:46 PM

ORE217: SB MP 0 to 5.9
ORE217, US 26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 2:32 PM

ORE219: MP 18.35 to 20.8
ORE219, Newberg

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
5/01/2026 8:39 PM

ORE22: MP 11.79
ORE22, 12 miles East of Intersection with Salmon River Highway ORE18

Maintenance Work
No to Minimum Delay
Comments
Utility work is causing minimal delay to traffic. Use caution.
Last Updated
5/22/2026 8:33 AM

ORE22: WB MP 17 to 15.34
ORE22, 8 miles West of Salem

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 4:24 PM

ORE22: MP 21 to 24.07
ORE22, 4 miles West of Salem

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
Last Updated
5/01/2026 8:40 PM

ORE22: MP 30
ORE22, Mill City

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 10:27 AM

ORE223: MP 2.13 to 4.28
ORE223, Dallas

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
5/01/2026 8:33 PM

ORE224: EB MP 0 to 2.7
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
4/17/2025 3:08 PM

ORE224: MP 8.16 to 49.97
ORE224, 2 miles West of Tong Road near Damascus

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 2:33 PM

ORE224: MP 36 to 37
ORE224, 13 miles East of Estacada

Construction Work
No to Minimum Delay
Comments
No traffic impacts expected. Project Description: Repairs are being made on OR 224 at milepost 36.7 (approximately 10 miles east of Estacada) after a winter storm event in December.
Last Updated
4/10/2026 2:53 PM

ORE234: MP 14.66 to 15.37
ORE234, 3 miles West of Intersection with Crater Lake Highway ORE62

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Sunken pavement; use caution. Crews will return in the spring to complete repairs and install safety features. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M25033)
Last Updated
3/09/2026 10:41 AM

ORE237: MP 31.54 to 32.15
ORE237, North Powder

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be on site prepping, forming, pouring, milling, paving and working on landscape. Use caution, prepare to slow, obey all traffic signs throughout work zone(s).
Last Updated
5/20/2026 1:50 AM

ORE240: MP 11.04 to 11.26
ORE240, Newberg

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
3/30/2026 6:34 PM

ORE241: EB MP 0 to 15
ORE241, Intersection with Oregon Coast Highway US101

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 11:10 AM

ORE241: MP 3.5 to 3.8
ORE241, 3 miles East of Coos Bay

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution.
Last Updated
5/21/2026 4:56 PM

ORE242: MP 61.91 to 84
ORE242, 7 miles East of Intersection with McKenzie Highway ORE126

Information
Seasonal Closure
Comments
The highway is closed for the season. Use alternate route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/regions/pages/mckenzie-highway.aspx)
Last Updated
5/20/2026 12:40 PM

ORE245: MP 0 to 21
ORE245, Intersection with John Day Highway US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:00 AM

ORE31: MP 29 to 45
ORE31, 18 miles North of Silver Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 3:51 PM

ORE31: MP 60 to 61
ORE31, 9 miles North of Summer Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 7:05 PM

ORE31: MP 62 to 70
ORE31, 7 miles North of Summer Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 6:31 PM

ORE31: MP 82 to 90
ORE31, 13 miles South of Summer Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/04/2026 3:07 PM

ORE31: MP 82 to 89
ORE31, 13 miles South of Summer Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 1:25 PM

ORE331: MP 0 to 4.84
ORE331, Intersection with Oregon - Washington Highway ORE11

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:55 PM

ORE331: SB MP 4.84 to 0
ORE331, Intersection with Oregon Trail Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:55 PM

ORE334: MP 0 to 18.12
ORE334, Intersection with Pendleton - Cold Springs Highway ORE37

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 2:32 PM

ORE335: MP 0 to 9.79
ORE335, Helix

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 3:18 PM

ORE36: MP 7 to 47
ORE36, 1 mile West of Swisshome

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/22/2026 12:56 AM

ORE36: MP 46 to 51
ORE36, 2 miles West of Cheshire

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 10:28 PM

ORE36: MP 46 to 0.01
ORE36, 2 miles West of Cheshire

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 5:04 AM

ORE37: MP 0.88 to 14
ORE37, Intersection with Columbia River Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 11:37 AM

ORE37: MP 30.7 to 13.2
ORE37, Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 12:42 PM

ORE37: MP 30.75 to 13.25
ORE37, Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:47 PM

ORE38: MP 36 to 0
ORE38, Elkton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 11:07 AM

ORE402: MP 21 to 0
ORE402, 7 miles East of Monument

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:30 PM

ORE402: MP 23 to 33
ORE402, 9 miles East of Monument

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 3:38 PM

ORE402: MP 27 to 34
ORE402, 8 miles West of Long Creek

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:30 AM

ORE413: MP 11.03 to 11.45
ORE413, Intersection with Pine Creek Highway

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
3/24/2026 1:09 PM

ORE42: EB MP 0 to 9.7
ORE42, Intersection with Oregon Coast Highway US101

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/28/2026 5:41 PM

ORE42: WB MP 0 to 21
ORE42, Intersection with Oregon Coast Highway US101

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 7:51 AM

ORE42: MP 13
ORE42, Coquille

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 9:01 AM

ORE42: MP 20.8 to 21.9
ORE42, Myrtle Point

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/21/2026 4:53 PM

ORE42: MP 21 to 0
ORE42, Myrtle Point

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 4:09 PM

ORE42: MP 36.1
ORE42, 1 mile West of Remote

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:56 PM

ORE42: MP 72 to 77
ORE42, 1 mile West of Winston

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:57 PM

ORE42S: MP 7
ORE42S, 4 miles West of Riverton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 10:11 AM

ORE43: SB MP 0 to 11.55
ORE43, Intersection with Mount Hood Highway US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:33 PM

ORE47: MP 0 to 11
ORE47, Intersection with Lower Columbia River Highway US30

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 2:46 PM

ORE47: MP 46.14
ORE202, Intersection with Mist - Clatskanie Highway ORE110

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
5/26/2026 8:00:00 AM
Lanes Affected
(Northbound) 1 Lane
Comments
Utility work is occurring. Prepare to slow.
Last Updated
5/20/2026 9:02 AM

ORE47: MP 46.14 to 57
ORE202, Intersection with Mist - Clatskanie Highway ORE110

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 1:08 PM

ORE47: MP 47.12 to 47.2
ORE47, 1 mile South of Messing Creek Bridge

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
5/26/2026 8:00:00 AM
Lanes Affected
(Northbound) 1 Lane
Comments
Utility work is occurring. Prepare to slow.
Last Updated
5/20/2026 9:02 AM

ORE51: MP 5.81 to 6.34
ORE51, Independence

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
5/01/2026 8:34 PM

ORE53: MP 0.04 to 11
ORE53, Intersection with Sunset Highway US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:46 PM

ORE540: MP 0.79 to 0.9
ORE540, North Bend

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:53 PM

ORE540: SB MP 4 to 10
ORE540, 3 miles South of North Bend

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 7:33 AM

ORE542: MP 18 to 18.91
ORE542, Powers

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 9:34 AM

ORE569: EB MP 4.5 to 13
ORE569, Eugene

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 6:05 AM

ORE58: MP 42 to 44
ORE58, 3 miles West of McCredie Springs

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Expect daytime single lane closures with an automatic flagger assistant device helping direct traffic east of Oakridge near milepost 43, construction noise and delays up to 20 minutes. Work is currently scheduled to be Monday through Friday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22557)
Last Updated
1/04/2026 12:26 PM

ORE58: MP 48.7 to 69.52

Snow Zone
Informational only
Affected Area
Willamette Pass Summit (Elev. 5128') - East of McCreadie Springs to Odell Lake
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
Last Updated
5/11/2026 10:23 AM

ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is planned to begin in February. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737)
Last Updated
5/01/2026 8:36 PM

ORE6: MP 49 to 51
ORE6, Intersection with Nehalem Highway ORE47

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/01/2026 8:32 PM

ORE62: MP 35.41
ORE62, 15 miles East of Shady Cove

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane traffic controlled by an automated flagging system. Most delays will be less than 5-10 minutes. Crews working Monday – Friday, with closures in place 24/7 until Fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22629)
Last Updated
5/21/2026 5:01 PM

ORE7: MP 50 to 34
ORE7, Baker City

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 9:46 AM

ORE74: MP 46 to 82
ORE74, Heppner

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/04/2026 4:03 PM

ORE74: MP 72 to 82
ORE74, 11 miles North of Intersection with Pendleton - John Day Highway US395

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:44 PM

ORE74: MP 83 to 73
ORE74, Intersection with Pendleton - John Day Highway US395

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 3:11 PM

ORE8: MP 1.55
ORE8, 1 mile East of Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 4:15 PM

ORE8: MP 2.24
ORE8, 1 mile East of Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 9:15 AM

ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
Last Updated
12/09/2025 8:27 AM

ORE8: MP 3.82 to 3.51
ORE8, 1 mile West of Highway 217

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Nighttime lane closures (8:00 p.m. to 5:30 a.m.) on Canyon Road, Monday through Friday. • Travelers can expect nighttime flagging at Rose Biggi Avenue and Cedar Hills Thursday and Friday nights. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18758)
Last Updated
4/19/2026 8:44 AM

ORE8: MP 5 to 1
ORE8, 2 miles West of Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 9:12 AM

ORE8: WB MP 13.82 to 17.67
ORE8, Hillsboro

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No traffic impacts. Project Description: This safety improvement project in three locations on OR 8 in Hillsboro and Forest Grove includes new sidewalks, an enhanced pedestrian crosswalk, new lighting and upgraded traffic signals. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21608)
Last Updated
5/10/2026 6:17 AM

ORE86: MP 3 to 70
ORE86, Intersection with Old Oregon Trail Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 4:48 PM

ORE86: MP 34.01 to 70.58
ORE86, 7 miles West of Richland

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite replacing guardrail at various locations. Expect daytime lane closures with flagging.
Last Updated
5/18/2026 1:44 AM

ORE86: MP 40.64
ORE86, Richland

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Bridge work is occurring. Expect delays due to possible single lane closures with flaggers or signal control. Use caution, prepare to slow.
Last Updated
4/21/2026 1:05 AM

ORE86: MP 42.01 to 42.4
ORE86, Richland

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
3/24/2026 1:11 PM

ORE86: MP 56.47
ORE86, 14 miles West of Oregon - Idaho Border

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Bridge work is occurring. Expect delays due to possible single lane closures with flaggers or signal controls. Use caution, prepare to slow.
Last Updated
4/21/2026 1:15 AM

ORE99: MP 10.2 to 11.25
ORE99, 1 mile North of Phoenix

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. The week of April 26, expect single lane traffic through the construction area as the contractor begins paving. Expect intermittent lane closures through the work zone on OR 99, Monday through Friday.
Last Updated
5/21/2026 5:01 PM

ORE99: MP 14.42 to 16.09
ORE99, Cottage Grove

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-cottagegrove)
Last Updated
5/01/2026 8:35 PM

ORE99: EB MP 57 to 35
ORE38, Intersection with Pacific Highway I-5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/22/2026 5:21 AM

ORE99E: MP 40.75 to 40.81
ORE99E, Brooks

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/01/2026 8:37 PM

ORE99EB: MP 2 to 5
99EBus, Salem, Intersection with Hyacinth St NE (East)/Verda Ln (West)

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 3:28 PM

ORE99W: SB MP 4.4 to 4.45
ORE99W, 3 miles North of Tigard (north city limits)

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:30 PM

ORE99W: SB MP 4.45 to 4.65
ORE99W, 3 miles North of Tigard (north city limits)

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:50 PM

ORE99W: NB MP 23.23 to 24.49
ORE99W, Intersection with Hillsboro - Silverton Highway ORE214

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
5/01/2026 8:40 PM

ORE99W: NB MP 38.07 to 37.8
ORE99W, McMinnville

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22554)
Last Updated
5/22/2026 7:07 AM

ORE99W: MP 63.17 to 63.57
ORE99W, Monmouth

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
5/05/2026 6:56 AM

ORE99W: NB MP 84.17 to 86.31
ORE99W, Intersection with Corvallis - Newport Highway US20

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Work on the project has now begun. Expect night time lane closures Monday through Thursday nights from 7:00 PM to 6:00 AM. Expect some noise and short delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22785)
Last Updated
5/14/2026 10:36 AM

HWY100: MP 18 to 19.92
HWY100, 4 miles West of Ainsworth State Park

Construction Work
No to Minimum Delay
Comments
The east viaduct is opened. Periodic single-lane closures on the East Viaduct until 9 a.m. starting May 18. Use caution and watch for workers. Traffic Impacts: A section of the Historic Columbia River Highway/U.S. 30 between Multnomah Falls and the Oneonta Trailhead reopened Friday. Periodic lane closures expected until 9 a.m. each day. I-84 is open. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle, pedestrian or bicycle access to Multnomah Falls heading westbound on the Historic Highway from Exit 35. The Oneonta trailhead is open to hikers, with limited parking. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)
Last Updated
5/19/2026 11:36 AM