Northwest Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

HWY100, 2 miles East of Troutdale MP 3

The Stark Street bridge is closed at Historic Columbia River Highway. Use alternate route.
Updated
10/22/2024 7:19:00 AM

Closure

ORE141, Tigard MP 5

Hall Boulevard is closed where it passes over OR 217 in Tigard, at Pfaffle Street. Use Greenburg Road as a detour route.

The Hall Boulevard overpass over OR 217 near OR 99W and Pfaffle Street in Tigard is closed for nine months, starting in March 2024. The intersection of Pfaffle Street and Hall Boulevard is also closed. Drivers are not permitted to turn onto Hall Boulevard from Pfaffle Street or turn onto Pfaffle Street from Hall Boulevard. All vehicle traffic should use the signed detour using Greenburg Road. People walking and bicycling will still be able to cross OR 217 via a temporary pedestrian bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)

Updated
3/11/2024 11:33:00 AM

Closure

HWY100, 5 miles West of Ainsworth State Park MP 18

A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025.

Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle or bicycle access to Multnomah Falls heading eastbound on the Historic Highway. The Wahkeena-Multnomah Falls return trail #442 is open to hikers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)

Updated
10/1/2024 10:05:00 AM

I-205: SB MP 8.32 to 11.06
I-205, West Linn

Construction Work
Estimated delay under 20 minutes
Comments
Single lane closures on Clackamette Drive, Willamette Falls Drive. Auxiliary lane closure on OR 99E north. Pedestrian detours on OR 43 and OR 99E.
Last Updated
11/11/2024 5:59 AM

I-205: MP 9.031 to 9.29
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 9.00 to MP 9.40 (Oregon City) Effective November 25, 2024, this section of I-205 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 26, 2024.
Last Updated
11/20/2024 7:00 PM

I-205: MP 9.58
I-205, 1 mile North of Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 9.60 to MP 8.65 (Oregon City) Effective December 2, 2024, this section of I-205 southbound will be restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 6, 2024.
Last Updated
11/20/2024 7:00 PM

I-405: NB MP 0.19
I-405, Interstate 5

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
11/21/2024 12:59 AM

I-5: SB MP 240.79
I-5, 7 miles North of Albany

Information
Informational only
Rest Area
Comments
The access road between the NB and SB rest areas is closed due to high water.
Last Updated
11/18/2024 3:46 PM

I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
11/13/2024 6:53 PM

I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
11/13/2024 6:53 PM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
11/20/2024 12:03 AM

I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
11/13/2024 6:53 PM

I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is December 29, 2024.
Last Updated
11/20/2024 7:00 PM

I-5: SB MP 262 to 240.15
I-5, 8 miles North of Intersection with ORE22, in Salem

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect occasional nighttime shoulder and lane closures from 9 p.m. to 5 a.m. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21553)
Last Updated
9/30/2024 4:17 PM

I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
Last Updated
11/07/2024 5:21 AM

I-5: NB MP 293.4 to 297.25
I-5, 1 mile North of Highway 217

Construction Work
Informational only
Comments
Four miles of I-5 will close from 9pm Friday June 28 through 5am Monday July 1 in SW Portland. Detours on I-205/I-84 or OR 217/U.S. 26/I-405. Four miles of I-5 will be closed from 9pm Friday June 28 through 5am Monday July 1 in SW Portland. Detours on I-205/I-84 or OR 217/U.S. 26/I-405. Crews are rebuilding the I-5 structure over SW 26th Avenue. <!--Links Start Here--> [I-5 over SW 26th Avenue Improvements Project](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20486)
Last Updated
6/28/2024 11:10 PM

I-5: SB MP 295.9 to 296.1
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway

Construction Work
Estimated delay under 20 minutes
Comments
Periodic lane closures on I-5 and SW 26th Ave.
Last Updated
8/25/2024 3:27 AM

I-5: MP 297.08 to 297.55
I-5, Portland, Intersection with SW Terwilliger Blvd

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 297.00 to MP 298.00 (Portland) Effective November 22, 2024, this section of I-5 northbound will be restricted to 23 feet 00 inches in width at nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is November 23, 2024.
Last Updated
11/20/2024 7:00 PM

I-5: MP 298.74 to 299.53
I-5, I-405 South Interchange

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 298.50 to MP 299.60 (Portland) Effective November 18, 2024, this section of I-5 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 19, 2024.
Last Updated
11/20/2024 7:00 PM

I-5: MP 299.17 to 300.08
I-5, I-405 South Interchange

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 299.00 to MP 300.08 (Portland) Effective November 19, 2024, this section of I-5 northbound will be restricted to 15 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 15 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 20, 2024.
Last Updated
11/20/2024 7:00 PM

I-5: MP 300.08
I-5, 1 mile South of Interstate 84

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 300.08 (Portland) Effective November 18, 2024, this section of I-5 northbound will be restricted to 15 feet 9 inches in height at all hours. Loads over 15 feet 9 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 20, 2024.
Last Updated
11/20/2024 7:00 PM

I-5: MP 300.38
I-5, 1 mile South of Interstate 84

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 300.38 (Portland) Effective November 18, 2024, this section of I-5 southbound will be restricted to 15 feet 8 inches in height at all hours. Loads over 15 feet 8 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 19, 2024.
Last Updated
11/20/2024 7:00 PM

I-5: MP 300.4 to 300.03
I-5, 1 mile South of Interstate 84

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 300.00 to MP 300.50 (Portland) Effective November 18, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Monday through Thursday between the hours of 9 PM and 5 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width, may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 19, 2024.
Last Updated
11/20/2024 7:00 PM

I-84: WB MP 12.52 to 16.67
I-84, Gresham, Intersection with 181st Ave

Construction Work
No to Minimum Delay
Comments
No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
6/28/2024 8:13 AM

I-84: MP 12.73 to 13.04
I-84, Gresham, Intersection with 181st Ave

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 12.40 to MP 13.10 (Portland) Effective November 22, 2024, this section of I-84 eastbound will be restricted to 18 feet 00 inches in width at night between the hours of 8 PM & 8 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 23, 2024.
Last Updated
11/20/2024 7:00 PM

I-84: MP 13.03 to 77

Snow Zone
Informational only
Affected Area
NE 181st in Troutdale east to just west of the Rowena Exit
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: MP 13.03 to 44
TROUTDALE - CASCADE LOCKS REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
11/20/2024 8:35 PM

I-84: MP 13.95 to 12.71
I-84, 1 mile East of Gresham, Intersection with 181st Ave

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 14.00 to MP 12.50 (Portland) Effective November 22, 2024, this section of I-84 westbound will be restricted to 18 feet 00 inches in width at night between the hours of 8 PM & 8 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 23, 2024.
Last Updated
11/20/2024 7:00 PM

I-84: MP 14.66 to 13.95
I-84, Fairview, Intersection with 223rd Ave

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 14.70 to MP 13.40 (Portland) Effective November 22, 2024, this section of I-84 westbound will be restricted to 18 feet 00 inches in width at night between the hours of 8 PM & 8 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 23, 2024.
Last Updated
11/20/2024 7:00 PM

I-84: EB MP 58.39 to 59
I-84, 6 miles West of Hood River

Construction Work
Closure
Off Ramp
Comments
I-84 east Exit 58 closed around the clock. Ramps Affected. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
9/08/2024 7:38 AM

US101: MP 55.28 to 55.97
US101, Garibaldi

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20252)
Last Updated
11/19/2024 7:31 AM

US101: MP 98.85 to 104.2

Snow Zone
Informational only
Affected Area
Cascade Head - just north of Neskowin Creek to just north of the Salmon River
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US101: MP 114.52 to 117.39
US101, Lincoln City

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes (Southbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
11/15/2024 5:25 PM

US101: MP 121.42 to 125
US101, 3 miles North of Lincoln Beach

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
11/15/2024 5:22 PM

US101: MP 129.74
US101, 3 miles South of Depoe Bay

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Occasional lane closures with flaggers helping direct. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21727)
Last Updated
11/11/2024 11:23 AM

US26: MP 2 to 4
US26, 2 miles East of Intersection with Oregon Coast Highway US101

Information
Future Event: Estimated delay under 20 minutes
Expected Start Date
11/21/2024 8:00:00 AM
Comments
Utility work is occurring. Prepare to slow.
Last Updated
11/20/2024 9:21 AM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8 a.m. to 5 p.m. and 9 p.m. to 5 a.m. weekdays. Flaggers periodically directing traffic.
Last Updated
10/20/2024 1:28 PM

US26: MP 6 to 8
US26, 3 miles West of Necanicum

Information
Future Event: No to Minimum Delay
Expected Start Date
11/21/2024 8:00:00 AM
Comments
Utility work is causing minimal delay to traffic. Use caution.
Last Updated
11/20/2024 9:23 AM

US26: MP 8.1 to 8.71
US26, 1 mile West of Necanicum

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21224)
Last Updated
10/25/2024 3:19 PM

US26: MP 9.72 to 35.11

Snow Zone
Informational only
Affected Area
David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 25.12 to 42.5

Snow Zone
Informational only
Affected Area
Sandy to Zigzag
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 37.73 to 45.43

Snow Zone
Informational only
Affected Area
Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 37.73 to 45.43
SUNSET SUMMIT REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
3 in.
Last Updated
11/20/2024 9:16 PM

US26: MP 42.5 to 60
GOVERNMENT CAMP REPORTING STATION

Severe Weather Hazard
Informational only
Weather Condition
Snow Flurries
Pavement Condition
Slush, Snow Pack Breaking Up
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
32 F
New Snow
0 in.
Roadside Snow
26 in.
Last Updated
11/20/2024 8:05 PM

US26: MP 53.5
US26, Intersection with Timberline Highway

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
11/21/2024 3:12 AM

US26: MP 59.57 to 75.5

Snow Zone
Informational only
Affected Area
Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 3.94 to 6.51
US30, Portland

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime lane closures. Pedestrian detours. Bicycles use roadway travel lanes.
Last Updated
5/26/2024 7:33 AM

US30: MP 11.93
HWY100, 5 miles East of Corbett

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
Last Updated
11/20/2024 7:00 PM

US30: MP 18.37 to 65.99
CLATSKANIE REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
0 in.
Last Updated
11/20/2024 9:17 PM

US30: MP 23.15
US30, 2 miles East of Warren

Commercial Vehicle Information
Informational only
Details
US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
Last Updated
11/20/2024 7:00 PM

US30: MP 48.31 to 61.01

Snow Zone
Informational only
Affected Area
Rainier to Clatskanie
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 72.32 to 76.76

Snow Zone
Informational only
Affected Area
Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
Last Updated
8/11/2024 12:42 PM

US30BY: WB MP 0.42
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
Paving and flagging on NE Lombard St between N Syracuse and N Leavitt. 7pm-5am Sept. and Oct. N Philadelphia St closes at N Ivanhoe during nightwork. Nighttime paving and traffic holds with flagging on NE Lombard St between N Syracuse and N Leavitt Ave. 7pm-5am Sept. and Oct. N Philadelphia St closes at N Ivanhoe during nightwork.
Last Updated
9/09/2024 1:33 PM

US30BY: MP 1.29 to 14.7
US30BP, 1 mile East of Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
Around-the-clock lane closures between Holman Street and 149th Street. Pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/regions/pages/r1adacurbramps.aspx)
Last Updated
11/11/2024 6:00 AM

ORE131: MP 8.33
ORE131, Tillamook

Commercial Vehicle Information
Informational only
Details
OR131 MP 8.33 (Trask River Bridge - Tillamook) Effective July 23, 2024, OR131 crossing Trask River Bridge at MP 8.33 is restricted to 14 tons for all vehicles.
Last Updated
11/20/2024 7:00 PM

ORE141: MP 4.25 to 4.44
ORE141, Tigard

Commercial Vehicle Information
Informational only
Details
OR141 (Hall Blvd) NB & SB MP 4.25 to MP 4.50 (Tigard) Effective March 4, 2024, this section of OR141 (Hall Boulevard) will be closed at all hours. The estimated completion date for this work is January 15, 2025.
Last Updated
11/20/2024 7:00 PM

ORE141: MP 4.69 to 4.73
ORE141, Tigard

Crash/Hazard
Closure
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Hall Boulevard is closed where it passes over OR 217 in Tigard, at Pfaffle Street. Use Greenburg Road as a detour route. The Hall Boulevard overpass over OR 217 near OR 99W and Pfaffle Street in Tigard is closed for nine months, starting in March 2024. The intersection of Pfaffle Street and Hall Boulevard is also closed. Drivers are not permitted to turn onto Hall Boulevard from Pfaffle Street or turn onto Pfaffle Street from Hall Boulevard. All vehicle traffic should use the signed detour using Greenburg Road. People walking and bicycling will still be able to cross OR 217 via a temporary pedestrian bridge. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
3/11/2024 11:33 AM

ORE164: MP 6.27
ORE164, Jefferson

Maintenance Work
No to Minimum Delay
Comments
Bridge construction is occurring. Prepare to slow. Watch for workers. Be aware of pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21731)
Last Updated
5/02/2024 5:34 AM

ORE173: MP 0.12 to 5.49

Snow Zone
Informational only
Affected Area
Timberline - US26/Government Camp to Timberline Lodge
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE173: MP 0.12 to 5.49
TIMBERLINE LODGE REPORTING STATION

Severe Weather Hazard
Informational only
Weather Condition
Snow Flurries
Pavement Condition
Packed Snow
Chain Restrictions
Chains Required. Traction tires allowed in place of chains on vehicles under 10,000 GVW and not towing. Vehicles towing must use chains.
Current Temp
29 F
New Snow
1 in.
Roadside Snow
75 in.
Last Updated
11/20/2024 8:05 PM

ORE18: MP 12 to 18

Snow Zone
Informational only
Affected Area
Van Duzer Corridor - (Murphy Hill Summit Elev. 760') Just west of Bear Creek thru the Van Duzer Corridor
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE211: MP 11.8
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Shoulder closures and pedestrian detours.
Last Updated
10/20/2024 1:29 PM

ORE211: MP 14 to 22
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Lane closures with flaggers directing traffic 7 a.m. to 3 p.m. on OR 211 from Molalla to Colton. Periodic nighttime lane closures with flaggers directing traffic.
Last Updated
9/23/2024 7:28 AM

ORE213: MP 2.23
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 (82nd Ave/Old Hwy 213) MP 2.24 crossing over railroad and light rail (Portland) Effective July 23, 2024, the state owned bridge on a city street (82nd Ave.) crossing over railroad and light rail is restricted to the following weights: 29 tons for SU5 & SU6 (5 and 6 axle single-unit truck); 31 tons for SU7 (7 axle single-unit truck).
Last Updated
11/20/2024 7:00 PM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
Informational only
Comments
Daytime and nighttime lane closures between Foster Road and Causey Avenue. Partial side street closures at Harney. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
10/27/2024 12:03 PM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective January 31, 2024, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 29, 2024.
Last Updated
11/20/2024 7:00 PM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective March 11, 2023, this section of OR213 northbound and southbound will be intermittently restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM, Friday and Saturday nights between the hours of 8 PM and 8 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 9, 2024.
Last Updated
11/20/2024 7:00 PM

ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Nighttime single lane closures on OR 217 in both directions weekdays. Nighttime lane closures on the 72nd Avenue overpass weekdays. Sidewalk closure on the south side of Hall Boulevard between Scholls Ferry Road and Cascade Avenue. Ongoing closures: Hall Boulevard over OR 217 in Tigard is closed until early 2025 to replace the bridge. Periodic lane closures on Hall Boulevard between Scholls Ferry Road and Cascade Avenue. One lane in each direction is closed around-the-clock on the Scholls Ferry Road overpass until mid-November. Auxiliary lane closures on OR 217 south from Scholls Ferry Road to OR 99W and on OR 217 north from Scholls Ferry Road to Denney Road. Expect shoulder closures on OR 217, various on- and off-ramps, and on local roads near the highway ramps. Various on- and off-ramps temporarily narrowed. Pedestrian detours on the Hall Boulevard overpass in Beaverton. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
11/18/2024 6:51 AM

ORE217: MP 2.26 to 2.7
ORE217, 2 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 2B on- and off-ramps to/from Allen Blvd (Beaverton) Effective January 1, 2022, the OR217 southbound Exit 2B on- and off-ramps to/from Allen Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is December 2, 2024.
Last Updated
11/20/2024 7:00 PM

ORE217: MP 3.56
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4A off-ramp to Hall Blvd (Beaverton) Effective January 24, 2022, the OR217 southbound Exit 4A off-ramp to Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is January 31, 2025.
Last Updated
11/20/2024 7:00 PM

ORE217: MP 3.83
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB on-ramp from Hall Blvd (Beaverton) Effective January 19, 2022, the OR217 southbound on-ramp from Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is February 9, 2025.
Last Updated
11/20/2024 7:00 PM

ORE217: MP 4.12 to 4.51
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Rd (Beaverton) Effective January 19, 2022, the OR217 southbound Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 15, 2024.
Last Updated
11/20/2024 7:00 PM

ORE217: MP 4.741
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 5 on-ramp from Greenburg Rd (Tigard) Effective August 15, 2023, the OR217 northbound Exit 5 on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 31, 2025.
Last Updated
11/20/2024 7:00 PM

ORE217: MP 4.78 to 5.17
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB on-ramp from Greenburg Rd (Beaverton) Effective January 26, 2022, the OR217 southbound on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 31, 2025.
Last Updated
11/20/2024 7:00 PM

ORE217: MP 5.13
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 5 off-ramp to Greenburg Rd (Tigard) Effective November 4, 2022, the OR217 northbound Exit 5 off-ramp to Greenburg Road will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is January 31, 2025.
Last Updated
11/20/2024 7:00 PM

ORE217: MP 5.69
ORE217, 6 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 6 off-ramp to OR99W (Tigard) Effective November 4, 2022, the OR217 southbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is August 31, 2025.
Last Updated
11/20/2024 7:00 PM

ORE217: MP 6.19
ORE217, 6 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 6 off-ramp to OR99W (Tigard) Effective November 8, 2024, the OR217 northbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width between the hours of 6 AM & 3 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 15, 2024.
Last Updated
11/20/2024 7:00 PM

ORE22: MP 32 to 73

Snow Zone
Informational only
Affected Area
Gates City Limit to Marion Forks
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE22: MP 66.23 to 73
MARION FORKS REPORTING STATION

Weather Warning
Informational only
Weather Condition
Rain
Pavement Condition
Spots of Ice
Chain Restrictions
Carry Chains or Traction Tires
Current Temp
32 F
New Snow
0 in.
Roadside Snow
5 in.
Last Updated
11/20/2024 8:28 PM

ORE223: MP 0 to 4.83
ORE223, Intersection with Willamina - Salem Highway ORE22

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Traffic Impact - Expect shoulder and lane closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
11/08/2024 5:18 PM

ORE224: MP 10
ORE224, Tong Road near Damascus

Crash/Hazard
Unconfirmed
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median
Comments
An unconfirmed report of hazardous tree or vegetation has been received. Use caution.
Last Updated
11/21/2024 3:33 AM

ORE224: MP 49.911
ORE224, Ripplebrook Ranger Station

Commercial Vehicle Information
Informational only
Details
OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
11/20/2024 7:00 PM

ORE35: EB MP 57.47 to 57.68
US26, Intersection with Mount Hood Highway OR35

Construction Work
Informational only
Comments
No traffic impacts. Construction is paused for winter. Project Description: This project will resurface the bridge deck on the Oregon Highway 35 overpass at U.S. 26 (Mt. Hood Highway) interchange in Mt. Hood, east of Government Camp. Making these repairs now increases the service life of the road and provides a smoother, safer ride for travelers. <!--Links Start Here--> [Link to Additional Information](https://tinyurl.com/OR35atUS26)
Last Updated
10/27/2024 12:02 PM

ORE35: MP 60 to 83.56

Snow Zone
Informational only
Affected Area
White River - Jct US26 to ODOT Maintenance Station
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE35: MP 60 to 62
WHITE RIVER REPORTING STATION

Severe Weather Hazard
Informational only
Weather Condition
Snow Flurries
Pavement Condition
Packed Snow
Chain Restrictions
Chains Required. Traction tires allowed in place of chains on vehicles under 10,000 GVW and not towing. Vehicles towing must use chains.
Current Temp
31 F
New Snow
1 in.
Roadside Snow
33 in.
Last Updated
11/20/2024 8:07 PM

ORE43: MP 11.29 to 11.35
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
OR43 NB & SB MP 11.18 to MP 11.36 (West Linn) Effective November 25, 2024, this section of OR43 northbound and southbound will be restricted to 12 feet 00 inches in width at night between the hours of 8 PM & 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 26, 2024.
Last Updated
11/20/2024 7:00 PM

ORE43: MP 11.43 to 11.66
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
OR43 NB & SB MP 11.43 to MP 11.66 (Oregon City) Effective December 12, 2024, this section of OR43 northbound and southbound will be closed at night between the hours of 9 PM and 5 AM. The estimated completion date for this work is December 13, 2024.
Last Updated
11/20/2024 7:00 PM

ORE47: MP 0 to 11.71

Snow Zone
Informational only
Affected Area
OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE47: MP 88.05
ORE47, 1 mile North of Forest Grove

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
11/20/2024 7:00 PM

ORE53: MP 17.76
ORE53, 1 mile North of Intersection with Oregon Coast Highway US101

Commercial Vehicle Information
Informational only
Details
OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
11/20/2024 7:00 PM

ORE6: MP 16.06 to 37.5

Snow Zone
Informational only
Affected Area
Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE6: MP 16.06 to 37.5
WILSON RIVER SMT REPORTING STATION

Weather Warning
Informational only
Weather Condition
No Report
Pavement Condition
No Report
Chain Restrictions
Carry Chains or Traction Tires
New Snow
0 in.
Roadside Snow
4 in.
Last Updated
11/20/2024 9:16 PM

ORE6: MP 23.56 to 24.67
ORE6, 15 miles West of Glenwood

Information
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Utility work is occurring. Prepare to slow. Currently work is scheduled from 9 a.m. to 3 p.m. Monday through Thursday.
Last Updated
11/18/2024 7:44 PM

ORE6: MP 35
ORE6, 4 miles West of Glenwood

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Sunken grade. Prepare to slow.
Last Updated
11/21/2024 1:41 AM

ORE99: MP -0.36
ORE99W, Portland

Commercial Vehicle Information
Informational only
Details
OR99W MP -0.36 (Steel Bridge - Portland) Effective July 23, 2024, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
11/20/2024 7:00 PM

ORE99: MP 1.41
ORE99W, I-405 South Interchange

Commercial Vehicle Information
Informational only
Details
OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
11/20/2024 7:00 PM

ORE99: MP 11.81
ORE99E, Oregon City

Commercial Vehicle Information
Informational only
Details
OR99E NB off-ramp to I-205 NB (Oregon City) Effective September 30, 2023, the OR99E Northbound off-ramp to I-205 northbound will be restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2024.
Last Updated
11/20/2024 7:00 PM

ORE99E: NB MP 5.72 to 8
ORE99E, 1 mile South of Milwaukie

Construction Work
No to Minimum Delay
Comments
Single lane closures 9 a.m. to 3 p.m. at SE Maple Street. Pedestrian detours. Maple Street closed at OR 99E. Follow signed detour. Daytime road construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23521)
Last Updated
11/04/2024 12:35 PM

ORE99E: MP 20.3 to 21.8
ORE99E, Canby

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18775)
Last Updated
11/11/2024 6:01 AM

ORE99W: MP 3.25 to 3.65
ORE99W, Intersection with Beaverton - Hillsdale Highway ORE10

Construction Work
No to Minimum Delay
Comments
Nighttime lane closures and flagging to pave two bridges on OR 99W.
Last Updated
9/26/2024 1:46 PM

ORE99W: MP 7.7 to 10.4
ORE99W, Tigard (north city limits)

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures 9 p.m. to 5 a.m. Flaggers directing traffic at intersections throughout the project area. The dedicated right turn lane from northbound OR99W to Main Street is closed. Right turns are still permitted. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20435)
Last Updated
11/06/2024 10:50 AM

ORE99W: MP 7.8
ORE99W, Tigard (north city limits)

Maintenance Work
Estimated delay under 20 minutes
Comments
Roadwork has the signal at Pacific Hwy and 68th Ave deactivated with flaggers controlling traffic. Prepare to slow or move over for worker safety.
Last Updated
11/20/2024 9:01 PM

ORE99W: MP 57.49 to 57.81
ORE99W, Intersection with Willamina - Salem Highway ORE22

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Traffic Impact - Expect shoulder and lane closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
11/08/2024 5:18 PM

ORE99W: MP 58.9 to 60.31
ORE99W, 1 mile South of Rickreall

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Reduced Speed Limit of 45 mph in the project area. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21374)
Last Updated
11/06/2024 6:44 PM

HWY100: MP 2.55
HWY100, 2 miles East of Troutdale

Crash/Hazard
Closure
Comments
The Stark Street bridge is closed at Historic Columbia River Highway. Use alternate route.
Last Updated
10/22/2024 7:19 AM

HWY100: MP 17.5 to 17.68
HWY100, 5 miles West of Ainsworth State Park

Construction Work
Closure
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
A section of the Historic Columbia River Highway/U.S. 30 between Wahkeena Falls and Multnomah Falls is closed to all users until Memorial Day 2025. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle or bicycle access to Multnomah Falls heading eastbound on the Historic Highway. The Wahkeena-Multnomah Falls return trail #442 is open to hikers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
10/01/2024 10:05 AM