Northwest Oregon Road Conditions

Alerts!

US30BP, 2 miles West of Intersection with East Portland Highway I-205 MP 9; Closure with Detour
The highway is closed; a detour is in place. Use an alternate route.
Issued: 06/29/2015 6:21 pm

US30BP, 2 miles West of Intersection with East Portland Highway I-205 MP 9; Closure with Detour
Crash US-30 bypass at 60th. All lanes are closed. Local detour in place. Expect delays.
Updated: 06/29/2015 5:44 pm

ORE99W, Intersection with Pacific Highway I-5 MP -6 - -5; Closure with Detour
The southbound lanes of OR 99W (North Denver Avenue) will be closed until July 16, 2015 between North Victory Boulevard and North Argyle Street., Project Description: This project is rehabilitating and repaving the OR 99W (North Denver Avenue) bridge from North Victory Boulevard to North Argyle Street. The North Schmeer Road/Denver Avenue intersection and southbound ramp from North Victory Boulevard to North Denver Avenue will be realigned. The work is expected to be complete in the fall of 2015. Traffic Impacts: Travelers should expect limited lane closures and nighttime work on OR 99W and nearby streets as crews prepare for the next phase of work. The Columbia Slough Trail will be closed between Whitaker Road just west of North Denver Avenue for the 90 day closure. Detour signs are posted for bikes and pedestrians.
Updated: 06/12/2015 4:16 pm

US101B, 2 miles West of Astoria MP 5; Closure with Detour
The Lewis and Clark River Bridge will be closed starting December 1, 2014; a detour will be in place. Use an alternate route., The Lewis & Clark River Bridge is scheduled to be closed to facilitate construction activities starting December 1, 2014. This closure is anticipated to last until August 1, 2015. A detour route will be designated with signing during the length of the closure. The project is scheduled to be completed in November 2017.
Updated: 05/20/2015 5:25 pm

Road Conditions by Route

I-5 MP 244.49 to 244.91

Informational only; Commercial Vehicle Information
Details: I-5 MP 244 to MP 246 NB (south of Salem) Effective May 15, 2015, this section of I-5 northbound will be restricted to 12 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is June 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 250.15 to 251.76

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) 1 Lane
Comments: Expect night time closures with flaggers controlling two way traffic on Kuebler Boulevard Monday through Friday. Project Summary: The I-5 Kuebler Interchange Project will address the increasing congestion at the interchange by modifying the existing southbound off ramp, which will decrease the conflicts at Kuebler that have caused back-ups on I-5 southbound. The new ramp will meet modern standards and contain excess capacity. The project will also add a westbound to southbound I-5 loop on ramp and modify the eastbound to southbound I-5 on ramp.
Updated: 06/24/2015 12:21 pm

I-5 MP 271.5 to 272.2

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 06/29/2015 7:17 pm

I-5 MP 271.6 to 274.69

Informational only; Commercial Vehicle Information
Details: I-5 MP 271.35 to MP 276.01 NB & SB (Woodburn) Effective August 26, 2013, this section of I-5 southbound will be restricted to 17 feet 01 in. in height. Effective November 13, 2014, this section of I-5 northbound will be restricted to 16 feet 09 in. in height. In addition, the on- and off-ramps to/from I-5 northbound and southbound Exit 271 to OR214 and OR219 will be restricted to 16 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 16 feet 00 in. in width. Estimated date of completion is September 30, 2016.
Updated: 06/29/2015 7:00 pm

I-5 MP 283.11 to 284.88

Informational only; Commercial Vehicle Information
Details: I-5 MP 285 to MP 283 SB (Wilsonville) Effective July 24, 2015, this section of I-5 southbound will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 26, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 290.4

No to Minimum Delay; Construction Work
Comments: Expect periodic nighttime lane closures on the I-5 northbound truck lane at Southwest Barbur Boulevard from 8 p.m. to 5 a.m. Project Description: Construction is underway on a seismic retrofit project for five bridges along the Interstate 5 corridor between Portland’s South Waterfront district and the Tualatin River. Retrofitting the state’s older bridges to meet modern seismic specifications will help ensure I-5 would not be immobilized in the event Oregon experiences a powerful earthquake. Traffic Impacts: Motorists should exercise caution and slow down as they approach Marine Drive from North Frontage Road (heading west). Westbound I-84 traffic will be diverted from the temporary alignment on Wednesday, May 27 to the North Frontage Road before returning to I-84 at the far side of the interchange. This nighttime detour will be in place from 10 p.m. to 5 a.m.
Updated: 06/06/2015 03:12 am

I-5 MP 290.48

Informational only; Commercial Vehicle Information
Details: I-5 MP 290.48 (Lower Boones Ferry Rd crossing under I-5) - Lake Oswego Effective June 14, 2014, Lower Boones Ferry Rd crossing under I-5 will be intermittently closed between the hours of 10 PM & 7 AM. These closures are NOT on the I-5 mainline, and the Exit 290 ramps will remain open. Estimated date of completion is July 25, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 293.62

Informational only; Commercial Vehicle Information
Details: I-5 MP 293.62 NB (Truck Lane - Portland) Effective April 22, 2015, the I-5 northbound truck lane will be closed on Monday through Friday between the hours of 8 PM & 5 AM, and on Saturdays between the hours of 8 PM & 8 AM. When closed, truck traffic will be directed to remain on the I-5 northbound mainline. In addition, when open, the I-5 northbound truck lane will be restricted to 20 feet 00 in. in width. Estimated date of completion is June 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 294.03 to 300.94

Informational only; Commercial Vehicle Information
Details: I-5 MP 294 to MP 301 NB & SB (Portland) Effective May 14, 2015, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 10 PM & 8 AM. In addition, the height will be restricted to 14 feet 10 in. in height northbound, and 15 feet 00 in. in height southbound during the same time. Estimated date of completion is July 15, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 294.03 to 300.94

Informational only; Commercial Vehicle Information
Details: I-5 MP 301 to MP 294 SB ramps (Portland) Effective June 1, 2015, the following ramps will be intermittently closed between the hours of 8 PM & 9 AM: ramp from Harbor Dr to I-5 SB; I-5 SB Exit 299A to OR43 / Lake Oswego; ramp from Hood Ave to I-5 SB; I-5 SB Exit 297 to Terwilliger Blvd; I-5 SB Exit 296B to Multnomah Blvd; I-5 SB Exit 296A to Barbur Blvd; I-5 SB Exit 295 to Capitol Hwy; ramp from Capitol Hwy to I-5 SB. Estimated date of completion is July 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 294.05

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from Barbur Blvd (Portland) Effective April 22, 2015, the ramp from Barbur Blvd to I-5 northbound will be restricted to 23 feet 00 in. in width. Estimated date of completion is June 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 294.05 to 300.73

Informational only; Commercial Vehicle Information
Details: I-5 MP 294 to MP 301 NB ramps (Portland) Effective June 1, 2015, the following ramps will be intermittently closed between the hours of 8 PM & 9 AM: ramp from Barbur Blvd to I-5 NB (near Exit 294); I-5 NB Exit 295 to Taylors Ferry Rd; ramp from Capitol Hwy to I-5 NB; ramp from Spring Garden St to I-5 NB; I-5 NB Exit 297 to / from Terwilliger Blvd ; ramp from Multnomah Blvd to I-5 NB; I-5 NB Exit 298 to Corbett Ave; I-5 NB Exit 299A to / from OR43 / Macadam Ave. Estimated date of completion is August 10, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 294.21 to 305.44

Informational only; Construction Work
Lanes Affected: (Southbound) Median , All Lanes , Shoulder (Northbound) Median , All Lanes , Shoulder
Comments: Traffic Impacts: Expect single and double lane, shoulder, and ramp closures on I-5 Monday night through Saturday morning, from 8 p.m. to 6 a.m. Interstate 5 – Southwest Capitol Highway to North Lombard Street – Paving and Signs Project Description: The project will take place on Interstate 5 from Southwest Capitol Highway to North Lombard Street and will include: • Sign Replacement: Work is under way to begin replacing many of the green highway signs on I-5 from Southwest Corbett Avenue to North Lombard Street and on both decks of the Fremont Bridge (I-405) will be replaced. Existing signs will be updated to meet federal standards; new signs will feature more reflective materials and a less cluttered design, making them easier to read. • Paving: Starting this spring/summer*, about seven miles of I-5 between Southwest Capitol Highway and the Marquam Bridge will be repaved. The pavement, last replaced in 2004, is deteriorating and needs to be repaired. Transitions to on- and off-ramps will also be repaved and improvements will be made to several bridges. Traffic Impacts: • No work will take place from Thursday, July 2 to Sunday, July 5 during the Independence Day holiday weekend. • Shoulder and double lane closures on I-5 southbound (between mileposts 303 and 304), from Northeast Alberta to the Fremont Bridge) from 8 p.m. to 6 a.m. for sign replacement. • Expect nighttime single lane closures on I-5 from the Marquam Bridge to Southwest Capitol Highway between 8 p.m. and 5:30 a.m. Monday night through Thursday for preliminary paving work. • Expect daytime work on the shoulder of the northbound on-ramps at Southwest Capitol Highway, Spring Garden and Terwilliger Boulevard between 6 a.m. and 4 p.m. Monday through Thursday for electrical work.
Updated: 06/26/2015 4:19 pm

I-5 MP 295

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: The right lane is closed at Taylor's Ferry for road maintenance operations. Use caution.
Updated: 06/29/2015 8:25 pm

I-5 MP 298.24 to 306.12

Informational only; Commercial Vehicle Information
Details: I-5 MP 298 to MP 306 NB & SB (Portland) Effective February 9, 2015, this section of I-5 will be restricted to 15 feet 05 in. in height northbound, and 14 feet 06 in. in height southbound between the hours of 8 PM & 8 AM. Estimated date of completion is October 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 298.24 to 306.12

Informational only; Commercial Vehicle Information
Details: I-5 MP 298 to MP 306 NB & SB (Portland) Effective February 9, 2015, this section of I-5 will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 298.75

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 298 ramp to Corbett Ave (Portland) Effective March 2, 2015, the ramp from I-5 northbound Exit 298 to Corbett Ave will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 299.17

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 299A ramp to Macadam Ave (OR43) NB (Portland) Effective March 2, 2015, the ramp from I-5 northbound Exit 299A to Macadam Ave (OR43) northbound will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is June 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 299.19 to 303.08

Informational only; Commercial Vehicle Information
Details: I-5 SB MP 303.08 to MP 299.00 (Portland) Effective June 1, 2015, this section of I-5 will be intermittently closed between the hours of 10 PM & 8 AM. In addition, the following ramps will be intermittently closed during the same time: ramp from Greeley Avenue to I-5 southbound; ramp from I-405 northbound to I-5 southbound; ramps to / from I-5 southbound Exit 302A to Moda Center; I-5 southbound Exit 301 ramp to I-84 eastbound; I-84 southbound Exit 300B ramp to US26 / OR99E / OMSI / Oregon City; ramp from I-84 westbound to I-5 southbound; ramp from I-5 southbound to I-405 northbound; I-5 southbound Exit 299A ramp to OR43 southbound. Estimated date of completion is August 25, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 299.52

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 299B ramp to I-405 NB (Portland) Effective July 20, 2015, the ramp from I-5 northbound Exit 299B to I-405 northbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 24, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 299.52

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 299B ramp to I-405 NB and Naito Pkwy (Portland) Effective June 15, 2015, the ramp from I-5 northbound to I-405 northbound and Naito Pkwy will be intermittently closed between the hours of 10 PM & 8 AM. Estimated date of completion is August 15, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 299.9 to 300.08

Informational only; Commercial Vehicle Information
Details: I-5 MP 299.9 to MP 300.1 NB (Marquam Bridge - Portland) Effective June 15, 2015, this section of I-5 northbound will be intermittently closed between the hours of 10 PM & 8 AM. Estimated date of completion is August 15, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 300.26 to 300.36

Informational only; Commercial Vehicle Information
Details: I-5 MP 300.12 to MP 300.38 NB (Portland) Effective July 20, 2015, this section of I-5 northbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 24, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 300.271

Informational only; Commercial Vehicle Information
Details: I-5 SB ramp to I-405 NB (Portland) Effective July 20, 2015, the ramp from I-5 southbound to I-405 northbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 24, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 300.32 to 301.13

Informational only; Commercial Vehicle Information
Details: I-5 MP 300.32 to MP 301.13 NB (Portland) Effective June 19, 2015, this section of I-5 northbound will be intermittently closed on Friday nights between the hours of 10 PM & 5 AM. Estimated date of completion is August 1, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 300.66

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 300 ramp to I-84 EB (Portland) Effective June 19, 2015, the ramp from I-5 northbound Exit 300 to I-84 eastbound will be intermittently closed on Friday nights between the hours of 10 PM & 5 AM. Estimated date of completion is August 1, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 300.7 to 301.42

Informational only; Commercial Vehicle Information
Details: I-5 MP 301.44 to MP 300.44 SB (Portland) Effective July 20, 2015, this section of I-5 southbound will be restricted to 13 feet 00 in. in width, and 14 feet 06 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 24, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 301.7

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 300B to Morrison Bridge Westbound - City Center Effective May 3, 2015, the I-5 southbound Exit 300B off-ramp to the Morrison Bridge Westbound - City Center will be closed per the following schedule: Closed Sunday, May 3, 2015, between 7 AM & 7 PM; Closed Sunday, June 14, 2015, between 7 AM & 7 PM; Closed Sunday, July 12, 2015, between 7 AM & 7 PM. Estimated date of completion is July 12, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 301.7

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 300B ramp to US26 / OR99E (Portland) Effective March 2, 2015, the ramp from I-5 southbound Exit 300B to US26 / OR99E will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 302.011

Informational only; Commercial Vehicle Information
Details: I-5 SB ramp from Weidler St / Wheeler Ave / Winning Way (Portland) Effective March 2, 2015, the ramp from Weidler St / Wheeler Ave / Winning Way to I-5 southbound will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 302.68

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from Broadway St (Portland) Effective March 2, 2015, the ramp from Broadway St to I-5 northbound will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 304.47

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 303 ramp to Alberta St / Swan Island (Portland) Effective March 2, 2015, the ramp from I-5 southbound Exit 303 to Alberta St / Swan Island will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 305.12

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 304 ramp to Rosa Parks Way (Portland) Effective March 2, 2015, the ramp from I-5 southbound Exit 304 to Rosa Parks Way will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 305.22

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 305A ramp to Lombard St (US30 Bypass) EB (Portland) Effective March 2, 2015, the ramp from I-5 northbound Exit 305A to Lombard St (US30 Bypass) eastbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is June 30, 2015.
Updated: 06/29/2015 7:00 pm

I-5 MP 305.41

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 305B ramp to Lombard St (US30 Bypass) WB (Portland) Effective March 2, 2015, the ramp from I-5 northbound Exit 305B to Lombard St (US30 Bypass) westbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is June 30, 2015.
Updated: 06/29/2015 7:00 pm

I-84 MP .37

Informational only; Commercial Vehicle Information
Details: I-84 WB ramp to City Center / OMSI / Morrison Bridge (Portland) Effective March 2, 2015, the ramp from I-84 westbound to City Center / OMSI / Morrison Bridge will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. The ramp from I-84 WB to I-5 SB will remain open. Estimated date of completion is October 30, 2015.
Updated: 06/29/2015 7:00 pm

I-84 MP 16.66 to 17.37

Informational only; Commercial Vehicle Information
Details: I-84 MP 16.65 to MP 17.48 EB (Troutdale) Effective June 25, 2015, this section of I-84 eastbound will be closed between the hours of 10 PM & 5 AM. When closed, all traffic will be directed to take Exit 17 to the South Frontage Rd, and re-enter I-84 eastbound. Estimated date of completion is June 26, 2015.
Updated: 06/29/2015 7:00 pm

I-84 MP 16.9

Informational only; Commercial Vehicle Information
Details: Marine Dr SB crossing under I-84 (Troutdale) Effective June 26, 2015 at 10 PM, Marine Dr southbound crossing under I-84 will be closed. This closure is NOT on the I-84 mainline, and the I-84 eastbound and westbound Exit 17 ramps will remain open. Marine Dr will re-open by 5 AM on Monday, June 29, 2015.
Updated: 06/29/2015 7:00 pm

I-84 MP 17

No to Minimum Delay; Construction Work
Comments: Motorist should use caution as they approach Marine Drive from North Frontage. The right turn to Marine Drive has been shifted. Project Description: The project will widen Marine Drive between the two frontage roads to allow for two-way traffic. It will also replace the existing Interstate 84 overpass bridges at Marine Drive with a new bridge. The Marine Drive intersections at the Frontage Roads will also be improved. Traffic Impacts: Expect a nighttime closure of the eastbound off-ramp to Troutdale (exit 17) on Thursday, June 25 from 10 p.m. to 5 a.m. Friday, June 26. Eastbound I-84 traffic will follow a signed detour route onto the South Frontage Road (heading east). Marine Drive will be closed from North Frontage Road to South Frontage Road from Friday, June 25 from 10 p.m. to Monday, June 29 at 5 a.m. for demolition of the old eastbound structure. A signed detour will be in place. For more information: www.i-84TroutdaleExit17.org
Updated: 06/26/2015 4:30 pm

I-84 MP 62

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Westbound) 1 Lane , Shoulder
Comments: Police activity has the right lane closed at milepost 62 WB. Use caution and expect minor delays.
Last Updated: 06/29/2015 8:24 pm

I-205 MP 12.46

Informational only; Commercial Vehicle Information
Details: I-205 MP 12 to MP 14 NB & SB (Clackamas) Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is July 1, 2015.
Updated: 06/29/2015 7:00 pm

I-205 MP 21.12

Estimated delay under 20 minutes; Crash/Hazard
Lanes Affected: (Southbound) 1 Lane
Comments: A crash has the right lane closed at Glisan St. Use caution and expect delays.
Last Updated: 06/29/2015 6:47 pm

I-205 MP 23.47

Informational only; Commercial Vehicle Information
Details: I-205 SB on-ramp from US30 Bypass (Portland) Effective June 8, 2015, the ramp from US30 Bypass to I-205 southbound will be intermittently closed between the hours of 9 PM & 5:30 AM. Estimated date of completion is August 16, 2015.
Updated: 06/29/2015 7:00 pm

I-405 MP 0

Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 SB (Portland) Effective June 7, 2015, the ramp from I-405 southbound to I-5 southbound will be intermittently closed between the hours of 10 PM & 8 AM. Estimated date of completion is July 29, 2015.
Updated: 06/29/2015 7:00 pm

I-405 MP .47 to 2.12

Informational only; Commercial Vehicle Information
Details: I-405 MP 0.41 to MP 2.12 NB (Portland) Effective July 10, 2015, this section of I-405 northbound will be restricted to 17 feet 00 in. in width, and 15 feet 05 in. in height between the hours of 9 PM & 5 AM. Estimated date of completion is July 11, 2015.
Updated: 06/29/2015 7:00 pm

I-405 MP .77

Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 NB (Portland) Effective June 19, 2015, the ramp from I-405 southbound to I-5 northbound will be intermittently closed on Friday nights between the hours of 10 PM & 5 AM. Estimated date of completion is August 1, 2015.
Updated: 06/29/2015 7:00 pm

I-405 MP .77

Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 NB (Portland) Effective July 20, 2015, the ramp from I-405 southbound to I-5 northbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is July 24, 2015.
Updated: 06/29/2015 7:00 pm

I-405 MP .8

Informational only; Commercial Vehicle Information
Details: I-405 SB ramp from SW 5th Ave (Portland) Effective June 19, 2015, the ramp from SW 5th Ave to I-405 southbound will be intermittently closed on Friday nights between the hours of 10 PM & 5 AM. Estimated date of completion is August 1, 2015.
Updated: 06/29/2015 7:00 pm

ORE8 MP 11.28 to 14.66

Estimated delay under 20 minutes; Construction Work
Comments: Periodic daytime single lane closures on 10th Avenue (between Maple and Baseline), from 9 a.m. to 3 p.m. Monday through Friday, as well on Baseline. Project Description: ODOT and the City of Hillsboro are partnering on a paving and utility improvement project on Oregon Highway 8 – Tualatin Valley (TV) Highway/Baseline Street – between Southwest Minter Bridge Road and Southwest 331st Avenue. Work on TV Highway involves grinding, reconstructing, paving, and restriping; significantly upgrading the City’s water and storm water systems; improving more than 100 ADA ramps (accessible curb ramps); and repairing and paving the Dairy Creek Bridge. Traffic Impacts: Travelers should expect a continuous, double lane closure (right and center lane) on Baseline Street from 1st Avenue to Adams Avenue to reconstruct and repave the highway through Saturday morning, June 27. Flaggers are directing all traffic at the intersection of Baseline Street and 1st Avenue. Travelers should expect nighttime lane closures beginning Monday night, June 29 through Thursday morning, July 2 to finish most of the remaining paving work from 7 p.m. to 5:30 a.m. During the nighttime work, the following sections will be paved: • Baseline Street from 7th Avenue to 5th Avenue • Baseline Street from Adams Avenue to just beyond Dennis Avenue • A small section of Oak Street west of Dennis Avenue On Monday night June 29 from 7 p.m. to 5:30 a.m., flaggers will be controlling all directions of traffic at the intersection of Baseline Street and 7th Avenue. Access to Tuality Hospital will be maintained at all times. Paving work is weather dependent and will be rescheduled if it rains. • TriMet service on Baseline Street will be intermittently affected during this reconstruction work. Temporary bus stop closures will be communicated on www.TriMet.org and at the bus stops. • Driveways into and out of businesses and residences on Baseline Street will have access during the lane closures. There may be delays getting into/out of driveways if the contractor is actively working in front of the driveway. The contractor will be placing “business open” signs at the driveway entrances so customers know to patronize businesses. Please let us know if you have any questions or concerns/trouble with accessing your business or residence during this work. • Expect intermittent daytime lane closures from 9 a.m. to 3 p.m. on 10th Avenue from Baseline Street to Maple Street for electrical work.
Updated: 06/26/2015 4:47 pm

ORE8 MP 11.28 to 14.66

Informational only; Commercial Vehicle Information
Details: OR8 MP 11.28 to MP 14.67 EB & WB (Hillsboro) Effective June 11, 2015, this section of OR8 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is June 30, 2015.
Updated: 06/29/2015 7:00 pm

ORE8 MP 12.69

Estimated delay under 20 minutes; Maintenance Work
Comments: Flaggers are controlling the traffic at the intersections of SE 7th Ave. and SE 8th Ave. for road work, please use caution.
Updated: 06/29/2015 7:34 pm

ORE10 MP 1.48 to 1.5

Informational only; Commercial Vehicle Information
Details: OR10 (Beaverton-Hillsdale Hwy) MP 1.41 to MP 1.51 EB & WB (Beaverton) Effective March 16, 2015, this section of OR10 (Beaverton-Hillsdale Hwy) will be restricted to 9 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

ORE18 MP 2.13 to 2.67

Informational only; Commercial Vehicle Information
Details: OR18 Business MP 2.13 to MP 2.67 EB & WB (Willamina) Effective July 4, 2015, this section of OR18 Business will be closed between the hours of 6 PM & 7 PM for one day only.
Updated: 06/29/2015 7:00 pm

ORE18 MP 45.63

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Bridge work is occurring. Use caution. Expect minor delays
Updated: 06/29/2015 8:24 pm

ORE18 MP 51.57

Informational only; Commercial Vehicle Information
Details: OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 06/29/2015 7:00 pm

ORE22 MP 10.49

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 06/29/2015 7:00 pm

ORE22 MP 10.66

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 06/29/2015 7:00 pm

ORE22 MP 25.9 to 55

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. Paving project Sunday thru Wednesday nights, 6pm to 6am
Updated: 06/26/2015 08:25 am

ORE22 MP 28.5 to 32

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 06/29/2015 8:25 pm

ORE22 MP 30.03

Informational only; Commercial Vehicle Information
Details: Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Updated: 06/29/2015 7:00 pm

ORE43 MP .31

Informational only; Commercial Vehicle Information
Details: OR43 NB ramp to I-5 NB (Portland) Effective June 19, 2015, the ramp from OR43 northbound to I-5 northbound will be intermittently closed on Friday nights between the hours of 10 PM & 5 AM. Estimated date of completion is August 1, 2015.
Updated: 06/29/2015 7:00 pm

ORE43 MP .31

No to Minimum Delay; Construction Work
Comments: The I-5 bridge work over SW Hood Avenue in South Waterfront requires a 24-hour single lane closure on Hood Ave under the I-5 bridge. Project Description: Construction is underway on a seismic retrofit project for five bridges along the Interstate 5 corridor between Portland’s South Waterfront district and the Tualatin River. Retrofitting the state’s older bridges to meet modern seismic specifications will help ensure I-5 would not be immobilized in the event Oregon experiences a powerful earthquake. Traffic Impacts: Expect periodic lane closures on Southwest Hood Avenue in South Waterfront. All traffic on Southwest Hood Avenue can travel directly onto Southwest Bancroft Street without using the detour.
Updated: 05/23/2015 03:14 am

ORE43 MP .31

Informational only; Commercial Vehicle Information
Details: OR43 (Macadam Ave) NB ramp to I-5 NB (Portland) Effective June 15, 2015, the ramp from OR43 (Macadam Ave) northbound to I-5 northbound will be intermittently closed between the hours of 10 PM & 8 AM. Estimated date of completion is August 15, 2015.
Updated: 06/29/2015 7:00 pm

ORE43 MP 6.04 to 9.02

Informational only; Commercial Vehicle Information
Details: OR43 MP 6.04 to MP 9.02 NB & SB (West Linn) Effective October 15, 2014, this section of OR43 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is June 30, 2016.
Updated: 06/29/2015 7:00 pm

ORE43 MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 06/29/2015 7:00 pm

ORE47 MP 34.17 to 34.71

Informational only; Commercial Vehicle Information
Details: OR47 MP 34 to MP 35 NB & SB (Yamhill) Effective July 18, 2015, this section of OR47 will be closed between the hours of 10 AM & 11 AM for one day only.
Updated: 06/29/2015 7:00 pm

ORE51 MP 0 to 2.35

Informational only; Commercial Vehicle Information
Details: OR51 MP 0.00 to MP 2.35 EB & WB (Monmouth to Independence) Effective July 4, 2015, this section of OR51 will be closed between the hours of 11 AM & 3 PM for one day only.
Updated: 06/29/2015 7:00 pm

ORE53 MP 5.981

Informational only; Commercial Vehicle Information
Details: OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Updated: 06/29/2015 7:00 pm

ORE99 MP -5.5 to -4.75

Informational only; Commercial Vehicle Information
Details: OR99W (Denver Ave) MP -5.50 to MP -4.75 SB (Portland) Effective April 15, 2015, this section of OR99W (Denver Ave) SB will be closed at all hours. Estimated date of completion is July 14, 2015.
Updated: 06/29/2015 7:00 pm

ORE99 MP -5.45 to -4.75

Informational only; Commercial Vehicle Information
Details: OR99W (Denver Ave) MP -4.75 to MP -5.50 NB (Portland) Effective March 2, 2015, this section of OR99W (Denver Ave) NB will be restricted to 14 feet 00 in. in width per the following schedule: Monday through Friday between the hours of 8 PM & 6 AM; Saturday between the hours of 7 PM & 8 AM; Sunday between the hours of 7 PM & 9 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is July 14, 2015.
Updated: 06/29/2015 7:00 pm

ORE99 MP 10.3 to 10.71

Informational only; Commercial Vehicle Information
Details: OR99W MP 10.26 to MP 10.70 NB & SB (Tigard) Effective February 2, 2015, this section of OR99W will be restricted to 11 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is October 2, 2015.
Updated: 06/29/2015 7:00 pm

ORE99 MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.20 SB (Tualatin River Bridge - King City) OR99W southbound crossing Tualatin River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 06/29/2015 7:00 pm

ORE99 MP 12.2

Informational only; Commercial Vehicle Information
Details: OR99W MP 12.15 to MP 12.25 SB (Tualatin River Bridge - King City) Effective June 8, 2015, this section of OR99W southbound will be restricted to 13 feet 00 in. in width on Monday through Saturday between the hours of 6 AM & 2 PM. Estimated date of completion is September 30, 2015.
Updated: 06/29/2015 7:00 pm

ORE99 MP 20.23 to 21.86

Informational only; Commercial Vehicle Information
Details: OR99E MP 20 to MP 22 NB & SB (Canby) Effective December 1, 2014, this section of OR99E will be restricted to 10 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr after sunrise (NIGHTTIME). Estimated date of completion is June 30, 2015.
Updated: 06/29/2015 7:00 pm

ORE99 MP 21.86 to 24.95

Informational only; Commercial Vehicle Information
Details: OR99E MP 21.86 to MP 24.95 NB & SB (south of Canby) Effective May 26, 2015, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 8 AM & 8 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. In addition, effective June 8, 2015, this section of OR99E will be restricted to 12 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is August 28, 2015.
Updated: 06/29/2015 7:00 pm

ORE99 MP 24.67

Informational only; Commercial Vehicle Information
Details: OR99E MP 24.67 NB & SB (Pudding River Bridge - Aurora) Effective May 26, 2015, this section of OR99E will be restricted to 15 feet 03 in. in height in both directions of travel at all times. Estimated date of completion is August 28, 2015.
Updated: 06/29/2015 7:00 pm

ORE104 MP 4.62

Informational only; Commercial Vehicle Information
Details: OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Updated: 06/29/2015 7:00 pm

ORE120 MP .38

Informational only; Commercial Vehicle Information
Details: OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 06/29/2015 7:00 pm

ORE130 MP 3.23

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 06/29/2015 7:00 pm

ORE130 MP 3.6

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 06/29/2015 7:00 pm

ORE130 MP 3.82

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 06/29/2015 7:00 pm

ORE130 MP 4.15

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 06/29/2015 7:00 pm

ORE130 MP 4.76

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 06/29/2015 7:00 pm

ORE164 MP 5.49 to 6.12

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 5.49 to MP 6.12 (Jefferson) Effective July 18, 2015, this section of OR164 (Jefferson Hwy) will be closed between the hours of 11 AM & 12 noon for one day only.
Updated: 06/29/2015 7:00 pm

ORE164 MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 06/29/2015 7:00 pm

ORE194 MP 7.17 to 7.56

Informational only; Commercial Vehicle Information
Details: OR194 MP 7.17 to MP 7.56 EB & WB (Monmouth) Effective July 4, 2015, this section of OR194 will be closed between the hours of 11 AM & 3 PM for one day only.
Updated: 06/29/2015 7:00 pm

ORE210 MP 9.03 to 9.2

No to Minimum Delay; Construction Work
Comments: Oregon Highway 210 – Southwest Scholls Ferry Road – from Oregon Highway 217 to Southwest Cascade Avenue Project Description: This project will improve safety on Oregon Highway 210 (Southwest Scholls Ferry Road) from Oregon Highway 217 to Southwest Cascade Avenue. Project elements include adding a dedicated left turn signal for Southwest Cascade Avenue traffic turning onto Southwest Scholls Ferry Road, shielding traffic signals to reduce driver confusion, building a new sidewalk, bike lane and ADA (Americans with Disabilities Act) ramps and replacing lights on the OR 217 on- and off-ramps for Southwest Hall Boulevard and Southwest Scholls Ferry Road. Traffic Impacts: Travelers should expect periodic nighttime single lane closures at Southwest Cascade Avenue from 8 p.m. to 6 a.m. Monday through Wednesday, in both directions
Updated: 06/26/2015 5:04 pm

ORE210 MP 9.06 to 9.2

Informational only; Commercial Vehicle Information
Details: OR210 (Scholls Hwy) MP 9.02 to MP 9.21 EB & WB (Beaverton) Effective March 16, 2015, this section of OR210 (Scholls Hwy) will be restricted to 9 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

ORE212 MP 7.23 to 7.25

Estimated delay under 20 minutes; Construction Work
Comments: Travelers should expect shoulder closures on OR 224 and SE 135th Avenue as crews install new signs. Project Description: The project will improve safety at the intersection of Oregon Highway 224 (Clackamas Highway) and Southeast 135th Avenue by replacing the traffic light poles, adding left turn signals for vehicles traveling from Southeast 135th Avenue to OR 224, and adding street lights. The project will also build a new bus pullout east of the intersection, a new sidewalk along the south side of OR 224, after removing the hedge next to the soundwall, and sidewalk ramps on the corners. Traffic Impacts: No traffic impacts. This project is complete.
Updated: 05/16/2015 01:09 am

ORE213 MP 4.36 to 6.56

No to Minimum Delay; Construction Work
Comments: Travelers should be aware of changes to travel lanes during construction. Project Description: The Sunrise JTA (Oregon Jobs and Transportation Act) Project will address existing congestion and safety problems in the Oregon Highway 212/224 corridor by constructing a new road from Interstate 205 to Southeast 122nd Avenue. Major project elements include: • Constructing a new two-lane limited access highway (one lane each direction) from the Milwaukie Expressway (OR 224) at I-205 to Southeast 122nd Avenue at OR 212/224. • Constructing a new I-205 overcrossing that will connect 82nd Drive and 82nd Avenue. • Improving bicycle and pedestrian accommodations in the project area. • Improving the intersection of Southeast 122nd Avenue and OR 212/224. Traffic Impacts: Travelers should be aware of changes to travel lanes during construction. Interstate 205 • Single lane of I-205 northbound off-ramp (exit 13) to OR 224 (Milwaukie Expressway) will be continuously closed for up to 18 weeks during construction of a retaining wall. • Travelers in the OR 224 (Milwaukie Expressway) right turn lane to I-205 northbound on-ramp should expect periodic stops, as trucks enter and exit the excavation site for a new water quality detention pond. Travelers should expect to see trucks lined up on the shoulder of OR 224 while they wait to be loaded. Southeast 82nd Drive • At Southeast 82nd Drive, near the intersection of Southeast Herbert Court, the travel lanes may be shifted or reduced to one lane controlled by flaggers Monday through Thursday 7a.m. to 5 a.m. while the road is paved. Southeast Mather Road, Southeast Minuteman Way and Southeast Lawnfield • At Southeast Mather Road and Southeast Bordeaux Lane expect lane closures, with flaggers directing traffic, Monday through Thursday from 7 a.m. to 5 p.m. for installation of embankment material for the new OR 224 extension. • At Southwest Minuteman Way expect one way traffic controlled by flaggers Monday through Thursday from 7 a.m. to 5 p.m. for installation water quality manholes and striping • Southeast Lawnfield Road is permanently closed (between the Union Pacific Railroad crossing and Southeast 82nd Drive). A new extension of Southeast Minuteman Way connects Southeast Mather Road and Southeast Lawnfield Road. For more information: www.sunrisejta.org
Updated: 06/26/2015 5:10 pm

ORE213 MP 8.2 to 9.9

Estimated delay under 20 minutes; Construction Work
Comments: Construction work in place. Please use caution. This project will repave Southeast 82nd Avenue (OR 213) between Southeast King Road and the north end of the Mt. Scott Creek Bridge (near Southeast Sunnybrook Boulevard). Traffic Impacts: Expect nighttime single lane closures on OR 213 (Southeast 82nd Avenue) between Southeast King Road and Southeast Causey Avenue from 7 p.m. to 5:30 a.m. Sunday through Wednesday. Signalized intersections will be controlled with flaggers as needed. ODOT is partnering with law enforcement for extra presence in the highway construction zone. For more information: LMSC.82ndaveprojects.com or call the 24-hour noise hotline at (503) 412-2374.
Updated: 06/26/2015 5:05 pm

ORE213 MP 8.3 to 9.41

Informational only; Commercial Vehicle Information
Details: OR213 (82nd Ave) MP 8.30 to MP 9.65 NB & SB (Portland) Effective June 4, 2015, this section of OR213 (82nd Ave) will be restricted to 10 feet 00 in. in width on Monday to Friday nights between the hours of 7 PM & 5:30 AM. Estimated date of completion is July 30, 2015.
Updated: 06/29/2015 7:00 pm

ORE214 MP 36.63 to 37.87

Informational only; Commercial Vehicle Information
Details: OR214 EB & WB MP 36.24 to MP 37.87 (Woodburn) Effective August 26, 2013, OR214 between Willow Ave (west of I-5) and Settlemeier Ave (east of I-5) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2016.
Updated: 06/29/2015 7:00 pm

ORE217 MP 3.56

Informational only; Commercial Vehicle Information
Details: OR217 SB Exit 4A ramp to Hall Blvd (Tigard) Effective March 25, 2015, the ramp from OR217 southbound Exit 4A to Hall Blvd will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

ORE217 MP 3.81

Informational only; Commercial Vehicle Information
Details: OR217 NB on-ramp from OR210 / Scholls Ferry Rd (Tigard) Effective March 25, 2015, the ramp from OR210 / Scholls Ferry Rd to OR217 northbound intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

ORE217 MP 3.83

Informational only; Commercial Vehicle Information
Details: OR217 SB on-ramp from Hall Blvd (Tigard) Effective March 25, 2015, the ramp from Hall Blvd to OR217 southbound will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

ORE217 MP 4.12

Informational only; Commercial Vehicle Information
Details: OR217 SB Exit 4B ramp to OR210 / Scholls Ferry Rd (Tigard) Effective March 25, 2015, the ramp from OR217 southbound Exit 4B to OR210 / Scholls Ferry Rd will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

ORE217 MP 4.44

Informational only; Commercial Vehicle Information
Details: OR217 NB Exit 4 ramp to OR210 / Scholls Ferry Rd (Tigard) Effective March 25, 2015, the ramp from OR217 northbound Exit 4 to OR210 / Scholls Ferry Rd will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

ORE217 MP 4.51

Informational only; Commercial Vehicle Information
Details: OR217 SB on-ramp from OR210 / Scholls Ferry Rd (Tigard) Effective March 25, 2015, the ramp from OR210 / Scholls Ferry Rd to OR217 southbound will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

ORE219 MP 23.46

Informational only; Commercial Vehicle Information
Details: OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 06/29/2015 7:00 pm

ORE219 MP 28.04 to 28.29

Informational only; Commercial Vehicle Information
Details: OR219 MP 28.04 to MP 28.29 (St Paul) Effective July 4, 2015, this section of OR219 will be closed between the hours of 9:45 AM and 12 noon for one day only.
Updated: 06/29/2015 7:00 pm

ORE224 MP 11 to 12

Estimated delay under 20 minutes; Construction Work
Comments: Clackamas Highway Safety Project underway at SE 197th Avenue, use caution. This project will improve visibility for travelers, as well as make road conditions safer along OR 224 at Southeast 197th Avenue. The project will realign OR 224 to prevent crashes, remove trees and reuse them in stream restoration projects, and widen the shoulder to provide room for vehicle breakdowns and cyclists.
Updated: 06/15/2015 1:43 pm

ORE240 MP 5 to 9

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution.
Updated: 05/13/2015 2:37 pm

ORE99EB MP 4.8

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction is occurring in this area. Watch for pilot cars and expect minor delays.
Updated: 06/29/2015 8:12 pm

ORE99W MP -5.5 to -4.75

Closure with Detour; Construction Work
Comments: The southbound lanes of OR 99W (North Denver Avenue) will be closed until July 16, 2015 between North Victory Boulevard and North Argyle Street. Project Description: This project is rehabilitating and repaving the OR 99W (North Denver Avenue) bridge from North Victory Boulevard to North Argyle Street. The North Schmeer Road/Denver Avenue intersection and southbound ramp from North Victory Boulevard to North Denver Avenue will be realigned. The work is expected to be complete in the fall of 2015. Traffic Impacts: Travelers should expect limited lane closures and nighttime work on OR 99W and nearby streets as crews prepare for the next phase of work. The Columbia Slough Trail will be closed between Whitaker Road just west of North Denver Avenue for the 90 day closure. Detour signs are posted for bikes and pedestrians.
Updated: 06/12/2015 4:16 pm

ORE99W MP 10.36 to 10.71

Estimated delay under 20 minutes; Construction Work
Comments: Travelers can expect periodic daytime lane closures on SW Gaarde St and SW McDonald St. between 9 a.m. and 3 p.m. Night work Tuesday through Thursday. Project Description: The intersection improvement project on Oregon Highway 99 West, from the Southwest Gaarde Street/McDonald Street intersection to Bull Mountain Road in the City of Tigard, will include adding turn lanes on OR 99W, an additional southbound lane on OR 99W southbound and an additional lane on Southwest Gaarde Street and Southwest McDonald Street. Work should be complete by the end of 2015. Traffic Impacts: The construction crew is currently installing storm pipe, retaining walls, curbs and sidewalks, driveways, light pole foundations, signal pole foundations and paving along OR 99W, Southwest Gaarde Street and Southwest McDonald Street. Travelers can expect daytime and nighttime work this week, including an early morning (4:30 a.m.-7 a.m.) concrete pour on OR99W southbound. Weekday lane closures on Southwest Gaarde Street between 7 a.m. and 4 p.m. and shoulder work between 4 and 5 p.m. Travelers can expect daytime, weekday lane closures on Southwest McDonald Street between 9 a.m. and 3 p.m. and shoulder work between 7 to 9 a.m. and 3 to 5 p.m. Expect nighttime closures on OR99W between 8 p.m. and 6 a.m. • Flaggers will be present for traffic safety between 7 a.m. and 5 p.m. • Sidewalks on the west side of OR 99W and on the north side of Southwest Gaarde Street are closed, and are expected to reopen the week of July 6. • Business driveways on the west side of OR 99W and on the north side of Southwest Gaarde Street will be closed for concrete placement, but businesses will remain open and driveways will still be accessible. For more information: www.oregon.gov/ODOT/HWY/REGION1/Pages/GaardeMcDonald.aspx
Updated: 06/26/2015 5:00 pm

ORE99W MP 20

No to Minimum Delay; Crash/Hazard
Comments: Hazardous debris is causing no to minimum delays, use caution.
Last Updated: 06/29/2015 8:19 pm

ORE99E MP 8.81 to 8.6

Informational only; Construction Work
Comments: Limited traffic impacts as signal electrical work is completed from the roadway shoulder. Project Description: Construction is underway on a safety improvement project to reduce crashes, provide safer pedestrian crossings and improve visibility at the intersection of OR 99E (Southeast McLoughlin Boulevard) at Southeast Vineyard Road and north of Southeast Vineyard Road. The project is scheduled to be complete in summer 2015. Safety improvements include: • Installing a new traffic signal at the intersection of OR 99E (Southeast McLoughlin Boulevard) and Southeast Vineyard Road. • Installing a pedestrian island on OR 99E (Southeast McLoughlin Boulevard) north of Southeast Vineyard Road near the bus stop locations. • Installing a traffic separator north of Southeast Vineyard Road. • Removing existing pedestrian island on OR 99E (Southeast McLoughlin Boulevard), located south of Southeast Vineyard Road. • Installing ADA ramps at all corners of the intersection of OR 99E (Southeast McLoughlin Boulevard) and Southeast Vineyard Road. • Enhanced street recognition signage. • Improved lighting. Traffic Impacts: The traffic signals are in place and the project is complete. No more traffic impacts are expected.
Updated: 05/29/2015 10:33 pm

ORE99E MP 21.86 to 24.95

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 2 Lanes (Southbound) 2 Lanes
Comments: Construction is underway on a paving and safety improvement project to repave OR 99E from SW Berg Pkwy in Canby to just north of 2nd Street in Aurora. Project Description:The project will include bridge work, sidewalk ramp upgrades and pavement striping changes near Lone Elder Road. Traffic Impacts: Travelers should expect nighttime single lane closures in the two lane section of the highway (from the Top-O-Hill Restaurant to the Pudding River Bridge) from 8 p.m. to 6 a.m. Monday through Thursday as crews remove the existing pavement and repave, as well as begin work on the Pudding River Bridge. Flaggers will be in place, along with a pilot car, and travelers may experience up to 20 minute delays. ODOT is partnering with law enforcement for extra presence in the highway construction zone. For more information: www.Oregon.gov/ODOT/HWY/REGION1/Pages/OR99EBergto2nd.aspx or call the 24-hour noise hotline at (503) 412-2378.
Updated: 06/26/2015 4:57 pm

US20 MP 16.29 to 21.88

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Flaggers will be facilitating trucks entering and leaving the workzone. Expect occasional momentary delays. This project will accomplish movement of 2-3 million cubic yards of earthwork, landslide mitigation including placement of more than 400 ground anchors, construction of 70,000 feet of horizontal drains, erosion control, and landscaping.
Updated: 06/18/2015 4:44 pm

US20 MP 23.38

Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge - Eddyville) Effective May 19, 2006, the Yaquina River Bridge near Eddyville is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
Updated: 06/29/2015 7:00 pm

US26 MP 23.87 to 24.61

Informational only; Commercial Vehicle Information
Details: US26 MP 23.87 to MP 24.61 EB & WB (Sandy) Effective July 9, 2015, this section of US26 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 6:30 PM & 9:30 PM for one day only.
Updated: 06/29/2015 7:00 pm

US26 MP 49 to 56

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: 24-hour flagging on the west end of the project from 5 a.m. Monday to 10 a.m. Friday. Blasting will close the hwy 6:30-7:30 pm Monday, Tuesday & Thurs Construction of safety improvements to prevent severe and fatal crashes on U.S. 26 from east of Kiwanis Camp Road to east of the Mirror Lake Curves and preserve the highway to Oregon Highway 35 is underway on Mt. Hood. Work on the nearly eight mile stretch of U.S. 26 includes: • Paving between Silent Rock and OR 35. • Cutting back the slope along a 600 foot section at Map Curve to provide a 27 foot wide ditch for rocks to land away from the road. • Cutting back the rock slope east of the runaway truck ramp to east of the Mirror Lake trailhead. • Highway widening to install a median barrier. • Constructing a retaining wall to reduce impacts to existing trails from highway widening work. • Extending the westbound passing lanes for a total of about 1,400 feet. Traffic Impacts: K&E Excavating will work Monday through Thursday from sunrise to sunset. This week's work will require flagging throughout the three-mile project area and blasting on Monday and Tuesday. Hauling will also continue along Lolo Pass Road and Trillium Lake Road. Details include: U.S. 26 • Travelers should expect up to one hour closure of U.S. 26 from 6:30 to 7:30 p.m., Monday and Tuesday for rock blasting. This is subject to change due to site conditions and work progress. • Monday through Thursday during daylight hours, travelers will encounter traffic stops controlled by flaggers, with lane and shoulder closures from sunrise to sunset throughout the three-mile project area. Travelers should expect up to 20-minutes. • One lane will remain open in each direction for a nearly three-mile stretch of U.S. 26 from east of Kiwanis Camp Road to east of the Mirror Lake Curves. This lane closure will remain in place around-the-clock until October 31. Lolo Pass Road • Hauling will continue along Lolo Pass Road and take place Monday through Thursday from sunrise to sunset. People in the area should use caution and expect truck traffic. Trillium Lake Road • Hauling will continue along Trillium Lake Road and take place Monday through Thursday from sunrise to sunset. Road 31 • Road 31 will be closed to all traffic around-the-clock Monday through Thursday. Laurel Hill Trail • Trail closures as crews work on nearby slopes. For more information: www.US26MtHoodSafety.org
Updated: 06/26/2015 4:39 pm

US26 MP 50.12 to 57.2

Informational only; Commercial Vehicle Information
Details: US26 MP 47.20 to MP 57.45 EB & WB (Government Camp) Beginning April 1, 2015, this section of US26 will be closed for approximately 30 minutes per the following schedule: In April, May, September, and October: 30-minute closures may occur Mon/Tues/Thurs nights between the hours of 5:30 PM & 6:30 PM. In June, July, and August: 30-minute closures may occur Mon/Tues/Thurs nights between 6:30 PM & 7:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. Effective April 6, 2015, this section of US26 will be restricted to 22 feet 00 in. in width at all hours. Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

US26 MP 53.51

Informational only; Commercial Vehicle Information
Details: US26 MP 53.51 EB & WB (Government Camp) Effective April 1, 2015, this section of US26 will be restricted to 17 feet 03 in. in height. Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

US26 MP 61

Estimated delay under 20 minutes; Construction Work
Comments: Monday through Friday, expect daytime lane restrictions on southbound Helvetia Road between the westbound ramp intersection and Jacobson Road. Project Description: The U.S. 26 Brookwood Parkway/Helvetia Interchange project will improve traffic flow and safety in the interchange area. Project elements include: • Constructing a new westbound U.S. 26 to southbound Brookwood Parkway exit loop ramp. • Reconstructing the westbound U.S. 26 entrance ramp from Helvetia Road. • Widening the Brookwood Parkway overcrossing to accommodate additional northbound and southbound lanes over U.S 26. • Extending the right-turn lane from northbound Brookwood Parkway to the eastbound U.S. 26 entrance ramp. • Adding sidewalks and bike lanes within the interchange area. Traffic Impacts: No traffic impacts are expected as crews work off the roadway during the daytime. No work is planned from noon on Thursday, July 2 until midnight on Sunday, July 5.
Updated: 06/26/2015 4:37 pm

US26 MP 61.06

Informational only; Commercial Vehicle Information
Details: US26 MP 61.06 EB & WB (Brookwood/Helvetia Rd Interchange - Hillsboro) Effective May 14, 2014, this section of US26 will be intermittently closed Monday through Friday nights between the hours of 10 PM & 5 AM. All traffic can bypass the closure by taking Exit 61, then re-entering the highway. Estimated date of completion is October 31, 2015.
Updated: 06/29/2015 7:00 pm

US26 MP 70.68

Informational only; Commercial Vehicle Information
Details: US26 EB Exit 71 to Sylvan (Portland) Effective April 1, 2015, the ramp from US26 eastbound Exit 71 to Sylvan will be restricted to 15 feet 00 in. in width between the hours of 9 AM & 3 PM (DAYTIME). Estimated date of completion is July 31, 2015.
Updated: 06/29/2015 7:00 pm

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to 30 tons gross weight.
Updated: 06/29/2015 7:00 pm

US30 MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 06/29/2015 7:00 pm

US30 MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 06/29/2015 7:00 pm

US30 MP 20.39

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 06/29/2015 7:00 pm

US30 MP 48.67

Informational only; Commercial Vehicle Information
Details: US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Updated: 06/29/2015 7:00 pm

US101 MP 0 to 3.3

Estimated delay under 20 minutes; Maintenance Work
Comments: Bridge work is occurring. Use caution. Expect minor delays
Updated: 06/22/2015 08:34 am

US101 MP 1.8 to 3.03

Informational only; Maintenance Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Bridge work is occurring. Use caution. US101: Columbia River (Astoria–Megler) Bridge (Oregon Coast Highway, mile post 1.80 to 3.03) This project consists of recoating the steel above the bridge deck on the southern side of the Columbia River Bridge along U.S. 101 north of Astoria. The scheduled work includes prepping and painting the steel above the bridge deck along with miscellaneous touch-up painting throughout the bridge structure. Flaggers will control single lane traffic during construction activities as required. Lane delays will be allowed anytime on weekdays and weekends. Expect delays of up to 20 minutes and drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. No lane closures will be occurring from noon on Thursday, July 2nd through midnight on Monday, July 6th. The project is scheduled to be completed in July 2015.
Updated: 06/29/2015 11:26 am

US101 MP 4.78

Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 06/29/2015 7:00 pm

US101 MP 4.78

Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) Effective December 1, 2014, this section of US101 Business is closed. Estimated date of completion is September 8, 2015.
Updated: 06/29/2015 7:00 pm

US101 MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Updated: 06/29/2015 7:00 pm

US101 MP 40.71

Informational only; Commercial Vehicle Information
Details: US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita) Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.
Updated: 06/29/2015 7:00 pm

US101 MP 43 to 43.34

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Road construction is occurring, use caution. Oregon Coast Highway, mile post 43.00 to 43.34) The work consists of replacement of an existing culvert at Neahkahnie Creek with a tunnel structure and enhancement of the stream bed as well as relocating and improving the highway alignment along U.S. 101 near Manzanita. Also, turning lane movements into downtown Manzanita will be enhanced. The scheduled work includes installation of temporary shoring. Flaggers may need to occasionally control single lane traffic during construction when work is occurring. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. No lane closures will be occurring from noon on Thursday, July 2nd through midnight on Monday, July 6th. The project is scheduled to be completed in October 2016.
Updated: 06/29/2015 11:23 am

US101 MP 104.4 to 105

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Traffic has been routed onto a diversion and speed has been reduced to 45 MPH. Expect intermittent single lane closures and delays up to 20 minutes. The purpose of this project is to assist the US Forest Service in the restoration efforts to restore the Salmon River Estuary. This project will install a new fish passage culvert to connect Fraser Creek on the east side of US101 with the original Fraser Creek Channel on the west side of US101 that was cut off when US101 was constructed..
Updated: 06/18/2015 4:42 pm

US101 MP 113.82 to 115.56

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Crews will be installing new software for the signals. Most of the work will be done from the highway shoulders and some nighttime lane closures. This project is an adaptive signal project that will create a new traffic signal control system along US101. The signal will adapt to real-time traffic demands along the corridor, easing congestion and improving traffic flow. Project is scheduled to complete May 30, 2015.
Updated: 06/18/2015 4:34 pm

US101 MP 115.9 to 116.8

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Detour is in place to route traffic around the work zone. Flaggers may be stopping traffic for short periods to let trucks on and off the road. The project will widen US101 with a lane in each direction and a center turn lane. It will create wider shoulders, new curb and sidewalk, new pedestrian crossing, new signal at 32nd Street, retaining walls, and landscaping.
Updated: 06/18/2015 4:45 pm

US101 MP 121.35

Informational only; Commercial Vehicle Information
Details: US101 MP 121.25 to MP 121.45 NB & SB (south of Lincoln City) Effective July 13, 2015, this section of US101 will be restricted to 12 feet 00 in. in width. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permits Unit for information. Estimated date of completion is August 17, 2015.
Updated: 06/29/2015 7:00 pm

US101 MP 124.9 to 125.2

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Work on the bridge deck will increase this week with single lane closures. Lane closures will be from 6 PM to 10 AM. Expect delays up to 20 minutes. This bridge preservation project will repair damaged concrete in the bridge's pillars, spans and supports. It will also construct a cathodic protection system to inhibit corrosion in the reinforced steel.
Updated: 06/18/2015 4:37 pm

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 NB & SB (Yaquina Bay Bridge - Newport) Effective July 12, 2015, this section of US101 will be restricted to 10 feet 00 in. in width, and 14 feet 08 in. in height from 1/2 hr after sunset until 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is July 16, 2015.
Updated: 06/29/2015 7:00 pm

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 06/29/2015 7:00 pm

US101B MP 4.78 to 6.89

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Bridge construction is occurring at the Old Youngs Bay bridge on US101 Business, one lane traffic with flaggers, use caution. (Warrenton - Astoria Highway, mile post 4.78 and 6.89) This project consists of performing bridge rehabilitation work at both the Old Youngs Bay and Lewis & Clark River Bridges along US101(Bus.). The scheduled work includes reconstruction of the Lewis & Clark River Bridge. The Lewis & Clark River Bridge is now closed to facilitate construction activities. This full closure is anticipated to last until September 4, 2015. A detour route is currently designated with signing. The scheduled work at the Old Youngs Bay Bridge includes rehabilitation of the electrical and mechanical systems. Flaggers will control single lane traffic at the Old Youngs Bay Bridge during construction when work is occurring as required. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. No lane closures will be occurring from noon on Thursday, July 2nd through midnight on Monday, July 6th. The project is scheduled to be completed in November 2017.
Updated: 06/29/2015 11:24 am

US101B MP 4.78

Closure with Detour; Crash/Hazard
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: The Lewis and Clark River Bridge will be closed starting December 1, 2014; a detour will be in place. Use an alternate route. The Lewis & Clark River Bridge is scheduled to be closed to facilitate construction activities starting December 1, 2014. This closure is anticipated to last until August 1, 2015. A detour route will be designated with signing during the length of the closure. The project is scheduled to be completed in November 2017.
Last Updated: 05/20/2015 5:25 pm

US30BY MP 9.2

Closure with Detour; Crash/Hazard
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Crash US-30 bypass at 60th. All lanes are closed. Local detour in place. Expect delays.
Last Updated: 06/29/2015 5:44 pm

US30BY MP 9.47 to 9.2

Closure with Detour; Crash/Hazard
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: The highway is closed; a detour is in place. Use an alternate route.
Last Updated: 06/29/2015 6:21 pm