Road Conditions

Northwest Oregon Road Conditions by Route

Hwy100 MP 8.76 to 22

Closure; Crash/Hazard
Lanes Affected: (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments: The highway is closed. Use alternate routes.
Last Updated: 10/17/2017 06:56 am

I-5 MP 232.02 to 245.04

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes
Comments: Road construction is occurring, use caution. Ramps Affected. Expect minor delays from 10 PM Sunday night to 5:30 AM Monday morning. Monday night thru Thursday from 9:00 PM to 5:30 AM. Ramps will be closed during paving and a signed detour route will be provided.
Updated: 10/14/2017 08:43 am

I-5 MP 234.08 to 244.88

Informational only; Commercial Vehicle Information
Details: I-5 MP 234.0 to MP 245.5 NB & SB (north of Albany) Effective August 13, 2017, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 5:30 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 234.08 to 244.88

Informational only; Commercial Vehicle Information
Details: I-5 MP 234.0 to MP 245.5 SB (north of Albany) Effective August 13, 2017, this section of I-5 southbound will be restricted to 15 feet 10 in. in height between the hours of 9 PM & 5:30 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 234.11 to 248.62

Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exits 235-244 on- and off-ramps (Albany to Salem) Effective August 20, 2017, the following on- and off-ramps to/from I-5 northbound and southbound will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 5:30 AM: Exits 235, 237, 238, 239, 242, 243, 244. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 236 to 238

No to Minimum Delay; Maintenance Work
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 10/17/2017 9:09 pm

I-5 MP 240.95

Informational only; Commercial Vehicle Information
Details: I-5 MP 240.85 NB & SB (Santiam Rest Area - north of Albany) Effective September 11, 2017, the Santiam Rest Area will be closed to truck traffic. Effective September 18, 2017, the Santiam Rest Area will be closed to all traffic. This closure is NOT on the I-5 mainline. Estimated date of completion is October 4, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 257 to 258

Future Event: No to Minimum Delay; Maintenance Work
Expected Start Date: 10/18/2017 9:00:00 PM
Lanes Affected: (Northbound) 1 Lane , Shoulder
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution. Work will be done 9:00 PM to 5:00 AM.
Updated: 10/16/2017 12:02 pm

I-5 MP 262 to 264

Informational only; Maintenance Work
Lanes Affected: (Northbound) , Shoulder
Comments: Hazard tree removal. Work will be done on the shoulder. Use caution thru area.
Updated: 10/09/2017 09:07 am

I-5 MP 262 to 264

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) , Shoulder
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/09/2017 09:35 am

I-5 MP 270.5 to 282.86

Informational only; Commercial Vehicle Information
Details: I-5 MP 270.50 to MP 283.01 NB & SB (Woodburn to Wilsonville) Effective July 5, 2017, this section of I-5 will be restricted to 17 feet 01 in. in height southbound, and 16 feet 09 in. in height northbound, on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 270.5 to 282.86

Informational only; Commercial Vehicle Information
Details: I-5 MP 270.50 to MP 283.01 NB & SB (Woodburn to Wilsonville) Effective July 5, 2017, this section of I-5 will be restricted to 15 feet 00 in. in width on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 271 to 283

No to Minimum Delay; Maintenance Work
Comments: Road maintenance operations are occurring 9:00 PM to 5:00 AM, Sunday thru Thursday in both the northbound and southbound lanes. Use caution thru area.
Updated: 10/06/2017 4:22 pm

I-5 MP 271.5 to 283

No to Minimum Delay; Construction Work
Comments: Road construction is occurring, use caution. Road work will be done Sunday thru Thursday, 9:00 PM to 5:00 AM. South Bound, Exit 271, will be closed. Southbound I-5 Exit 271 Ramp will be closed Sunday through Thursday between 9 p.m. and 5 a.m. Detour for Woodburn Southbound: Take the next exit, Exit 263 ( Brooklake Rd), cross over and enter northbound I-5. Drive back to Exit 271.
Updated: 10/10/2017 06:55 am

I-5 MP 272.03

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 271 ramp to OR214 and OR219 (Woodburn) Effective September 5, 2017, the ramp from I-5 southbound Exit 271 to OR214 and OR219 will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 278.44 to 278.84

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 278 on- and off-ramps to/from Ehlen Rd (Aurora) Effective August 27, 2017, the I-5 southbound Exit 278 on- and off-ramps to/from Ehlen Rd will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 281.56 to 282.04

Informational only; Commercial Vehicle Information
Details: I-5 NB & SB on and off-ramps to/from French Prairie Rest Area (south of Wilsonville) Effective August 9, 2017, the I-5 northbound and southbound on- and off-ramps to/from French Prairie Rest Area will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 282.34 to 282.86

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 282B on- and off-ramps to/from Charbonneau District (south of Wilsonville) Effective August 9, 2017, the ramps from I-5 southbound Exit 282B to/from Charbonneau District will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 282.35

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 282 ramp to Canby (south of Wilsonville) Effective August 9, 2017, the ramp from I-5 northbound Exit 282 to Canby will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 299.17 to 300.73

Informational only; Commercial Vehicle Information
Details: I-5 NB MP 299 to MP 301 (Marquam Bridge Portland) Effective November 17, 2017, this section of I-5 northbound will be closed between the hours of 9 PM to 5 AM. Estimated date of completion is November 18, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 300.5 to 302

Estimated delay under 20 minutes; Construction Work
Comments: Periodic nighttime lane and ramp closures Saturday 9 p.m. to 8 a.m., Monday through Friday 10 p.m. to 5 a.m. Periodic closures on I-5 in both directions (Broadway/Weidler to the East end of the Marquam Bridge) Monday through Friday. The ramp from I-84 westbound to I-5 Northbound and the Wheeler on-ramp to I-5 south will be periodically closed.
Updated: 10/13/2017 1:17 pm

I-5 MP 301 to 302

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/17/2017 11:37 pm

I-5 MP 301.06 to 301.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 301 to MP 302 NB & SB (Portland) Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 301.06 to 301.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 301 to MP 302 NB & SB (Portland) Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 06 in. in height southbound, and 16 feet 01 in. in height northbound, between the hours of 10 PM & 5 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 301.09

OFF RAMP
Closure; Maintenance Work
Comments: Road work has exit 300B to Morrison Bridge and City Center closed until October 22nd. City Center traffic use an alternate route. Ramps Affected.
Updated: 10/14/2017 06:33 am

I-5 MP 301.36

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from the Morrison Bridge (Portland) Effective June 8, 2017, the ramp from the Morrison Bridge to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 301.7

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 300B ramp to OR99E/Oregon City/OMSI (Portland) Effective June 8, 2017, the ramp from I-5 southbound Exit 300B to OR99E/Oregon City/OMSI will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 302.011

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Wheeler St (Portland) Effective June 8, 2017, the ramp from Wheeler St to I-5 southbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 307.69 to 307.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 307.70 to MP 307.98 NB (Portland) Effective September 21, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width per the following schedule; Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Mobile homes with eaves allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 26, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 307.69 to 307.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 307.70 to MP 307.98 SB (Portland) Effective September 21, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width per the following schedule; Sunday through Thursday nights between the hours of 11 PM & 5 AM; Friday and Saturday nights between the hours of 12:01 AM & 6 AM. Mobile homes with eaves allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 26, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 307.77 to 307.97

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 308 On/Off Ramps (Jantzen Beach) Effective September 21, 2017, the I-5 northbound Exit 308 on/off ramps will be intermittently closed per the following schedule; Sunday through Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 8 AM; Saturday nights between the hours of 8 PM & 9 AM. Estimated date of completion is September 26, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 307.99

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 308 Off Ramp (Jantzen Beach) Effective September 21, 2017, the I-5 southbound Exit 308 off ramp will be intermittently closed per the following schedule; Sunday through Thursday nights between the hours of 8 PM & 5 AM; Friday and Saturday nights between the hours of 9 PM & 7 AM. Estimated date of completion is September 26, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 308.38

Informational only; Commercial Vehicle Information
Details: I-5 SB Interstate Bridge (Portland at OR/WA Border) Effective October 21, 2017, I-5 southbound crossing the Interstate Bridge will be closed between the hours of 10 PM & 7 AM. Estimated date of completion is October 22, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 0 to 1.97

Informational only; Commercial Vehicle Information
Details: I-84 MP 0 to MP 2 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0 to 1.97

Informational only; Commercial Vehicle Information
Details: I-84 MP 0 to MP 2 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0

Informational only; Commercial Vehicle Information
Details: I-84 WB to I-5 NB Ramp Effective June 26, 2017, the ramp from I-84 westbound to I-5 northbound will be intermittently closed per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday & Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0

Estimated delay under 20 minutes; Construction Work
Comments: The ramp from I-84 westbound to I-5 north will be closed Monday through Friday from 10 p.m. to 5 a.m. (until 8 a.m. Saturday).
Updated: 10/13/2017 1:17 pm

I-84 MP .54

Informational only; Commercial Vehicle Information
Details: I-84 EB on-ramp from the Morrison Bridge (Portland) Effective June 8, 2017, the ramp from the Morrison Bridge to I-84 eastbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 1.19 to 4.95

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 15 feet 09 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 1.19 to 4.95

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 2 to 2.98

Informational only; Commercial Vehicle Information
Details: I-84 MP 2 to MP 3 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 2 to 2.98

Informational only; Commercial Vehicle Information
Details: I-84 MP 2 to MP 3 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 2.17 to 3.56

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Eastbound) 1 Lane
Comments: Road construction is occurring, use caution. Ramps Affected.
Updated: 10/17/2017 9:00 pm

I-84 MP 3.35 to 3.84

Informational only; Commercial Vehicle Information
Details: I-84 MP 3 to MP 4 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 16 feet 02 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 3.35 to 3.84

Informational only; Commercial Vehicle Information
Details: I-84 MP 3 to MP 4 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 5 to 3.56

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/18/2017 12:05 am

I-84 MP 5.01 to 5.86

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 6 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 17 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 5.01 to 5.86

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 6 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 16 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 5.01 to 5.87

Informational only; Commercial Vehicle Information
Details: I-84 MP 6 to MP 5 WB (Portland) Effective August 1, 2017, this section of I-84 westbound will be restricted to 19 feet 00 in. in width, per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 5.74

OFF RAMP
Closure; Maintenance Work
Comments: Road maintenance operations have the ramp closed EB to I-205 NB, use an alternate route. Ramps Affected.
Updated: 10/17/2017 8:45 pm

I-84 MP 7 to 0

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Double lane closures in both directions of I-84 (from I-5 to I-205) from 8 p.m. to 5:30 a.m. weekdays.
Updated: 10/13/2017 1:19 pm

I-84 MP 17.37 to 45.33

Informational only; Commercial Vehicle Information
Details: I-84 MP 17 to MP 46 EB & WB (Troutdale to Cascade Locks) Effective September 18, 2017, this section of I-84 will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is September 29, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 17.56 to 18.06

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.5 to MP 21.0 EB & WB (east of Troutdale) Effective August 9, 2017, this section of I-84 will be restricted to 21 feet 00 in. in width between the hours of 8 PM & 10 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 28

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:02 am

I-84 MP 31.14 to 31.28

OFF RAMP
Closure; Information
Comments: MULTNOMAH FALLS EXIT CLOSED
Last Updated: 10/17/2017 01:28 am

I-84 MP 35

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:03 am

I-84 MP 35.71

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:01 am

I-84 MP 40

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:02 am

I-84 MP 41

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:01 am

I-84 MP 51 to 52

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Expect rolling slowdowns between 12:30 and 2:30 p.m. Thursday, Oct. 19 for rock blasting. Rock blasting will occur one weekday per week through mid-November for trail construction.
Updated: 10/17/2017 07:36 am

I-84 MP 51.22 to 54.77

Informational only; Commercial Vehicle Information
Details: I-84 MP 52 to MP 54 EB & WB (Wyeth) Effective September 25, 2017 this section of I-84 eastbound and westbound will be restricted to 16 feet 00 in. in width. Estimated date of completion is December 19, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 52 to 54

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Eastbound) Median , 1 Lane
Comments: Due to road work in the area, I-84 is reduced to a single 18.5 foot lane from milepost 52 to 54 with a reduced speed limit of 50 MPH.
Updated: 10/14/2017 06:34 am

I-84 MP 54 to 53

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) Median , 1 Lane
Comments: Due to road work in the area, I-84 is reduced to a single 18.5 foot lane from milepost 54 to 52 with a reduced speed limit of 50 MPH.
Updated: 10/07/2017 06:07 am

I-84 MP 55.83 to 56.25

Informational only; Commercial Vehicle Information
Details: I-84 EB & WB Exit 56 on- and off-ramps to/from Viento State Park Effective September 14, 2017, the I-84 eastbound and westbound Exit 56 on- and off-ramps to/from Viento State Park will be restricted to 19 feet 00 in. in width between the hours of 8 PM & 7 AM. Estimated date of completion is November 30, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 56

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:00 am

I-84 MP 56.04

Informational only; Commercial Vehicle Information
Details: I-84 MP 56.04 EB & WB (Viento State Park) Effective September 14, 2017, this section of I-84 will be closed between the hours of 8 PM & 7 AM. When closed, all traffic will be directed to take the Exit 56 off-ramp and re-enter I-84. Estimated date of completion is November 30, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP .25 to 2

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane , Shoulder
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/17/2017 10:28 pm

I-205 MP 1 to 9

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime single lane closures in both directions. Ramps to/from 10th Street and OR 43 impacted. Closures are from 10 p.m. to 5 a.m. Shoulder closures on 10th Street. The 10th Street I-205 on- and off-ramps will be closed Wednesday and Thursday beginning at 9 p.m. Saturday night, the OR 43 northbound on-ramp to I-205 north will be closed.
Updated: 10/13/2017 1:20 pm

I-205 MP 1.24 to 8.69

Informational only; Commercial Vehicle Information
Details: I-205 MP 0.99 to MP 8.82 NB & SB (Tualatin to West Linn) Effective July 9, 2017, this section of I-205 will be restricted to 13 feet 00 in. in width at the following times: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-205 MP 2.86 to 3.55

Informational only; Commercial Vehicle Information
Details: I-205 NB & SB Exit 3 on- and off-ramps to/from Stafford Rd (Lake Oswego) Effective July 23, 2017, the I-205 northbound and southbound Exit 3 on- and off-ramps to/from Stafford Rd will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 6.09 to 6.88

Informational only; Commercial Vehicle Information
Details: I-205 NB & SB Exit 6 on- and off-ramps to/from 10th St (West Linn) Effective July 23, 2017, the I-205 northbound and southbound Exit 6 on- and off-ramps to/from 10th St will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 8.5 to 9.031

Informational only; Commercial Vehicle Information
Details: I-205 NB & SB Exit 8 on- and off-ramps to/from OR43 (West Linn) Effective July 23, 2017, the I-205 northbound and southbound Exit 8 on- and off-ramps to/from OR43 will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 8.82

ON RAMP
Closure; Maintenance Work
Comments: Road maintenance operations are occurring, use an alternate route. Ramps Affected.
Updated: 10/17/2017 10:26 pm

I-205 MP 13.07 to 16.24

Informational only; Commercial Vehicle Information
Details: I-205 MP 13.0 to MP 16.3 NB & SB (Clackamas) Effective February 13, 2017, this section of I-205 will be restricted to 17 feet 00 in. in height at the following times: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM and Friday night 8 PM to 8 AM. Estimated date of completion is October 30, 2017.
Updated: 10/17/2017 7:01 pm

I-205 MP 16.2 to 26.56

Informational only; Commercial Vehicle Information
Details: I-205 MP 16 to MP 26 NB & SB (Portland) Effective September 17, 2017, this section of I-205 will be restricted to 16 feet 05 in. in height between the hours of 10 PM & 5:30 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 16.2 to 26.56

Informational only; Commercial Vehicle Information
Details: I-205 MP 16 to MP 26 NB & SB (Portland) Effective September 17, 2017, this section of I-205 will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5:30 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 21.71

Informational only; Commercial Vehicle Information
Details: I-205 SB Exit 21B to I-84 WB (Portland) Effective August 3, 2017, the ramp from I-205 southbound Exit 21B to I-84 westbound will be intermittently closed, per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM. Estimated date of completion is November 30, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 22.22 to 23.68

Estimated delay of 20 minutes - 2 hours; Maintenance Work
Lanes Affected: (Northbound) 2 Lanes
Comments: Road maintenance operations have the two right lane closed NB between I-84 EB, and Killingsworth, use caution.
Updated: 10/17/2017 8:43 pm

I-405 MP .77

Informational only; Commercial Vehicle Information
Details: I-405 SB Ramp to I-5 NB (Portland) Effective November 17, 2017, the on-ramp from I-405 southbound to I-5 northbound will be closed between the hours of 9 PM to 5 AM. Estimate date of completion is November 18, 2017.
Updated: 10/17/2017 7:02 pm

ORE8 MP 3.18 to 10

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime lane closures at intersections (Brookwood to OR 217) from 8 p.m. to 5 a.m. Shoulder closures on Cornelius Pass Road, Murray Boulevard and Scholls Ferry Road in both directions weekday nights.
Updated: 10/13/2017 1:37 pm

ORE8 MP 6.45 to 6.75

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts.
Updated: 10/13/2017 1:37 pm

ORE8 MP 7 to 10

Estimated delay under 20 minutes; Construction Work
Comments: Periodic daytime lane closures on Cornelius Pass and TV Highway.
Updated: 10/04/2017 4:57 pm

ORE8 MP 17.8

No to Minimum Delay; Construction Work
Comments: Single lane closure on westbound OR 8 from 9 a.m. to 3 p.m. weekdays. Night lane closures OR 8 and OR 47 weekdays from 7 p.m. to 6 a.m. Signal work will require flaggers directing traffic from 10 p.m. to 5 a.m.
Updated: 10/13/2017 1:37 pm

ORE10 MP 2 to 6.3

Estimated delay under 20 minutes; Construction Work
Comments: Periodic daytime lane closures at Capitol Highway.
Updated: 10/16/2017 12:23 pm

ORE18 MP 51.57

Informational only; Commercial Vehicle Information
Details: OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

ORE22 MP 10.49

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 10/17/2017 7:01 pm

ORE22 MP 10.66

Informational only; Commercial Vehicle Information
Details: OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Updated: 10/17/2017 7:01 pm

ORE22 MP 30.03

Informational only; Commercial Vehicle Information
Details: Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Updated: 10/17/2017 7:01 pm

ORE35 MP 58

No to Minimum Delay; Construction Work
Comments: Single lane closures with flagging. Work will occur in multiple locations along U.S. 26 between Rhododendron and the Wapanitia Junction and OR 35 in Parkdale.
Updated: 10/13/2017 1:30 pm

ORE43 MP .31

Informational only; Commercial Vehicle Information
Details: OR43 NB Ramp to I-5 NB (Portland) Effective November 17, 2017, the on-ramp from OR43 to I-5 northbound will be closed between the hours of 9 PM to 5 AM. Estimate date of completion is November 18, 2017.
Updated: 10/17/2017 7:02 pm

ORE43 MP 11.16

Estimated delay under 20 minutes; Construction Work
Comments: Saturday night, the OR 43 northbound on-ramp to I-205 north will be closed.
Updated: 10/13/2017 1:29 pm

ORE43 MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 10/17/2017 7:01 pm

ORE47 MP 88.05

Informational only; Commercial Vehicle Information
Details: OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Updated: 10/17/2017 7:01 pm

ORE47 MP 90.64

Informational only; Commercial Vehicle Information
Details: OR47 MP 90.64 SB (Forest Grove) Effective September 5, 2017, this section of OR47 southbound will be intermittently closed Monday through Friday between the hours of 9 AM & 3 PM. Estimated date of completion is October 17, 2017.
Updated: 10/17/2017 7:01 pm

ORE47 MP 90.64

Informational only; Commercial Vehicle Information
Details: OR47 MP 90.56 to MP 90.64 NB & SB (Forest Grove) Effective August 29, 2017, this section of OR47 will be restricted to 16 feet 00 in. in width. Estimated date of completion is October 17, 2017.
Updated: 10/17/2017 7:01 pm

ORE53 MP .4 to .6

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. OR53 @ Joe Creek (Region 2 Fish Passage) M.P. 0.58 Sec. (Necanicum Highway, mile post 0.52 to 0.63) The work consists of replacement of an existing culvert at Joe Creek with a steel arch culvert and enhancement of the stream bed along OR53 a half mile south of its junction with US26. The scheduled work includes installation of the new culvert. Flaggers will be controlling single lane, two way traffic during construction of the arch culvert 24 hours a day. Minor delays should be expected and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in October 2017.
Updated: 10/17/2017 08:27 am

ORE53 MP .52 to .63

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: Bridge work is occurring. Use caution. Expect minor delays OR53 @ Joe Creek (Region 2 Fish Passage) M.P. 0.58 Sec. (Necanicum Highway, mile post 0.52 to 0.63) The work consists of replacement of an existing culvert at Joe Creek with a steel arch culvert and enhancement of the stream bed along OR53 a half mile south of its junction with US26. The scheduled work includes installation of the new culvert. Flaggers will be controlling single lane, two way traffic during construction of the arch culvert 24 hours a day. Minor delays should be expected and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in October 2017.
Updated: 08/24/2017 07:54 am

ORE53 MP .58

Informational only; Commercial Vehicle Information
Details: OR53 MP 0.58 NB & SB (south of US26) Effective July 18, 2017, this section of OR53 will be restricted to 14 feet 00 in. in width. Estimated date of completion is October 20, 2017.
Updated: 10/17/2017 7:02 pm

ORE53 MP 5.981

Informational only; Commercial Vehicle Information
Details: OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Updated: 10/17/2017 7:01 pm

ORE99 MP 3.07 to 4.78

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 4.78 to MP 3.07 NB (Milwaukie) Effective July 7, 2017, this section of OR99E northbound will be closed on weekends from Friday at 10 PM until Monday at 5 AM. No closures will take place the weekends of August 11-14, and August 25-28. Estimated date of completion is September 1, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.49

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 NB & SB (Milwaukie) Effective July 3, 2017, this section of OR99E will be restricted to 17 feet 01 in. in height per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.49

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 SB (Milwaukie) Effective July 3, 2017, this section of OR99E southbound will be restricted to 8 feet 06 in. in width per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights at 8 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.43

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 4.49 to MP 3.07 NB (Milwaukie) Effective July 3, 2017, this section of OR99E northbound will be restricted to 8 feet 06 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.53 to 3.72

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) SB on- and off-ramps to/from Bybee Blvd (Milwaukie) Effective July 5, 2017, the OR99E southbound ramps to/from Bybee Blvd will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:01 pm

ORE99 MP 4.08

Informational only; Commercial Vehicle Information
Details: Terwilliger Blvd at OR99W MP 4.08 NB & SB (Portland) Effective October 13, 2017 at 8 PM, Terwilliger Blvd crossing over I-5 will be closed. This closure is NOT on the OR99W mainline. Estimated date of completion is 5 AM, October 16, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 4.34 to 4.44

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) NB & SB ramps to/from Tacoma St (Milwaukie) Effective June 19, 2017, the OR99E northbound and southbound ramps to/from Tacoma St will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is September 29, 2017.
Updated: 10/17/2017 7:01 pm

ORE99 MP 5.43

Informational only; Commercial Vehicle Information
Details: OR99E SB ramp to OR224 EB (Milwaukie) Effective June 19, 2017, the ramp from OR99E southbound to OR224 eastbound will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

ORE99 MP 5.43

Informational only; Commercial Vehicle Information
Details: OR99E SB ramp to OR224 EB (Milwaukie) Effective July 3, 2017, the ramp from OR99E southbound to OR224 eastbound will be closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 10 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 12.56 to 12.6

Informational only; Commercial Vehicle Information
Details: OR99E MP 12.55 to MP 12.57 NB & SB (Oregon City) Effective October 11, 2017 this section of OR99E northbound and southbound will be closed to truck traffic between the hours of 8 PM and 5 AM. Estimated date of completion is October 30, 2017.
Updated: 10/17/2017 7:02 pm

ORE104 MP 4.62

Informational only; Commercial Vehicle Information
Details: OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Updated: 10/17/2017 7:01 pm

ORE120 MP .38

Informational only; Commercial Vehicle Information
Details: OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 10/17/2017 7:01 pm

ORE130 MP 3.23

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 10/17/2017 7:01 pm

ORE130 MP 3.6

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 10/17/2017 7:01 pm

ORE130 MP 3.82

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 10/17/2017 7:01 pm

ORE130 MP 4.15

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 10/17/2017 7:01 pm

ORE130 MP 4.76

Informational only; Commercial Vehicle Information
Details: OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 10/17/2017 7:01 pm

ORE141 MP 5

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts.
Updated: 10/13/2017 1:39 pm

ORE164 MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

ORE173 MP 5 to 5.49

No to Minimum Delay; Construction Work
Comments: Single lane closures with flagging. Work will occur in multiple locations along U.S. 26 between Rhododendron and the Wapanitia Junction and OR 35 in Parkdale.
Updated: 10/13/2017 1:32 pm

ORE213 MP .9 to 1

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts.
Updated: 07/28/2017 11:00 pm

ORE213 MP 6.18 to 6.24

Informational only; Commercial Vehicle Information
Details: OR213 (82nd Dr) MP 6.18 to MP 6.24 NB & SB (Portland) Effective July 31, 2017, this section of OR213 (82nd Dr) will be restricted to 10 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is October 18, 2017.
Updated: 10/17/2017 7:02 pm

ORE213 MP 8 to 10

No to Minimum Delay; Construction Work
Comments: Periodic daytime lane closures in both directions (between SE Southgate Street and King Road). For more information: 24-hour noise hotline 503-412-2374.
Updated: 10/13/2017 1:39 pm

ORE213 MP 9.14 to 10.9

Informational only; Commercial Vehicle Information
Details: OR213 MP 10.90 to MP 9.14 NB (Mulino) Effective July 3, 2017, this section of OR213 northbound will be restricted to 12 feet 00 in. in width. Estimated date of completion is December 31, 2017.
Updated: 10/17/2017 7:02 pm

ORE213 MP 9.14 to 10.9

Informational only; Commercial Vehicle Information
Details: OR213 MP 9.14 to MP 10.90 NB & SB (Mulino) Effective March 20, 2017, this section of OR213 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. Estimated date of completion is December 31, 2017.
Updated: 10/17/2017 7:01 pm

ORE213 MP 9.14 to 10.9

Informational only; Commercial Vehicle Information
Details: OR213 MP 9.14 to MP 10.90 SB (Mulino) Effective July 3, 2017, this section of OR213 southbound will be restricted to 9 feet 00 in. in width. Estimated date of completion is December 31, 2017.
Updated: 10/17/2017 7:02 pm

ORE219 MP 21.17 to 22.19

Estimated delay under 20 minutes; Construction Work
Comments: Lanes and shoulders of traffic periodically interrupted by close or flagging at night 7PM to 6:30AM Mon-Thurs and daytime 9AM-3PM M-R, Fri 9AM-12PM. Modernization: Grading, drainage, sign structures, paving, signals and roadside development.
Updated: 10/11/2017 1:17 pm

ORE219 MP 23.46

Informational only; Commercial Vehicle Information
Details: OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

ORE224 MP .27

Informational only; Commercial Vehicle Information
Details: OR224 WB ramp to OR99E NB (Milwaukie) Effective July 3, 2017, the ramp from OR224 westbound to OR99E northbound will be restricted to 13 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

ORE99W MP 4.22

Closure with Detour; Maintenance Work
Comments: Road work has closed Terwilliger Boulevard over I-5 until Monday morning. A detour is in place using Taylors Ferry to Spring Garden, to 19th.
Updated: 10/14/2017 06:25 am

ORE99E MP 3.07 to 4.34

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road maintenance operations have the left lane closed in both directions between SE Harold, and Tacoma, use caution.
Updated: 10/17/2017 7:10 pm

ORE99E MP 3.5 to 5.72

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Periodic nighttime single lane closures weekdays from 7 p.m. to 5 a.m.
Updated: 10/13/2017 1:38 pm

US26 MP 47 to 57.45

No to Minimum Delay; Construction Work
Comments: Single lane closures with flagging. Work will occur in multiple locations along U.S. 26 between Rhododendron and the Wapinitia Junction and OR 35 in Parkdale.
Updated: 10/13/2017 1:30 pm

US26 MP 53.01 to 56.98

Informational only; Commercial Vehicle Information
Details: US26 MP 53.00 to MP 57.15 EB & WB (North Plains) Effective May 22, 2017, this section of US26 will be restricted to 11 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 53.01 to 56.98

Informational only; Commercial Vehicle Information
Details: US26 MP 53.00 to MP 57.15 EB & WB (North Plains) Effective May 22, 2017, this section of US26 will be restricted to 16 feet 07 in. in height between the hours of 8 PM & 6 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 57 to 53.01

Estimated delay under 20 minutes; Construction Work
Comments: Periodic nighttime lane closures on U.S. 26 and daytime shoulder closures.
Updated: 10/06/2017 8:17 pm

US26 MP 62 to 65

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime lane closures on U.S. 26 eastbound (between Cornelius Pass Road and NW 185th Avenue) from 9 p.m. to 5 a.m. Lane and shoulder closures on Cornelius Pass Road.
Updated: 10/06/2017 8:25 pm

US26 MP 62.12 to 64.75

Informational only; Commercial Vehicle Information
Details: US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro) Effective October 31, 2016, this section of US26 will be restricted to 10 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 62.12 to 64.75

Informational only; Commercial Vehicle Information
Details: US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro) Effective October 31, 2016, this section of US26 will be restricted to 14 feet 00 in. in width on Saturdays from 1/2 hr before sunrise until 8 AM, and on Sundays from 1/2 hr before sunrise until 9 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 62.49

Informational only; Commercial Vehicle Information
Details: US26 WB Exit 62A to Cornelius Pass Rd SB (Hillsboro) Effective March 3, 2017, the ramp from US26 westbound Exit 62A to Cornelius Pass Rd southbound is closed to all single-trip oversize/overweight permits. Estimated date of completion is December 15, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 69 to 73

No to Minimum Delay; Construction Work
Comments: Day shoulder closures on U.S. 26 in both directions. Periodic nighttime closures of the multi-use path along the south side of U.S. 26 (between SW 79th Avenue and SW Katherine Lane) with detours. Path users should expect a section of path reduced to 6 feet.
Updated: 10/13/2017 1:27 pm

US26 MP 73.53 to 73.7

Informational only; Commercial Vehicle Information
Details: US26 MP 73.53 EB & WB (Vista Ridge Tunnel - Portland) Effective October 27, 2017, this section of US26 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 9 PM & 5 AM. Estimated date of completion is October 28, 2017.
Updated: 10/17/2017 7:02 pm

US26 MP 73.75

Informational only; Commercial Vehicle Information
Details: US26 WB ramp from I-405 NB (Portland) Effective October 27, 2017, the ramp from I-405 northbound to US26 westbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 28, 2017.
Updated: 10/17/2017 7:02 pm

US26 MP 73.8

Informational only; Commercial Vehicle Information
Details: US26 WB ramp from Clay St (Portland) Effective October 27, 2017, the ramp from Clay St to US26 westbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 28, 2017.
Updated: 10/17/2017 7:02 pm

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 EB & WB (Sandy River Bridge - Troutdale) Effective October 29, 2017, this section of US30 (Historic Columbia River Hwy) will be closed between the hours of 5 AM & 2 PM. Estimated date of completion is October 29, 2017.
Updated: 10/17/2017 7:02 pm

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Updated: 10/17/2017 7:01 pm

US30 MP 1.32 to 1.85

Informational only; Commercial Vehicle Information
Details: US30 Bypass MP 1.32 to MP 1.85 EB & WB (Portland) Effective June 23, 2017, this section of US30 Bypass will be restricted to 12 feet 00 in. in width. Loads wider than 12 feet 00 in. in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is December 1, 2017.
Updated: 10/17/2017 7:01 pm

US30 MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 10/17/2017 7:01 pm

US30 MP 17.11 to 18.05

No to Minimum Delay; Construction Work
Lanes Affected: (Eastbound) , Shoulder (Westbound) , Shoulder
Comments: Road construction is occurring causing no to minimum delays, use caution.
Updated: 10/16/2017 08:23 am

US30 MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 10/17/2017 7:01 pm

US30 MP 20.39

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 10/17/2017 7:01 pm

US30 MP 48.67

Informational only; Commercial Vehicle Information
Details: US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Updated: 10/17/2017 7:01 pm

US101 MP 2.78 to 3.26

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Bridge work is occurring. Use caution. Expect minor delays US101: Columbia R (Astoria–Megler) Br Painting, Ph2 (Oregon Coast Highway, mile post 2.78 to 3.26) This project consists of recoating the steel below the bridge deck on the southern side of the Columbia River Bridge along U.S. 101 north of Astoria. The scheduled work includes installation of the work containment structures and preparation and coating of the steel beneath the bridge deck. Flaggers will control single lane traffic during construction activities as required. Lane delays will be allowed anytime on weekdays and weekends. Expect delays of up to 20 minutes and drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in September 2018.
Updated: 10/11/2017 5:14 pm

US101 MP 4.78

Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 10/17/2017 7:01 pm

US101 MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 EB & WB (Old Youngs Bay Bridge) Effective November 14, 2017, this section of US101 Business will be closed between the hours of 8 PM to 6 AM. Estimated date of completion is November 16, 2017.
Updated: 10/17/2017 7:02 pm

US101 MP 6.89

Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Updated: 10/17/2017 7:01 pm

US101 MP 40.71

Informational only; Commercial Vehicle Information
Details: US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita) Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.
Updated: 10/17/2017 7:01 pm

US101 MP 48.74 to 50.64

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) , Shoulder (Southbound) , Shoulder
Comments: Road construction is occurring, use caution.
Updated: 09/01/2017 08:01 am

US101 MP 50.64 to 48.74

No to Minimum Delay; Maintenance Work
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 10/02/2017 08:06 am

US101 MP 58.54 to 58.97

No to Minimum Delay; Maintenance Work
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 10/02/2017 08:04 am

US101 MP 62.35 to 60.03

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) Median , 1 Lane (Southbound) Median , 1 Lane
Comments: Road maintenance operations are occurring, use caution. Traffic controlled by flaggers.
Updated: 10/09/2017 08:01 am

US101 MP 65.7

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder
Comments: U.S. 101/OR6 Traffic Improvement Project in Tillamook Ramps Affected. U.S. 101/OR6 Traffic Improvement Project in Tillamook This project improves traffic operations and performance, and increases safety on U.S. 101 and OR 6 through downtown Tillamook and across Hoquarton Slough. The project will lengthen the U.S. 101 couplet to the Hoquarton Slough by extending Pacific Avenue north beyond 1st Street and replacing the existing slough bridge with a new four-lane bridge. The new bridge will be up to 5 feet higher than the existing bridge. The project will also widen the travel lanes on Main and Pacific Avenues from 1st to 4th Streets. Turn lanes will be added at key intersections through town. The project also improves the Hoquarton Interpretive Area, and adds gateway elements and downtown beautification. Construction will be occurring adjacent to the highway. Expect shoulder closures and night time work. Look for construction vehicles entering and leaving the highway. The project is expected to be completed in the fall of 2018.
Updated: 09/08/2016 09:39 am

US101 MP 111.3

Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. There will be intermittent lane closures. Work will begin on Monday, October 16. The left turn lane on NE E Devils Lake Road at the junction with U.S.101 will be closed to allow construction of a concrete traffic separator. Work is scheduled to last the entire week.
Updated: 10/15/2017 08:39 am

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 10/17/2017 7:01 pm

US101B MP 4.78

Estimated delay under 20 minutes; Maintenance Work
Comments: Performing bridge rehabilitation work at both the Old Youngs Bay and Lewis & Clark River Bridges along US101(Bus.). Expect delays up to 20 minutes. US101(Bus.): Old Youngs Bay & Lewis & Clark River Bridges (Warrenton - Astoria Highway, mile post 4.78 and 6.89) This project consists of performing bridge rehabilitation work at both the Old Youngs Bay and Lewis & Clark River Bridges along US101(Bus.). The scheduled work at the Lewis & Clark River Bridge includes coating the bridge steel underneath the bridge deck. Flaggers will control single lane traffic at the Lewis & Clark River Bridge during construction when work is occurring as required. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The scheduled work at the Old Youngs Bay Bridge includes rehabilitation of the electrical and mechanical systems along with the substructure of the bridge. In addition, coating of the bridge steel underneath the bride deck will be occurring. Flaggers will control single lane traffic at the Old Youngs Bay Bridge during construction when work is occurring as required. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in November 2017.
Updated: 02/24/2017 1:18 pm

US101B MP 6.89 to 4.78

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder
Comments: Bridge construction is occurring at the Old Youngs Bay bridge on US101 Business, one lane traffic with flaggers, use caution. US101(Bus.): Old Youngs Bay & Lewis & Clark River Bridges (Warrenton - Astoria Highway, mile post 4.78 and 6.89) This project consists of performing bridge rehabilitation work at both the Old Youngs Bay and Lewis & Clark River Bridges along US101(Bus.). The scheduled work at the Lewis & Clark River Bridge includes coating the bridge steel underneath the bridge deck. Flaggers will control single lane traffic at the Lewis & Clark River Bridge during construction when work is occurring as required. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The scheduled work at the Old Youngs Bay Bridge includes rehabilitation of the electrical and mechanical systems along with the substructure of the bridge. In addition, coating of the bridge steel underneath the bride deck will be occurring. Flaggers will control single lane traffic at the Old Youngs Bay Bridge during construction when work is occurring as required. Minor delays should be expected when single lane closures are occurring and the public is reminded to drive through the area with caution. Oregon State Police will be enforcing the speed limit through the work zone area. The project is scheduled to be completed in November 2017.
Updated: 10/11/2017 5:14 pm

North Oregon Road Conditions by Route

I-82 MP 0

Informational only; Commercial Vehicle Information
Details: I-82 MP 0.00 NB & SB (Columbia River Bridge - Umatilla) Effective August 7, 2017, this section of I-82 will be restricted to 14 feet 00 in. in width. Load wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact Washington DOT at 360-704-6340 for additional information. Estimated date of completion is September 28, 2018.
Updated: 10/17/2017 7:01 pm

I-84 MP 35.71

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:01 am

I-84 MP 40

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:02 am

I-84 MP 41

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:01 am

I-84 MP 51 to 52

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Expect rolling slowdowns between 12:30 and 2:30 p.m. Thursday, Oct. 19 for rock blasting. Rock blasting will occur one weekday per week through mid-November for trail construction.
Updated: 10/17/2017 07:36 am

I-84 MP 51.22 to 54.77

Informational only; Commercial Vehicle Information
Details: I-84 MP 52 to MP 54 EB & WB (Wyeth) Effective September 25, 2017 this section of I-84 eastbound and westbound will be restricted to 16 feet 00 in. in width. Estimated date of completion is December 19, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 52 to 54

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Eastbound) Median , 1 Lane
Comments: Due to road work in the area, I-84 is reduced to a single 18.5 foot lane from milepost 52 to 54 with a reduced speed limit of 50 MPH.
Updated: 10/14/2017 06:34 am

I-84 MP 54 to 53

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) Median , 1 Lane
Comments: Due to road work in the area, I-84 is reduced to a single 18.5 foot lane from milepost 54 to 52 with a reduced speed limit of 50 MPH.
Updated: 10/07/2017 06:07 am

I-84 MP 55.83 to 56.25

Informational only; Commercial Vehicle Information
Details: I-84 EB & WB Exit 56 on- and off-ramps to/from Viento State Park Effective September 14, 2017, the I-84 eastbound and westbound Exit 56 on- and off-ramps to/from Viento State Park will be restricted to 19 feet 00 in. in width between the hours of 8 PM & 7 AM. Estimated date of completion is November 30, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 56

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:00 am

I-84 MP 56.04

Informational only; Commercial Vehicle Information
Details: I-84 MP 56.04 EB & WB (Viento State Park) Effective September 14, 2017, this section of I-84 will be closed between the hours of 8 PM & 7 AM. When closed, all traffic will be directed to take the Exit 56 off-ramp and re-enter I-84. Estimated date of completion is November 30, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 61.81 to 64.15

Informational only; Commercial Vehicle Information
Details: I-84 MP 61.45 to MP 64.15 EB (Hood River) Effective October 19, 2017, this section of I-84 eastbound will be restricted to 16 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is October 20, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 64.11

Informational only; Commercial Vehicle Information
Details: I-84 EB on-ramp from 2nd St (Hood River) Effective October 19, 2017, the ramp from 2nd St to I-84 eastbound will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is October 20, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 86.9 to 87.1

OFF RAMP
No to Minimum Delay; Construction Work
Comments: Road construction is occurring on the shoulder of the EB Exit 87. Expect no to minimum delays, use caution. Ramps Affected.
Updated: 10/15/2017 3:39 pm

I-84 MP 114.43 to 114.76

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: The contractor will not be performing any lane closures in the workzone, but will be on site cleaning up materials. Expect no delays.
Updated: 10/15/2017 3:44 pm

I-84 MP 114.6

Informational only; Commercial Vehicle Information
Details: I-84 MP 114.6 EB & WB (east of Rufus) Effective August 14, 2017, this section of I-84 will be restricted to 12 feet 00 in. in width between the hours of 7 PM & 7 AM. Wider loads may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 114.6

Informational only; Commercial Vehicle Information
Details: I-84 MP 114.6 EB & WB (east of Rufus) Effective August 14, 2017, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 7 PM. Wider loads may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:02 pm

ORE35 MP 58

No to Minimum Delay; Construction Work
Comments: Single lane closures with flagging. Work will occur in multiple locations along U.S. 26 between Rhododendron and the Wapanitia Junction and OR 35 in Parkdale.
Updated: 10/13/2017 1:30 pm

ORE35 MP 82.62 to 84

No to Minimum Delay; Construction Work
Comments: Single lane closures with flagging. Work will occur in multiple locations along U.S. 26 between Rhododendron and the Wapanitia Junction and OR 35 in Parkdale.
Updated: 10/13/2017 1:30 pm

ORE35 MP 101.82

Informational only; Commercial Vehicle Information
Details: OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Updated: 10/17/2017 7:01 pm

ORE173 MP 5 to 5.49

No to Minimum Delay; Construction Work
Comments: Single lane closures with flagging. Work will occur in multiple locations along U.S. 26 between Rhododendron and the Wapanitia Junction and OR 35 in Parkdale.
Updated: 10/13/2017 1:32 pm

US26 MP 47 to 57.45

No to Minimum Delay; Construction Work
Comments: Single lane closures with flagging. Work will occur in multiple locations along U.S. 26 between Rhododendron and the Wapinitia Junction and OR 35 in Parkdale.
Updated: 10/13/2017 1:30 pm

US26 MP 57.45 to 71

No to Minimum Delay; Construction Work
Comments: Single lane closures with flagging. Work will occur in multiple locations along U.S. 26 between Rhododendron and the Wapanitia Junction and OR 35 in Parkdale.
Updated: 10/13/2017 1:30 pm

US30 MP 30.42

Informational only; Commercial Vehicle Information
Details: US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.
Updated: 10/17/2017 7:01 pm

US30 MP 30.46

OFF RAMP
Informational only; Crash/Hazard
Comments: A closure is in place at this time. Ramps Affected.
Last Updated: 10/17/2017 08:01 am

US30 MP 57.83 to 57.85

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Single lane closures will be used to perform rehab and bridge construction. Expect minimal delays, MON-FRI 7am to 5pm. A signed vehicular detour route is in place to provide an optional route around the closures, please plan your trip accordingly. 20 minute lanes closures can be expected at all other times until paving is complete. All closures will be controlled by flagging operations, expect delays.
Updated: 10/15/2017 3:49 pm

US30 MP 63.78 to 63.8

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Single lane closures will be used to perform rehab and bridge construction. Expect minimal delays, MON-FRI 7am to 5pm. Expect minimal delays.
Updated: 10/15/2017 3:49 pm

US30 MP 72.11

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Single lane closures will be used to perform rehab and bridge construction. Expect minimal delays, MON-FRI 7am to 5pm.
Updated: 10/15/2017 3:50 pm

Northeast Oregon Road Conditions by Route

I-84 MP 256.4

Informational only; Commercial Vehicle Information
Details: I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry) Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

I-84 MP 284.38 to 295.67

Informational only; Commercial Vehicle Information
Details: I-84 MP 284 to MP 297 EB & WB (west of Baker City) Effective April 25, 2017, this section of I-84 will be restricted to 18 feet 00 in. in width. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 284.38 to 295.67

Informational only; Commercial Vehicle Information
Details: I-84 MP 284 to MP 297 EB & WB (west of Baker City) Effective April 25, 2017, this section of I-84 will be restricted to 17 feet 00 in. in height eastbound, and 16 feet 11 in. in height westbound. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 284.5 to 297

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Road construction is occurring causing no to minimum delays, use caution.
Updated: 10/12/2017 2:09 pm

I-84 MP 313.12 to 318.53

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Road construction is occurring causing no to minimum delays. Expect intermittent lane closures and no to minimum delays. Speeds are reduced for all traffic in the workzone. Bicycle riders detoured around construction zone via old U.S. 30 (adjacent to freeway), between Exit 313 and 327.
Updated: 10/12/2017 1:09 pm

I-84 MP 313.29 to 317.77

Informational only; Commercial Vehicle Information
Details: I-84 MP 313.0 to MP 318.5 EB & WB (east of Baker City) Effective April 3, 2017, this section of I-84 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

ORE82 MP 0 to 1.16

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Road construction is occurring with single lane closures Mon-Fri. Alternate pedestrian routing is in place. Use caution.
Updated: 10/11/2017 4:20 pm

ORE86 MP 40.64

Informational only; Commercial Vehicle Information
Details: OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Updated: 10/17/2017 7:01 pm

ORE339 MP 2.76

Informational only; Commercial Vehicle Information
Details: OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 10/17/2017 7:01 pm

ORE339 MP 3.16

Informational only; Commercial Vehicle Information
Details: OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 10/17/2017 7:01 pm

ORE339 MP 3.31

Informational only; Commercial Vehicle Information
Details: OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 10/17/2017 7:01 pm

West Oregon Road Conditions by Route

99 MP 128.99

Informational only; Commercial Vehicle Information
Details: Old OR99 (DC388) Old Winchester Bridge (Roseburg) Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.
Updated: 10/17/2017 7:01 pm

I-5 MP 118 to 120

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) 1 Lane (Northbound) 2 Lanes
Comments: Road construction is occurring causing no to minimum delays, use caution. Watch for intermittent shoulder closures. Ramps Affected.
Updated: 10/04/2017 12:47 pm

I-5 MP 124 to 125.5

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/17/2017 11:30 pm

I-5 MP 140.48

Informational only; Commercial Vehicle Information
Details: I-5 NB On-Ramp from Oakland (Old Hwy 99/DC388) Effective October 15, 2017, the ramp from Old Hwy 99/DC388 to I-5 northbound will be closed between the hours of 7 PM to 6 AM. Estimated date of completion is October 16, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 148.36

Informational only; Commercial Vehicle Information
Details: I-5 SB On-Ramp from Rice Hill (Exit 148) Effective October 15, 2017, the ramp from Rice Hill to I-5 southbound will be closed between the hours of 7 PM to 6 AM. Estimated date of completion is October 16, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 151.81

Informational only; Commercial Vehicle Information
Details: I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

I-5 MP 154.54 to 162.57

Informational only; Commercial Vehicle Information
Details: I-5 MP 154 to MP 163 NB & SB (Anlauf) Effective September 5, 2017, this section of I-5 will be restricted to 16 feet 00 in. in width on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 10, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 156.49 to 156.65

Informational only; Commercial Vehicle Information
Details: I-5 MP 156.50 to MP 157.50 NB (Yoncalla) Effective October 22, 2017, this section of I-5 will be restricted to 12 feet 00 in. in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is November 10, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 156.65

Informational only; Commercial Vehicle Information
Details: I-5 MP 156.65 NB & SB (crossing under Cox Rd - Anlauf) Effective September 5, 2017, this section of I-5 will be restricted to 16 feet 07 in. in height on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is October 6, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 163 to 154

No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays, use caution. Final work is scheduled for later this fall.
Updated: 10/04/2017 12:44 pm

I-5 MP 164.44

Informational only; Commercial Vehicle Information
Details: I-5 MP 164 to MP 165 NB & SB (Anlauf) Effective August 1, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 194 to 195.7

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) Median , 3 Lanes , Shoulder (Northbound) Median , 3 Lanes , Shoulder
Comments: Road construction is occurring causing less than 20 minute delays, use caution. Ramps Affected.
Updated: 10/11/2017 3:52 pm

I-5 MP 230.861 to 231

Informational only; Commercial Vehicle Information
Details: I-5 MP 230.70 to MP 231.00 SB (Albany) Effective October 30, 2017, this section of I-5 southbound will be restricted to 12 feet 00 in. in width between the hours of 9 PM to 5:30 AM. Estimated date of completion is November 13, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 232.02 to 245.04

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes
Comments: Road construction is occurring, use caution. Ramps Affected. Expect minor delays from 10 PM Sunday night to 5:30 AM Monday morning. Monday night thru Thursday from 9:00 PM to 5:30 AM. Ramps will be closed during paving and a signed detour route will be provided.
Updated: 10/14/2017 08:43 am

I-5 MP 234.08 to 244.88

Informational only; Commercial Vehicle Information
Details: I-5 MP 234.0 to MP 245.5 NB & SB (north of Albany) Effective August 13, 2017, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 5:30 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 234.08 to 244.88

Informational only; Commercial Vehicle Information
Details: I-5 MP 234.0 to MP 245.5 SB (north of Albany) Effective August 13, 2017, this section of I-5 southbound will be restricted to 15 feet 10 in. in height between the hours of 9 PM & 5:30 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 234.11 to 248.62

Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exits 235-244 on- and off-ramps (Albany to Salem) Effective August 20, 2017, the following on- and off-ramps to/from I-5 northbound and southbound will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 5:30 AM: Exits 235, 237, 238, 239, 242, 243, 244. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 236 to 238

No to Minimum Delay; Maintenance Work
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution.
Updated: 10/17/2017 9:09 pm

I-5 MP 240.95

Informational only; Commercial Vehicle Information
Details: I-5 MP 240.85 NB & SB (Santiam Rest Area - north of Albany) Effective September 11, 2017, the Santiam Rest Area will be closed to truck traffic. Effective September 18, 2017, the Santiam Rest Area will be closed to all traffic. This closure is NOT on the I-5 mainline. Estimated date of completion is October 4, 2017.
Updated: 10/17/2017 7:02 pm

ORE22 MP 30.03

Informational only; Commercial Vehicle Information
Details: Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Updated: 10/17/2017 7:01 pm

ORE34 MP .13

Informational only; Commercial Vehicle Information
Details: Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.
Updated: 10/17/2017 7:01 pm

ORE38 MP 1 to 42

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Intermittent traffic control with flaggers, for culvert replacement project. This project will build two bridges and replace more than 30 culverts, throughout the project area. Construction will continue until September 2018.
Updated: 10/04/2017 12:40 pm

ORE38 MP 22.75 to 22.84

Informational only; Commercial Vehicle Information
Details: OR38 MP 21 to MP 26 EB & WB (east of Scottsburg) Effective August 28, 2017, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 15, 2018.
Updated: 10/17/2017 7:02 pm

ORE38 MP 41.98

Informational only; Commercial Vehicle Information
Details: OR38 MP 41 to MP 42 EB & WB (west of Drain) Effective August 28, 2017, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 15, 2018.
Updated: 10/17/2017 7:02 pm

ORE99 MP 2.17 to 2.25

Informational only; Commercial Vehicle Information
Details: OR99E MP 2.17 to MP 2.25 NB & SB (Albany) Effective November 11, 2017, this section of OR99E will be restricted to 8 feet 06 in. in width between the hours of 11 AM & 1 PM for one day only.
Updated: 10/17/2017 7:02 pm

ORE99 MP 103.68

Informational only; Commercial Vehicle Information
Details: OR99W MP 103.68 NB & SB (north of Junction City) Effective April 24, 2017, this section of OR99W will be restricted to 15 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 13, 2017.
Updated: 10/17/2017 7:01 pm

ORE126 MP 1.34

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield) OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

ORE138 MP .1

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Watch for lane closures and signed detours in the downtown areas for night work. Expect heavy congestion and delays during peak travel times. Ramps Affected. Several traffic signals are being replaced, flaggers will provide traffic control as needed. Motorists may want to use alternate routes. Pedestrians should watch for sidewalk and crosswalk closures throughout the work zone, and look for pedestrian detour signs. This project will help improve safety in the downtown area and the flow of traffic between Diamond Lake Blvd and I-5.
Updated: 10/04/2017 12:41 pm

ORE164 MP 6.24

Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

ORE241 MP .51

Informational only; Commercial Vehicle Information
Details: OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Updated: 10/17/2017 7:01 pm

ORE242 MP 55.46 to 76.65

Closure; Crash/Hazard
Comments: The highway is closed. Use alternate routes.
Last Updated: 10/17/2017 2:16 pm

ORE242 MP 84.8

Closure; Crash/Hazard
Comments: The highway is closed due to damage caused by a wildfire. Use alternate routes.
Last Updated: 10/16/2017 4:57 pm

ORE569 MP 11.38 to 11.67

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring causing no to minimum delays. Watch for construction equipment and workers in roadway. Use caution. • Building a new bridge over I-5 to accommodate a reconfigured onramp • Building a sound wall south of Beltline and east of Coburg Road • Adding an additional lane on eastbound Beltline from Coburg Road to I-5 on ramp • Extending the multi-use path for bike and pedestrian travelers. The multi-use path will be extended south, linking Harlow Road to North Garden Way Remarks: This is the last phase of a multi-year interchange project. Minimal delays during the day are expected. Travelers should expect distractions from off-road work in the area and be prepared for trucks entering and exiting the roadway. Night work is estimated to begin mid-August and may continue for several weeks, Monday through Thursday. Crews will be working on median barrier work and paving activities on Beltline. Motorists should expect single lane closures on eastbound and westbound Beltline during night work with crews present from 8 p.m. to 6 a.m. The contractor will be constructing sound wall 3 and performing earthwork grading along eastbound Beltline. Drivers should use caution when traveling through the project site and pay attention to the 45 mph speed zone reduction on eastbound Beltline. Oregon State Police are enforcing the speed limit through the work zone area. This project is scheduled to be completed December 2017.
Updated: 10/11/2017 3:53 pm

ORE569 MP 11.5 to 12

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/17/2017 9:15 pm

ORE99W MP 103.5 to 103.76

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction is occurring, use caution. The temporary traffic signal has been removed and two lanes of travel are open. Flagging will be used as needed to complete the work. Drivers can expect minor delays.
Updated: 10/14/2017 07:59 am

ORE99W MP 103.5 to 103.76

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Bridge work is occurring. Use caution. Expect minor delays.
Updated: 08/27/2017 5:22 pm

US20 MP 2.24 to 2.42

Informational only; Commercial Vehicle Information
Details: US20 MP 2.25 to MP 2.50 EB & WB (Toledo) Effective October 16, 2017, this section of US20 eastbound and westbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 30, 2017.
Updated: 10/17/2017 7:02 pm

US20 MP 2.25

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) Median , 1 Lane (Eastbound) Median , 1 Lane
Comments: Road maintenance operations are occurring, use caution. Traffic will be controlled by flaggers, 24 hours a day. Expect delays.
Updated: 10/14/2017 07:53 am

US20 MP 10.57 to 11.01

Informational only; Commercial Vehicle Information
Details: US20 MP 10.57 to MP 11.01 EB & WB (Albany) Effective November 11, 2017, this section of US20 will be closed between the hours of 11 AM & 1 PM for one day only.
Updated: 10/17/2017 7:02 pm

US20 MP 10.82 to 10.91

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/16/2017 07:51 am

US20 MP 10.82 to 10.91

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Work to start on waterline installation which will cause short term intermittent lane closures. Highway improvements associated with the new Downtown Albany Fire House. This project will reconstruct curbs, sidewalk & sidewalk ramps, removing fire signals and new marked crosswalks.
Updated: 05/22/2017 11:40 am

US20 MP 14.1 to 14.27

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) Median , 2 Lanes (Eastbound) Median , 2 Lanes
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/16/2017 08:13 am

US20 MP 15.78 to 31.48

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , 1 Lane (Eastbound) Median , 1 Lane
Comments: Road construction is occurring, use caution. Eastbound and westbound traffic will have periodic lane closures.
Updated: 10/14/2017 07:40 am

US20 MP 33.35 to 49.86

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Construction work in area.Traffic will be controlled by flaggers and pilot car. Expect minor delays. Work hours will be 6:00 PM to 6:00 AM Sunday thru Thursday, eastbound and westbound.
Updated: 10/14/2017 07:51 am

US20 MP 44.45 to 48.88

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Paving project and guardrail repairs. Traffic controlled by flaggers and pilot car. Work will be done Sunday thru Thursday 8:00pm to 5:00am, eastbound and westbound.
Updated: 10/11/2017 2:01 pm

US20 MP 80.88 to 87.22

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 1 Lane
Comments: Road construction will have single lane closures Monday thru Thursday 7:00 AM to 7:00 PM and on Friday 7:00 AM to 12:00 PM, use caution. Traffic controlled by flaggers and pilot car.
Updated: 09/30/2017 5:47 pm

US101 MP 141.67

Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Updated: 10/17/2017 7:01 pm

US101 MP 190.87 to 191.21

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Expect single lane closures with flagger control and possible 20 minute delay. Project Summary: This project will make repairs to the existing concrete and reinforcement and replace the cathodic protection system on the Siuslaw River Bridge Seismic restraints to help maintain the integrity of the bridge in an earthquake will also be added. Sidewalk closure on one side of bridge. A new ornamental bridge rail will replace the existing rail along with improved pedestrian access to the bridge. Work is to be completed by the end of March in 2019.
Updated: 10/11/2017 3:44 pm

US101 MP 190.98

Informational only; Commercial Vehicle Information
Details: US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

US101 MP 211

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction on the Umpqua River Bridge. Expect intermittent lane closures and traffic control with flaggers.
Updated: 10/04/2017 12:34 pm

US101 MP 211.21

Informational only; Commercial Vehicle Information
Details: US101 MP 211.21 NB & SB (Umpqua River Bridge - Reedsport) Effective October 9, 2017, this section of US101 will be restricted to 14 feet 00 in. in width on Monday to Thursday between the hours of 7 AM & 7 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

US101 MP 233.4 to 234.5

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road construction is occurring causing no to minimum delays, use caution. Intermittent night lane closures on McCullough Bridge. Watch for flaggers and workers on the bridge. Both sidewalks on the bridge are open, pedestrians are advised to use caution.
Updated: 10/04/2017 12:25 pm

US101 MP 233.99

Informational only; Commercial Vehicle Information
Details: US101 MP 233.99 (McCullough Bridge - Coos Bay) Effective October 15, 2013, this section of US101 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is November 1, 2018.
Updated: 10/17/2017 7:01 pm

US101 MP 252.7

Informational only; Crash/Hazard
Comments: East Beaver Hill Rd off of Hwy 101 is closed due to a slide. Use alternate route. Hwy 101 is open.
Last Updated: 10/14/2017 08:56 am

Central Oregon Road Conditions by Route

HWY372 MP 5.09 to 5.19

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Eastbound) 1 Lane (Westbound) 1 Lane
Comments: Road construction is occurring 7AM-5PM with single lane closures and flaggers. No to minimum delays expected. Rimrock trailhead will be closed October 4th through the 21st.
Updated: 10/06/2017 09:19 am

ORE27 MP 1.9

Informational only; Commercial Vehicle Information
Details: OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 10/17/2017 7:01 pm

ORE27 MP 2.88

Informational only; Commercial Vehicle Information
Details: OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 10/17/2017 7:01 pm

ORE27 MP 4.62

Informational only; Commercial Vehicle Information
Details: OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Updated: 10/17/2017 7:01 pm

ORE27 MP 27.23

Informational only; Commercial Vehicle Information
Details: OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.
Updated: 10/17/2017 7:01 pm

ORE242 MP 55.46 to 76.65

Closure; Crash/Hazard
Comments: The highway is closed. Use alternate routes.
Last Updated: 10/17/2017 2:16 pm

ORE242 MP 84.8

Closure; Crash/Hazard
Comments: The highway is closed due to damage caused by a wildfire. Use alternate routes.
Last Updated: 10/16/2017 4:57 pm

ORE372 MP 5.92

Informational only; Commercial Vehicle Information
Details: OR372 (Century Drive Hwy) MP 5.09 to MP 5.19 EB & WB (Bend) Effective October 9, 2017, this section of OR372 will be restricted to 12 feet 00 in. in width. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 21, 2017.
Updated: 10/17/2017 7:02 pm

US20 MP 0 to 15.2

No to Minimum Delay; Construction Work
Comments: Grinding operations are occurring Tuesday night with up to 20 min delays. Additional work will be performed around the work zone.
Updated: 10/11/2017 12:24 am

US20 MP 80.88 to 87.22

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 1 Lane
Comments: Road construction will have single lane closures Monday thru Thursday 7:00 AM to 7:00 PM and on Friday 7:00 AM to 12:00 PM, use caution. Traffic controlled by flaggers and pilot car.
Updated: 09/30/2017 5:47 pm

US20 MP 99.2 to 100.3

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Intermittent cleanup work will be occurring with no delays to traffic expected.
Updated: 10/07/2017 10:23 am

US97 MP 134.44 to 134.93

Informational only; Commercial Vehicle Information
Details: US97 MP 134.50 to MP 134.93 SB (Bend) Effective October 9, 2017, this section of US97 southbound will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 6 AM. Estimated date of completion is November 13, 2017.
Updated: 10/17/2017 7:02 pm

US97 MP 139.97

Unconfirmed; Crash/Hazard
Lanes Affected: (Northbound) 1 Lane
Comments: An unconfirmed report of an abandoned vehicle creating a hazard has been received. Use caution.
Last Updated: 10/15/2017 11:38 am

US97 MP 164.91 to 166.26

No to Minimum Delay; Construction Work
Comments: No work is planned for this week.
Updated: 10/04/2017 3:03 pm

East Oregon Road Conditions by Route

I-84 MP 313.12 to 318.53

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Road construction is occurring causing no to minimum delays. Expect intermittent lane closures and no to minimum delays. Speeds are reduced for all traffic in the workzone. Bicycle riders detoured around construction zone via old U.S. 30 (adjacent to freeway), between Exit 313 and 327.
Updated: 10/12/2017 1:09 pm

I-84 MP 313.29 to 317.77

Informational only; Commercial Vehicle Information
Details: I-84 MP 313.0 to MP 318.5 EB & WB (east of Baker City) Effective April 3, 2017, this section of I-84 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 330.42 to 342.92

Informational only; Commercial Vehicle Information
Details: I-84 MP 329.00 to MP 344.50 EB & WB (Pleasant Valley) Effective September 24, 2017, this section of I-84 will be restricted to 17 feet 10 in. in height eastbound, and 17 feet 03 in. in height westbound between the hours of 7 PM & 7 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 330.42 to 342.9

Informational only; Commercial Vehicle Information
Details: I-84 MP 329.00 to MP 344.50 EB & WB (Pleasant Valley) Effective October 17, 2017, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 7 AM & 7 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 24, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 330.42 to 342.9

Informational only; Commercial Vehicle Information
Details: I-84 MP 329.00 to MP 344.50 EB & WB (Pleasant Valley) Effective September 24, 2017, this section of I-84 will be restricted to 13 feet 00 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

ORE86 MP 40.64

Informational only; Commercial Vehicle Information
Details: OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Updated: 10/17/2017 7:01 pm

US20 MP 246.03 to 246.04

Informational only; Commercial Vehicle Information
Details: US20 MP 246.00 to MP 246.05 EB & WB (Vale) Effective October 27, 2017, this section of US20 will be restricted to 14 feet 00 in. in width between the hours of 6 AM & 6 PM. Loads wider than 14 feet 00 in. in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 10, 2017.
Updated: 10/17/2017 7:02 pm

US30 MP .46

Informational only; Commercial Vehicle Information
Details: US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

Southwest Oregon Road Conditions by Route

I-5 MP 31

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 10/17/2017 10:53 pm

I-5 MP 31

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 10/17/2017 10:53 pm

I-5 MP 31 to 35

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) Median , 1 Lane (Northbound) Median , 1 Lane
Comments: Expect fast lane closures, NB and SB, 7 PM to 7 AM, for cable barrier installation.
Updated: 10/10/2017 06:09 am

I-5 MP 33 to 45

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/17/2017 8:58 pm

I-5 MP 44 to 67

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) Median , 1 Lane (Northbound) Median , 1 Lane
Comments: Expect single lane closures, for safety cable barrier installation.
Updated: 10/04/2017 12:24 pm

I-5 MP 82 to 119

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) Median , 1 Lane (Northbound) Median , 1 Lane
Comments: Road construction is occurring, use caution. Intermittent fast lane and shoulder closures, for cable-barrier installation. This part of the project is between Glendale and south Roseburg.
Updated: 10/04/2017 11:29 am

I-5 MP 104.85

Informational only; Commercial Vehicle Information
Details: I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Updated: 10/17/2017 7:01 pm

I-5 MP 118 to 120

No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) 1 Lane (Northbound) 2 Lanes
Comments: Road construction is occurring causing no to minimum delays, use caution. Watch for intermittent shoulder closures. Ramps Affected.
Updated: 10/04/2017 12:47 pm

ORE62 MP .7 to 5.7

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , 3 Lanes , Shoulder (Eastbound) Median , 3 Lanes , Shoulder
Comments: All lanes on Hwy 62 are open between 6 AM to 7 PM, Mon-Thur, and 6 AM to 10 PM, Fri-Sun. Always use caution, watch for lane closures, and signs. The new access to Crater Lake Avenue at Fowler Lane is open and the existing access at Corey Road is closed. North/Middle: Daytime, watch for truck traffic in the Vilas / Hwy 62 intersection. South: Agate Road at Hwy 62 is permanently closed. During the day, workers and equipment will be working off the roadway. Use caution, and watch for workers throughout the project.
Updated: 10/04/2017 11:43 am

ORE62 MP 20 to 20.76

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Intermittent traffic control with flaggers, from the Rogue River Bridge to Cleveland St. This is for an enhancement project.
Updated: 10/04/2017 12:21 pm

ORE99 MP -.19 to -.09

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 2 Lanes (Southbound) 2 Lanes
Comments: Sunday through Thursday nights, 7 PM to 7 AM, expect single lane traffic on the Caveman Bridge. Contractor is installing a work platform. This project will rehabilitate the Caveman Bridge, in Grants Pass. This is scheduled for completion by March, 2019, any traffic impacts will occur at night.
Updated: 10/04/2017 12:23 pm

ORE99 MP 14.6 to 17.8

No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane , Shoulder
Comments: Road construction is occurring causing no to minimum delays, use caution. Intermittent single lane closures for utility work in Talent. This is daytime work in preparation for highway upgrades.
Updated: 10/04/2017 11:44 am

ORE140 MP 0 to 5.97

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Traffic control with flaggers and pilot car, for night work, use caution. Scheduled hours are 7 PM to 7 AM, Sunday night through Thursday night.
Updated: 10/04/2017 11:31 am

ORE234 MP .04

Informational only; Commercial Vehicle Information
Details: OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

US101 MP 311.4

Informational only; Commercial Vehicle Information
Details: US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic. Effective May 5, 2017, during construction, on-site certified flaggers may be provided to the carrier at no cost on a case-by-case basis during construction hours. Contact the Over-Dimension Permit Unit for information.
Updated: 10/17/2017 7:01 pm

US101 MP 347.78

Informational only; Commercial Vehicle Information
Details: US101 MP 347.78 NB & SB (north of Brookings) Effective July 31, 2017, this section of US101 will be restricted to 16 feet 00 in. in width. Estimated date of completion is August 31, 2019.
Updated: 10/17/2017 7:02 pm

US101 MP 348

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: The bridge is limited to a single lane of traffic, controlled by a temporary signal, until summer 2019. This is for painting the Thomas Creek Bridge.
Updated: 10/04/2017 12:31 pm

South Oregon Road Conditions by Route

ORE140 MP 0 to 5.97

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Traffic control with flaggers and pilot car, for night work, use caution. Scheduled hours are 7 PM to 7 AM, Sunday night through Thursday night.
Updated: 10/04/2017 11:31 am

ORE140 MP 82.8 to 84.86

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Traffic control with flaggers and pilot car, 24 hours a day, Monday through Friday. This is for excavation and grading, on the Antelope Canyon project.
Updated: 10/04/2017 11:33 am

Southeast Oregon Road Conditions by Route

No adverse road conditions reported at this time.

City of Bend Road Conditions by Route

No adverse road conditions reported at this time.

City of Eugene Road Conditions by Route

I-5 MP 194 to 195.7

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) Median , 3 Lanes , Shoulder (Northbound) Median , 3 Lanes , Shoulder
Comments: Road construction is occurring causing less than 20 minute delays, use caution. Ramps Affected.
Updated: 10/11/2017 3:52 pm

ORE126 MP 1.34

Informational only; Commercial Vehicle Information
Details: OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield) OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 10/17/2017 7:01 pm

ORE569 MP 11.38 to 11.67

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring causing no to minimum delays. Watch for construction equipment and workers in roadway. Use caution. • Building a new bridge over I-5 to accommodate a reconfigured onramp • Building a sound wall south of Beltline and east of Coburg Road • Adding an additional lane on eastbound Beltline from Coburg Road to I-5 on ramp • Extending the multi-use path for bike and pedestrian travelers. The multi-use path will be extended south, linking Harlow Road to North Garden Way Remarks: This is the last phase of a multi-year interchange project. Minimal delays during the day are expected. Travelers should expect distractions from off-road work in the area and be prepared for trucks entering and exiting the roadway. Night work is estimated to begin mid-August and may continue for several weeks, Monday through Thursday. Crews will be working on median barrier work and paving activities on Beltline. Motorists should expect single lane closures on eastbound and westbound Beltline during night work with crews present from 8 p.m. to 6 a.m. The contractor will be constructing sound wall 3 and performing earthwork grading along eastbound Beltline. Drivers should use caution when traveling through the project site and pay attention to the 45 mph speed zone reduction on eastbound Beltline. Oregon State Police are enforcing the speed limit through the work zone area. This project is scheduled to be completed December 2017.
Updated: 10/11/2017 3:53 pm

ORE569 MP 11.5 to 12

Estimated delay under 20 minutes; Maintenance Work
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/17/2017 9:15 pm

City of La Grande Road Conditions by Route

ORE82 MP 0 to 1.16

No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Road construction is occurring with single lane closures Mon-Fri. Alternate pedestrian routing is in place. Use caution.
Updated: 10/11/2017 4:20 pm

City of Medford Road Conditions by Route

I-5 MP 31 to 35

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) Median , 1 Lane (Northbound) Median , 1 Lane
Comments: Expect fast lane closures, NB and SB, 7 PM to 7 AM, for cable barrier installation.
Updated: 10/10/2017 06:09 am

I-5 MP 31

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 10/17/2017 10:53 pm

I-5 MP 31

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road construction is occurring, use caution.
Updated: 10/17/2017 10:53 pm

ORE62 MP .7 to 5.7

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , 3 Lanes , Shoulder (Eastbound) Median , 3 Lanes , Shoulder
Comments: All lanes on Hwy 62 are open between 6 AM to 7 PM, Mon-Thur, and 6 AM to 10 PM, Fri-Sun. Always use caution, watch for lane closures, and signs. The new access to Crater Lake Avenue at Fowler Lane is open and the existing access at Corey Road is closed. North/Middle: Daytime, watch for truck traffic in the Vilas / Hwy 62 intersection. South: Agate Road at Hwy 62 is permanently closed. During the day, workers and equipment will be working off the roadway. Use caution, and watch for workers throughout the project.
Updated: 10/04/2017 11:43 am

Portland Metro Road Conditions by Route

Hwy100 MP 8.76 to 22

Closure; Crash/Hazard
Lanes Affected: (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments: The highway is closed. Use alternate routes.
Last Updated: 10/17/2017 06:56 am

I-5 MP 299.17 to 300.73

Informational only; Commercial Vehicle Information
Details: I-5 NB MP 299 to MP 301 (Marquam Bridge Portland) Effective November 17, 2017, this section of I-5 northbound will be closed between the hours of 9 PM to 5 AM. Estimated date of completion is November 18, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 300.5 to 302

Estimated delay under 20 minutes; Construction Work
Comments: Periodic nighttime lane and ramp closures Saturday 9 p.m. to 8 a.m., Monday through Friday 10 p.m. to 5 a.m. Periodic closures on I-5 in both directions (Broadway/Weidler to the East end of the Marquam Bridge) Monday through Friday. The ramp from I-84 westbound to I-5 Northbound and the Wheeler on-ramp to I-5 south will be periodically closed.
Updated: 10/13/2017 1:17 pm

I-5 MP 301 to 302

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/17/2017 11:37 pm

I-5 MP 301.06 to 301.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 301 to MP 302 NB & SB (Portland) Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 301.06 to 301.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 301 to MP 302 NB & SB (Portland) Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 06 in. in height southbound, and 16 feet 01 in. in height northbound, between the hours of 10 PM & 5 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 301.09

OFF RAMP
Closure; Maintenance Work
Comments: Road work has exit 300B to Morrison Bridge and City Center closed until October 22nd. City Center traffic use an alternate route. Ramps Affected.
Updated: 10/14/2017 06:33 am

I-5 MP 301.36

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from the Morrison Bridge (Portland) Effective June 8, 2017, the ramp from the Morrison Bridge to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 301.7

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 300B ramp to OR99E/Oregon City/OMSI (Portland) Effective June 8, 2017, the ramp from I-5 southbound Exit 300B to OR99E/Oregon City/OMSI will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 302.011

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Wheeler St (Portland) Effective June 8, 2017, the ramp from Wheeler St to I-5 southbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 307.69 to 307.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 307.70 to MP 307.98 NB (Portland) Effective September 21, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width per the following schedule; Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Mobile homes with eaves allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 26, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 307.69 to 307.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 307.70 to MP 307.98 SB (Portland) Effective September 21, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width per the following schedule; Sunday through Thursday nights between the hours of 11 PM & 5 AM; Friday and Saturday nights between the hours of 12:01 AM & 6 AM. Mobile homes with eaves allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 26, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 307.77 to 307.97

Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 308 On/Off Ramps (Jantzen Beach) Effective September 21, 2017, the I-5 northbound Exit 308 on/off ramps will be intermittently closed per the following schedule; Sunday through Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 8 AM; Saturday nights between the hours of 8 PM & 9 AM. Estimated date of completion is September 26, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 307.99

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 308 Off Ramp (Jantzen Beach) Effective September 21, 2017, the I-5 southbound Exit 308 off ramp will be intermittently closed per the following schedule; Sunday through Thursday nights between the hours of 8 PM & 5 AM; Friday and Saturday nights between the hours of 9 PM & 7 AM. Estimated date of completion is September 26, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 308.38

Informational only; Commercial Vehicle Information
Details: I-5 SB Interstate Bridge (Portland at OR/WA Border) Effective October 21, 2017, I-5 southbound crossing the Interstate Bridge will be closed between the hours of 10 PM & 7 AM. Estimated date of completion is October 22, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 0 to 1.97

Informational only; Commercial Vehicle Information
Details: I-84 MP 0 to MP 2 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0 to 1.97

Informational only; Commercial Vehicle Information
Details: I-84 MP 0 to MP 2 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0

Informational only; Commercial Vehicle Information
Details: I-84 WB to I-5 NB Ramp Effective June 26, 2017, the ramp from I-84 westbound to I-5 northbound will be intermittently closed per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday & Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0

Estimated delay under 20 minutes; Construction Work
Comments: The ramp from I-84 westbound to I-5 north will be closed Monday through Friday from 10 p.m. to 5 a.m. (until 8 a.m. Saturday).
Updated: 10/13/2017 1:17 pm

I-84 MP .54

Informational only; Commercial Vehicle Information
Details: I-84 EB on-ramp from the Morrison Bridge (Portland) Effective June 8, 2017, the ramp from the Morrison Bridge to I-84 eastbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 1.19 to 4.95

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 15 feet 09 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 1.19 to 4.95

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 2 to 2.98

Informational only; Commercial Vehicle Information
Details: I-84 MP 2 to MP 3 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 2 to 2.98

Informational only; Commercial Vehicle Information
Details: I-84 MP 2 to MP 3 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 2.17 to 3.56

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Eastbound) 1 Lane
Comments: Road construction is occurring, use caution. Ramps Affected.
Updated: 10/17/2017 9:00 pm

I-84 MP 3.35 to 3.84

Informational only; Commercial Vehicle Information
Details: I-84 MP 3 to MP 4 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 16 feet 02 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 3.35 to 3.84

Informational only; Commercial Vehicle Information
Details: I-84 MP 3 to MP 4 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 5 to 3.56

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/18/2017 12:05 am

I-84 MP 5.01 to 5.86

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 6 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 17 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 5.01 to 5.87

Informational only; Commercial Vehicle Information
Details: I-84 MP 6 to MP 5 WB (Portland) Effective August 1, 2017, this section of I-84 westbound will be restricted to 19 feet 00 in. in width, per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 5.01 to 5.86

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 6 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 16 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 5.74

OFF RAMP
Closure; Maintenance Work
Comments: Road maintenance operations have the ramp closed EB to I-205 NB, use an alternate route. Ramps Affected.
Updated: 10/17/2017 8:45 pm

I-84 MP 7 to 0

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Double lane closures in both directions of I-84 (from I-5 to I-205) from 8 p.m. to 5:30 a.m. weekdays.
Updated: 10/13/2017 1:19 pm

I-84 MP 17.56 to 18.06

Informational only; Commercial Vehicle Information
Details: I-84 MP 17.5 to MP 21.0 EB & WB (east of Troutdale) Effective August 9, 2017, this section of I-84 will be restricted to 21 feet 00 in. in width between the hours of 8 PM & 10 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP .25 to 2

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane , Shoulder
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/17/2017 10:28 pm

I-205 MP 1 to 9

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime single lane closures in both directions. Ramps to/from 10th Street and OR 43 impacted. Closures are from 10 p.m. to 5 a.m. Shoulder closures on 10th Street. The 10th Street I-205 on- and off-ramps will be closed Wednesday and Thursday beginning at 9 p.m. Saturday night, the OR 43 northbound on-ramp to I-205 north will be closed.
Updated: 10/13/2017 1:20 pm

I-205 MP 1.24 to 8.69

Informational only; Commercial Vehicle Information
Details: I-205 MP 0.99 to MP 8.82 NB & SB (Tualatin to West Linn) Effective July 9, 2017, this section of I-205 will be restricted to 13 feet 00 in. in width at the following times: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-205 MP 2.86 to 3.55

Informational only; Commercial Vehicle Information
Details: I-205 NB & SB Exit 3 on- and off-ramps to/from Stafford Rd (Lake Oswego) Effective July 23, 2017, the I-205 northbound and southbound Exit 3 on- and off-ramps to/from Stafford Rd will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 6.09 to 6.88

Informational only; Commercial Vehicle Information
Details: I-205 NB & SB Exit 6 on- and off-ramps to/from 10th St (West Linn) Effective July 23, 2017, the I-205 northbound and southbound Exit 6 on- and off-ramps to/from 10th St will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 8.5 to 9.031

Informational only; Commercial Vehicle Information
Details: I-205 NB & SB Exit 8 on- and off-ramps to/from OR43 (West Linn) Effective July 23, 2017, the I-205 northbound and southbound Exit 8 on- and off-ramps to/from OR43 will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 8.82

ON RAMP
Closure; Maintenance Work
Comments: Road maintenance operations are occurring, use an alternate route. Ramps Affected.
Updated: 10/17/2017 10:26 pm

I-205 MP 13.07 to 16.24

Informational only; Commercial Vehicle Information
Details: I-205 MP 13.0 to MP 16.3 NB & SB (Clackamas) Effective February 13, 2017, this section of I-205 will be restricted to 17 feet 00 in. in height at the following times: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM and Friday night 8 PM to 8 AM. Estimated date of completion is October 30, 2017.
Updated: 10/17/2017 7:01 pm

I-205 MP 16.2 to 26.56

Informational only; Commercial Vehicle Information
Details: I-205 MP 16 to MP 26 NB & SB (Portland) Effective September 17, 2017, this section of I-205 will be restricted to 16 feet 05 in. in height between the hours of 10 PM & 5:30 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 16.2 to 26.56

Informational only; Commercial Vehicle Information
Details: I-205 MP 16 to MP 26 NB & SB (Portland) Effective September 17, 2017, this section of I-205 will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5:30 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 21.71

Informational only; Commercial Vehicle Information
Details: I-205 SB Exit 21B to I-84 WB (Portland) Effective August 3, 2017, the ramp from I-205 southbound Exit 21B to I-84 westbound will be intermittently closed, per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM. Estimated date of completion is November 30, 2017.
Updated: 10/17/2017 7:02 pm

I-205 MP 22.22 to 23.68

Estimated delay of 20 minutes - 2 hours; Maintenance Work
Lanes Affected: (Northbound) 2 Lanes
Comments: Road maintenance operations have the two right lane closed NB between I-84 EB, and Killingsworth, use caution.
Updated: 10/17/2017 8:43 pm

I-405 MP .77

Informational only; Commercial Vehicle Information
Details: I-405 SB Ramp to I-5 NB (Portland) Effective November 17, 2017, the on-ramp from I-405 southbound to I-5 northbound will be closed between the hours of 9 PM to 5 AM. Estimate date of completion is November 18, 2017.
Updated: 10/17/2017 7:02 pm

ORE8 MP 3.18 to 10

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime lane closures at intersections (Brookwood to OR 217) from 8 p.m. to 5 a.m. Shoulder closures on Cornelius Pass Road, Murray Boulevard and Scholls Ferry Road in both directions weekday nights.
Updated: 10/13/2017 1:37 pm

ORE8 MP 6.45 to 6.75

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts.
Updated: 10/13/2017 1:37 pm

ORE8 MP 7 to 10

Estimated delay under 20 minutes; Construction Work
Comments: Periodic daytime lane closures on Cornelius Pass and TV Highway.
Updated: 10/04/2017 4:57 pm

ORE10 MP 2 to 6.3

Estimated delay under 20 minutes; Construction Work
Comments: Periodic daytime lane closures at Capitol Highway.
Updated: 10/16/2017 12:23 pm

ORE43 MP .31

Informational only; Commercial Vehicle Information
Details: OR43 NB Ramp to I-5 NB (Portland) Effective November 17, 2017, the on-ramp from OR43 to I-5 northbound will be closed between the hours of 9 PM to 5 AM. Estimate date of completion is November 18, 2017.
Updated: 10/17/2017 7:02 pm

ORE43 MP 11.16

Estimated delay under 20 minutes; Construction Work
Comments: Saturday night, the OR 43 northbound on-ramp to I-205 north will be closed.
Updated: 10/13/2017 1:29 pm

ORE43 MP 11.43

Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 10/17/2017 7:01 pm

ORE99 MP 3.07 to 4.49

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 NB & SB (Milwaukie) Effective July 3, 2017, this section of OR99E will be restricted to 17 feet 01 in. in height per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.49

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 SB (Milwaukie) Effective July 3, 2017, this section of OR99E southbound will be restricted to 8 feet 06 in. in width per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights at 8 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.43

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 4.49 to MP 3.07 NB (Milwaukie) Effective July 3, 2017, this section of OR99E northbound will be restricted to 8 feet 06 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.78

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 4.78 to MP 3.07 NB (Milwaukie) Effective July 7, 2017, this section of OR99E northbound will be closed on weekends from Friday at 10 PM until Monday at 5 AM. No closures will take place the weekends of August 11-14, and August 25-28. Estimated date of completion is September 1, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.53 to 3.72

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) SB on- and off-ramps to/from Bybee Blvd (Milwaukie) Effective July 5, 2017, the OR99E southbound ramps to/from Bybee Blvd will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:01 pm

ORE99 MP 4.08

Informational only; Commercial Vehicle Information
Details: Terwilliger Blvd at OR99W MP 4.08 NB & SB (Portland) Effective October 13, 2017 at 8 PM, Terwilliger Blvd crossing over I-5 will be closed. This closure is NOT on the OR99W mainline. Estimated date of completion is 5 AM, October 16, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 4.34 to 4.44

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) NB & SB ramps to/from Tacoma St (Milwaukie) Effective June 19, 2017, the OR99E northbound and southbound ramps to/from Tacoma St will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is September 29, 2017.
Updated: 10/17/2017 7:01 pm

ORE99 MP 5.43

Informational only; Commercial Vehicle Information
Details: OR99E SB ramp to OR224 EB (Milwaukie) Effective June 19, 2017, the ramp from OR99E southbound to OR224 eastbound will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

ORE99 MP 5.43

Informational only; Commercial Vehicle Information
Details: OR99E SB ramp to OR224 EB (Milwaukie) Effective July 3, 2017, the ramp from OR99E southbound to OR224 eastbound will be closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 10 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 12.56 to 12.6

Informational only; Commercial Vehicle Information
Details: OR99E MP 12.55 to MP 12.57 NB & SB (Oregon City) Effective October 11, 2017 this section of OR99E northbound and southbound will be closed to truck traffic between the hours of 8 PM and 5 AM. Estimated date of completion is October 30, 2017.
Updated: 10/17/2017 7:02 pm

ORE120 MP .38

Informational only; Commercial Vehicle Information
Details: OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Updated: 10/17/2017 7:01 pm

ORE141 MP 5

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts.
Updated: 10/13/2017 1:39 pm

ORE213 MP .9 to 1

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts.
Updated: 07/28/2017 11:00 pm

ORE213 MP 6.18 to 6.24

Informational only; Commercial Vehicle Information
Details: OR213 (82nd Dr) MP 6.18 to MP 6.24 NB & SB (Portland) Effective July 31, 2017, this section of OR213 (82nd Dr) will be restricted to 10 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is October 18, 2017.
Updated: 10/17/2017 7:02 pm

ORE213 MP 8 to 10

No to Minimum Delay; Construction Work
Comments: Periodic daytime lane closures in both directions (between SE Southgate Street and King Road). For more information: 24-hour noise hotline 503-412-2374.
Updated: 10/13/2017 1:39 pm

ORE224 MP .27

Informational only; Commercial Vehicle Information
Details: OR224 WB ramp to OR99E NB (Milwaukie) Effective July 3, 2017, the ramp from OR224 westbound to OR99E northbound will be restricted to 13 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

ORE99E MP 3.07 to 4.34

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road maintenance operations have the left lane closed in both directions between SE Harold, and Tacoma, use caution.
Updated: 10/17/2017 7:10 pm

ORE99E MP 3.5 to 5.72

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Periodic nighttime single lane closures weekdays from 7 p.m. to 5 a.m.
Updated: 10/13/2017 1:38 pm

ORE99W MP 4.22

Closure with Detour; Maintenance Work
Comments: Road work has closed Terwilliger Boulevard over I-5 until Monday morning. A detour is in place using Taylors Ferry to Spring Garden, to 19th.
Updated: 10/14/2017 06:25 am

US26 MP 62 to 65

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime lane closures on U.S. 26 eastbound (between Cornelius Pass Road and NW 185th Avenue) from 9 p.m. to 5 a.m. Lane and shoulder closures on Cornelius Pass Road.
Updated: 10/06/2017 8:25 pm

US26 MP 62.12 to 64.75

Informational only; Commercial Vehicle Information
Details: US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro) Effective October 31, 2016, this section of US26 will be restricted to 10 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 62.12 to 64.75

Informational only; Commercial Vehicle Information
Details: US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro) Effective October 31, 2016, this section of US26 will be restricted to 14 feet 00 in. in width on Saturdays from 1/2 hr before sunrise until 8 AM, and on Sundays from 1/2 hr before sunrise until 9 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 62.49

Informational only; Commercial Vehicle Information
Details: US26 WB Exit 62A to Cornelius Pass Rd SB (Hillsboro) Effective March 3, 2017, the ramp from US26 westbound Exit 62A to Cornelius Pass Rd southbound is closed to all single-trip oversize/overweight permits. Estimated date of completion is December 15, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 69 to 73

No to Minimum Delay; Construction Work
Comments: Day shoulder closures on U.S. 26 in both directions. Periodic nighttime closures of the multi-use path along the south side of U.S. 26 (between SW 79th Avenue and SW Katherine Lane) with detours. Path users should expect a section of path reduced to 6 feet.
Updated: 10/13/2017 1:27 pm

US26 MP 73.53 to 73.7

Informational only; Commercial Vehicle Information
Details: US26 MP 73.53 EB & WB (Vista Ridge Tunnel - Portland) Effective October 27, 2017, this section of US26 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 9 PM & 5 AM. Estimated date of completion is October 28, 2017.
Updated: 10/17/2017 7:02 pm

US26 MP 73.75

Informational only; Commercial Vehicle Information
Details: US26 WB ramp from I-405 NB (Portland) Effective October 27, 2017, the ramp from I-405 northbound to US26 westbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 28, 2017.
Updated: 10/17/2017 7:02 pm

US26 MP 73.8

Informational only; Commercial Vehicle Information
Details: US26 WB ramp from Clay St (Portland) Effective October 27, 2017, the ramp from Clay St to US26 westbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 28, 2017.
Updated: 10/17/2017 7:02 pm

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Updated: 10/17/2017 7:01 pm

US30 MP .03

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 EB & WB (Sandy River Bridge - Troutdale) Effective October 29, 2017, this section of US30 (Historic Columbia River Hwy) will be closed between the hours of 5 AM & 2 PM. Estimated date of completion is October 29, 2017.
Updated: 10/17/2017 7:02 pm

US30 MP 1.32 to 1.85

Informational only; Commercial Vehicle Information
Details: US30 Bypass MP 1.32 to MP 1.85 EB & WB (Portland) Effective June 23, 2017, this section of US30 Bypass will be restricted to 12 feet 00 in. in width. Loads wider than 12 feet 00 in. in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is December 1, 2017.
Updated: 10/17/2017 7:01 pm

US30 MP 13.14

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Updated: 10/17/2017 7:01 pm

US30 MP 17.11 to 18.05

No to Minimum Delay; Construction Work
Lanes Affected: (Eastbound) , Shoulder (Westbound) , Shoulder
Comments: Road construction is occurring causing no to minimum delays, use caution.
Updated: 10/16/2017 08:23 am

US30 MP 17.68

Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 10/17/2017 7:01 pm

City of Salem Road Conditions by Route

I-5 MP 257 to 258

Future Event: No to Minimum Delay; Maintenance Work
Expected Start Date: 10/18/2017 9:00:00 PM
Lanes Affected: (Northbound) 1 Lane , Shoulder
Comments: Road maintenance operations are occurring causing no to minimum delays, use caution. Work will be done 9:00 PM to 5:00 AM.
Updated: 10/16/2017 12:02 pm

City of Portland Road Conditions by Route

I-5 MP 299.17 to 300.73

Informational only; Commercial Vehicle Information
Details: I-5 NB MP 299 to MP 301 (Marquam Bridge Portland) Effective November 17, 2017, this section of I-5 northbound will be closed between the hours of 9 PM to 5 AM. Estimated date of completion is November 18, 2017.
Updated: 10/17/2017 7:02 pm

I-5 MP 300.5 to 302

Estimated delay under 20 minutes; Construction Work
Comments: Periodic nighttime lane and ramp closures Saturday 9 p.m. to 8 a.m., Monday through Friday 10 p.m. to 5 a.m. Periodic closures on I-5 in both directions (Broadway/Weidler to the East end of the Marquam Bridge) Monday through Friday. The ramp from I-84 westbound to I-5 Northbound and the Wheeler on-ramp to I-5 south will be periodically closed.
Updated: 10/13/2017 1:17 pm

I-5 MP 301 to 302

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 10/17/2017 11:37 pm

I-5 MP 301.06 to 301.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 301 to MP 302 NB & SB (Portland) Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 06 in. in height southbound, and 16 feet 01 in. in height northbound, between the hours of 10 PM & 5 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 301.06 to 301.99

Informational only; Commercial Vehicle Information
Details: I-5 MP 301 to MP 302 NB & SB (Portland) Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 301.09

OFF RAMP
Closure; Maintenance Work
Comments: Road work has exit 300B to Morrison Bridge and City Center closed until October 22nd. City Center traffic use an alternate route. Ramps Affected.
Updated: 10/14/2017 06:33 am

I-5 MP 301.36

Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from the Morrison Bridge (Portland) Effective June 8, 2017, the ramp from the Morrison Bridge to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 301.7

Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 300B ramp to OR99E/Oregon City/OMSI (Portland) Effective June 8, 2017, the ramp from I-5 southbound Exit 300B to OR99E/Oregon City/OMSI will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-5 MP 302.011

Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Wheeler St (Portland) Effective June 8, 2017, the ramp from Wheeler St to I-5 southbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0 to 1.97

Informational only; Commercial Vehicle Information
Details: I-84 MP 0 to MP 2 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0 to 1.97

Informational only; Commercial Vehicle Information
Details: I-84 MP 0 to MP 2 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0

Informational only; Commercial Vehicle Information
Details: I-84 WB to I-5 NB Ramp Effective June 26, 2017, the ramp from I-84 westbound to I-5 northbound will be intermittently closed per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday & Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 0

Estimated delay under 20 minutes; Construction Work
Comments: The ramp from I-84 westbound to I-5 north will be closed Monday through Friday from 10 p.m. to 5 a.m. (until 8 a.m. Saturday).
Updated: 10/13/2017 1:17 pm

I-84 MP .54

Informational only; Commercial Vehicle Information
Details: I-84 EB on-ramp from the Morrison Bridge (Portland) Effective June 8, 2017, the ramp from the Morrison Bridge to I-84 eastbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 1.19 to 4.95

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 1.19 to 4.95

Informational only; Commercial Vehicle Information
Details: I-84 MP 5 to MP 1 WB (Portland) Effective July 12, 2017, this section of I-84 westbound will be restricted to 15 feet 09 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:02 pm

I-84 MP 2 to 2.98

Informational only; Commercial Vehicle Information
Details: I-84 MP 2 to MP 3 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 2 to 2.98

Informational only; Commercial Vehicle Information
Details: I-84 MP 2 to MP 3 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 2.17 to 3.56

Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Eastbound) 1 Lane
Comments: Road construction is occurring, use caution. Ramps Affected.
Updated: 10/17/2017 9:00 pm

I-84 MP 3.35 to 3.84

Informational only; Commercial Vehicle Information
Details: I-84 MP 3 to MP 4 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 3.35 to 3.84

Informational only; Commercial Vehicle Information
Details: I-84 MP 3 to MP 4 EB (Portland) Effective June 1, 2017, this section of I-84 eastbound will be restricted to 16 feet 02 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

I-84 MP 7 to 0

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Double lane closures in both directions of I-84 (from I-5 to I-205) from 8 p.m. to 5:30 a.m. weekdays.
Updated: 10/13/2017 1:19 pm

I-405 MP .77

Informational only; Commercial Vehicle Information
Details: I-405 SB Ramp to I-5 NB (Portland) Effective November 17, 2017, the on-ramp from I-405 southbound to I-5 northbound will be closed between the hours of 9 PM to 5 AM. Estimate date of completion is November 18, 2017.
Updated: 10/17/2017 7:02 pm

ORE8 MP 3.18 to 10

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime lane closures at intersections (Brookwood to OR 217) from 8 p.m. to 5 a.m. Shoulder closures on Cornelius Pass Road, Murray Boulevard and Scholls Ferry Road in both directions weekday nights.
Updated: 10/13/2017 1:37 pm

ORE8 MP 6.45 to 6.75

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts.
Updated: 10/13/2017 1:37 pm

ORE10 MP 2 to 6.3

Estimated delay under 20 minutes; Construction Work
Comments: Periodic daytime lane closures at Capitol Highway.
Updated: 10/16/2017 12:23 pm

ORE43 MP .31

Informational only; Commercial Vehicle Information
Details: OR43 NB Ramp to I-5 NB (Portland) Effective November 17, 2017, the on-ramp from OR43 to I-5 northbound will be closed between the hours of 9 PM to 5 AM. Estimate date of completion is November 18, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.49

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 SB (Milwaukie) Effective July 3, 2017, this section of OR99E southbound will be restricted to 8 feet 06 in. in width per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights at 8 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.43

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 4.49 to MP 3.07 NB (Milwaukie) Effective July 3, 2017, this section of OR99E northbound will be restricted to 8 feet 06 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.78

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 4.78 to MP 3.07 NB (Milwaukie) Effective July 7, 2017, this section of OR99E northbound will be closed on weekends from Friday at 10 PM until Monday at 5 AM. No closures will take place the weekends of August 11-14, and August 25-28. Estimated date of completion is September 1, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.07 to 4.49

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 NB & SB (Milwaukie) Effective July 3, 2017, this section of OR99E will be restricted to 17 feet 01 in. in height per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 3.53 to 3.72

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) SB on- and off-ramps to/from Bybee Blvd (Milwaukie) Effective July 5, 2017, the OR99E southbound ramps to/from Bybee Blvd will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is October 15, 2017.
Updated: 10/17/2017 7:01 pm

ORE99 MP 4.08

Informational only; Commercial Vehicle Information
Details: Terwilliger Blvd at OR99W MP 4.08 NB & SB (Portland) Effective October 13, 2017 at 8 PM, Terwilliger Blvd crossing over I-5 will be closed. This closure is NOT on the OR99W mainline. Estimated date of completion is 5 AM, October 16, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 4.34 to 4.44

Informational only; Commercial Vehicle Information
Details: OR99E (McLoughlin Blvd) NB & SB ramps to/from Tacoma St (Milwaukie) Effective June 19, 2017, the OR99E northbound and southbound ramps to/from Tacoma St will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is September 29, 2017.
Updated: 10/17/2017 7:01 pm

ORE99 MP 5.43

Informational only; Commercial Vehicle Information
Details: OR99E SB ramp to OR224 EB (Milwaukie) Effective July 3, 2017, the ramp from OR99E southbound to OR224 eastbound will be closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 10 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:02 pm

ORE99 MP 5.43

Informational only; Commercial Vehicle Information
Details: OR99E SB ramp to OR224 EB (Milwaukie) Effective June 19, 2017, the ramp from OR99E southbound to OR224 eastbound will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

ORE141 MP 5

Estimated delay under 20 minutes; Construction Work
Comments: No traffic impacts.
Updated: 10/13/2017 1:39 pm

ORE224 MP .27

Informational only; Commercial Vehicle Information
Details: OR224 WB ramp to OR99E NB (Milwaukie) Effective July 3, 2017, the ramp from OR224 westbound to OR99E northbound will be restricted to 13 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is October 1, 2017.
Updated: 10/17/2017 7:01 pm

ORE99W MP 4.22

Closure with Detour; Maintenance Work
Comments: Road work has closed Terwilliger Boulevard over I-5 until Monday morning. A detour is in place using Taylors Ferry to Spring Garden, to 19th.
Updated: 10/14/2017 06:25 am

ORE99E MP 3.07 to 4.34

Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Road maintenance operations have the left lane closed in both directions between SE Harold, and Tacoma, use caution.
Updated: 10/17/2017 7:10 pm

ORE99E MP 3.5 to 5.72

Estimated delay of 20 minutes - 2 hours; Construction Work
Comments: Periodic nighttime single lane closures weekdays from 7 p.m. to 5 a.m.
Updated: 10/13/2017 1:38 pm

US26 MP 62 to 65

Estimated delay under 20 minutes; Construction Work
Comments: Nighttime lane closures on U.S. 26 eastbound (between Cornelius Pass Road and NW 185th Avenue) from 9 p.m. to 5 a.m. Lane and shoulder closures on Cornelius Pass Road.
Updated: 10/06/2017 8:25 pm

US26 MP 62.12 to 64.75

Informational only; Commercial Vehicle Information
Details: US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro) Effective October 31, 2016, this section of US26 will be restricted to 14 feet 00 in. in width on Saturdays from 1/2 hr before sunrise until 8 AM, and on Sundays from 1/2 hr before sunrise until 9 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 62.12 to 64.75

Informational only; Commercial Vehicle Information
Details: US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro) Effective October 31, 2016, this section of US26 will be restricted to 10 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.
Updated: 10/17/2017 7:01 pm

US26 MP 69 to 73

No to Minimum Delay; Construction Work
Comments: Day shoulder closures on U.S. 26 in both directions. Periodic nighttime closures of the multi-use path along the south side of U.S. 26 (between SW 79th Avenue and SW Katherine Lane) with detours. Path users should expect a section of path reduced to 6 feet.
Updated: 10/13/2017 1:27 pm

US26 MP 73.53 to 73.7

Informational only; Commercial Vehicle Information
Details: US26 MP 73.53 EB & WB (Vista Ridge Tunnel - Portland) Effective October 27, 2017, this section of US26 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 9 PM & 5 AM. Estimated date of completion is October 28, 2017.
Updated: 10/17/2017 7:02 pm

US26 MP 73.75

Informational only; Commercial Vehicle Information
Details: US26 WB ramp from I-405 NB (Portland) Effective October 27, 2017, the ramp from I-405 northbound to US26 westbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 28, 2017.
Updated: 10/17/2017 7:02 pm

US26 MP 73.8

Informational only; Commercial Vehicle Information
Details: US26 WB ramp from Clay St (Portland) Effective October 27, 2017, the ramp from Clay St to US26 westbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 28, 2017.
Updated: 10/17/2017 7:02 pm

Learn more about summer road construction. The easy way to get to the gorge. TripCheck is on Twitter.  Get more information. The OReGO Interest List