|
|
Cameras | Incidents & Weather | Construction | Truck Restrictions | Weather Stations | Snow Zones Cameras
Highway | Camera Location |
|---|
| I-5 | I-5 at 134th in Vancouver, WA
I-5 at 29th in Vancouver, WA
I-5 at 78th in Vancouver, WA
I-5 at 99th in Vancouver, WA
I-5 at Carman Drive
I-5 at Columbia
I-5 at Elligsen Rd.
I-5 at I-205
I-5 at Interstate Bridge - NB lanes, midspan
I-5 at Interstate Bridge - NB lanes, south end
I-5 at Interstate Bridge - SB lanes, north end
I-5 at Interstate Bridge - SB lanes, south end
I-5 at Interstate Bridge, top
I-5 at Lombard
I-5 at Lower Boones Road
I-5 at Main Street in Vancouver, WA
I-5 at Marine Drive
I-5 at Mill Plain in Vancouver, WA
I-5 at Norwood
I-5 at Nyberg
I-5 at Rosa Parks Way
I-5 at SR-14 in Vancouver, WA
I-5 at Victory
I-5 at Wilsonville Rd.
<return to map | | I-84 | I-84 at 102nd
I-84 at 105th
I-84 at 148th
I-84 at 181st
I-84 at 207th
I-84 at 223rd
I-84 at 257th
I-84 at 37th
I-84 at 53rd
I-84 at 67th
I-84 at 82nd
I-84 at Halsey - Lower
I-84 at Halsey - Upper
I-84 at I-205
<return to map | | I-205 | I-205 @ 10th West Linn
I-205 @ 99E
I-205 @ Blankenship Road
I-205 @ OR43
I-205 @ Prosperity Park Road
I-205 @ Stafford Road
I-205 @ Willamette Falls Viewpoint
I-205 at 92nd
I-205 at Airport Way
I-205 at Foster
I-205 at Gladstone
I-205 at Government Island
I-205 at Johnson Creek
I-205 at Killingsworth
I-205 at Lawnfield Rd.
I-205 at Mill Plain, in Vancouver, WA
I-205 at ORE212 -224
I-205 at Park Place - ORE213
I-205 at Powell
I-205 at Prescott St.
I-205 at Stark
I-205 at Sunnyside
<return to map | | SR-14 | SR-14 at I-205 East, in Vancouver, WA
SR-14 at I-205 West, in Vancouver, WA
<return to map | | SR-500 | SR-500 at 112th in Vancouver, WA
SR-500 at Thurston in Vancouver, WA
<return to map | | US26 | US26 at 185th Street
US26 at Bethany
US26 at Cornelius Pass
US26 at Helvetia
US26 at Murray
<return to map | | US30 | US30 at St. Johns Bridge
<return to map | Incidents & Weather Highway | Details |
|---|
US26 MP 70.13 US26, Beaverton Incident #: 78973 | Estimated delay under 20 minutes Crash/Hazard Lanes Affected: (Eastbound) 1 Lane Comments: Just east of Hwy 2 17, a crash has the left lane closed. Public Contact: ODOT/TMOC Portland Phone: (800) 977-6368 Last Updated: 11/20/2009 2:43 pm <return to map | ConstructionHighway | Details |
|---|
I-5 MP 289.95 - 283
I-5, 2 miles South of Highway 217 Incident #:71489 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Southbound) Median , All Lanes , Shoulder (Northbound) Median , All Lanes , Shoulder Comments: Expect nighttime lane and ramp closures closures this week on I-5 between Tualatin and Wilsonville. A contractor is working on a seven-mile paving project on I-5 between the Tualatin River and Willamette River in Wilsonville. Work includes widening the Nyberg Rd. off-ramp from I-5 south, adding auxiliary lanes on I-5 northbound from the Boone Bridge (Willamette River Bridge) to the Wilsonville Rd. off-ramp and from I-205 southbound to I-5 southbound to the Elligsen Rd. off-ramp, and building a new sound wall along I-5 south in Tualatin. Lane closures and ramp closures take place primarily on weeknights from 7:30 p.m. to 6 a.m.
During the week of Monday, Nov. 23, through Wednesday, Nov. 25, temporary striping and minor excavation work will require daytime shoulder closures on I-5 in both directions between Tualatin and Wilsonville.
The contractor closed and is currently working in the right lane of the 2-lane ramp from I-205 to
I-5 southbound. Traffic has shifted to the east (left) on the I-205 off-ramp to I-5 southbound and on I-5 southbound between Nyberg Road and N. Wilsonville, resulting in narrow shoulders in this 2-mile stretch.
The closure will allow the contractor to begin constructing the new auxiliary lane, improve drainage, and construct a new sound wall. During the week, the contractor will perform survey, pipe work and saw cutting on the I-205 to I-5 southbound ramp behind a barrier. This right lane closure and the traffic shift will remain in effect 24 hours a day until the auxiliary lane is complete in August 2010. .
During nighttime work hours, the contractor will install traffic loop detectors, set temporary barriers and install temporary striping. This work is weather dependent and requires lane closures on I-5 northbound from Wilsonville to Tualatin. The contractor will begin closing lanes at 7:30 p.m. each night. All lanes will be open by 6 a.m. the following morning.
During the week there will be intermittent on and off ramp closures at the I-205 to I-5 and Nyberg Interchanges. Monday night, Nov. 23, the Charbonneau on-ramp to I-5 northbound will close between 10 p.m. and 5 a.m. for sign cantilever installation. Tuesday night, Nov. 24, the contractor will close the I-205 to I-5 southbound ramp for two hours between 10 p.m. and 5 a.m. for striping. Motorists traveling to I-5 southbound from I-205 can take I-5 northbound to the Tualatin Sherwood off-ramp (exit 289) and enter I-5 southbound.
The speed limit on I-5 northbound and southbound is reduced to 55 MPH. This speed reduction is in effect 24 hours a day and will remain in place for the next couple months.
Please be alert to enhanced police traffic patrols by Oregon State Police in the I-5 Preservation work area.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 11/20/2009 12:04 pm <return to map | I-5 MP 305 - 307
I-5, 3 miles South of Oregon Washington Border Incident #:63811 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Southbound) Median , All Lanes , Shoulder (Northbound) Median , All Lanes , Shoulder Comments: Expect shoulder and nighttime lane closures on I-5 Monday through Wednesday. A contractor is working on a project to widen I-5 between Victory Boulevard and Lombard Street. The 1.2-mile project includes adding a third lane to southbound I-5, constructing a new southbound entrance ramp bridge at Columbia Boulevard, widening bridges and adding shoulders to northbound I-5. Lane closures on I-5 will only take place during nighttime hours, generally between 8 p.m. and 5 a.m.
The contactor is working on widening the northbound side of the freeway. During the week of Monday, Nov. 23, to Wednesday, Nov. 25, the contractor will perform daytime shoulder closures on I-5 and the northbound Victory Blvd off-ramp (exit 306B) between 9 a.m. and 3 p.m. The shoulder closures will allow the contractor to remove concrete barrier from the off-ramp and install temporary erosion control measures on the newly constructed slope. Please exercise caution and watch for trucks entering and exiting the work zone on the northbound Victory Blvd off-ramp (exit 306B). Monday, November 23, the contractor will close the right lane of I-5 southbound in the project limits from 11 p.m. to 5 a.m. for installation of new camera poles and moving concrete barrier.
The contractor opened the new Columbia Blvd. off-ramp (exit 306A). Motorists should be aware that the alignment of the new Columbia Blvd. off-ramp requires motorists to exit I-5 approximately a quarter-mile to the south of the old Columbia Blvd. off-ramp.
During daytime work hours there will be periodic lane closures on Schmeer Road, Columbia Blvd. and the Columbia Blvd. to I-5 southbound on-ramp. Watch for shoulder closures on the northbound I-5 Victory Blvd. off-ramp. Flaggers will be on site to direct motorists and bicyclists.
Please be aware that work zone speed limits are enforced by enhanced police traffic patrols in the area.
For more information: www.oregon.gov/ODOT/HWY/REGION1/I-5DeltaPark/index.shtml
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 11/20/2009 12:06 pm <return to map | I-205 MP 9.03 - 9.31
I-205, 9 miles North of Interstate 5 Incident #:73298 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Southbound) Median , All Lanes , Shoulder (Northbound) Median , All Lanes , Shoulder Comments: Expect nighttime lane and ramp closures from 8 p.m. to 5 a.m. this week A preservation project is under way on the Abernethy Bridge that crosses the Willamette River linking Oregon City and West Linn. Work includes replacing bridge joints and paving the bridge. Most work will take place during nighttime work hours from 8 p.m. and 5 a.m. Motorists can expect nighttime multiple lane closures and on- and off-ramp closures along the Abernethy Bridge.
During the week of Sunday night, Nov. 15, through Thursday night, Nov. 19, the contractor will work on replacing the southbound I-205 bridge joints. This work will require lane closures on I-205 southbound nightly from 8 p.m. to 5 a.m. The contractor plans to close lanes in one direction at a time.
To prevent motorists from entering the work zone during the nighttime lane closures, the contractor will close the Oregon 43 West Linn/Lake Oswego (exit 8) or the Oregon 99E Oregon City/Gladstone (exit 9) on- and off-ramps. During the ramp closure, one ramp will remain open at all times. Detour signs will direct motorists during the ramp closures.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 11/13/2009 11:32 am <return to map | I-405 MP .1 - 4
I-405, Interstate 5 Incident #:77147 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Southbound) Median , All Lanes , Shoulder (Northbound) Median , All Lanes , Shoulder Comments: Expect nighttime lane closures and ramp closures on I-405 in both directions this week. Work is under way on a project to repave Interstate 405 from the Fremont Bridge to the Marquam Bridge. Work includes repaving the ramps to and from I-405, relighting the freeway corridor and tunnels, and upgrading freeway signs. This work requires nighttime lane and ramp closures during the duration of the project.
The contractor will perform concrete repairs on I-405 northbound near Glisan Street. This work will require closing the center lane of I-405 northbound near Glisan Street. To prevent motorists from entering the work zone, the contractor will close the Burnside Couch
on-ramp to I-405 northbound.
The work will take place Friday night, Nov. 20, from 10 p.m. to 5 a.m. Saturday morning, Nov. 21, and Saturday night, Nov. 21, from 7:30 p.m. to 7 a.m. Sunday morning, Nov. 22. This work is weather dependent and may be cancelled in the event of heavy rain.
Daytime work during the week of Monday, Nov. 23, through Wednesday, Nov. 25, includes electrical conduit installation, tunnel lighting modification and sign work. This work will require left and right shoulder closures in both directions on I-405 and the on- and off-ramps to I-405.
During nighttime hours, the contractor will work on signs and lighting on I-405 in both directions. This work will require multiple lane closures in both directions from 10 p.m. to 5 a.m. each night Sunday night, Nov. 22, through Tuesday night, Nov. 24.
Sunday, Nov. 22, through Tuesday, Nov. 24 there will be 24-hour shoulder closures in the U.S.26 eastbound to I-405 northbound tunnel. The shoulder closures will allow the contractor to work on lighting.
Scheduled ramp closures:
¨ The contractor will close the Everett Street off-ramp and the Burnside/Couch on-ramp on I-405 northbound nightly between 10 p.m. and 5 a.m. for electrical work Sunday, Nov. 22, through Tuesday, Nov. 24.
¨ The contractor will close the Glisan Street on-ramp to I-405 northbound and the Everett Street off-ramp from I-405 southbound nightly between 10 p.m. to 5 a.m. Monday, Nov. 23, and Tuesday, Nov. 24 for light pole installation.
Please be alert to enhanced police traffic patrols in the I-405 Preservation work area.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 11/20/2009 12:02 pm <return to map | ORE213 MP 2.23 ORE213, Portland Incident #:77252 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder Comments: Expect alternating single lane closures on N.E. 82nd Ave. in each direction Monday through Wednesday. Work is under way on a safety improvement project along N.E. 82nd Avenue between N.E. Wasco and N.E. Jonesmore. The work includes building a 220-foot median
safety sculpture, improving crosswalks and bus stops and paving N.E. 82nd Ave. between N.E. Jonesmore and N.E. Wasco. Most work will take place during the day between 8 a.m.
and 3 p.m. Night work will take place between 7 p.m. and 6 a.m.
During the week of Monday, Nov. 23, through Wednesday, Nov. 25, the contractor will pour concrete for the center median pedestal, weather permitting. The work will require daytime single lane closures on N.E. 82nd Ave. between N.E. Jonesmore and N.E. Wasco in both directions from 8 a.m. and 3 p.m. One lane will remain open in each direction during the work.
Please be alert to enhanced police patrols by the Portland Police Bureau in the project area.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 11/20/2009 12:07 pm <return to map | ORE217 MP 1.47 - 0
ORE217, 1 mile South of US 26 Incident #:68093 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder Comments: Watch for lane closures on Highway 217 and flagging on the Wilshire Street overpass Monday through Wednesday. A contractor is working on a project to add a third through-lane to Highway 217 northbound between Oregon Highway 8 (Tualatin-Valley Highway) and U.S. 26 (Sunset Highway). This project also includes building retaining walls and improving drainage on the highway, lengthening the Wilshire St. overpass, and paving and striping the project area and the Highway 217/U.S. 26 interchange ramps. Lane closures on Highway 217 will only take place from 7 p.m. to 5 a.m. nightly.
Additionally, only one lane connects Highway 217 northbound to U.S. 26 eastbound. Motorists must use the right lane to travel to U.S. 26 eastbound. Motorists traveling in the center lane of Highway 217 northbound will not be able to access U.S. 26 eastbound. The center lane of Highway 217 northbound will now only continue north to Barnes Road and will not connect to U.S. 26 eastbound. These new lane configurations will be in place for the duration of the project.
The Wilshire Street overpass is being reconstructed. The week of Monday, Nov. 23, through Wednesday, Nov. 25, flaggers will be controlling both directions of traffic on the Wilshire St. overpass from 6:30 a.m. to 5:30 p.m. Motorists may experience delays on Wilshire St. of up to 10 minutes. The sidewalk on the south side of the Wilshire Street overpass is closed. Pedestrians are detoured to the sidewalk on the north side of the overpass.
During the week, the contractor will work on constructing the retaining wall near the new Wilshire Street overpass and the Wilshire Street off-ramp and continuing to build the retaining wall on Highway 217 north of the Walker Rd. on-ramp. This work will take place behind a temporary barrier during daytime work hours from 6:30 a.m. to 5:30 p.m.
Please be aware that work zone speed limits are enforced by enhanced police traffic patrols in the area. Fines will double in this construction zone.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 11/20/2009 12:07 pm <return to map | ORE99E MP .89 - 1.69
ORE99E, Portland Incident #:33312 | Estimated delay under 20 minutes Construction Work Comments: Be aware of Highway 99E northbound and southbound traffic shifts. Expect nighttime closures of S.E. Division St. Work is under way on a project to replace the Martin Luther King, Jr. Boulevard and Grand Avenue viaducts on Highway 99E. Lane closures on Highway 99E will only take place during nighttime hours. Normal daytime work hours are 7 a.m. to 3:30 p.m., Monday, Nov. 23, to Wednesday, Nov. 25.
Traffic on the Highway 99E northbound viaduct has been shifted to a temporary structure. Northbound traffic is shifted to the west to allow the contractor to begin building the new northbound viaduct. Motorists are encouraged to slow down when traveling through the new alignment.
The contractor has closed access at Division Place to the on- and off-ramp to southbound Highway 99E. However, the on- and off-ramp to Highway 99E south will remain open during the closure via a detour to S.E. 4th Avenue. This detour will be in effect through the summer.
During the week, column and footing construction work will require the closure of Caruthers Street under the viaducts. Bikes and motor traffic will be detoured around the construction work during the Caruthers Street closure. Division Street will be closed intermittently to allow material deliveries and construction work. Flaggers will control traffic during these closures. Division Place also will have intermittent lane closures for bridge work. Flaggers will control traffic during these closures.
The contractor has closed the ramp connecting westbound Division Street to northbound Highway 99E (Grand Avenue). This ramp is scheduled to be closed until 2010 to allow crews to remove the existing northbound viaduct and build a new structure.
During the ramp closure, motorists will be directed to take Division Street to northbound 7th Avenue to westbound Clay Street to northbound Highway 99E (Grand Avenue).
Please be alert to enhanced police traffic patrols in the project area.
Click the link below for more information.
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 11/20/2009 12:09 pm <return to map | US26 MP 64.29 - 57.16
US26, 2 miles East of Cornelious Pass Exit Incident #:70109 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder Comments: Nighttime directional closures of U.S. 26 Friday, Saturday and Sunday between Helvetia Road and 185th Ave. A contractor is working on a paving project on U.S. 26 (Sunset Highway) from 185th Avenue to Glencoe Road. In addition to paving both directions of the highway and the ramps, work includes adding cable barrier in the center median, repairing guardrail, upgrading highway signs, and striping. Work on the project will primarily take place at night.
The contractor plans to replace the signs on U.S. 26 attached to the Helvetia Road and 185th Avenue overpasses. The contractor will place a large crane in the travel lanes of U.S. 26 to install the new signs. This work will require closing one direction of U.S. 26 per night. The work will take place as follows and may be changed due to weather:
¨ Friday, Nov. 20, from midnight to 6 a.m. Saturday morning, the contractor will install signs on the Helvetia Road overpass crossing U.S. 26 westbound. This will require closing U.S. 26 westbound at the Helvetia Road/N.W. Brookwood Parkway off-ramp (exit 61). The contractor will close one lane on U.S. 26 westbound at 8 p.m. and the second lane will close at midnight. Motorists traveling on U.S. 26 westbound will exit U.S. 26 at the Helvetia Road/N.W. Brookwood Parkway off-ramp (exit 61), cross Helvetia Road and re-enter U.S. 26 westbound at the Helvetia Road/N.W. Brookwood Parkway on-ramp to U.S. 26 westbound. Motorists should be aware of flaggers controlling traffic at the Helvetia Road on- and off-ramps.
¨ Saturday, Nov. 21, from midnight to 6 a.m. Sunday morning, the contractor will install signs on the Helvetia Road overpass crossing U.S. 26 eastbound. This will require closing U.S. 26 eastbound at the Helvetia Road/N.W. Brookwood Parkway off-ramp (exit 61). Motorists traveling on U.S. 26 eastbound will exit U.S. 26 at the Helvetia Road/N.W. Brookwood Parkway off-ramp (exit 61), cross Helvetia Road and re-enter U.S. 26 eastbound at the Helvetia Road/N.W. Brookwood Parkway on-ramp to U.S. 26 eastbound. Motorists should be aware of flaggers controlling traffic at the Helvetia Road on- and off-ramps.
¨ Sunday, Nov. 22, from midnight to 4:30 a.m. Monday morning, the contractor will install signs on the 185th Avenue overpass crossing U.S. 26 westbound. This will require closing U.S. 26 westbound at the 185th Avenue off-ramp (exit 64). Motorists traveling on U.S. 26 westbound will exit U.S. 26 at the 185th Avenue off-ramp (exit 64), cross 185th Avenue and re-enter U.S. 26 westbound at the 185th Avenue on-ramp to U.S. 26 westbound. Motorists should be aware of flaggers controlling traffic at the 185th Avenue on- and off-ramps.
Monday, Nov. 23, through Wednesday, Nov. 25, the contractor will perform general cleanup activities during the day. Night work will consist of striping, installing cable barrier and signs. Nighttime lane closures will take place from 10 p.m. to 5 a.m. Daytime work may require shoulder closures only.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 11/20/2009 12:11 pm <return to map | Trucking (Commercial Vehicle) RestrictionsHighway | Details |
|---|
99 MP 1.05 ORE99E, Portland Incident #: 73606 | Informational only Commercial Vehicle Information Details: OR99E SB Union Av. Viaduct OR99E SB Union Av. Viaduct at MP1.05 under City of Portland jurisdiction on MLK Blvd is restricted to single vehicles only and legal axle weights with a maximum GVW of 50,000 lbs. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-5 MP 287.93 I-5, Interstate 205 Incident #: 78356 | Informational only Commercial Vehicle Information Details: I-5 SB Ramp from I-205 SB Effective October 30, 2009 the I-205 SB Ramp to I-5 SB will be restricted to 17 feet 00 in, in width between the hours of 10PM & 5 AM. Estimated date of completion is June 30, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-5 MP 298.78 - 297.07
I-5, I-405 South Interchange Incident #: 78409 | Informational only Commercial Vehicle Information Details: I-5 MP 298 to MP 297 SB Effective November 14, 2009 this section of I-5 will be restricted to 16 feet 07 in. in height between the hours of 6 AM and 5 PM. Estimated date of completion is November 14, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-5 MP 305.44 - 306.7
I-5, 3 miles South of Oregon Washington Border Incident #: 73673 | Informational only Commercial Vehicle Information Details: I-5 MP 305.44 to MP 306.70 NB & SB Effective April 21, 2008 this section of I-5 will be restricted to 14 ft. 00 in. in width between the hours of 11 PM to 5 AM. In addition the height will be restricted to 15 ft 11 in. SB & 15 ft. 08 in. NB. 24 hours per day. Estimated date of completion is October 31, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-5 MP 305.93 I-5, 2 miles South of Oregon Washington Border Incident #: 73647 | Informational only Commercial Vehicle Information Details: I-5 MP 305.93 SB on ramp from Columbia Blvd Effective May 21, 2008 the SB on ramp from Columbia Blvd to I-5 will be restricted to 17 ft. 00 in. in width. Estimated date of completion is October 31, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-5 MP 305.98 I-5, 2 miles South of Oregon Washington Border Incident #: 77508 | Informational only Commercial Vehicle Information Details: I-5 Exit 306-A NB to Columbia Blvd. Effective November 2, 2009 the I-5 NB Exit 306-A to Columbia Blvd will be restricted to 16 feet 00 in. in width. Estimated date of completion is December 12, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-5 MP 306.45 I-5, 2 miles South of Oregon Washington Border Incident #: 75767 | Informational only Commercial Vehicle Information Details: I-5 NB Exit 306-B ( to the Expo Center Portland) Beginning October 27, 2009 the I-5 North Bound Exit 306-B off ramp will be restricted to 16 feet 00 in. in width. Estimated date of completion is December 01, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-5 MP 306.7 - 305.44
I-5, 1 mile South of Oregon Washington Border Incident #: 73670 | Informational only Commercial Vehicle Information Details: I-5 MP 305.44 to MP 306.70 NB & SB Effective April 21, 2008 this section of I-5 will be restricted to 14 ft. 00 in. in width between the hours of 11 PM to 5 AM. In addition the height will be restricted to 15 ft 11 in. SB & 15 ft. 08 in. NB. 24 hours per day. Estimated date of completion is October 31, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-84 MP 0 I-84, Interstate 5 Incident #: 77866 | Informational only Commercial Vehicle Information Details: I-84 MP 0.00 EB Ramp from I-5 SB Effective November 14, 2009 the ramp from I-5 South Bound to I-84 EB will be closed between the hours of 9 PM & 6 AM. Estimated date of completion is November 15, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-84 MP .52 I-84, 1 mile East of Interstate 5 Incident #: 77867 | Informational only Commercial Vehicle Information Details: I-84 on-ramp from OR99E/Grand Ave EB (Portland) Effective November 14, 2009 the on-ramp from OR99E/Grand Ave will be closed between the hours of 9 PM & 6 AM. Estimated date of completion is November 15, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-84 MP 2.05 I-84, 2 miles East of Interstate 5 Incident #: 77868 | Informational only Commercial Vehicle Information Details: I-84 on-ramp from 33rd Ave WB (Portland) Effective November 14, 2009 the on-ramp from 33rd Ave. to I-84 WB will be closed between the hours of 9 PM & 6 AM. Estimated date of completion is November 15, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-84 MP 16.55 I-84, Troutdale Incident #: 77637 | Informational only Commercial Vehicle Information Details: I-84 MP 16.55 EB & WB Effective November 19, 2009, this section of I-84 will be restricted to 12 feet 00 in. in width between the hours of 10 PM & 5 AM. In addition, during the same time, the height crossing under the Union Pacific Railroad structure will be restricted to 18 feet 05 in. in height going eastbound, and 16 feet 09 in. in height going westbound. Estimated date of completion is November 22 2009.. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-84 MP 17.68 I-84, 1 mile East of Troutdale Incident #: 73609 | Informational only Commercial Vehicle Information Details: I-84 MP 17.68 WB (Sandy River Bridge) I-84 MP 17.68 WB only Sandy River Bridge is restricted to STP's beyond Wt. Table 5. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP .8 I-405, 1 mile North of Interstate 5 Incident #: 78700 | Informational only Commercial Vehicle Information Details: I-405 SB on-ramp from SW 5th Ave. Effective December 6, 2009 the on ramp from SW 5th Ave will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 8, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP .95 I-405, 1 mile North of Interstate 5 Incident #: 78701 | Informational only Commercial Vehicle Information Details: I-405 SB on-ramp from Broadway Street Effective December 6, 2009 the on-ramp from Broadway St. to I-405 SB will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 8, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP .951 I-405, 1 mile North of Interstate 5 Incident #: 78681 | Informational only Commercial Vehicle Information Details: I-405 NB Exit 1-C to SW 6th Ave. Effective December 2, 2009 the off ramp to SW 6th Ave. at Exit 1-C on I-405 NB will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 3, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 1.17 I-405, 1 mile North of Interstate 5 Incident #: 78582 | Informational only Commercial Vehicle Information Details: I-405 on-ramp from SW. 6th Ave. NB Effective November 30, 2009 the on-ramp from SW 6th Ave to I-405 NB will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 2, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 1.24 I-405, 1 mile North of Interstate 5 Incident #: 78583 | Informational only Commercial Vehicle Information Details: I-405 Exit 1-D to SW 12th Ave NB Effective November 30, 2009 the I-405 NB Exit 1-D to SW 12th Ave will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 2, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 1.36 I-405, 1 mile North of Interstate 5 Incident #: 78682 | Informational only Commercial Vehicle Information Details: I-405 SB on-ramp from 13th Avenue/Montgomery St. Effective December 1, 2009 the on-ramp from 13th Ave/Montgomery St. to I-405 SB will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 4, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 1.41 I-405, 1 mile North of Interstate 5 Incident #: 78698 | Informational only Commercial Vehicle Information Details: I-405 SB Ramp from US26 EB Effective December 9, 2009 the ramp from US26 EB to I-405 SB will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 11, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 1.551 I-405, 2 miles North of Interstate 5 Incident #: 78315 | Informational only Commercial Vehicle Information Details: I-405 SB on-ramp from SW Taylor St Effective November 29, 2009, the on-ramp from SW Taylor St to I-405 SB will be closed between the hours of 10 PM & 5 AM. The authorized detour route is to enter I-405 SB from Montgomery St. Estimated date of completion is December 1, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 1.87 I-405, 2 miles North of Interstate 5 Incident #: 78697 | Informational only Commercial Vehicle Information Details: I-405 Exit 2-A to Salmon St. Effective December 6, 2009 the off ramp to Salmon St. at Exit 2-A on I-405 NB will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 8, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 2.1 I-405, 2 miles South of Interstate 5 Incident #: 78696 | Informational only Commercial Vehicle Information Details: I-405 SB on-ramp from SW 16th Ave Effective December 6, 2009 the on ramp from SW 16th Ave will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 8, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 2.11 I-405, 2 miles South of Interstate 5 Incident #: 78311 | Informational only Commercial Vehicle Information Details: I-405 NB Exit 2B to Everett St Effective November 22, 2009, the off ramp from I-405 NB to Everett St will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is November 24, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 2.451 I-405, 2 miles South of Interstate 5 Incident #: 78312 | Informational only Commercial Vehicle Information Details: I-405 NB on-ramp from Couch/Burnside St Effective November 22, 2009, the on-ramp from Couch/Burnside St to I-405 NB will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is November 24, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 2.591 - 2.62
I-405, 1 mile South of Interstate 5 Incident #: 78313 | Informational only Commercial Vehicle Information Details: I-405 NB on-ramp from Glisan St Effective November 23, 2009, the on-ramp from Glisan St to NB I-405 will be closed between the hours of 10 pm & 5 AM. Estimated date of completion is November 25, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | I-405 MP 2.64 I-405, 1 mile South of Interstate 5 Incident #: 78314 | Informational only Commercial Vehicle Information Details: I-405 SB Exit 2B to Everett St Effective November 23, 2009, the off ramp from I-405 SB to Everett St will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is November 25, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | ORE43 MP 11.43 ORE43, Interstate 205 Incident #: 73612 | Informational only Commercial Vehicle Information Details: OR43 MP 11.43 Arch Bridge Effective February 23, 2009 the Arch Bridge on OR43 at MP11.43 will be restricted to legal axle weights and a maximum of 28,000 lbs GVW. No commercial trucks allowed. Estimated date of completion is November 1, 2011. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | ORE99 MP 1 - 1.49
ORE99E, Portland Incident #: 73669 | Informational only Commercial Vehicle Information Details: OR99E SB MP 0.90 to MP 1.50 (MLK/Union Ave Viaduct) Effective April 17, 2007, this section of OR99E in SE Portland will be restricted to a maximum of 21 ft. 00 in. in width across two traffic lanes. The bridge is restricted to 80,000 lbs. Estimated date of completion is April, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | ORE99 MP 12.2 ORE99W, Tigard Incident #: 73572 | Informational only Commercial Vehicle Information Details: OR99W SB MP 12.20 Tualatin River Bridge MP 12.20 Tualatin River Bridge in King City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | US26 MP 61.06 US26, 1 mile West of Cornelious Pass Exit Incident #: 77883 | Informational only Commercial Vehicle Information Details: US26 MP 61.06 EB & WB (Hwy #047) Crossing under Helvetia Rd Effective November 19, 2009 there will be intermittent closures on US26 crossing under Helvetia Rd. between the hours of 11 PM & 4:30 AM. All loads must go up and over when directed to do so by traffic control devises at exit 64. Estimated date of completion is November 24, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | US26 MP 64.28 US26, 2 miles East of Cornelious Pass Exit Incident #: 77885 | Informational only Commercial Vehicle Information Details: US26 MP 64.28 EB & WB (Hwy #047 - Crossing under 185th Ave.) Effective November 19, 2009 there will be intermittent closures on US26 crossing under 185th between the hours of 11 PM & 4:30 AM. All loads must go up and over when directed to do so by traffic control devises at exit 64. Estimated date of completion is November 24, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | US26 MP 64.29 US26, 2 miles East of Cornelious Pass Exit Incident #: 77882 | Informational only Commercial Vehicle Information Details: US26 MP 64.28 EB & WB (Hwy #047 - Crossing under 185th Ave.) Effective November 19, 2009 there will be intermittent closures on US26 crossing under 185th between the hours of 11 PM & 4:30 AM. All loads must go up and over when directed to do so by traffic control devises at exit 64. Estimated date of completion is November 24, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | US26 MP 73.75 US26, 1 mile West of Intersection with Pacific Highway West ORE99W Incident #: 77884 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) EB on-ramp to I-405 NB Effective November 9, 2009, the ramp from US26 EB to I-405 NB will be restricted to 14 feet 00 in. in width. Estimated date of completion is November 13, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | US26 MP 73.81 US26, 1 mile West of Intersection with Pacific Highway West ORE99W Incident #: 78699 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) EB on-ramp to I-405 SB Effective December 9, 2009 the ramp from US26 EB to I-405 SB will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is December 11, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | US30 MP .03 HWY100, Troutdale Incident #: 73621 | Informational only Commercial Vehicle Information Details: US30 MP 0.03 Historic Columbia River Highway Historic US30 MP 0.03 Sandy River Bridge is restricted to 30 tons Gross. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | US30 MP 13.14 HWY100, 6 miles East of Corbett Incident #: 73619 | Informational only Commercial Vehicle Information Details: US30 MP 13.14 Historic Columbia River Highway Historic US30 MP13.14 Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Wt. Talbe 1 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 11/20/2009 10:00 am <return to map | Automated Road & Weather StationsLocation | Details |
|---|
| I-205 at Division Street | Temp: 43.9F Dew Point: 42.3F Rel. Humidity: 94% Wind Direction: SW Wind (Avg.): 14 mph Wind (Gusts): 17 mph
Last Updated: 11/20/09 3:01 pm
<return to map | | Glen Jackson Bridge North Channel (I-205 MP 26.4) | No Current Report From This Station. Last Updated: 11/13/08 03:47 am
<return to map | | I-5 at Portland - Interstate Bridge | Temp: 45.8F Dew Point: 42.7F Rel. Humidity: 89% Wind Direction: S Wind (Avg.): 10 mph Wind (Gusts): 12 mph
Last Updated: 11/20/09 2:54 pm
<return to map | | I-84 at Troutdale | Temp: 44.9F Dew Point: 41.5F Rel. Humidity: 88% Wind Direction: SE Wind (Avg.): 1 mph Wind (Gusts): 1 mph
Last Updated: 11/20/09 2:52 pm
<return to map | | ORE99E at Canemah | Temp: 43.9F Dew Point: 41.2F Rel. Humidity: 90% Wind Direction: SW Wind (Avg.): 6 mph Wind (Gusts): 12 mph Visibility: 1.1 mi.
Last Updated: 11/20/09 3:02 pm
<return to map | Snow ZonesDetails |
|---|
I-84 MP 13.03 - MP 77 NE 181st in Troutdale east to just west of the Rowena Exit | Minimum Chain Restriction: Carry chains or traction tires regardless of conditions. <return to map | |
Printer-Friendly
Contact Us
 | Alerts: | Weather Alert North Coast, Central Coast High Wind Watch *NOAA Issue Date: 11/20/2009 2:29 PM
In effect from Saturday afternoon through late
Saturda... more | Weather Alert North Cascades, Lane Co. Cascades, WA-South Cascad... Winter Weather Advisory *NOAA Issue Date: 11/20/2009 2:27 PM
For snow remains in... more | Weather Alert North Cascades, Lane Co. Cascades, WA-South Cascad... Winter Storm Watch *NOAA Issue Date: 11/20/2009 2:27 PM
...Winter Weather Adviso... more View all alerts |  |
View all announcements

|