Statewide Oregon Road Conditions

Highways with no adverse conditions do not show up on this report.

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

ORE229, 10 miles North of Siletz MP 14 - 15

A landslide has occurred. Use an alternate route.

<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx)

Updated
5/29/2026 8:22:00 PM

Conditional Closure

US30, 6 miles West of The Dalles MP 67 - 69

The highway is open to local traffic and local deliveries only. No through traffic allowed.
Updated
6/8/2026 3:57:00 AM

Weather Alert

North & East Klamath Co. & West Lake Co.

Freeze Warning

NOAA Issue Date: 6/8/2026 10:10:00 PM What Sub-freezing temperatures of 27 to 32 expected. Where Northern and eastern Klamath county and western Lake county, including Chemult, Crescent, Sprague River, Bly, and winter rim. When From 2 AM to 8 AM PDT Wednesday. Impacts Frost and freeze conditions could kill crops, other sensitive vegetation and possibly damage unprotected outdoor plumbing. Precautionary/preparedness actions... Take steps now to protect tender plants from the cold.

Weather Alert

Klamath Basin, Central & East Lake Co.

Frost Advisory

NOAA Issue Date: 6/8/2026 10:10:00 PM What Temperatures of 33 to 36 will result in frost formation. Locally temperatures may drop to near or just below freeing early Wednesday morning. Where In California, Modoc county and eastern and south-central Siskiyou county. In Oregon, central and eastern Lake county and Klamath basin. In California, this includes areas east of McCloud, Dorris, Tulelake, Tennant, newell, Canby, likely, Alturas, davis creek and surrounding areas. In Oregon, this includes Klamath Falls, Keno, Merrill, Chiloquin, Lakeview, Valley Falls, Silver Lake and surrounding areas. When From 2 AM to 8 AM PDT Wednesday. Impacts Frost could harm sensitive outdoor vegetation. Sensitive outdoor plants may be killed if left uncovered. Precautionary/preparedness actions... Take steps now to protect tender plants from the cold.

Weather Alert

North Central Oregon

Wind Advisory

NOAA Issue Date: 6/8/2026 09:57:00 PM What West winds 20 to 30 MPH with gusts up to 50 MPH expected. Where North central Oregon. When Until 5 PM PDT Tuesday. Impacts Gusty winds will blow around unsecured objects. Tree limbs could be blown down and a few Power outages may result. Precautionary/preparedness actions... Winds this strong can make driving difficult, especially for high profile vehicles. Use extra caution.

Weather Alert

East Columbia Gorge, Lower Columbia Basin, Foothills of the Southern Blue Mountains, WA-East Columbia Gorge, Simcoe Highlands

Wind Advisory

NOAA Issue Date: 6/8/2026 09:57:00 PM What West winds 25 to 35 MPH with gusts up to 50 MPH expected. Where Eastern Columbia river gorge of Oregon and Washington, lower Columbia basin of Oregon, foothills of the southern Blue Mountains of Oregon, and simcoe highlands. When From 2 AM to 11 PM PDT Tuesday. Impacts Gusty winds will blow around unsecured objects. Tree limbs could be blown down and a few Power outages may result. Precautionary/preparedness actions... Winds this strong can make driving difficult, especially for high profile vehicles. Use extra caution.

Weather Alert

Foothills of the Northern Blue Mountains, Kittitas Valley

Wind Advisory

NOAA Issue Date: 6/8/2026 09:57:00 PM What West winds 20 to 30 MPH with gusts up to 50 MPH expected. Where In Oregon, foothills of the northern Blue Mountains of Oregon. In Washington, Kittitas Valley. When From 8 AM to 11 PM PDT Tuesday. Impacts Gusty winds will blow around unsecured objects. Tree limbs could be blown down and a few Power outages may result. Precautionary/preparedness actions... Winds this strong can make driving difficult, especially for high profile vehicles. Use extra caution.

I-105: EB MP 0.89
I-105, Eugene

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/27/2026 4:38 AM

I-105: EB MP 0.89 to 9.97
I-105, Eugene

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 6:06 AM

I-105: EB MP 1.21
I-105, Eugene

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 7:05 AM

I-205: NB MP 0 to 8.82
I-205, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 2:32 PM

I-205: NB MP 0 to 8.82
I-205, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/13/2026 2:35 PM

I-205: NB MP 0 to 8.82
I-205, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 2:35 PM

I-205: NB MP 0 to 8.82
I-205, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 2:31 PM

I-205: NB MP 1.2 to 8.82
I-205, 1 mile North of Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 9:59 AM

I-205: NB MP 2.8 to 8.82
I-205, Stafford Rd

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 2:31 PM

I-205: NB MP 2.8 to 8.82
I-205, Stafford Rd

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/05/2026 3:33 PM

I-205: SB MP 3.4 to 0
I-205, Stafford Rd

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 2:32 PM

I-205: SB MP 6.5 to 0.85
I-205, Oregon City, Intersection with 10th St

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 2:32 PM

I-205: SB MP 7.6 to 0
I-205, West Linn

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/28/2026 2:30 PM

I-205: MP 8.5 to 9.56
I-205, OR 99E

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/20/2026 12:00:00 AM
Details
Alert: I-205 NB MP 8.50 to MP 9.56 (Oregon City) Effective June 20, 2026, this section of I-205 northbound will be closed at night between the hours of 11 PM & 7 AM. The estimated completion date for this work is June 21, 2026.
Last Updated
6/08/2026 4:00 PM

I-205: MP 8.56 to 9.9
I-205, OR 99E

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/15/2026 12:00:00 AM
Details
Alert: I-205 SB MP 8.56 to MP 9.90 (Oregon City) Effective June 15, 2026, this section of I-205 southbound will be intermittently restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is July 2, 2026.
Last Updated
6/08/2026 4:00 PM

I-205: MP 8.56 to 9.56
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 NB MP 8.56 to MP 9.56 (Oregon City) Effective, February 25, 2026, this section of I-205 northbound will be restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. The estimated completion date for this work is June 27, 2026.
Last Updated
6/08/2026 4:00 PM

I-205: SB MP 8.8 to 9.3
I-205, OR 99E

Construction Work
Estimated delay under 20 minutes
Comments
Lane and ramp closures in Oregon City and West Linn. • Nighttime ramp closures: o I-205 Northbound to OR99E (Exit 9 NB) Tuesday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. -205 Southbound to OR43 (Exit 8 SB) Tuesday through Friday from 10:00 pm to 5:00 am. o OR43 to I-205 Northbound Tuesday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. • Nighttime lane closures: o I-205 Northbound Tuesday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. o OR 99E Northbound Lane Tuesday through Thursday from 10:00 pm to 5:00 am and Friday from 10:00 pm to 7:00 am. o OR43 Southbound closed Tuesday and Wednesday 8:00 pm to 6:00 am. o OR43 Northbound lane closed Wednesday 8:00 pm to 6:00 am. • Flagging: o Main St Tuesday through Saturday 7:00 am to 5:30 pm. <!--Links Start Here--> [Link to Additional Information](https://www.i205corridor.org/updates)
Last Updated
5/26/2026 6:15 PM

I-205: MP 9.01
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective April 27, 2026, the I-205 southbound Exit 8 off-ramp to OR43 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is July 2, 2026.
Last Updated
6/08/2026 4:00 PM

I-205: MP 9.23
I-205, OR 99E

Commercial Vehicle Information
Informational only
Details
Alert: I-205 NB Exit 9 off-ramp to OR99E NB (Oregon City) Effective February 25, 2026, the I-205 northbound Exit 9 off-ramp to OR99E northbound will be closed Monday through Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. The estimated completion date for this work is June 23, 2026.
Last Updated
6/08/2026 4:00 PM

I-205: MP 9.56
I-205, OR 213 Park Place

Commercial Vehicle Information
Informational only
Details
Alert: I-205 SB Exit 9 off-ramp to OR99E (Oregon City) Effective April 6, 2026, the I-205 southbound Exit 9 off-ramp to OR99E will be intermittently restricted to 9 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 9 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 27, 2026.
Last Updated
6/08/2026 4:00 PM

I-205: NB MP 16.6 to 24.5
I-205, Intersection with SE Johnson Creek Blvd

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/04/2026 3:13 PM

I-205: NB MP 23 to 12
I-205, NE Prescott St

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22772)
Last Updated
4/16/2026 10:44 AM

I-205: SB MP 24 to 16
I-205, Portland

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:20 PM

I-205: SB MP 24.8 to 16
I-205, Oregon Washington Border

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:29 PM

I-405: SB MP 0.37
I-405, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 2:43 PM

I-405: SB MP 1.04 to 0
I-405, 1 mile South of Intersection with US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/28/2026 2:30 PM

I-405: MP 1.6 to 1.94
I-405, Intersection with US26

Commercial Vehicle Information
Informational only
Details
Alert: I-405 NB Exit 2A off-ramp to Salmon St/Providence Park (Portland) Effective June 6, 2026, the I-405 northbound Exit 2A off-ramp to Salmon Street/Providence Park will be closed between the hours of 4:30 PM & 11:30 PM. The estimated completion date for this work is June 6, 2026.
Last Updated
6/08/2026 4:00 PM

I-405: NB MP 2.2 to 2.1
I-405, Intersection with US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/13/2026 2:31 PM

I-405: NB MP 2.2 to 2.1
I-405, Intersection with US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 9:59 AM

I-405: SB MP 2.2 to 2.1
I-405, Intersection with US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:27 PM

I-405: SB MP 3.29
I-405, Intersection with US30

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 2:35 PM

I-405: MP 4.2 to 0.77
I-405, Interstate 5

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
8/9/2026 12:00:00 AM
Details
Alert: I-405 SB MP 4.20 to MP 0.77 (Portland) Effective August 9, 2026, this section of I-405 southbound will be closed Sunday morning at 5:00 AM to Sunday afternoon at 1:00 PM for the Providence Bridge Pedal. The estimated completion date for this event is August 9, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: NB MP 20 to 22
I-5, 5 miles North of Ashland

Maintenance Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 8:58 PM

I-5: NB MP 58.18 to 66.7
I-5, Intersection with Pacific Highway ORE99

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane and shoulder closures Sunday – Friday from 7 a.m. – 7 p.m. <!--Links Start Here--> [Link to additional information](https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2Fprojects%2Fpages%2Fproject-details.aspx%3Fproject%3D21674&data=05%7C02%7CCarter.B.HARPER%40odot.oregon.gov%7C317a6bfac3c14ad58b8808de0b344b86%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C638960516398910346%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=k%2FDlSc6c62l%2F5z4iMoJ%2FdoDe40RmykdT3DPFi%2BolSjY%3D&reserved=0)
Last Updated
5/21/2026 5:02 PM

I-5: MP 58.3
I-5, Intersection with Pacific Highway ORE99

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/24/2026 12:00:00 AM
Details
Alert: I-5 SB Exit 58 off-ramp to OR99/US199/NE Scoville Rd (Grants Pass) Effective June 24, 2026, the I-5 southbound Exit 58 off-ramp to OR99/US199/NE Scoville Road will be closed at night from 7:00 PM to 7:00 AM. The estimated completion date for this work is June 26, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 58.3
I-5, Intersection with Pacific Highway ORE99

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/23/2026 12:00:00 AM
Details
Alert: I-5 NB Exit 58 on-ramp from OR99/US199/NE Scoville Rd (Grants Pass) Effective June 23, 2026, the I-5 northbound Exit 58 on-ramp from OR99/US199/NE Scoville Road will be closed at night from 7:00 PM to 7:00 AM. The estimated completion date for this work is June 26, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 58.52 to 61.68
I-5, Grants Pass

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB MP 58.52 to 61.68 (Grants Pass) Effective November 20, 2025, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 59.94
I-5, 2 miles North of Grants Pass

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 59.94 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 17 feet 1 inches in height Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. The estimated completion date for this work is October 15, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 61.5
I-5, 4 miles North of Grants Pass

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/21/2026 12:00:00 AM
Details
Alert: I-5 SB Exit 61 on- and off-ramp to/from Monument Drive (Grants Pass) Effective June 21, 2026, the I-5 southbound Exit 61 on- and off-ramp to/from Monument Drive will be closed at night between the hours of 7:00 PM & 7:00 AM. The estimated completion date for this work is June 23, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 61.5
I-5, 4 miles North of Grants Pass

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/16/2026 12:00:00 AM
Details
Alert: I-5 NB Exit 61 on-ramp from Merlin Road (Grants Pass) Effective June 16, 2026, the I-5 northbound on-ramp from Merlin Road will be closed at night between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is June 18, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 61.5
I-5, 4 miles North of Grants Pass

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/16/2026 12:00:00 AM
Details
Alert: I-5 NB Exit 61 off-ramp to Merlin Road (Grants Pass) Effective June 16, 2026, the I-5 northbound Exit 61 off-ramp to Merlin Road will be closed at night between the hours of 7:00 PM & 7:00 AM. The estimated completion date for this work is June 18, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 62 to 58.17
I-5, 4 miles North of Grants Pass

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 62.00 to 58.17 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: NB MP 64 to 67
I-5, 6 miles North of Grants Pass

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Ramps Affected.
Last Updated
6/08/2026 7:37 PM

I-5: MP 66
I-5, 8 miles North of Grants Pass

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB Exit 66 on- and off-ramp to/from Monument Dr (Grants Pass) Effective June 1, 2026, the I-5 northbound Exit 66 on- and off-ramp to/from Monument Drive will be closed at night between the hours of 7:00 PM & 7:00 AM. The estimated completion date for this work is June 10, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 66
I-5, 8 miles North of Grants Pass

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/16/2026 12:00:00 AM
Details
Alert: I-5 SB Exit 66 on- and off-ramp to/from Monument Dr (Grants Pass) Effective June 16, 2026, the I-5 southbound Exit 66 on- and off-ramp to/from Monument Drive will be closed at night between the hours of 7:00 PM & 7:00 AM. The estimated completion date for this work is June 18, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: SB MP 66.8
I-5, 9 miles North of Grants Pass

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Southbound) 2 Lanes
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
5/21/2026 9:46 AM

I-5: NB MP 103
I-5, 5 miles North of Canyonville

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 10:55 AM

I-5: MP 119.3 to 119.7
I-5, Intersection with Coos Bay - Roseburg Highway ORE42

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/17/2026 12:00:00 AM
Details
Alert: I-5 SB Exit 119 on/off-ramps to/from OR42 (Winston) Effective June 17, 2026, the I-5 southbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is June 24, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 119.7 to 119.9
I-5, 5 miles South of Roseburg

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB Exit 119 on/off-ramps to/from OR42 (Winston) Effective May 31, 2026, the I-5 northbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is June 12, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: SB MP 129
I-5, 4 miles North of Roseburg

Maintenance Work
Estimated delay under 20 minutes
Comments
Bridge work is occurring. Prepare to slow.
Last Updated
6/01/2026 6:19 PM

I-5: MP 129.1 to 128.71
I-5, 4 miles North of Roseburg

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 129.10 to 128.71 (Roseburg) Effective May 31, 2026, this section of I-5 southbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 6:00 PM and 7:00 AM. The estimated completion date for this work is July 1, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 129.1 to 128.71
I-5, 4 miles North of Roseburg

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 129.10 to 128.71 (Roseburg) Effective May 31, 2026, this section of I-5 southbound will be restricted to 14 feet 10 inches in width daily Monday through Thursday between the hours of 7:00 AM and 6:00 PM and Friday from 7:00 AM until Sunday at 6:00 PM. The estimated completion date for this work is July 1, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 129.1 to 128.71
I-5, 4 miles North of Roseburg

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/21/2026 12:00:00 AM
Details
Alert: I-5 NB MP 128.75 to MP 129.15 (Roseburg) Effective June 21, 2026, this section of I-5 northbound will be restricted to 9 feet 08 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 8:00 AM. The estimated completion date for this work is July 24, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 129.15 to 128.75
I-5, 4 miles North of Roseburg

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/21/2026 12:00:00 AM
Details
Alert: I-5 NB MP 128.75 to MP 129.15 (Roseburg) Effective June 21, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width daily Monday through Thursday between the hours of 8:00 AM and 7:00 PM and Friday from 8:00 AM until Sunday at 7:00 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is July 24, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 129.17 to 128.5
I-5, 4 miles North of Roseburg

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB Exit 129 on-ramp from Del Rio Rd (Roseburg) Effective May 31, 2026, the I-5 southbound on-ramp from Del Rio Road will be restricted to 10 feet 00 inches in width daily Monday through Thursday between the hours of 7:00 AM and 6:00 PM and Friday from 7:00 AM until Sunday at 6:00 PM. The estimated completion date for this work is July 14, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 129.17 to 128.5
I-5, 4 miles North of Roseburg

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB Exit 129 on-ramp from Del Rio Rd (Roseburg) Effective June 3, 2026, the I-5 southbound on-ramp from Del Rio Road will be closed Sunday through Thursday nights between the hours of 6:00 PM and 7:00 AM. The estimated completion date for this work is July 14, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: SB MP 129.85 to 128.85
I-5, 5 miles North of Roseburg

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 6:05 PM

I-5: NB MP 168 to 135
I-5, 6 miles South of Cottage Grove

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/08/2026 2:33 PM

I-5: NB MP 174 to 209
I-5, Cottage Grove

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 5:57 AM

I-5: MP 174.76
I-5, Cottage Grove

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/15/2026 12:00:00 AM
Details
Alert: I-5 NB Exit 174 off-ramp to OR99/Row River Rd (Cottage Grove) Effective June 15, 2026, the I-5 northbound Exit 174 off-ramp to OR99/Row River Road will be closed at night between the hours of 7 PM & 8 AM. The estimated completion date for this work is June 16, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 174.83
I-5, Cottage Grove

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/14/2026 12:00:00 AM
Details
Alert: I-5 SB Exit 174 on-ramp from OR99/Row River Rd (Cottage Grove) Effective June 14, 2016, the I-5 southbound Exit 174 on-ramp from OR99/Row River Road will be closed at night between the hours of 7 PM & 8 AM. The estimated completion date for this work is June 15, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 175.02
I-5, Cottage Grove

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/15/2026 12:00:00 AM
Details
Alert: I-5 NB Exit 174 on-ramp from OR99/Row River Rd (Cottage Grove) Effective June 15, 2026, the I-5 northbound Exit 174 on-ramp from OR99/Row River Road will be closed at night between the hours of 7 PM & 8 AM. The estimated completion date for this work is June 16, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: SB MP 176 to 169
I-5, 2 miles North of Cottage Grove

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Construction starts April 26, 2026, expect: Single lane closures, 7:00 P.M. to 8:00 A.M. Exit 172 and 174 ramp closures with detours as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22938)
Last Updated
5/21/2026 4:29 AM

I-5: SB MP 193.94
I-5, Intersection with Eugene - Springfield Highway I-105

Maintenance Work
Closure
Off Ramp
Comments
Road maintenance operations are occurring. Use an alternate route. Ramps Affected.
Last Updated
6/08/2026 8:22 PM

I-5: NB MP 209 to 174
I-5, 14 miles North of Intersection with Beltline Highway

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 6:20 AM

I-5: NB MP 210 to 244
I-5, 15 miles North of Intersection with Beltline Highway

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:35 AM

I-5: SB MP 244 to 209
I-5, 10 miles South of Intersection with ORE22, in Salem

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:35 AM

I-5: MP 248
I-5, 6 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/8/2026 12:00:00 AM
Details
Alert: I-5 SB Exit 248 off-ramp to Delaney Rd SE (Salem) Effective July 8, 2026, at 6:00 AM the I-5 southbound off-ramp to Delaney Rd SE will be closed at all hours (for 48 hours). The estimated completion date for this work is 6 AM, on July 10, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: NB MP 248.42 to 248.73
I-5, 6 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
5/01/2026 8:32 PM

I-5: NB MP 248.65 to 249.73
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
Off Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
5/01/2026 8:32 PM

I-5: NB MP 248.69
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Estimated delay under 20 minutes
Off Ramp
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Ramps Affected. Southbound Commercial Street on ramp will be closed will be 5/7/26 at 6 am to 5/9/26 6 am. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
5/07/2026 10:37 AM

I-5: MP 249 to 252
I-5, 5 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/22/2026 12:00:00 AM
Details
Alert: I-5 NB & SB MP 249 to MP 252 (Salem) Effective June 22, 2026, this section of I-5 northbound and southbound will be closed at night between the hours of 10 PM and 5 AM. The estimated completion date for this work is June 25, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: NB MP 249.08 to 249.85
I-5, 5 miles South of Intersection with ORE22, in Salem

Construction Work
Informational only
On Ramp
Comments
Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929)
Last Updated
5/01/2026 8:33 PM

I-5: MP 251.79 to 248.15
I-5, 2 miles South of Intersection with ORE22, in Salem

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2027.
Last Updated
6/08/2026 4:00 PM

I-5: NB MP 253.89 to 259
I-5, Intersection with ORE22, in Salem

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 12:39 PM

I-5: NB MP 260 to 281
I-5, 6 miles North of Intersection with ORE22, in Salem

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 4:07 PM

I-5: NB MP 265 to 254
I-5, 7 miles South of Woodburn

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 6:46 PM

I-5: NB MP 277.39 to 279.45
I-5, 5 miles North of Woodburn

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)
Last Updated
5/22/2026 2:45 AM

I-5: NB MP 291.95
I-5, Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 12:02 PM

I-5: NB MP 293.49 to 300
I-5, 1 mile North of Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:32 PM

I-5: SB MP 297 to 300
I-5, Portland, Intersection with SW Terwilliger Blvd

Construction Work
No to Minimum Delay
Comments
No traffic impacts. ODOT is installing RealTime Variable Advisory Speed (VAS) signs along a busy stretch of Interstate 5 through south Portland from the Ross Island Bridge to Terwilliger Boulevard. Realtime VAS signs give drivers notice to slow down before they reach a problem area — improving traffic flow and helping to reduce rear-end crashes and congestion. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602)
Last Updated
4/15/2026 4:11 PM

I-5: MP 299.21 to 299.35
I-5, I-405 South Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 NB MP 299.21 to MP 299.35 (Portland) Effective June 8, 2026, this section of I-5 northbound will be restricted to 16 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 16 feet 00 inches in width, may be accommodated on a case-by-case basis. The estimated completion date for this work is June 10, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 299.52 to 301.33
I-5, 1 mile North of I-405 South Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
8/9/2026 12:00:00 AM
Details
Alert: I-5 NB MP 299.52 to MP 301.33 (Top deck of Marquam Bridge - Portland) Effective August 9, 2026, this section of I-5 northbound will be closed Sunday morning at 5:00 AM to Sunday 12:00 PM (noon) for the Providence Bridge Pedal. The estimated completion date for this event is August 9, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: NB MP 299.8 to 299.9
I-5, 1 mile North of I-405 South Interchange

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 2:35 PM

I-5: MP 299.9
I-5, 1 mile North of I-405 South Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
8/9/2026 12:00:00 AM
Details
Alert: I-5 NB on-ramp from OR43 NB (Portland) Effective August 9, 2026, the I-5 northbound on-ramp from OR43 northbound will be closed Sunday morning at 5:00 AM to Sunday 12:00 PM (noon) for the Providence Bridge Pedal. The estimated completion date for this event is August 9, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.2 to 302.3
I-5, Interstate 84

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/19/2026 12:00:00 AM
Details
Alert: I-5 SB Exit 300B off-ramp to Morrison Bridge (Portland) Effective June 19, 2026, the I-5 southbound Exit 300B off-ramp to Morrison Bridge will be closed Friday through Monday night between the hours of 10 PM & 5 AM. The estimated completion date for this work is June 22, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.2 to 302.3
I-5, Interstate 84

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/12/2026 12:00:00 AM
Details
Alert: I-5 SB Exit 300B off-ramp to Morrison Bridge (Portland) Effective June 12, 2026, the I-5 southbound Exit 300B off-ramp to Morrison Bridge will be closed Friday through Monday night between the hours of 10 PM & 5 AM. The estimated completion date for this work is June 16, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.29 to 301.23
I-5, Interstate 84

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/12/2026 12:00:00 AM
Details
Alert: I-5 SB MP 301.29 to MP 301.23 (Portland) Effective June 12, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours 10 PM & 5 AM, and Friday through Saturday nights between the hours of 10 PM & 6 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 13th, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.35 to 303.47
I-5, Interstate 84

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/11/2026 12:00:00 AM
Details
Alert: I-5 NB and SB MP 301.35 to MP 303.47 (Portland) Effective July 11, 2026, this section of I-5 northbound and southbound will be closed beginning Saturday at 10 PM until Sunday at 12 PM (noon). The estimated completion date for this work is July 12, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.35 to 300.89
I-5, Interstate 84

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/23/2026 12:00:00 AM
Details
Alert: I-5 SB MP 301.35 to MP 300.89 (Portland) Effective June 23, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is July 14, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.35 to 300.89
I-5, Interstate 84

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/23/2026 12:00:00 AM
Details
Alert: I-5 SB MP 301.35 to MP 300.89 (Portland) Effective June 23, 2026, this section of I-5 southbound will be restricted to 14 feet 11 inches in height Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is July 14, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.5 to 302.7
I-5, 1 mile South of I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 302.70 to MP 301.50 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday night thru Friday night between the hours of 10 PM and 5 AM and Saturday night between the hours of 10 PM and 8 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 7, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.58
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 301.58 (Portland) Effective May 7, 2026, this section of I-5 southbound will be restricted to 14 feet 7 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 14 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 7, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: NB MP 301.59
I-5, I-405 North Interchange

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane
Comments
Road maintenance will have the left lane closed NB at MP 300B. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 9:54 PM

I-5: MP 301.59 to 301.96
I-5, I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/17/2026 12:00:00 AM
Details
Alert: I-5 NB MP 301.59 to MP 301.96 (Portland) Effective June 17, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 7, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.6 to 302.8
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 302.80 to MP 301.60 (Portland) Effective May 21, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 7, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 301.7
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB Exit 300B off-ramp to US26 EB / OR99E (Portland) Effective May 11, 2026, the I-5 southbound Exit 300B off-ramp to US26 eastbound / OR99E will be closed Monday through Friday night between the hours of 10 PM to 5 AM. The estimated completion date for this work is June 7, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: SB MP 301.85 to 301.72
I-5, I-405 North Interchange

Construction Work
No to Minimum Delay
Comments
Intermittent nighttime lane closures on I-5 SB from the Convention Center to Burnside from 9 p.m. to 6 a.m. weather permitting. No detours required. We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5 completing a seismic retrofit, extending an existing merging lane on SB I-5, and constructing a new sign structure. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/)
Last Updated
4/03/2026 4:28 PM

I-5: MP 301.91
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB Exit 301 off-ramp to I-84 EB (Portland) Effective May 11, 2026, the I-5 southbound Exit 301 off-ramp to I-84 eastbound will be closed Monday through Friday night between the hours of 10 PM & 5 AM. The estimated completion date for this work is June 7, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 302.33
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
Alert: I-5 SB MP 302.33 (Portland) Effective May 7, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 7, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: MP 302.35 to 302.66
I-5, I-405 North Interchange

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
8/9/2026 12:00:00 AM
Details
Alert: I-5 NB on-ramp from NE Broadway Avenue (Portland) Effective August 9, 2026, the I-5 northbound on-ramp from NE Broadway Avenue will be closed Sunday morning at 5:00 AM to Sunday 1:00 PM for the Providence Bridge Pedal. The estimated completion date for this event is August 9, 2026.
Last Updated
6/08/2026 4:00 PM

I-5: SB MP 303.08 to 300.28
I-5, 1 mile South of Portland, Intersection with Going St

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/15/2026 11:57 AM

I-5: SB MP 308 to 301
I-5, Oregon Washington Border

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 3:01 PM

I-5: SB MP 308 to 301
I-5, Oregon Washington Border

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 11:40 AM

I-84: WB MP 0 to 16
I-84, Interstate 5

Construction Work
No to Minimum Delay
Comments
Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/10/2026 3:19 PM

I-84: EB MP 0 to 16
I-84, Interstate 5

Construction Work
No to Minimum Delay
Comments
Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/10/2026 3:31 PM

I-84: EB MP 0 to 9.7
I-84, Interstate 5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/08/2026 3:02 PM

I-84: MP 0.2
I-84, Interstate 5

Commercial Vehicle Information
Informational only
Details
Alert: I-84 WB off-ramp to Holladay St/1st Ave/Moda Center (Portland) Effective May 15, 2026, the I-84 westbound off-ramp to Holladay Street/1st Avenue/Moda Center will be closed at all hours. The estimated completion date for this work is June 8, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: EB MP 10 to 17
I-84, Portland, Intersection with 122nd Ave

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 2:01 PM

I-84: WB MP 18
I-84, 1 mile East of Troutdale

Construction Work
No to Minimum Delay
Comments
Daytime periodic lane closures on Jordan Road, with flaggers directing traffic. We're building a new multi-use path parallel to Jordan Road (near I-84 at Exit 18) from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/10/2026 3:21 PM

I-84: EB MP 18 to 64
I-84, 1 mile East of Troutdale

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 12:46 PM

I-84: EB MP 18 to 42
I-84, 1 mile East of Troutdale

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 2:31 PM

I-84: MP 35.58 to 39
I-84, 5 miles East of Multnomah Falls

Commercial Vehicle Information
Informational only
Details
Alert: I-84 WB MP 35 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: MP 36 to 39
I-84, 5 miles East of Multnomah Falls

Commercial Vehicle Information
Informational only
Details
Alert: I-84 EB MP 36 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 eastbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: EB MP 37 to 38
I-84, 6 miles East of Multnomah Falls

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) Median , 1 Lane
Comments
Road work has the EB left lane closed at mile post 37. The onramp from Warrendale to EB is closed. Prepare to slow or move over for worker safety. Ramps Affected.
Last Updated
3/01/2026 2:11 PM

I-84: MP 37 to 37.6
I-84, 6 miles East of Multnomah Falls

Commercial Vehicle Information
Informational only
Details
Alert: I-84 EB on-ramp from NE Frontage Rd/Hwy 100 (Warrendale) Effective March 1, 2026, the I-84 eastbound on-ramp from NE Frontage Road/Highway 100 will be closed at all hours. The estimated completion date for this work is July 7, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: EB MP 37.3 to 38.4
I-84, 6 miles East of Multnomah Falls

Construction Work
Estimated delay under 20 minutes
Comments
Expect EB and WB lane closures on I-84 at McCord Creek BR. with one lane open each direction. Traffic revisions in place. Frontage Rd onramp closed. We are working on a construction project to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale through fall 2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766)
Last Updated
5/29/2026 3:40 PM

I-84: WB MP 38.5 to 37.5
I-84, 7 miles West of Cascade Locks

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane
Comments
Road work has the WB left lane closed at mile post 38.5. Prepare to slow or move over for worker safety.
Last Updated
3/01/2026 12:56 PM

I-84: EB MP 42 to 64
I-84, 3 miles West of Cascade Locks

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 12:09 PM

I-84: EB MP 67.5
I-84, 4 miles East of Hood River

Crash/Hazard
No to Minimum Delay
Comments
A disabled vehicle is creating a hazard, causing minimal delay to traffic. Use caution.
Last Updated
6/07/2026 1:11 PM

I-84: WB MP 74
I-84, 10 miles East of Hood River

Crash/Hazard
No to Minimum Delay
Comments
Hazardous debris is causing minimal delay to traffic. Use caution.
Last Updated
6/07/2026 1:10 PM

I-84: WB MP 85 to 69
I-84, The Dalles

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 10:00 AM

I-84: EB MP 87 to 138.9
I-84, The Dalles

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures Monday through Friday, 8pm to 6am for continued barrier work. Watch for speed reduction throughout workzone(s). Use caution, prepare to slow.
Last Updated
6/08/2026 1:11 AM

I-84: MP 108.5 to 109.5
I-84, 4 miles East of Biggs Junction

Commercial Vehicle Information
Informational only
Details
Alert: I-84 EB & WB MP 108.5 to MP 109.5 (Rufus) Effective May 17, 2026, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM and 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 26, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: MP 137.6 to 138.1
I-84, Arlington

Commercial Vehicle Information
Informational only
Details
Alert: I-84 EB & WB MP 137.60 to MP 138.10 (Arlington) Effective May 17, 2026, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM and 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 26, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: EB MP 138
I-84, Arlington

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of a pedestrian in the roadway creating a hazard has been received. Use caution.
Last Updated
6/08/2026 10:35 PM

I-84: EB MP 159.3
I-84, 5 miles West of Boardman

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures of Tower Road Bridge for continuing work. Use caution, prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22880)
Last Updated
6/08/2026 2:47 AM

I-84: MP 159.3
I-84, 5 miles West of Boardman

Commercial Vehicle Information
Informational only
Details
Alert: I-84 EB Exit 159 off-ramp to Tower Rd NB (Boardman) Effective June 3, 2026, the I-84 eastbound Exit 159 off-ramp to Tower Road northbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this work is June 10, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: MP 159.3
I-84, 5 miles West of Boardman

Commercial Vehicle Information
Informational only
Details
Alert: I-84 WB Exit 159 off-ramp to Tower Rd SB (Boardman) Effective June 3, 2026, the I-84 westbound Exit 159 off-ramp to Tower Road southbound will be closed at all hours. The estimated completion date for this work is June 10, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: MP 159.5
I-84, 5 miles West of Boardman

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/11/2026 12:00:00 AM
Details
Alert: I-84 WB Exit 159 off-ramp to Tower Rd SB & I-84 EB Exit159 off-ramp to Tower Rd NB (Boardman) Effective June 11, 2026, the I-84 westbound Exit 159 off-ramp to Tower Road southbound and the I-84 eastbound Exit 159 off-ramp to Tower Road northbound will be closed at all hours. The estimated completion date for this work is July 9, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: WB MP 167.73 to 177
US730, Intersection with Columbia River Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 2:25 PM

I-84: WB MP 193 to 216
I-84, 16 miles West of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 1:48 PM

I-84: EB MP 193 to 216
I-84, 16 miles West of Pendleton

Information
Informational only
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/03/2026 2:55 PM

I-84: EB MP 193 to 216
I-84, 16 miles West of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 12:10 PM

I-84: EB MP 216 to 193
I-84, 7 miles East of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 3:45 PM

I-84: EB MP 216 to 193
I-84, 7 miles East of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 4:08 PM

I-84: EB MP 216 to 193
I-84, 7 miles East of Pendleton

Information
Informational only
Comments
Road maintenance operations are or will be occurring. Use caution.
Last Updated
6/02/2026 4:15 PM

I-84: EB MP 216 to 228
I-84, 7 miles East of Pendleton

Weather Impact
Informational only
Comments
Winds have prompted ODOT to warn drivers of high profile vehicles MP216-228. Sensor detected an average wind speed of 36 mph. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles.
Last Updated
5/28/2026 5:48 PM

I-84: EB MP 216 to 228
I-84, 7 miles East of Pendleton

Weather Impact
Informational only
Comments
High wind warning. Use caution. Sensor detected an average wind speed of 40 mph. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles.
Last Updated
5/28/2026 5:39 PM

I-84: EB MP 217 to 230
I-84, 8 miles East of Pendleton

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Contractor will be doing final cleanup the week of 6/8 with minimal impact to traffic.
Last Updated
6/08/2026 3:28 AM

I-84: WB MP 220.7 to 224
I-84, 12 miles East of Pendleton

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures in westbound lanes throughout workzone(s). Use caution, prepare to slow.
Last Updated
6/08/2026 4:23 AM

I-84: EB MP 221.5
I-84, 13 miles East of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 8:32 AM

I-84: EB MP 222
I-84, 13 miles East of Pendleton

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 7:35 PM

I-84: WB MP 222.5 to 216
I-84, 14 miles East of Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 12:59 PM

I-84: WB MP 224.59
I-84, 16 miles East of Pendleton

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 11:37 AM

I-84: WB MP 228 to 216
I-84, 19 miles East of Pendleton

Weather Impact
Informational only
Comments
Winds have prompted ODOT to warn drivers of high profile vehicles MP228-216. Sensor detected an average wind speed of 36 mph. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles.
Last Updated
5/28/2026 5:46 PM

I-84: WB MP 228 to 216
I-84, 19 miles East of Pendleton

Weather Impact
Informational only
Comments
High wind warning. Use caution. Sensor detected an average wind speed of 40 mph. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles.
Last Updated
5/28/2026 5:38 PM

I-84: WB MP 236
I-84, 23 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 3:30 PM

I-84: WB MP 238
I-84, 21 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 12:22 PM

I-84: EB MP 238
I-84, 21 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 4:00 PM

I-84: WB MP 246 to 228
I-84, 13 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 4:03 PM

I-84: WB MP 249
I-84, 10 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 4:00 PM

I-84: EB MP 249.25 to 259.3
I-84, 10 miles West of La Grande

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Contractor will be doing final cleanup the week of 6/8 with minimal impact to traffic.
Last Updated
6/08/2026 3:30 AM

I-84: WB MP 251 to 235
I-84, 8 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 5:34 PM

I-84: WB MP 252
I-84, 7 miles West of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 3:24 PM

I-84: EB MP 261 to 263
I-84, La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:42 PM

I-84: WB MP 261 to 263
I-84, La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:42 PM

I-84: EB MP 263 to 265
I-84, 2 miles East of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:19 PM

I-84: EB MP 264 to 268
I-84, 3 miles East of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/28/2026 12:48 PM

I-84: WB MP 268 to 273
I-84, 7 miles East of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 2:13 PM

I-84: EB MP 270.4 to 274
I-84, 9 miles East of La Grande

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Contractor will be doing final cleanup the week of 6/8 with minimal impact to traffic.
Last Updated
6/08/2026 3:30 AM

I-84: EB MP 270.5 to 272.3
I-84, 10 miles East of La Grande

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
6/08/2026 4:31 AM

I-84: WB MP 273 to 276
I-84, 12 miles East of La Grande

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 2:25 PM

I-84: EB MP 276 to 279
I-84, 10 miles West of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 12:35 PM

I-84: EB MP 277 to 280
I-84, 9 miles West of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 2:37 PM

I-84: WB MP 278 to 276
I-84, 8 miles West of North Powder

Information
Informational only
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
6/02/2026 4:18 PM

I-84: WB MP 285 to 293
I-84, 1 mile West of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 9:54 AM

I-84: EB MP 285 to 290
I-84, 1 mile West of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 3:25 PM

I-84: EB MP 285 to 293
I-84, 1 mile West of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 9:54 AM

I-84: EB MP 290 to 296
I-84, 4 miles East of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 3:50 PM

I-84: WB MP 291 to 295
I-84, 5 miles East of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/28/2026 12:43 PM

I-84: WB MP 294 to 290
I-84, 8 miles East of North Powder

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 6:26 AM

I-84: WB MP 296 to 294
I-84, 9 miles West of Baker City

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 2:28 PM

I-84: EB MP 301 to 296
I-84, 4 miles West of Baker City

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 3:26 PM

I-84: EB MP 304
I-84, Intersection with Whitney Highway ORE7

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 4:18 PM

I-84: EB MP 304 to 302
I-84, Intersection with Whitney Highway ORE7

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 12:56 PM

I-84: EB MP 330 to 295
I-84, 16 miles West of Huntington

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 12:18 PM

I-84: EB MP 330 to 327
I-84, 16 miles West of Huntington

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 2:34 PM

I-84: WB MP 330.75 to 345.8
I-84, 15 miles West of Huntington

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Contractor will be doing final cleanup the week of 6/8 with minimal impact to traffic.
Last Updated
6/08/2026 3:30 AM

I-84: EB MP 334
I-84, 12 miles West of Huntington

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 10:39 PM

I-84: MP 335.76 to 376
I-84, 10 miles West of Huntington

Commercial Vehicle Information
Informational only
Details
Alert: I-84 EB and WB MP 335.76 to MP 376.00 (Weatherby to Ontario) Effective June 1, 2026, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Thursday between the hours of 6 AM & 6 PM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is June 30, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: EB MP 338 to 344
I-84, 8 miles West of Huntington

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/12/2026 7:58 AM

I-84: MP 351 to 356
I-84, 5 miles East of Huntington

Commercial Vehicle Information
Informational only
Details
Alert: I-84 EB & WB MP 351.0 to 356.0 (Huntington) Effective March 20, 2026, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is October 31, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: MP 351 to 356
I-84, 5 miles East of Huntington

Commercial Vehicle Information
Informational only
Details
Alert: I-84 WB Exit 356 on-ramp from OR201 (Huntington) Effective May 4, 2026, the I-84 westbound Exit 356 on-ramp from OR201 will be closed at all hours. The estimated completion date for this work will be July 31, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: EB MP 352.05 to 368.16
I-84, Baker - Malheur County Line

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Crews will be onsite continuing work. All traffic has transitioned to the eastbound side of the freeway. Expect possible single lane, shoulder, median, on and off ramp closures throughout work zone(s). Follow traffic signs, be prepared to slow and use caution while passing through work zone(s).
Last Updated
6/08/2026 4:34 AM

I-84: MP 353
I-84, 7 miles East of Huntington

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/29/2026 12:00:00 AM
Details
Alert: I-84 WB Exit 353 off-ramp to US30 (Huntington) Effective June 29, 2026, the I-84 westbound Exit 353 off- ramp to US30 will be closed at all hours. The estimated completion date for this work is July 02, 2026.
Last Updated
6/08/2026 4:00 PM

I-84: WB MP 365
I-84, 12 miles West of Ontario

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder
Comments
A vehicle fire has occurred causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 9:44 AM

I-84: WB MP 376 to 375
I-84, Ontario

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments
Bridge work is occurring. Prepare to slow. Watch for speed reduction throughout workzone. Use caution, prepare to slow.
Last Updated
6/08/2026 9:40 AM

US101: MP 0 to 37
US101, Oregon - Washington Border

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 11:49 AM

US101: MP 19.91
US101, Seaside

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 8:00 AM

US101: MP 26 to 36
US101, 4 miles North of Cannon Beach

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 10:20 AM

US101: MP 35 to 21
US101, 5 miles South of Cannon Beach

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 12:23 PM

US101: MP 112.35 to 121.44
US101, Lincoln City

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect nighttime lane closures and delays for ADA curb ramp construction. No lane closures will occur over the weekend. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434)
Last Updated
6/03/2026 7:42 PM

US101: MP 127.61
US101, Depoe Bay

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday. Most lane closures will occur during nighttime hours, with a few exceptions that will happen during the day between the hours of 7AM and 5PM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110)
Last Updated
5/01/2026 8:37 PM

US101: MP 134
US101, 7 miles North of Newport

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
5/01/2026 8:30 PM

US101: MP 136
US101, 5 miles North of Newport

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
5/01/2026 8:30 PM

US101: MP 156 to 156.5
US101, Intersection with Alsea Highway ORE34

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/20/2026 12:00:00 AM
Details
Alert: US101 NB & SB MP 156 to MP 156.5 (Waldport) On Saturday June 20, 2026, this section of US101 northbound and southbound will be closed between the hours of 12 PM (noon) & 1 PM for the Waldport Beachcombers Day Parade.
Last Updated
6/08/2026 4:00 PM

US101: MP 168 to 196
US101, Lincoln - Lane County Line

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 4:46 PM

US101: MP 190 to 199
US101, Intersection with Florence - Eugene Highway ORE126

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:25 AM

US101: MP 205 to 229
US101, 4 miles North of Gardiner

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 5:57 AM

US101: MP 232 to 233
US101, 3 miles North of North Bend

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety. This project will end sometime in September.
Last Updated
6/04/2026 11:20 AM

US101: NB MP 236 to 236.5
US101, North Bend

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Lane closure causing minimal delay to traffic. Use caution.
Last Updated
1/17/2026 1:13 PM

US101: NB MP 239.5 to 235.09
US101, 2 miles South of Coos Bay

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 6:43 AM

US101: MP 243 to 199
US101, 1 mile North of Intersection with Coos Bay - Roseburg Highway ORE42

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 3:04 PM

US101: MP 243 to 261
US101, 1 mile North of Intersection with Coos Bay - Roseburg Highway ORE42

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 1:24 PM

US101: NB MP 244 to 240.38
US101, Intersection with Coos Bay - Roseburg Highway ORE42

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 8:50 AM

US101: MP 254 to 261
US101, 10 miles South of Intersection with Coos Bay - Roseburg Highway ORE42

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 12:54 PM

US101: MP 275 to 300
US101, Bandon

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 10:25 AM

US101: MP 300 to 330
US101, Port Orford

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/28/2026 10:27 AM

US101: MP 312
US101, 12 miles South of Port Orford

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/21/2026 4:57 PM

US101: MP 327.4 to 329.5
US101, Wedderburn

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:57 PM

US101: MP 331 to 363
US101, 2 miles South of Gold Beach

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 11:03 AM

US101: MP 354.8 to 359.3
US101, Brookings

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:57 PM

US101B: MP 0 to 7
US101B, Intersection with Fort Stevens Highway

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:23 PM

US101B: NB MP 0.15 to 29
ORE202, Intersection with Oregon Coast Highway US101

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:04 PM

US199: NB MP 2.15
US199, Grants Pass

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement on pathway is causing minimal delay to traffic. Pedestrians and bicyclists use caution.
Last Updated
2/06/2026 12:45 PM

US199: MP 14 to 41
US199, 2 miles South of Wonder

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for daytime lane and shoulder closures in the work zone, Monday-Thursday. Flaggers and pilot cars will provide traffic control. Expect delays of up to 20 minutes.
Last Updated
5/21/2026 5:04 PM

US20: MP 1.75
US20, Albany

Construction Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
6/17/2026 6:00:00 AM
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Work is currently scheduled from 6 a.m. to 4 p.m. on 6/17/2026.
Last Updated
5/11/2026 10:22 AM

US20: MP 1.82 to 2.8
US20, N.E. Purcell Blvd. (Bend)

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22442)
Last Updated
5/18/2026 1:27 AM

US20: NB MP 14.7
US20, Tumalo

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:21 PM

US20: NB MP 14.7
US20, Tumalo

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:42 PM

US20: NB MP 17
US20, 1 mile North of Bend

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/27/2026 2:41 PM

US20: MP 18.8
US20, Intersection with The Dalles - California Highway US97

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
6/05/2026 3:39 PM

US20: MP 19.8 to 19.7
US20, 1 mile South of Intersection with The Dalles - California Highway US97

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
10/1/2026 12:00:00 AM
Details
Alert: US20 EB & WB on- and off-ramps to/from Division St (Bend) Effective October 1, 2026, the US20 eastbound and westbound on- and off-ramps to/from Division Street will be closed at all hours. The estimated completion date for this work is April 30, 2027.
Last Updated
6/08/2026 4:00 PM

US20: MP 27.25 to 27.93
US20, Intersection with Halsey - Sweet Home Highway ORE228

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/11/2026 12:00:00 AM
Details
Alert: US20 EB & WB MP 27.25 to MP 27.93 (Sweet Home) On Saturday July 11, 2026, this section of US20 eastbound and westbound will be closed from 10th Avenue (mile point 27.27) to 22nd Avenue (mile point 27.93) from 11 AM to 12 PM (noon) for the Sportsman's Holiday Parade.
Last Updated
6/08/2026 4:00 PM

US20: MP 45.99
US20, 3 miles East of Brothers

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/07/2026 2:14 AM

US20: MP 50.81 to 51.92
US20, Philomath

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Starting June 1st, you will see crews demoing on ADA corners to construct and remediate the ADA curb ramps throughout the community along the state highway. Drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-corvallis)
Last Updated
6/02/2026 5:53 AM

US20: NB MP 84 to 84.06
ORE99W, Intersection with Corvallis - Newport Highway US20

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Starting June 1st, you will see crews demoing on ADA corners to construct and remediate the ADA curb ramps throughout the community along the state highway. Drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-corvallis)
Last Updated
6/02/2026 5:56 AM

US20: MP 92.29 to 92.7
ORE126, Sisters

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Crews may be onsite continuing shoulder work to install new ADA ramps. Use caution, prepare to slow.
Last Updated
6/08/2026 1:25 AM

US20: MP 253 to 223
US20, 5 miles West of Intersection with Olds Ferry-Ontario Highway OR 201

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 12:52 PM

US26: EB MP 0 to 21
US26, Intersection with Oregon Coast Highway US101

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 9:34 AM

US26: MP 0.94 to 0.59
US26, 1 mile East of I-405

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
8/9/2026 12:00:00 AM
Details
Alert: US26 WB 0.94 to MP 0.59 (Ross Island Bridge - Portland) Effective August 9, 2026, this section of US26 westbound will be closed Sunday morning at 5:00 AM to Sunday afternoon at 1:00 PM for the Providence Bridge Pedal. The estimated completion date for this event is August 9, 2026.
Last Updated
6/08/2026 4:00 PM

US26: MP 1.47 to 1.55
US26, 1 mile East of I-405

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
8/9/2026 12:00:00 AM
Details
Alert: OR99E NB off-ramp to US26 WB/SE Woodward St (Ross Island Bridge - Portland) Effective August 9, 2026, the OR99E northbound off-ramp to US26 westbound/Woodward Street will be closed Sunday morning at 5:00 AM to Sunday afternoon at 1:00 PM for the Providence Bridge Pedal. The estimated completion date for this event is August 9, 2026.
Last Updated
6/08/2026 4:00 PM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8:00 a.m. to 5:00 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. • SE 174 Avenue will close south of SE Powell Blvd. April 19 – 26. Signed detours will be available. Possible nighttime work with closures. Travelers can expect congestion during construction. Alternate routes are available. Flaggers may be directing traffic.
Last Updated
4/19/2026 8:42 AM

US26: MP 5.87 to 7.9
US26, Portland

Commercial Vehicle Information
Informational only
Details
Alert: US26 EB & WB MP 5.87 to MP 7.9 (Portland) Effective July 13, 2025, this section of US26 eastbound and westbound will be restricted to 10 feet 00 inches in width at night half an hour after sunset to half an hour before sunrise. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 3, 2026.
Last Updated
6/08/2026 4:00 PM

US26: MP 7.9 to 9.96
US26, Portland

Commercial Vehicle Information
Informational only
Details
Alert: US26 Powell Blvd EB & WB 7.90 to MP 9.96 (Portland) Effective November 21, 2025, this section of US26 eastbound and westbound will be continuously restricted to 10 feet 00 inches in width at all hours. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 2, 2026.
Last Updated
6/08/2026 4:00 PM

US26: MP 8 to 0
US26, 1 mile West of Necanicum

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 8:45 AM

US26: MP 8.55
US26, Portland

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations have the intersection with 148th under flagger control. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 9:51 PM

US26: MP 13
US26, 4 miles East of Necanicum

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 1 Lane
Comments
Sunken grade. Prepare to slow.
Last Updated
5/04/2026 11:49 AM

US26: MP 16 to 26.1
US26, 10 miles North of Prineville

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/08/2026 8:48 AM

US26: MP 49 to 98
US26, 17 miles West of Mitchell

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/15/2026 11:56 AM

US26: MP 60.86
US26, Intersection with Helvetia Rd

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/13/2026 12:00:00 AM
Details
Alert: US26 EB Exit 61 off-ramp's left turn to Brookwood Pkwy/NW Helvetia Rd (Hillsboro) Effective June 13, 2026, the US26 eastbound left turn lane to northbound Brookwood Parkway/NW Helvetia Road, will be closed between the hours of 6:30 AM and 12:00 PM (noon). The estimated completion date for this work is June 13, 2026.
Last Updated
6/08/2026 4:00 PM

US26: MP 61.05
US26, Intersection with Helvetia Rd

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/13/2026 12:00:00 AM
Details
Alert: US26 WB Exit 61A off-ramp to NW Helvetia Rd SB (Hillsboro) Effective June 13th, 2026, the US26 westbound Exit 61A off-ramp to NW Helvetia Road southbound will be closed between the hours of 6:30 AM and 12:00 PM (noon). The estimated completion date for this work is June 13th, 2026.
Last Updated
6/08/2026 4:00 PM

US26: WB MP 68.32 to 68.36
US26, Beaverton, Intersection with Cedar Hills Blvd

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/26/2026 2:33 PM

US26: EB MP 73.81 to 73.97
US26, Portland, Vista Ridge Tunnel

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 2:32 PM

US26: NB MP 92.08 to 111
US97, Madras

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 3:32 PM

US26: NB MP 92.08 to 117
US97, Madras

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 11:39 AM

US26: MP 107
US26, 4 miles South of Warm Springs

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/05/2026 4:31 PM

US26: MP 190 to 231
US26, 15 miles South of Prairie City

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 12:05 PM

US26: MP 191 to 231
US26, Intersection with Whitney Highway ORE7

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 12:09 PM

US26: MP 198 to 191
US26, 14 miles North of Unity

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 8:32 AM

US26: MP 231.1 to 191.3
US26, Ironside

Maintenance Work
Informational only
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Chip seal operations are occurring causing minimal delay to traffic. Watch for loose rock. Prepare to slow or move over for worker safety.
Last Updated
5/29/2026 6:36 AM

US26: MP 256
US26, 5 miles North of Jamieson

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 2:37 PM

US26: MP 278 to 250
US26, Intersection with Central Oregon Highway US20

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 2:36 PM

US30: EB MP 0 to 6.6
US30, Intersection with Columbia River Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:31 PM

US30: MP 0 to 35
ORE11, Intersection with Pendleton Highway US30

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 3:48 PM

US30: MP 1.65 to 2.02
US30, La Grande

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/20/2026 12:00:00 AM
Details
Alert: US30/Hwy 66 NB & SB MP 1.65 to 2.02 (La Grande) On Saturday, June 20, 2026, this section of US30/Hwy 66 northbound and southbound will be closed from Fourth Street (mile point 1.65) to Greenwood Street (mile point 2.02) from 10:00 AM to 2:00 PM for the Touch a Truck Event. The estimated completion date is June 20, 2026.
Last Updated
6/08/2026 4:00 PM

US30: EB MP 2.81 to 3.61
US30, Pendleton

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be onsite to continue work on an ADA Curb Ramp project. Use caution, obey all signs while passing through the work zone.
Last Updated
6/02/2026 2:17 AM

US30: WB MP 6.49 to 0
US30, Umatilla Indian Reservation

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:30 PM

US30: MP 9.24 to 18.37
US30, Portland

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:50 PM

US30: MP 16.03 to 16.71
ORE203, Union

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/12/2026 12:00:00 AM
Details
Alert: OR237/OR203 NB & SB MP 16.03 to MP 16.71 (Union) Effective Friday June 12, 2026, this section of OR237/OR203 northbound and southbound will be closed from Grape Street (mile point 16.03) to Fulton Street (mile point 16.71) from 2 PM to 4 PM for the Eastern Oregon Livestock Show Parade. The estimated completion date is June 12, 2026.
Last Updated
6/08/2026 4:00 PM

US30: MP 40.44 to 40.73
US30, Haines

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/4/2026 12:00:00 AM
Details
Alert: US30/Hwy 66 NB & SB MP 40.44 to MP 40.73 (Haines) Effective Saturday, July 4, 2026, this section of US30/Hwy 66 northbound and southbound will be closed from First Street (mile point 40.44) to Fifth Street (mile point 40.73) from 5 AM to 2 PM for the 4th of July Parade. The estimated completion date is July 4, 2026.
Last Updated
6/08/2026 4:00 PM

US30: MP 48 to 70
US30, Rainier

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 7:58 PM

US30: MP 51.79 to 51.92
US30, Baker City

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/20/2026 12:00:00 AM
Details
Alert: US30 NB & SB MP 51.79 to 51.92 (Baker City) Effective Saturday, June 20, 2026, this section of US30 northbound and southbound will be closed from Broadway Street (mile point 51.79) to Court Avenue (mile point 51.92) from 11:00 AM to 3:00 PM for the Baker County Women Republican Chapter Kiddie Parade. The estimated completion date is June 20, 2026.
Last Updated
6/08/2026 4:00 PM

US30: MP 51.79 to 52.04
US30, Baker City

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/27/2026 12:00:00 AM
Details
Alert: US30 EB & WB MP 51.67 to 52.04 (Baker City) On Saturday June 27, 2026, this section of US30 eastbound and westbound will be closed from Broadway Street (mile point 51.67) to Auburn Avenue (mile point 52.04) from 9:00 AM to 8:00 PM for the time trials of the Baker City Cycling Classic. The estimated completion date is June 27, 2026.
Last Updated
6/08/2026 4:00 PM

US30: MP 55 to 60
US30, 6 miles West of Rainier

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/02/2026 4:43 PM

US30: MP 57 to 30
US30, 5 miles East of Clatskanie

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 4:27 PM

US30: MP 66.52 to 69.4
US30, 6 miles West of The Dalles

Crash/Hazard
Conditional Closure
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
The highway is open to local traffic and local deliveries only. No through traffic allowed.
Last Updated
6/08/2026 3:57 AM

US30: MP 70 to 18
US30, Columbia - Clatsop County Line

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 4:24 PM

US30: MP 70 to 85
US30, Columbia - Clatsop County Line

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 3:42 PM

US30: MP 91.01 to 94
US30, 6 miles East of Astoria

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/02/2026 7:38 PM

US30: MP 96 to 85
US30, Astoria

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 11:49 AM

US30BY: WB MP 0.25 to 0.26
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Project Description: This project restores the bridge on NW Bridge Ave. northwest of the St. Johns Bridge, connecting to U.S. 30 <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21704)
Last Updated
4/19/2026 8:43 AM

US30BY: WB MP 0.25 to 0.29
US30BP, Intersection with Lower Columbia River Highway US30

Maintenance Work
No to Minimum Delay
Off Ramp
Comments
Road work has the WB ramps to and from the St Johns Bridge closed. Use an alternate route. Ramps Affected.
Last Updated
6/06/2026 2:25 AM

US30BY: MP 0.25 to 0.29
US30BP, Intersection with Lower Columbia River Highway US30

Commercial Vehicle Information
Informational only
Details
Alert: US30 Bypass EB & WB MP 0.25 to MP 0.29 (Portland) Effective June 5, 2026, this section of US30 Bypass eastbound and westbound will be closed starting Friday at 9 PM for nine days until Sunday at 9 PM. The estimated completion date for this work is June 14, 2026.
Last Updated
6/08/2026 4:00 PM

US30BY: MP 6.14 to 9.21
US30BP, 1 mile East of Intersection with Pacific Highway I-5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:27 PM

US30BY: MP 8.19 to 8.41
US30BP, 3 miles West of Intersection with East Portland Highway I-205

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/26/2026 12:00:00 AM
Details
Alert: US30 Bypass EB & WB MP 8.19 to MP 8.41 (Portland) Effective June 26, 2026, this section of US30 Bypass eastbound and westbound will be closed all weekend starting at 10:00 PM on Friday to 5:00 AM on Monday. The estimated completion date for this work is June 29, 2026.
Last Updated
6/08/2026 4:00 PM

US30BY: MP 8.19 to 8.41
US30BP, 3 miles West of Intersection with East Portland Highway I-205

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/10/2026 12:00:00 AM
Details
Alert: US30 Bypass EB & WB MP 8.19 to MP 8.41 (Portland) Effective July 10, 2026, this section of US30 Bypass eastbound and westbound will be closed all weekend starting at 10:00 PM on Friday to 5:00 AM on Monday. The estimated completion date for this work is July 13, 2026.
Last Updated
6/08/2026 4:00 PM

US30BY: MP 8.29
US30BP, 3 miles West of Intersection with East Portland Highway I-205

Commercial Vehicle Information
Informational only
Details
Alert: US30 Bypass WB MP 8.29 (Portland) Effective May 8, 2026, this section of US30 Bypass will be restricted to 15 feet 1 inch in height at all hours. The estimated completion date for this work is September 1, 2026.
Last Updated
6/08/2026 4:00 PM

US395: MP 1.57 to 24
US395, Intersection with Old Oregon Trail Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:29 AM

US395: MP 4.33 to 6.03
US395, Hermiston

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite conducting work along side the highway. Traffic control devices will be in place while work is being performed. Exercise caution and obey all traffic control signs while passing through the work zone(s). <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23430)
Last Updated
6/02/2026 2:04 AM

US395: MP 27 to 40
US395, 12 miles South of Pilot Rock

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:53 PM

US395: MP 37 to 44
US395, 22 miles South of Pilot Rock

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:30 PM

US395: MP 49 to 64
US395, 34 miles South of Pilot Rock

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 3:25 PM

US395: MP 53 to 38
US395, 36 miles North of Long Creek

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 2:30 PM

US395: MP 64 to 77
US395, Umatilla - Grant County Line

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 4:10 PM

US395: MP 70 to 90
US395, 19 miles North of Long Creek

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/27/2026 3:59 PM

US395: MP 73.2
US395, 16 miles North of Long Creek

Information
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder
Comments
Highway erosion is causing minimal delay to traffic. There is an abrupt edge to the roadway. Use caution.
Last Updated
6/08/2026 12:25 AM

US395: MP 90 to 70
US395, 1 mile South of Long Creek

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:39 PM

US395: MP 145 to 157
US395, 2 miles South of Lakeview

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 12:57 AM

US730: EB MP 168 to 203
US730, Intersection with Columbia River Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:50 PM

US95: MP 0 to 10
US95, Oregon - Idaho Border

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 3:11 PM

US95: MP 20 to 10
US95, Jordan Valley

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 2:33 PM

US95: MP 20 to 30
US95, Jordan Valley

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 3:26 PM

US95: MP 30 to 45
US95, 10 miles South of Jordan Valley

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 3:20 PM

US97: MP 18.57 to 27.5
US97, 1 mile South of Moro

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Crews will be on-site periodically to set up traffic control signing and/or survey work for upcoming project. Use caution. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21648)
Last Updated
6/08/2026 1:08 AM

US97: MP 18.88 to 27.4
US97, 1 mile South of Moro

Commercial Vehicle Information
Informational only
Details
Alert: US97 NB & SB MP 18.88 to MP 27.4 (Moro & Grass Valley) Effective June 7, 2026, this section of US97 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM and 7 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
Last Updated
6/08/2026 4:00 PM

US97: MP 75.73
US97, 9 miles South of Intersection with The Dalles - California Highway US97

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 6:27 PM

US97: MP 92 to 67
US97, Madras

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 7:04 PM

US97: MP 114.56 to 116.56
US97, 1 mile North of Terrebonne

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Beginning Monday, April 27 at 7am, the Lower Bridge Way intersection at U.S. 97 will be closed to all traffic. There will be no access to or from Lower Bridge Way at U.S. 97, but U.S. 97 will remain open. Follow posted detours. Access to 11th Street will be closed on the north end of Terrebonne, use Central Avenue. Access to 11th St at south end of Terrebonne will be limited, use Smith Rock Way, Central Avenue and C Street. Prepare to slow, use caution, follow detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21162)
Last Updated
6/08/2026 1:20 AM

US97: MP 114.75 to 116.41
US97, 1 mile North of Terrebonne

Commercial Vehicle Information
Informational only
Details
Alert: US97 NB & SB MP 114.75 to MP 116.41 (Terrebonne) Effective May 11, 2026, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width at all hours. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2026.
Last Updated
6/08/2026 4:00 PM

US97: MP 115.23
US97, 1 mile North of Terrebonne

Commercial Vehicle Information
Informational only
Details
Alert: US97 NB & SB on- and off-ramps to/from Lower Bridge Way (Terrebonne) Effective April 27, 2026, the US97 northbound & southbound on- and off-ramps to/from Lower Bridge Way will be closed. The estimated completion date for this work is October 31, 2026.
Last Updated
6/08/2026 4:00 PM

US97: MP 116 to 86
US97, Terrebonne

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 4:04 PM

US97: MP 118.98 to 121.45
US97, 3 miles South of Terrebonne

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. The contractor will be onsite performing single lane closures on US97 NB and SB between Highland and Evergreen, Monday - Thursday night, 7pm - 6am. Traffic can expect minimal delays. Use caution, prepare to slow.
Last Updated
6/08/2026 1:17 AM

US97: MP 119 to 124
US97, 3 miles North of Redmond

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 8:44 AM

US97: MP 121.5 to 122.3
US97, Redmond

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 6:05 PM

US97: SB MP 133.7 to 135
US97, 1 mile North of Bend

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 3:50 PM

US97: NB MP 135.98 to 140.06
US97, Intersection with McKenzie - Bend Highway US20

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. The contractor will be installing ADA ramps at the intersections of Powers, Purcell, 27th and Windy Knolls with US20 Monday - Thursday, 8pm to 6am. Expect minimal delays, use caution and prepare to slow.
Last Updated
6/08/2026 1:21 AM

US97: SB MP 142 to 143.3
US97, Bend

Maintenance Work
Informational only
Comments
Road maintenance operations are or will be occurring. Ponderosa St is closed at Hwy 97. Use caution.
Last Updated
5/29/2026 8:24 AM

ORE10: SB MP 1.44 to 7.65
ORE99W, I-405 South Interchange

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:33 PM

ORE103: MP 0 to 9
ORE103, Intersection with Nehalem Highway ORE202

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:02 AM

ORE104: MP 0 to 6
ORE104, Fort Stevens State Park

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 1:23 PM

ORE11: MP 4 to 20.38
ORE11, 4 miles West of Pendleton

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane and shoulder closures throughout workzone(s). Use caution, prepare to slow.
Last Updated
6/08/2026 3:34 AM

ORE11: MP 4 to 20.38
ORE11, 4 miles West of Pendleton

Maintenance Work
Informational only
Comments
A road chip seal project is or will be occurring. Use caution. Watch for loose rock. A road chip seal project will be occurring with anticipated start date of June 16, 2026. Watch for loose rock, use caution, prepare to slow.
Last Updated
6/08/2026 3:36 AM

ORE126: MP 0 to 11
ORE126, Intersection with Santiam Highway US20

Maintenance Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
6/14/2026 6:00:00 PM
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/30/2026 4:03 PM

ORE126: MP 1.37
ORE126, Redmond

Commercial Vehicle Information
Informational only
Details
Alert: OR126 EB & WB on- and off-ramp/turn to/from SE Veterans Way (Redmond) Effective June 8, 2026, beginning at 7 AM the OR126 eastbound & westbound on- and off-ramp/turn to/from SE Veterans Way will be closed at all hours. The estimated completion date for this work is June 14, 2026 at 5 PM.
Last Updated
6/08/2026 4:00 PM

ORE126: EB MP 3.93 to 7.11
ORE126, Springfield

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-springfield)
Last Updated
5/01/2026 8:35 PM

ORE126: MP 8 to 54.97
ORE126, Springfield

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 5:11 AM

ORE126: MP 15 to 35
ORE126, 1 mile East of Mapleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 3:34 PM

ORE126: MP 16 to 55
ORE126, Prineville

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/08/2026 4:05 PM

ORE126: MP 17 to 15
ORE126, Prineville

Maintenance Work
Estimated delay under 20 minutes
Comments
Utility work is occurring. Prepare to slow.
Last Updated
6/08/2026 6:51 AM

ORE126: MP 45 to 52
ORE126, 1 mile West of Veneta

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:14 AM

ORE126: MP 47 to 0.02
ORE126, Veneta

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 4:29 AM

ORE126: MP 109.6 to 110.6
ORE126, 1 mile West of Redmond

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 9:32 AM

ORE126: MP 110.65 to 111.97
ORE126, Redmond

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect nightly single lane closures between 5th and 15th Monday through Thursday, 7pm to 7 am, to construct new ADA ramps and enhance signal operations. Various corners will be closed to pedestrian traffic during this time. Use caution, prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Projects/Pages/default.aspx)
Last Updated
6/08/2026 1:19 AM

ORE126B: WB MP 1.3 to 1.5
ORE126B, Springfield

Maintenance Work
Estimated delay under 20 minutes
Comments
Bridge work is occurring. Prepare to slow. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21762)
Last Updated
6/01/2026 12:29 PM

ORE138: MP 0.5 to 1.4
ORE138, Roseburg

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/21/2026 5:00 PM

ORE138: MP 26 to 0
ORE138, 9 miles East of Glide

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/15/2026 9:37 AM

ORE138: MP 26
ORE138, 9 miles East of Glide

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 5:40 AM

ORE138: MP 29.5 to 30.9
ORE138, 13 miles East of Glide

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/04/2026 4:27 PM

ORE138: MP 29.5 to 30.9
ORE138, 13 miles East of Glide

Commercial Vehicle Information
Informational only
Details
Alert: OR138 EB & WB MP 29.5 to MP 30.9 (Glide) Effective June 8, 2026, this section of OR138 eastbound and westbound will be restricted to 12 feet 00 inches in width at all times. The estimated completion date for this work is May 18, 2027.
Last Updated
6/08/2026 4:00 PM

ORE140: MP 28 to 39
ORE140, Adel

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 2:41 PM

ORE140: MP 54 to 61
ORE140, Bly

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/04/2026 2:17 PM

ORE140: MP 95 to 85
ORE140, 1 mile West of Lakeview

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 12:15 PM

ORE141: MP 2.71 to 4.97
ORE141, Intersection with Beaverton - Tigard Highway ORE217

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 9:24 AM

ORE141: MP 3.8 to 4.44
ORE141, Tigard

Construction Work
Estimated delay under 20 minutes
Comments
Traffic Impacts: No impacts. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647)
Last Updated
10/19/2025 6:14 AM

ORE141: MP 7.07 to 3.3
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010)
Last Updated
6/08/2025 6:59 AM

ORE141: MP 7.07 to 5.01
ORE141, Tigard

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431)
Last Updated
11/09/2025 5:54 PM

ORE153: MP 6 to 7
ORE153, Amity

Commercial Vehicle Information
Informational only
Details
Alert: OR153 EB & WB MP 6 to MP 7 (Amity) Effective January 5, 2026, this section of OR153 eastbound and westbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
Last Updated
6/08/2026 4:00 PM

ORE18B: MP 2 to 2.67
ORE18B, Willamina

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
Last Updated
5/01/2026 8:37 PM

ORE18B: MP 5.94 to 7.6
ORE18B, Sheridan

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556)
Last Updated
5/18/2026 11:22 AM

ORE19: MP 106
ORE19, 1 mile South of Kimberly

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 6:42 AM

ORE19: MP 117 to 105
ORE19, 8 miles North of Intersection with US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:28 PM

ORE201: MP 23 to 30
ORE201, 4 miles North of Ontario

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 5:55 AM

ORE201: MP 29.5
ORE201, Ontario

Crash/Hazard
No to Minimum Delay
Comments
There are rough road conditions causing minimal delay to traffic. Use caution.
Last Updated
6/06/2026 9:37 PM

ORE201: MP 30 to 0
ORE201, Ontario

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 3:06 PM

ORE202: MP 1.5 to 2
ORE202, Astoria

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/02/2026 4:59 PM

ORE202: MP 29 to 0.15
ORE202, Jewell

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:02 AM

ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution. Bridge construction is occurring. Prepare to slow. Watch for workers. 3/11/26 - 10/28/26: MP 38.5 to MP 38.63 (Bridge structure ID: 03113A) portable traffic signal in place with 24-hour lane closure. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23117)
Last Updated
5/13/2026 5:20 AM

ORE202: MP 38.5 to 38.63
ORE202, 3 miles North of Birkenfeld

Commercial Vehicle Information
Informational only
Details
Alert: OR202 EB & WB MP 38.5 to 38.63 (Vesper) Effective March 11, 2026, this section of OR202 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this work is October 27, 2026.
Last Updated
6/08/2026 4:00 PM

ORE202: MP 45 to 27
ORE202, 1 mile North of Mist

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 3:11 PM

ORE203: MP 6 to 7
ORE203, 6 miles South of Union

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:55 PM

ORE203: MP 9 to 10
ORE203, 2 miles North of Hot Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 8:08 AM

ORE203: NB MP 38.51 to 22
ORE203, Intersection with Old Oregon Trail Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 11:06 AM

ORE206: MP 73 to 54
ORE206, Intersection with Heppner - Spray Highway ORE207

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 4:27 PM

ORE206: MP 73.3 to 54.85
ORE206, Intersection with Heppner - Spray Highway ORE207

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:32 PM

ORE207: MP 0 to 5
ORE207, Intersection with Heppner Highway ORE74

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 3:29 PM

ORE207: MP 0 to 20
ORE207, Intersection with Heppner Highway ORE74

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 3:29 PM

ORE207: MP 0 to 24
ORE207, Intersection with Wasco - Heppner Highway ORE206

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 4:19 PM

ORE207: MP 0 to 3
ORE207, Intersection with Wasco - Heppner Highway ORE206

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 3:34 PM

ORE207: MP 1 to 16
ORE207, 1 mile South of Intersection with John Day Highway ORE19

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/15/2026 4:05 PM

ORE207: MP 3.5 to 0
ORE207, 4 miles East of Lexington

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 8:24 AM

ORE207: MP 7 to 20
ORE207, 7 miles East of Lexington

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 9:12 AM

ORE207: MP 18 to 19
ORE207, 9 miles South of Hardman

Information
No to Minimum Delay
Comments
Highway erosion is causing minimal delay to traffic. There is an abrupt edge to the roadway. Use caution.
Last Updated
6/08/2026 12:27 AM

ORE207: MP 24 to 36
ORE207, 15 miles South of Hardman

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:44 PM

ORE207: MP 35 to 25
ORE207, 6 miles North of Intersection with John Day Highway ORE19

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:01 PM

ORE207: MP 40.96 to 24
ORE207, Intersection with John Day Highway ORE19

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 2:23 PM

ORE211: MP 11.8
ORE211, Molalla

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Lane shifts and sidewalk closures expected. Project Description: A private development is underway off OR 211 near Ona Way in Molalla.
Last Updated
9/28/2025 8:36 AM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
5/05/2026 4:46 PM

ORE217: SB MP 0 to 5.9
ORE217, US 26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 2:32 PM

ORE219: MP 18.35 to 20.8
ORE219, Newberg

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
5/01/2026 8:39 PM

ORE219: MP 25.01
ORE219, 3 miles North of Saint Paul

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/17/2026 12:00:00 AM
Details
Alert: Marion County Roads EB McKay Rd, EB Yergen Rd, and EB Ehlen Rd Effective June 17, 2026, the McKay Rd, Yergen Rd, and Ehlen Rd corridor eastbound between OR219 and I-5 will be closed at night from 9:00 PM to 6:00 AM. The estimated completion date for this work is June 18, 2026.
Last Updated
6/08/2026 4:00 PM

ORE22: MP 2.53
ORE22, 3 miles East of Intersection with Salmon River Highway ORE18

Maintenance Work
Estimated delay under 20 minutes
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
6/03/2026 7:57 AM

ORE22: WB MP 17 to 15.34
ORE22, 8 miles West of Salem

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 4:24 PM

ORE22: MP 21 to 24.07
ORE22, 4 miles West of Salem

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem)
Last Updated
6/03/2026 6:44 AM

ORE22: MP 30
ORE22, Mill City

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 10:27 AM

ORE223: MP 2.13 to 4.28
ORE223, Dallas

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555)
Last Updated
5/01/2026 8:33 PM

ORE223: MP 2.92 to 3.86
ORE223, Dallas

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/25/2026 12:00:00 AM
Details
Alert: OR223 (Main St) NB & SB MP 2.92 to MP 3.86 (Dallas) Effective July 25, 2026, this section of OR223 northbound and southbound (Main St) will be closed between the hours of 6 AM & 2 PM July 25, 2026, for the Dallas Days Event.
Last Updated
6/08/2026 4:00 PM

ORE223: MP 3.15 to 3.38
ORE223, Dallas

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/24/2026 12:00:00 AM
Details
Alert: OR223 (Main St) SB MP 3.15 to MP 3.38 (Dallas) Effective July 24, 2026, this section of OR223 southbound (Main St) will be closed starting Friday at 6 AM to Saturday at 10 PM July 25, 2026, for the Dallas Days Event.
Last Updated
6/08/2026 4:00 PM

ORE224: MP -0.01 to 0.27
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/24/2026 12:00:00 AM
Details
Alert: OR224 EB MP -.01 to MP .27 (Milwaukie) Effective June 24, 2026, this section of OR224 eastbound will be closed at night between the hours of 8 PM and 6 AM. The estimated completion date for this work is June 26, 2026.
Last Updated
6/08/2026 4:00 PM

ORE224: MP -0.01 to 0.36
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/23/2026 12:00:00 AM
Details
Alert: OR224 WB MP -.01 to MP .36 & OR224 WB off-ramp to OR99E SB (Milwaukie) Effective June 23, 2026, this section of OR224 westbound and the OR224 westbound off-ramp to OR99E southbound will be closed at night between the hours of 8 PM and 6 AM. The estimated completion date for this work is June 25, 2026.
Last Updated
6/08/2026 4:00 PM

ORE224: EB MP 0 to 2.7
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
4/17/2025 3:08 PM

ORE224: MP 8.16 to 49.97
ORE224, 2 miles West of Tong Road near Damascus

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 2:33 PM

ORE224: MP 9.3 to 9.9
ORE224, 1 mile West of Tong Road near Damascus

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/17/2026 12:00:00 AM
Details
Alert: OR224 EB and WB MP 9.3 to MP 9.9 (Carver) Effective June 17, 2026, this section of OR224 eastbound and westbound will be restricted to 10 feet 00 inches in width Monday through Friday between the hours of 7 AM & 5 PM. The estimated completion date for this work is June 24, 2026.
Last Updated
6/08/2026 4:00 PM

ORE224: MP 36 to 37
ORE224, 13 miles East of Estacada

Construction Work
No to Minimum Delay
Comments
No traffic impacts expected. Project Description: Repairs are being made on OR 224 at milepost 36.7 (approximately 10 miles east of Estacada) after a winter storm event in December.
Last Updated
4/10/2026 2:53 PM

ORE229: MP 14.1 to 14.3
ORE229, 10 miles North of Siletz

Commercial Vehicle Information
Informational only
Details
Alert: OR229 NB & SB MP 14.18 (Siletz) Effective December 12, 2025, this section of OR229 northbound and southbound will be closed due to a landslide. There is no estimated date that the road will reopen at this time.
Last Updated
6/08/2026 4:00 PM

ORE229: MP 14.2 to 15.1
ORE229, 10 miles North of Siletz

Crash/Hazard
Closure
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
A landslide has occurred. Use an alternate route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx)
Last Updated
5/29/2026 8:22 PM

ORE234: MP 14.66 to 15.37
ORE234, 3 miles West of Intersection with Crater Lake Highway ORE62

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Sunken pavement; use caution. Crews will return July 6 to complete repairs and install safety features. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M25033)
Last Updated
6/05/2026 5:17 PM

ORE234: MP 15.1 to 15.2
ORE234, 2 miles West of Intersection with Crater Lake Highway ORE62

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/6/2026 12:00:00 AM
Details
Alert: OR234 EB & WB MP 15.1 to MP 15.2 (Eagle Point/Gold Hill) Effective July 6, 2026, this section of OR234 eastbound and westbound will be closed at all hours to repair a sink in the roadway. The estimated completion date for this emergency work is July 20, 2026.
Last Updated
6/08/2026 4:00 PM

ORE237: MP 31.54 to 32.15
ORE237, North Powder

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be on site prepping, forming, pouring, milling, paving and working on landscape. Use caution, prepare to slow, obey all traffic signs throughout work zone(s).
Last Updated
6/02/2026 2:15 AM

ORE240: MP 0.6 to 2.6
ORE240, Yamhill

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Overlay paving occurring along OR240 from Yamhill city limits east to MP 2.60. Single lane closures with flaggers. Work is currently scheduled from 8 a.m. to 5 p.m., Monday through Friday, beginning on June 2nd and ending on June 12th, 2026.
Last Updated
6/02/2026 7:38 PM

ORE240: MP 11.04 to 11.26
ORE240, Newberg

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
3/30/2026 6:34 PM

ORE241: EB MP 0 to 15
ORE241, Intersection with Oregon Coast Highway US101

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 11:10 AM

ORE241: MP 3.5 to 3.8
ORE241, 3 miles East of Coos Bay

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution.
Last Updated
5/21/2026 4:56 PM

ORE241: MP 3.55 to 3.82
ORE241, 3 miles East of Coos Bay

Commercial Vehicle Information
Informational only
Details
Alert: OR241 EB & WB MP 3.55 to MP 3.82 (Coos Bay) Effective August 13, 2025, this section of OR241 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this work is September 30, 2026.
Last Updated
6/08/2026 4:00 PM

ORE241: MP 3.55 to 3.82
ORE241, 3 miles East of Coos Bay

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/12/2026 12:00:00 AM
Details
Alert: OR241 EB & WB MP 3.55 to MP 3.82 (Coos Bay) Effective June 12, 2026, at 6:00 PM, this section of OR241 eastbound and westbound will be closed at all hours. The estimated completion date for this work is June 15, 2026.
Last Updated
6/08/2026 4:00 PM

ORE241: MP 3.55 to 3.82
ORE241, 3 miles East of Coos Bay

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/19/2026 12:00:00 AM
Details
Alert: OR241 EB & WB MP 3.55 to MP 3.82 (Coos Bay) Effective June 19, 2026, at 6:00 PM, this section of OR241 eastbound and westbound will be closed at all hours. The estimated completion date for this work is June 22, 2026.
Last Updated
6/08/2026 4:00 PM

ORE242: MP 61.91 to 84
ORE242, 7 miles East of Intersection with McKenzie Highway ORE126

Information
Seasonal Closure
Comments
The highway is closed for the season. Use alternate route. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/regions/pages/mckenzie-highway.aspx)
Last Updated
5/20/2026 12:40 PM

ORE244: MP 0 to 6
ORE244, Intersection with Pendleton - John Day Highway US395

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 4:08 PM

ORE244: MP 0 to 24
ORE244, Intersection with Pendleton - John Day Highway US395

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 4:51 PM

ORE244: MP 16 to 0
ORE244, 15 miles East of Ukiah

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 1:55 PM

ORE245: MP 0 to 21
ORE245, Intersection with John Day Highway US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:00 AM

ORE245: MP 0 to 18
ORE245, Intersection with John Day Highway US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/28/2026 11:04 AM

ORE245: MP 29 to 36.5
ORE245, 8 miles South of Intersection with Whitney Highway ORE7

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 11:11 AM

ORE245: MP 36 to 22
ORE245, 1 mile South of Intersection with Whitney Highway ORE7

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 4:19 PM

ORE255: MP 344 to 362
ORE255, 6 miles North of West Carpenterville

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 10:17 AM

ORE293: MP 1 to 13.52
ORE293, Jefferson - Wasco County Line

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 1:46 PM

ORE31: MP 29 to 45
ORE31, 18 miles North of Silver Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 3:51 PM

ORE31: MP 60 to 61
ORE31, 9 miles North of Summer Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 7:05 PM

ORE31: MP 62 to 70
ORE31, 7 miles North of Summer Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 6:31 PM

ORE31: MP 82 to 90
ORE31, 13 miles South of Summer Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/04/2026 3:07 PM

ORE31: MP 82 to 89
ORE31, 13 miles South of Summer Lake

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 1:25 PM

ORE31: MP 90 to 80
ORE31, 9 miles North of Paisley

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 3:11 PM

ORE31: MP 116 to 120
ORE31, 17 miles South of Paisley

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 2:35 PM

ORE331: MP 0 to 4.84
ORE331, Intersection with Oregon - Washington Highway ORE11

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:55 PM

ORE331: SB MP 4.84 to 0
ORE331, Intersection with Oregon Trail Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:55 PM

ORE334: MP 0 to 18.12
ORE334, Intersection with Pendleton - Cold Springs Highway ORE37

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 2:32 PM

ORE335: MP 0 to 9.79
ORE335, Helix

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 3:18 PM

ORE34: MP 0 to 0.5
ORE34, Intersection with Oregon Coast Highway US101

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/20/2026 12:00:00 AM
Details
Alert: OR34 EB & WB MP 0 to MP 0.5 (Waldport) On Saturday June 20, 2026, this section of OR34 eastbound and westbound will be closed between the hours of 12 PM (noon) & 1 PM for the Waldport Beachcombers Day Parade.
Last Updated
6/08/2026 4:00 PM

ORE351: MP 0 to 0.33
ORE351, Intersection with Wallowa Lake Highway ORE82

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/20/2026 12:00:00 AM
Details
Alert: OR351/Hwy 351 NB & SB 0.00 to 0.33 (Joseph) Effective June 20, 2026, this section of OR351/Hwy 351 northbound and southbound will be closed from Wallowa Avenue (mile point 0.00) to Third Street (mile point 0.33) from 6:30 AM to 4:00 PM, in the city of Joseph for the Wallowa Mountain Cruise Car Show. The estimated completion date is June 20, 2026.
Last Updated
6/08/2026 4:00 PM

ORE351: MP 1 to 11
ORE351, Joseph

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 8:51 AM

ORE36: MP 0.01 to 10.5
ORE36, Intersection with Florence - Eugene Highway ORE126

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 1:22 PM

ORE36: MP 7 to 47
ORE36, 1 mile West of Swisshome

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/22/2026 12:56 AM

ORE36: MP 46 to 51
ORE36, 2 miles West of Cheshire

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 10:28 PM

ORE36: MP 46 to 0.01
ORE36, 2 miles West of Cheshire

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 5:04 AM

ORE37: MP 0.88 to 14
ORE37, Intersection with Columbia River Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 11:37 AM

ORE37: MP 30.7 to 13.2
ORE37, Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 12:42 PM

ORE37: MP 30.75 to 13.25
ORE37, Pendleton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 3:47 PM

ORE38: MP 36 to 0
ORE38, Elkton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 11:07 AM

ORE380: MP 1 to 55
ORE380, 1 mile East of Prineville

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 1:05 PM

ORE39: MP 13.63
ORE39, Merrill

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/26/2026 5:44 PM

ORE402: MP 3 to 12
ORE402, 3 miles East of Kimberly

Crash/Hazard
No to Minimum Delay
Comments
A landslide has occurred causing minimal delay to traffic. Use caution.
Last Updated
6/08/2026 12:53 PM

ORE402: MP 21 to 0
ORE402, 7 miles East of Monument

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 1:30 PM

ORE402: MP 23 to 33
ORE402, 9 miles East of Monument

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 3:38 PM

ORE402: MP 27 to 34
ORE402, 8 miles West of Long Creek

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 11:30 AM

ORE413: MP 11.03 to 11.45
ORE413, Intersection with Pine Creek Highway

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
3/24/2026 1:09 PM

ORE42: EB MP 0 to 9.7
ORE42, Intersection with Oregon Coast Highway US101

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
4/28/2026 5:41 PM

ORE42: WB MP 0 to 21
ORE42, Intersection with Oregon Coast Highway US101

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 7:51 AM

ORE42: MP 13
ORE42, Coquille

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 9:01 AM

ORE42: MP 20.8 to 21.9
ORE42, Myrtle Point

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
5/21/2026 4:53 PM

ORE42: MP 21 to 0
ORE42, Myrtle Point

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 4:09 PM

ORE42: MP 36.1
ORE42, 1 mile West of Remote

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:56 PM

ORE42: MP 72 to 77
ORE42, 1 mile West of Winston

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:57 PM

ORE42: MP 72.54 to 76.95
ORE42, Winston

Commercial Vehicle Information
Informational only
Details
Alert: OR42 EB & WB MP 72.54 to MP 76.95 (Winston) Effective April 26, 2026, this section of OR42 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours beginning Sundays at 6 PM through Fridays at 3 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2026.
Last Updated
6/08/2026 4:00 PM

ORE42S: MP 7
ORE42S, 4 miles West of Riverton

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 10:11 AM

ORE43: SB MP 0 to 11.55
ORE43, Intersection with Mount Hood Highway US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 2:33 PM

ORE43: MP 11.08
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 SB off-ramp to I-205 NB (West Linn) Effective April 6, 2026, the OR43 southbound off-ramp to I-205 northbound will be closed Monday through Thursday nights between the hours of 10 PM and 5 AM, Friday nights between the hours of 10 PM and 7 AM, and Saturday nights between the hours of 10 PM & 8 AM. The estimated completion date for this work is June 23, 2026.
Last Updated
6/08/2026 4:00 PM

ORE43: MP 11.13 to 11.18
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 NB MP 11.13 to MP 11.18 (West Linn) Effective March 2, 2026, this section of OR43 northbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is July 2, 2026.
Last Updated
6/08/2026 4:00 PM

ORE43: MP 11.13 to 11.18
ORE43, Interstate 205

Commercial Vehicle Information
Informational only
Details
Alert: OR43 SB MP 11.13 to MP 11.18 (West Linn) Effective, March 2, 2026, this section of OR43 southbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is July 2, 2026.
Last Updated
6/08/2026 4:00 PM

ORE451: MP 0.03 to 10
ORE451, Intersection with Central Oregon Highway US20

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 1:38 PM

ORE47: MP 0 to 11
ORE47, Intersection with Lower Columbia River Highway US30

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/14/2026 2:46 PM

ORE47: MP 2 to 3
ORE47, 1 mile South of Clatskanie

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/02/2026 4:47 PM

ORE47: MP 41.5
ORE47, Intersection with Pacific Highway West ORE99W

Crash/Hazard
Estimated delay under 20 minutes
Comments
A crash has occurred. Prepare to slow or move over for worker safety.
Last Updated
6/01/2026 5:49 PM

ORE47: MP 46.14 to 57
ORE202, Intersection with Mist - Clatskanie Highway ORE110

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/18/2026 1:08 PM

ORE51: MP 5.81 to 6.34
ORE51, Independence

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Starting June 1st, you will see crews demoing on ADA corners to construct and remediate the ADA curb ramps throughout the community along the state highway. Drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
6/02/2026 5:47 AM

ORE53: MP 0.04 to 11
ORE53, Intersection with Sunset Highway US26

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:46 PM

ORE53: MP 11
ORE53, Clatsop - Tillamook County Line

Crash/Hazard
No to Minimum Delay
Comments
Sunken pavement is causing minimal delay to traffic. Use caution.
Last Updated
3/30/2026 6:35 PM

ORE540: MP 0.79 to 0.9
ORE540, North Bend

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
5/21/2026 4:53 PM

ORE540: MP 1.7 to 1.9
ORE540, North Bend

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/16/2026 12:00:00 AM
Details
Alert: OR540 SB MP 1.7 to MP 1.9 Newmark Connection (Empire) Effective June 16, 2026, the OR540 southbound Newmark Connection from Broadway Avenue to Newmark Street will be closed daily from 7:00 AM to 6:00 PM. The estimated completion date for this work is June 19, 2026.
Last Updated
6/08/2026 4:00 PM

ORE540: MP 1.73 to 2.24
ORE540, North Bend

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/16/2026 12:00:00 AM
Details
Alert: OR540 NB & SB MP 1.73 to MP 2.24 (Empire) Effective June 16, 2026, this section or OR540 northbound and southbound will be restricted to 10 feet 00 inches in width, daily, from 7:00 AM to 6:00 PM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 19, 2026.
Last Updated
6/08/2026 4:00 PM

ORE540: SB MP 4 to 10
ORE540, 3 miles South of North Bend

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 7:33 AM

ORE542: MP 18 to 18.91
ORE542, Powers

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 9:34 AM

ORE569: EB MP 4.5 to 13
ORE569, Eugene

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 6:05 AM

ORE58: MP 6 to 50
ORE58, 2 miles East of Pleasant Hill

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 4:25 AM

ORE58: MP 6 to 56
ORE58, 2 miles East of Pleasant Hill

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 12:12 AM

ORE58: MP 42 to 44
ORE58, 3 miles West of McCredie Springs

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Expect daytime single lane closures with an automatic flagger assistant device helping direct traffic east of Oakridge near milepost 43, construction noise and delays up to 20 minutes. Work is currently scheduled to be Monday through Friday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22557)
Last Updated
1/04/2026 12:26 PM

ORE6: MP 1 to 51.58
ORE6, 1 mile East of Tillamook

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509)
Last Updated
6/08/2026 4:48 PM

ORE6: MP 4.4 to 9
ORE6, 4 miles East of Tillamook

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Construction is expected to start after Memorial Day. Expect daytime work through mid June, then the contractor is scheduled to switch to night work. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22787)
Last Updated
6/02/2026 6:03 AM

ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is planned to begin in February. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737)
Last Updated
5/01/2026 8:36 PM

ORE6: MP 32.05 to 32.1
ORE6, 7 miles West of Glenwood

Commercial Vehicle Information
Informational only
Details
Alert: OR6 EB & WB MP 32.05 to 32.1 (Devils Lake Fork Wilson River Bridge) Effective February 9, 2026, this section of OR6 eastbound and westbound will be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs GVW, Weight Table 2, for all loads at all hours. The estimated completion date for this work is August 28, 2026.
Last Updated
6/08/2026 4:00 PM

ORE6: MP 49 to 51
ORE6, Intersection with Nehalem Highway ORE47

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
5/01/2026 8:32 PM

ORE62: MP 35.23 to 35.54
ORE62, 15 miles East of Shady Cove

Commercial Vehicle Information
Informational only
Details
Alert: OR62 EB & WB MP 35.23 to MP 35.54 (Shady Cove) Effective April 29, 2026, this section of OR62 eastbound and westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is September 30, 2026.
Last Updated
6/08/2026 4:00 PM

ORE62: MP 35.23 to 35.54
ORE62, 15 miles East of Shady Cove

Commercial Vehicle Information
Informational only
Details
Alert: OR62 EB & WB MP 35.23 to MP 35.54 (Shady Cove Peyton Bridge) Effective May 5, 2026, this section of OR62 eastbound and westbound will be restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle - Weight Table 3, for all loads at all hours. The estimated completion date for this work is September 30, 2026.
Last Updated
6/08/2026 4:00 PM

ORE62: MP 35.41
ORE62, 15 miles East of Shady Cove

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane traffic controlled by an automated flagging system. Most delays will be less than 5-10 minutes. Crews working Monday – Friday, with closures in place 24/7 until Fall 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22629)
Last Updated
5/21/2026 5:01 PM

ORE7: MP 0 to 0.18
ORE86, Intersection with La Grande - Baker Highway US30

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/20/2026 12:00:00 AM
Details
Alert: OR7/Hwy 12 EB & WB MP 0.00 to 0.18 (Baker City) Effective Saturday, June 20, 2026, this section of OR7/Hwy 12 eastbound and westbound will be closed from Broadway Avenue (mile point 0.00) to Madison Street (mile point 0.18) from 11:00 AM to 3:00 PM for the Baker County Republican Women Chapter Kiddie Parade. The estimated completion date is June 20, 2026.
Last Updated
6/08/2026 4:00 PM

ORE7: MP 0 to 0.06
ORE86, Intersection with La Grande - Baker Highway US30

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/27/2026 12:00:00 AM
Details
Alert: OR7/Hwy 12 EB & WB MP 0.00 to 0.06 (Baker City) On Saturday June 27, 2026, this section of OR7/Hwy 12 eastbound and westbound will be closed from Church Street to Auburn Avenue from 9 AM to 8 PM for the time trials of the Baker City Cycling Classic. The estimated completion date is June 27, 2026.
Last Updated
6/08/2026 4:00 PM

ORE7: MP 25 to 42
ORE7, 9 miles North of Whitney

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 3:55 PM

ORE7: MP 50 to 34
ORE7, Baker City

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/12/2026 9:46 AM

ORE7: MP 50 to 42
ORE7, Baker City

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 12:11 PM

ORE74: MP 19 to 10
ORE74, 9 miles North of Ione

Information
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Highway erosion is causing minimal delay to traffic. There is an abrupt edge to the roadway. Use caution.
Last Updated
5/29/2026 1:05 PM

ORE74: MP 46 to 82
ORE74, Heppner

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/04/2026 4:03 PM

ORE74: MP 72 to 82
ORE74, 11 miles North of Intersection with Pendleton - John Day Highway US395

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/06/2026 2:44 PM

ORE74: MP 83 to 73
ORE74, Intersection with Pendleton - John Day Highway US395

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/05/2026 3:11 PM

ORE8: MP 1.55
ORE8, 1 mile East of Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 4:15 PM

ORE8: MP 2.24
ORE8, 1 mile East of Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 9:15 AM

ORE8: WB MP 2.91 to 7.29
ORE8, Highway 217

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617)
Last Updated
12/09/2025 8:27 AM

ORE8: MP 3.82 to 3.51
ORE8, 1 mile West of Highway 217

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: Lane closures (9 a.m. to 3 a.m.) on Canyon Road. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18758)
Last Updated
5/24/2026 8:33 AM

ORE8: MP 5 to 1
ORE8, 2 miles West of Highway 217

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/21/2026 9:12 AM

ORE8: MP 8.32
ORE8, 3 miles East of Hillsboro

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations will have the traffic signals out at this intersection flaggers in place. Prepare to slow or move over for worker safety.
Last Updated
6/08/2026 8:30 PM

ORE8: MP 13.51 to 14
ORE8, Hillsboro

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/22/2026 12:00:00 AM
Details
Alert: OR8 WB MP 13.51 to MP 14.0 (Hillsboro) Effective June 22, 2026, this section of OR8 westbound will be restricted to 14 feet 00 inches in width at all hours. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 22, 2026.
Last Updated
6/08/2026 4:00 PM

ORE8: WB MP 13.82 to 17.67
ORE8, Hillsboro

Construction Work
No to Minimum Delay
Comments
Traffic Impacts: No traffic impacts. Project Description: This safety improvement project in three locations on OR 8 in Hillsboro and Forest Grove includes new sidewalks, an enhanced pedestrian crosswalk, new lighting and upgraded traffic signals. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21608)
Last Updated
5/10/2026 6:17 AM

ORE8: MP 17.6 to 17.7
ORE47, Forest Grove

Commercial Vehicle Information
Informational only
Details
Alert: OR8 EB and WB MP 17.6 to MP 17.7 (Cornelius) Effective May 26, 2026, this section of OR8 eastbound and westbound will be restricted to 14 feet 00 inches in width Monday through Thursday between the hours of 8 AM and 3 PM and Friday between the hours of 9 AM and 2 PM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 30, 2026.
Last Updated
6/08/2026 4:00 PM

ORE82: MP 12.06 to 12.4
ORE82, Imbler

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/4/2026 12:00:00 AM
Details
Alert: OR82/Hwy 10 EB & WB MP 12.06 to MP 12.40 (Imbler) Effective Saturday, July 4, 2026, this section of OR82/Hwy 10 eastbound and westbound will be closed from Second Street (mile point 12.06) to Seventh Street (mile point 12.40) from 11:30 AM to 1:00 PM for the 4th of July Parade. The estimated completion date is July 4, 2026.
Last Updated
6/08/2026 4:00 PM

ORE82: MP 46.78 to 47.31
ORE82, Wallowa

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/4/2026 12:00:00 AM
Details
Alert: OR82/Hwy 10 EB & WB MP 46.78 to MP 47.31 (Wallowa) Effective Saturday, July 4, 2026, this section of OR82/Hwy 10 eastbound and westbound will be closed from Second Street (mile point 46.78) to Ellen Street (mile point 47.31) from 10:30 AM to 12:30 PM for the 4th of July Parade. The estimated completion date is July 4, 2026.
Last Updated
6/08/2026 4:00 PM

ORE86: MP 3 to 70
ORE86, Intersection with Old Oregon Trail Highway I-84

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/11/2026 4:48 PM

ORE86: MP 22 to 42
ORE86, 19 miles West of Richland

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/01/2026 2:46 PM

ORE86: MP 32.01 to 5
ORE86, 9 miles West of Richland

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/02/2026 2:13 PM

ORE86: MP 33 to 3
ORE86, 8 miles West of Richland

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/03/2026 12:35 PM

ORE86: MP 34.01 to 70.58
ORE86, 7 miles West of Richland

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite replacing guardrail at various locations. Expect daytime lane closures with flagging.
Last Updated
6/08/2026 4:32 AM

ORE86: MP 40.64
ORE86, Richland

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Bridge work is occurring. Expect delays due to possible single lane closures with flaggers or signal control. Use caution, prepare to slow.
Last Updated
4/21/2026 1:05 AM

ORE86: MP 41.23 to 42.4
ORE86, Richland

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
6/20/2026 12:00:00 AM
Details
Alert: OR86/Hwy 12 EB & WB MP 41.23 to MP 42.40 (Richland) Effective Saturday, June 20, 2026, this section of OR86/Hwy 12 eastbound and westbound will be closed from New Bridge Road (mile point 41.23) to Moody Road (mile point 42.4) in the city of Richland on Saturday, June 20, 2026, from 10:00 AM to 11:00 AM for the Eagle Valley Days Parade. The estimated completion date is June 20, 2026.
Last Updated
6/08/2026 4:00 PM

ORE86: MP 42 to 76
ORE86, Richland

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/08/2026 3:40 PM

ORE86: MP 42 to 70
ORE86, Richland

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/27/2026 2:46 PM

ORE86: MP 42 to 70
ORE86, Richland

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/28/2026 3:13 PM

ORE86: MP 42.01 to 42.4
ORE86, Richland

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution.
Last Updated
3/24/2026 1:11 PM

ORE86: MP 53 to 70
ORE86, 12 miles East of Richland

Information
Informational only
Comments
Herbicide Application.
Last Updated
6/04/2026 2:50 PM

ORE86: MP 56.47
ORE86, 14 miles West of Oregon - Idaho Border

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Bridge work is occurring. Expect delays due to possible single lane closures with flaggers or signal controls. Use caution, prepare to slow.
Last Updated
4/21/2026 1:15 AM

ORE86: MP 63.65
ORE86, 7 miles West of Oregon - Idaho Border

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Bridge work is occurring. Prepare to slow. Bridge work will be occurring with traffic controlled by installed signals. Expect minimal delays, use caution, and prepare to slow.
Last Updated
6/08/2026 4:33 AM

ORE99: MP 10.2 to 11.25
ORE99, 1 mile North of Phoenix

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. The week of April 26, expect single lane traffic through the construction area as the contractor begins paving. Expect intermittent lane closures through the work zone on OR 99, Monday through Friday.
Last Updated
5/21/2026 5:01 PM

ORE99: MP 14.42 to 16.09
ORE99, Cottage Grove

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-cottagegrove)
Last Updated
5/01/2026 8:35 PM

ORE99: EB MP 57 to 35
ORE38, Intersection with Pacific Highway I-5

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/22/2026 3:16 PM

ORE99E: MP 3 to 4.4
ORE99E, Portland

Commercial Vehicle Information
Informational only
Details
Alert: OR99E NB & SB MP 3.00 to MP 4.40 (Portland) Effective June 1, 2026, this section of OR99E northbound and southbound will be restricted to 14 feet 00 inches in width Monday through Friday between the hours of 9:00 AM & 5:00 PM for northbound and 9:00 AM & 2:00 PM for southbound. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 23, 2026.
Last Updated
6/08/2026 4:00 PM

ORE99E: MP 11.63
ORE99E, Oregon City

Commercial Vehicle Information
Informational only
Details
Alert: OR99E SB off-ramp to I-205 SB (Oregon City) Effective March 2, 2026, the OR99E southbound off-ramp to I-205 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is July 2, 2026.
Last Updated
6/08/2026 4:00 PM

ORE99E: MP 40.75 to 40.81
ORE99E, Brooks

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/01/2026 5:32 PM

ORE99EB: NB MP 0.65 to 8.26
99EBus, 1 mile North of Salem, Intersection with Hyacinth St NE (East)/Verda Ln (West)

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/03/2026 6:43 AM

ORE99EB: MP 2 to 5
99EBus, Salem, Intersection with Hyacinth St NE (East)/Verda Ln (West)

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/07/2026 3:28 PM

ORE99W: SB MP 4.4 to 4.45
ORE99W, 3 miles North of Tigard (north city limits)

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/20/2026 2:30 PM

ORE99W: SB MP 4.45 to 4.65
ORE99W, 3 miles North of Tigard (north city limits)

Information
Informational only
Comments
Herbicide Application.
Last Updated
5/19/2026 2:50 PM

ORE99W: NB MP 23.23 to 24.49
ORE99W, Intersection with Hillsboro - Silverton Highway ORE214

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg)
Last Updated
5/01/2026 8:40 PM

ORE99W: MP 44 to 45
ORE99W, Amity

Commercial Vehicle Information
Informational only
Details
Alert: OR99W NB & SB MP 44 to MP 45 (Amity) Effective January 5, 2026, this section of OR99W northbound and southbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and on Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026.
Last Updated
6/08/2026 4:00 PM

ORE99W: MP 63.17 to 63.57
ORE99W, Monmouth

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Starting June 1st, you will see crews demoing on ADA corners to construct and remediate the ADA curb ramps throughout the community along the state highway. Drive with caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51)
Last Updated
6/02/2026 5:46 AM

ORE99W: NB MP 84.17 to 86.31
ORE99W, Intersection with Corvallis - Newport Highway US20

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Work on the project has now begun. Expect night time lane closures Monday through Thursday nights from 7:00 PM to 6:00 AM. Expect some noise and short delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22785)
Last Updated
5/14/2026 10:36 AM

HWY100: MP 8.8 to 9.3
HWY100, 2 miles East of Corbett

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Project description: We are making repairs to a missing section of historic rock wall due to a landslide that occurred in March on the Historic Columbia River Highway (U.S. 30) between Larch Mountain Road and Vista House. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
6/03/2026 4:37 PM

HWY100: MP 8.8 to 9.3
HWY100, 2 miles East of Corbett

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. Project description: We are making repairs to a missing section of historic rock wall due to a landslide that occurred in March on the Historic Columbia River Highway (U.S. 30) between Larch Mountain Road and Vista House. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
6/05/2026 2:33 PM

HWY100: MP 18 to 19.92
HWY100, 4 miles West of Ainsworth State Park

Construction Work
No to Minimum Delay
Comments
Periodic lane closures on a section of the Historic Columbia River Highway/US 30 between Multnomah Falls and the Oneonta Trailhead expected until 9am Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct reopened May 15 2026. Over the summer, travelers using the east viaduct can expect to see flaggers directing traffic while crews clean up the site, complete finishing touches on the railings and install permanent striping. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479)
Last Updated
5/24/2026 8:32 AM

: MP 34.62 to 34.17
ORE47, Yamhill

Commercial Vehicle Information
Future Event: Informational only
Expected Start Date
7/18/2026 12:00:00 AM
Details
Alert: OR47 NB & SB MP 34 to MP 35 (Yamhill) On July 18, 2026, this section of OR47 northbound and southbound will be closed between the hours of 10 AM & 11 AM for the Annual Derby Days Event.
Last Updated
6/08/2026 4:00 PM